03-25-2024
City Council Meeting
March 25, 2024
7:00 PM
Fridley City Hall, 7071 University Avenue N.E.
Agenda
Call to Order
The Fridley City Council (Council) requests that all attendees silence cell phones during the meeting. A paper copy
of the Agenda is at the back of the Council Chambers. A paper copy of the entire Agenda packet is at the podium.
FridleyMN.gov/1564/Agenda-
Center.
Pledge of Allegiance
Proclamations/Presentations
Proposed Consent Agenda
The following items are considered to beroutine by the Council and will be approved by one motion. There will be
no discussion of these items unless a Councilmember requests, at which time that item may be moved to the Regular
Agenda.
Meeting Minutes
1.Approve the Minutes from the City Council Meeting of March 11, 2024
2.Receive the Minutes from the City Council Conference Meeting of March 11, 2024
New Business
3.Resolution No. 2024-35, Scheduling a Public Hearing on April 8, 2024 on a Proposed
Amendment to the Fridley City Charter Chapter 1 Name, Boundaries, Powers and Construction
of Government, and Directing Publication of the Textof Ordinance No. 1421 in Full
4.Resolution No. 2024-36, Approving Minnesota Department of Natural Resources Outdoor
Recreation Grant Application for Commons Park Splash Pad
5.Resolution No. 2024-40, Approving Gifts, Donations and Sponsorships Received Between
February 15, 2024, and March 15, 2024
6.Resolution No. 2024-41, Approving and Authorizing the Signing of a Settlement Agreement
Between the City of Fridley and Stephen A. Ling and Stephanie Ling
Licenses
7.Resolution No. 2024-37, Approving Fridley Historical Society Gambling Permit
Claims
2
City Council Meeting 3/25/2024 Agenda Page 2
8. Resolution No. 2024-39, Approving Claims for the Period Ending March 20, 2024
Open Forum
The Open Forum allows the public to address the Council on subjects that are not on the Regular Agenda. The
Council may take action, reply, or give direction to staff. Please limit your comments to five minutes or less.
Regular Agenda
The following items are proposed for the Council's consideration. All items will have a presentation from City staff,
are discussed, and considered for approval by separate motions.
New Business
9. Resolution No. 2024-38, Approving an Amendment to the 2024 Street Rehabilitation Project No.
ST2024-01 Feasibility Report to Address Traffic Calming Measures Along and Adjacent to Channel
Road
Informal Status Reports
Adjournment
Upon request, accommodation will be provided to allow individuals with disabilities to participate in any
City of Fridley services, programs, or activities. Hearing impaired persons who need an interpreter or other
persons who require auxiliary aids should contact the City at (763) 572-3450.
3
CITY COUNCIL MEETING
March 25, 2024
Iiiiir
Fridley 7:00 PM
Fridley Civic Campus, 7071 University Avenue N.E.
SIGN IN SHEET
If you wish to address the City Council, please sign in so that staff or a member of the City Council may
contact you. Thank you.
Name Email Phone Item No.
Jufn!2/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By:Roberta Collins, Assistant to the City Manager
Title
Approve the Minutes from the City Council Meeting of March 11, 2024
Background
Attached are the minutes from the City Council meeting of March 11, 2024.
Financial Impact
None.
Recommendation
Staff recommend the approval of the minutes from the City Council meeting of March 11, 2024.
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
X Organizational Excellence
Attachments and Other Resources
Minutes from the City Council Meeting of March 11, 2024
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
4
Jufn!2/
City Council Meeting
March 11,2024
7:00 PM
Fridley City Hall, 7071 University Avenue NE
Minutes
Call to Order
Mayor Lund called the City Council Meeting of March 11,2024, to order at 7:00 p.m.
Present
Mayor Scott Lund
Councilmember Dave Ostwald
Councilmember Tom Tillberry
Councilmember Ann Bolkcom
Absent
Councilmember Ryan Evanson
Others Present
Walter Wysopal, City Manager
Scott Hickok, Community Development Director
Nancy Abts, Associate Planner
Pledge Of Allegiance
Proclamations/Presentations
Approval of Proposed Consent Agenda
Motion made byCouncilmemberBolkcom to adopt the proposed Consent Agenda.Seconded by
CouncilmemberTillberry.
Upon a voice vote, all voting aye, Mayor Lund declared the motion carried unanimously.
Approval/Receipt of Minutes
1.Approve the Minutes from the City Council Meeting of February 26,2024.
2.Receive the Minutes from the Council Workshop Meeting of February 26,2024.
3.Receive the Minutes from the Planning CommissionMeeting of February 21, 2024.
4.Receive the Minutes from the Parks and Recreation Commission Meeting of December 4, 2023.
5
Jufn!2/
City Council Meeting 3/11/2024 Minutes Page 2
5.!Receive the Minutes from the Parks and Recreation Commission Meeting of January 2, 2024.
Old Business
6. Ordinance No. 1419, Creating Title No. 5 (Lands and Buildings) of the Fridley City Code and the
Chapters Contained Therein.
7. Ordinance No. 1420, Amending the Fridley City Code Chapter 209, Fees, to Update Parks and
Recreation Fees.
New Business
8. Resolution No. 2024-29, Approving a Water Quality Cost Share Agreement with the Coon Creek
Watershed District for the Purchase of a Leaf Vacuum System.
9. Resolution No. 2024-30, Approving a Grant Agreement with the Minnesota Department of Natural
Resources for Shade Tree Management.
10. Resolution No. 2024-31, Approving the City of Fridley Housing Improvement Area Policy.
11. Resolution No. 2024-
Continuity of Operations Plan (COOP).
Claims
12. Resolution No. 2024-32 Approving Claims for the Period Ending March 6, 2024.
Adoption of Regular Agenda
Motion made by Councilmember Ostwald to adopt the regular agenda. Seconded by Councilmember
Bolkcom.
Upon a voice vote, all voting aye, Mayor Lund declared the motion carried unanimously.
Open Forum, Visitors: (Consideration of Items not on Agenda 15 minutes.)
No one from the audience spoke.
Regular Agenda
New Business
13. Resolution No. 2024-34 Denying an Interim Use Permit (IUP #24-01) Requested by Amarok, LLC
to Allow a 10-Foot-Tall Electric Fence at 4650 Main Street N.E. (Ward 3)
6
Jufn!2/
City Council Meeting 3/11/2024 Minutes Page 3
Nancy Abts, Associate Planner, presented a request from Amarok on behalf of Electric Motor Supply
Company for an Interim Use Permit (IUP) to allow a ten-foot tall, low-voltage electric security fence
at 4650 Main Street NE. She reviewed the site description and history and adjacent property uses.
She also reviewed details of the IUP request, the purpose of an IUP, and the criteria that must be met
to be eligible for an IUP. She stated that staff recommends denial of the request, as did the Planning
Commission after its review on February 21 with a vote of 5-1. She stated that if electric fences are
desired more broadly in industrial areas of the Fridley, the Commission agreed that it would be more
appropriate to consider a text amendment rather than using the IUP tool.
Councilmember Bolkcom asked if there is any updated information on the offer for the police to meet
with the property owner, as was discussed at the Planning Commission meeting.
Ms. Abts confirmed that a member from the department was able to go to the site and provide some
recommendations.
Scott Hickok, Community Development Director, reviewed some of the recommendations made by
the department related to fencing, lighting and camera use. He noted that a police trailer could also
be used on the site.
Councilmember Bolkcom stated that she visited the site and was concerned with the condition of the
fence and vegetation growth. She believed that this was a different situation than the previously
granted electric fence.
Ted White, Electric Motor Supply, stated that the company has had issues with people cutting the
fence and coming into the yard and damaging their equipment for the past ten years. He commented
on the different things they have tried to improve security on the site and the path he has taken to
reach this potential solution. He noted that because people are cutting the fence, it would not make
sense to replace the fence with a new chain link fence. He stated that he did meet with police and
fire to discuss potential solutions. He recognized that the steel fence would be quite a bit more
expensive. He noted that they do plan to clean vegetation from the site to the extent possible and
allowed by the railroad.
Mayor Lund commented that staff always work to help businesses in this community. He stated that
he does not want to see electric fences all over the community and this request does not meet the
criteria. He commented that other options have also been provided to aid in security and hoped that
some of those options would solve the issues.
Councilmember Tillberry asked if the applicant understands the reasoning behind the
recommendation of denial from the Planning Commission.
Mr. White commented that while he does understand the reasoning behind their recommendation,
he did not believe someone would be injured by the fence which would be 300 feet interior to his
property line.
Councilmember Tillberry commented that safety, location and appearance were reasonings for denial
in this request compared to the Copart request.
7
Jufn!2/
City Council Meeting 3/11/2024 Minutes Page 4
Councilmember Bolkcom asked the applicant for more details on what is kept in that yard area that
is becoming damaged.
Mr. White replied that the company buys and sells industrial electrical distribution equipment, noting
that it is outdoor equipment that is large, heavy and difficult to move which cannot be stored inside.
He stated that although the equipment is locked up, the people are cutting the locks similar to the
fences. He explained that the copper wire is valuable to thieves, and the thieves taking out the couple
hundred dollars in wire causes thousands of dollars in damage, often making the equipment unable
to be resold. He averaged about $100,000 per year in damages from theft.
Councilmember Bolkcom asked if the steel fence could be installed for less than the yearly damages.
Mr. White replied that could be done but the electric fence was a cheaper option.
Councilmember Bolkcom commented that she does not like that aesthetic in a residential
neighborhood area.
Councilmember Ostwald asked if a solid fence would be as effective in the opinion of the applicant.
Mr. White replied that the electric fence does provide immediate notification if someone is attempting
to tamper with the fence.
Michael Pate, Amarok, commented that people will go over a solid fence and noted that a solid fence
also blocks what is occurring inside that perimeter once the person scales the fence. He stated that
the electric fence is an alarm, which is installed inside the existing perimeter fence and explained how
the low-voltage system works in conjunction with the alarm system. He explained that there are no
concerns for safety with this type of system. He said the fence will not be noticeable, although the
signs may be visible in the same manner as a license plate would be. He stated that perhaps a three-
year period be allowed to try this out, or perhaps the end date would be if the business changes
ownership.
Mayor Lund commented that he would think about reviewing this within the City Code as they
continue to update the Code.
Councilmember Bolkcom commented that in her discussions with staff, she does not believe staff
would like to do that.
Mr. Hickok explained that this is not an apples-to-apples comparison with the previous application
that was reviewed for this type of use. He stated that in that previous review the Council did not have
an interest in pursuing a text amendment at that time. He stated that staff can only work under the
parameters provided by the Council and therefore unless direction is provided by the Council, staff
must go under the previous direction. He explained that if the Council approves this, it would be no
different than any other business on the corridor.
Mr. Pate commented that he has these fences in 7,000 communities nationwide. He commented that
this property is zoned industrial and is across from a residential neighborhood. He commented that
8
Jufn!2/
City Council Meeting 3/11/2024 Minutes Page 5
the standards of his company prevent installation within the residential district, again noting that this
is an industrial district. He stated that the same type or even more powerful devices can be purchased
at Tractor Supply and are installed on residential and farming properties. He noted that the fence
would be 300 feet from the trail and further from the residential properties.
Motion made by Councilmember Bolkcom to adopt Resolution No. 2024-34, Denying an Interim Use
Permit (IUP #24-01) Requested by Amarok, LLC to Allow a 10-Foot-Tall Electric Fence at 4650 Main
Street N.E. Seconded by Councilmember Ostwald.
Councilmember Ostwald commented that he can see both sides of this request. He stated that he is
basing his decision on the recommendation of the Planning Commission, staff, and the standards
within the Code.
Council encouraged the applicant to continue to work with staff to find a solution for the property.
Council agreed to have a discussion on whether a text amendment would be appropriate for this
issue.
Upon a voice vote, all voting aye, Mayor Lund declared the motion carried unanimously.
Informal Status Reports
Councilmember Tillberry noted the Springbrook Spree will be held on April 6 at Springbrook Nature
Center, and encouraged the public to purchase tickets to attend this fundraising event. Mayor Lund
noted that the Springbrook Nature Center Foundation Board is holding the event and all funds raised are
used for improvements and enhancements for the Nature Center.
Councilmember Bolkcom congratulated the Public Safety Department, noting that the Council had the
opportunity to view the new fire truck and its safety equipment tonight.
Wally Wysopal, City Manager, referenced the discussion on February 12 related to the redevelopment of
Commons Park, and he stated staff heard the message from the public relating to the need for ball fields.
He said staff have met with representatives from the athletic association and School District 14 to continue
to identify needs and solutions.
Adjourn
Motion made by Councilmember Ostwald to adjourn. Seconded by Councilmember Bolkcom.
Upon a voice vote, all voting aye, Mayor Lund declared the motion carried unanimously and the meeting
adjourned at 7:54 p.m.
Respectfully Submitted,
Melissa Moore Scott J. Lund
City Clerk Mayor
9
Jufn!3/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By:Roberta S. Collins, Assistant to the City Manager
Title
Receive the Minutes from theCity Council Conference Meeting of March 11, 2024
Background
Attached are the minutes from the City Council conference meeting of March 11, 2024.
Financial Impact
Recommendation
Receive the minutes from theCity Council conference meeting ofMarch 11, 2024.
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
X Organizational Excellence
Attachments and Other Resources
Minutes from the City Council Conference Meeting of March 11, 2024.
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
:
Jufn!3/
Council Conference Meeting
March 11, 2024
5:00P.M.
Fridley City Hall, 7071 University Avenue NE
Minutes
Roll Call
Present:Mayor Scott Lund
Councilmember Dave Ostwald
Councilmember Tom Tillberry
Councilmember Ann Bolkcom
Absent:Councilmember Ryan Evanson
Others Present:Walter Wysopal, City Manager
Ryan George, Director of Public Safety
Maddison Zikmund, Deputy Director -Fire
Jim Kosluchar, Public Works Director
Jason Wiehle, Operations Manager Water/Sewer
Items for Discussion
1.Fire Truck Tour.
Maddison Zikmund, Deputy Director Fire, provided a tour and review of the new fire truck to
Council.
2. Drinking Water and Public Works Department Update.
Jim Kosluchar, Public Works Director, and Jason Wiehle, Operations Manager Water/Sewer,
3.2024 Public Safety Update.
Ryan George, Director of Public Safety, provided a continuation of the 2024 Public Safety Update.
21
Jufn!4/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By:Beth Kondrick, Deputy City Clerk
Title
Resolution No. 2024-35,Scheduling a Public Hearing on April 8, 2024on a Proposed Amendment to the
Fridley City Charter Chapter 1 Name, Boundaries,Powers and Construction of Government, and Directing
Publication of the Text of OrdinanceNo. 1421in Full
Background
The City Charter (Charter) is the fundamental law which defines the authorities and powers of the City
of Fridley (City). Minnesota Statute (M.S.) § 410.05 authorizes the establishing of a Charter Commission
(Commission) comprised of fifteen court-appointed residents who meet approximately seven times per
year to discuss and refine the Charter in response to the needs of the community.
On February 5,the Commission finalized itsreview of Chapter 1, Name, Boundaries, Powers and
Construction of Government. Pursuant to M.S. § 410.12, subd. 7, the recommended revisions to the
Chapter were compiled into Ordinance No. 1421.Resolution No. 2024-35 schedules a public hearing
for the ordinance on April 8.
Financial Impact
None.
Recommendation
Staff recommend a motion approvingResolution No. 2024-35.
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
X Organizational Excellence
Attachments and Other Resources
Resolution No. 2024-35
Public Hearing Notice for Ordinance No. 1421
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
22
Jufn!4/
Resolution No. 2024-35
Scheduling a Public Hearing on April 8, 2024 on a Proposed Amendment to the Fridley City
Charter Chapter 1, Name, Boundaries, Powers and Construction of Government
Whereas, pursuant to Minnesota Statute § 410.12, Subd. 7, the Fridley City Council may amend the
City Charter by ordinance upon recommendation of the Charter Commission; and
Whereas, the Charter Commission reviewed, discussed and recommended an amendment by
ordinance to Chapter 1, Name, Boundaries, Powers and Construction of Government, on February 6,
2024; and
Whereas, within one month of receiving a recommendation to amend the Charter by ordinance, the
City must publish Notice of a Public Hearing (Notice) on the proposal; and
Whereas, the Notice must contain the text of the recommended amendment (Exhibit A).
Now, therefore be it resolved, that the City Council of the City of Fridley hereby schedules a public
hearing for April 8, 2024 in the Council Chambers of the Fridley Civic Campus, 7071 University Avenue
NE, Fridley, Minnesota at 7:00 p.m. to consider an amendment to the Fridley City Charter, Chapter 1,
Name, Boundaries, Powers and Construction of Government.
Be it further resolved, that the City Council directs the City Clerk to publish the text of the
recommended ordinance, as shown in Exhibit A, in full, at least two weeks but not more than one
month before the Public Hearing in the Official Publication.
th
Passed and adopted by the City Council of the City of Fridley this 25 day of March, 2024.
_______________________________________
Scott J. Lund Mayor
Attest:
___________________________________
Melissa Moore City Clerk
23
Jufn!4/
Ordinance No. 1421
Amending the Name, Boundaries, Powers and Construction of GovernmentChapter of the
Fridley City Charter
The Fridley City Charter Commission has completed its review of the Fridley City Charter Chapter
1and has recommended an amendment of the City Charter by Ordinance to the City Council on
February 5, 2024. The Fridley City Council hereby finds after review, examination and
recommendation of the Charter Commission that the Fridley City Charter should be hereby
amended and the City of Fridley does ordain:
Fridley City Charter
Chapter 1. Name, Boundaries, Powers and Construction of Government
Section 1.01 Definitions
Home Rule Charter, City Charter, Charter: .
Home Rule Charter Commission: A body of 15 Fridley residents appointed by the district courtwho
work collaboratively to evaluate and propose changes tothe Fridley City Charter that reflect the
importance of the Charter to enable effective government operations that reflect the values of
residents.
Voter: A registered voter who lives in the City.
Section 1.01.Section 1.02Name and Boundaries
Upon the taking effect of this Chapter, the Village of Fridley in the County of Anoka and State of
Minnesota shall become a City under the name of City of Fridley and shall continue to be a municipal
corporation with boundaries the same as they now are established or as they may hereafter be
established.
Section 1.03 Charter, A Public Act
The Charter was approved by voters on September 10, 1957. It isa public act and need not be
pleaded or proved in any case.
Section 1.02.Section 1.04Powers of the City
The City of Fridley:
shall have perpetual succession;
may sue and be sued;
24
Jufn!4/
may use and alter its seal at pleasure;
shall be capable of contracting and being contracted with;
may take by purchase, condemnation, gift, devise, or otherwise, and hold, lease, sell and convey
all such real and personal property as its purposes may require, or the transaction of its business
may render convenient, within or without the limits of the City;
may acquire, construct, own, lease and operate public utilities, and render public service of every
kind;
may grant franchises or licenses for the construction, operation and maintenance of public
utilities in, over, upon and under the streets and publicplaces in the City, and shall have power
to fix and regulate the fares, tolls, or charges which may be collected, the extensions which shall
be made, and regulate the services which shall be rendered by any owner or operator of a public
utility franchise or license;
may assess, levy and collect taxes, for general or special purposes, on all subjects or objects
which the city may lawfully tax;
may borrow money on the faith and credit of the City or on a public utility or other property
owned by the Cityor the revenues therefrom by the issuance and sale of bonds or certificates
of indebtedness;
may appropriate the money of the City for all lawful purposes;
may provide for, construct, regulate, and maintain public works and local improvements;
may levy and collect assessments against real property within the City for local improvements
and services including garbage and refuse collection and disposal;
may license and regulate persons, corporations and associations engaged in any occupation,
trade or business;
may define, prohibit, abate, and suppress all things detrimental to the health, morals, comfort,
safety, convenience and welfare of the inhabitants of the City, and all nuisances and causes
thereof;
may regulate the construction, height and materials used in all buildings, and the maintenance
and occupancy thereof;
may regulate and control the use for whatever purposes of the streets and other public places;
25
Jufn!4/
may make and enforce local police, sanitary, and other regulations;
may pass ordinances for maintaining and promoting the peace, good government and welfare
of the City, and for the performance of all the functions thereof;
shall have all the powers possessed by municipal corporations at common law;
shall have, retain and may exercise all powers, functions, rights, and privileges, heretofore
possessed by the Village of Fridley;
may exercise such powers beyond its corporate limits as may be necessary for the effective
exercise of any powers granted herein as now authorized by law;
and in addition thereto, the City of Fridley shall have and exercise all powers, functions, rights,
and privileges exercised by, or which are incidental to, or inherent in, municipal corporations and
are not denied to it by the Constitution or general laws of the State of Minnesota.
The enumeration of powers herein shall not be construed to limit or restrict the powers granted in
general terms, nor shall any specific power granted in this charter be construed to limit or restrict the
powers granted in this Section.
In addition to the powers herein and hereafter granted, the City of Fridley shall have full power to
deal with all matters of municipal concern and have complete self-government in harmony with and
subject to the Constitution and laws of the State of Minnesota.
Section 1.03. Charter, A Public Act
This Charter shall be a public act and need not be pleaded or proved in any case. It shall take effect
fifteen (15) days from and after its adoption by the voters.
Section 1.04. Definitions
1.Eligible voter.
A resident of the City of Fridley who is qualified to register to vote.
2.Registered Voter.
An eligible voter who is currently registered in the City of Fridley.
3.Voter.
A registered voter who has votedin the City of Fridley within the last four years.
26
Jufn!4/
4.Electorate.
The whole body of eligible voters.
Passed and adopted by the City Council of the City of Fridley on this \[xx\] day of \[Month\], 2024.
______________________________________
Scott J. Lund -Mayor
______________________________________
Melissa Moore -City Clerk
Public Hearing:
First Reading:
Second Reading:
27
Jufn!5/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By:Mike Maher, Parks and Recreation Director
Title
Resolution No. 2024-36, Approving Minnesota Department of Natural ResourcesOutdoor Recreation
Grant Application forCommons Park Splash Pad
Background
The Minnesota Department of Natural Resources(DNR)offers an Outdoor Recreation Grant Program
for matching grants up to $350,000. The approved site design and budget for Commons Park include a
splash pad feature. The total project amount is $700,000 and the $350,000 City of Fridley match is
included in the approved project budgetfor Commons Park as part of the Park System Improvement
Plan.
The grant application is currently being refinedafter DNR staff review prior to the submission deadline
of April 1, 2024.
Financial Impact
A grant award through the Minnesota DNR Outdoor Recreation Grant program would increase the
capacity of the approved Commons Park project budget.
Recommendation
Staff recommendthe approval of Resolution 2024-36, Approving Minnesota Department of Natural
Resources Outdoor Recreation Grant Application for Commons Park Splash Pad.
Focus on Fridley Strategic Alignment
X Vibrant Neighborhoods &Places X Community Identity &Relationship Building
Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
Organizational Excellence
Attachments and Other Resources
Resolution No. 2024-36
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
28
Jufn!5/
Resolution No. 2024-36
Approving 2024 Grant Application for Minnesota Department of Natural Resources
Outdoor Recreation Grant for Commons Park Splash Pad
Whereas, the Minnesota Department of Natural Resources (DNR) offers an Outdoor Recreation
Grant Program designed to connect people to the outdoors, promote conservation, and improve
access to natural resources; and
Whereas, the City of Fridley (City) has identified that a splash pad feature is a public desire for
inclusion in the Commons Park redevelopment project; and
Whereas, through subsequent meetings, staff and other key stakeholder groups find that an
project would benefit this service offering to the community.
Now, therefore be it resolved, that the Fridley City Council hereby finds and orders:
1.!The City of Fridley will act as legal sponsor for the project contained in the Outdoor
Recreation Grant application to be submitted on March 29, 2024 and that Mike Maher,
Parks and Recreation Director, is hereby authorized to apply to the Department of Natural
Resources for funding of this project on behalf of the City.
2.!The City maintains an adequate Conflict of Interest Policy and, throughout the term of the
contract, will monitor and report any actual or potential conflicts of interest to the State,
upon discovery.
3.!The City has the legal authority to apply for financial assistance, and it has the financial
capability to meet the match requirement (if any) and ensure adequate construction,
operation, maintenance and replacement of the proposed project for its design life.
4.!The City has not incurred any development costs and has not entered into a written
purchase agreement to acquire the property described in the Cost Breakdown section on
this application.
5.!The City has or will acquire fee title or permanent easement over all the land described in
the boundary map or recreational site plan included in the application.
6.!Upon approval of its application by the State, the City may enter into an agreement with
the State for the above-referenced project, and that the City certifies that it will comply
with all applicable laws and regulations as stated in the grant agreement including
dedicating the park property for uses consistent with the funding grant program into
perpetuity.
29
Jufn!5/
7.!That Mike Maher, Parks and Recreation Director, is hereby authorized to execute such
agreements as necessary to implement the project on behalf of the applicant.
th
Passed and adopted by the City Council of the City of Fridley this 25 day of March, 2024.
_______________________________________
Scott J. Lund Mayor
Attest:
Melissa Moore City Clerk
2:
/
5
!
1
3
n
f
u
J
Qsftfoufe!cz
)874*!661.8971
Gmbhtijq!Sfdsfbujpo
Csfuu!Bmufshpuu
csfuuAbhtijqqmbz/dpn
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dpnnpot!Qbsl
Tqmbti!Qbe!Eftjho!Qspqptbm!1302:03135
brvbujy/qmbzmtj/dpn
:63/556/6246!!}!!988/743/1614!
/
5
!
2
3
n
f
u
J
/
5
!
3
3
n
f
u
J
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dpnnpot!Qbsl
Eftjho$!2294287.12.12!!!1302:03135
/
5
!
4
3
n
f
u
J
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dpnnpot!Qbsl
Eftjho$!2294287.12.12!!!1302:03135
/
5
!
5
3
n
f
u
J
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dpnnpot!Qbsl
Eftjho$!2294287.12.12!!!1302:03135
/
5
!
6
3
n
f
u
J
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dpnnpot!Qbsl
Eftjho$!2294287.12.12!!!1302:03135
/
5
!
7
3
n
f
u
J
fff
o
popo
ofoof
\[\[\[
\[p\[p\[p
mzmz
uu
njnn
UpUpUp
GbGbGb
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dpnnpot!Qbsl
Eftjho$!2294287.12.12!!!1302:03135
f
ofof
p
\[p\[p
dd
njnjn
obobob
EzEEz
/
5
!
8
3
n
f
u
J
277!HQN
Ejnfotjpot
Qspkfdu!Efubjmt
:1.1M!y!61.1X
Upubm!Tztufn!Gmpx!Sbuf
Dpmps!Bqqspwbm
Dpmpst!tipxo!bsf!gps!sfqsftfoubujpo!qvsqptft/
Eftjho!Efubjmt
ª3134!Brvbujy!cz!Mboetdbqf!Tusvduvsft/!!Bmm!Sjhiut!Sftfswfe
Dvtupnfs!TjhobuvsfEbuf
Dpnnpot!Qbsl
Eftjho$!2294287.12.12!!!1302:03135
Dpotvmu!xjui!zpvs!Sfqsftfoubujwf!gps!bduvbm!dpmps!txbudift!gps!obm!dpmps!tfmfdujpo/
!Tjmwfs
Nfubmmjd
Cmvf
B{vsf!
Efojn
Zfmmpx
Mjnpo
Qbjou!Dpmpst
Bdszmjd!DpmpstBdszmjd!Dpmpst
Zfmmpx
+Tvsgbdf!ojtift!boe0ps!tjuf!gvsojtijoht!tipxo!bsf!dpodfquvbm!boe!qspwjefe!cz!puifst/
8
Qspqptfe!Dpmps!Qbmfuuf
Jufn!5/
2024 Pricing V2
Proposal
2/19/2024
Dated: Commons Park Splash Pad
Project Name:
Prepared For: Brett Altergott1183176-01-01
Aquatix Proposal Number:
Flagship Recreation
166
763-550-7860
Total GPM:
brett@flagshipplay.com
Dear Brett:
It is our understanding that Aquatix by Landscape Structures is to provide the following water play features for the
above referenced project.
Water Play Features
QtyModel #
DescriptionUnit Sales PriceFinal Sales Price
$.00
$.00
Acrylic Tot Shower DomeAQ101109
1
$2.00
$2.00
AquaGatherAQ100767
1
$26,.00
$26,.00
AquaHedra®- SSAQ101157
1
$2.00
$200
Bucket Trio w/Acrylic
AQ101066
1
$4,00
$4,.00
Large GeoMisterAQ100752
1
$20,.00
$10,.00
Jet StreamAQ100835
2
$35,00.00
$35,00.00
Nautilus1AQ100844
1
$8,00
$8,.00
RocketStream
AQ100819
1
$11,.00
$11,.00
SprayStackerAQ200303
1
$13,.00
$13,.00
UniFlowAQ101055
1
$3.00
$3.00
VersoSplash®AQ101095
1
$14,.00
$14,.00
WaterWay
AQ100785
1
$8,00
$8,.00
WhirlPadAQ200501
1
$7.00
$7.00
Funnel Twist- SS316626
1
$700
$7.00
Sea Crawler- SSAQ101160
1
$4,.00
$7.00
Stream Jet - SSAQ101159
6
$200
Water play feature design notes:
¤All above water play features are to be the standard product of Aquatix by Landscape Structures.
¤All ground spray features are imbed and installed prior to concrete being poured.
¤Pricing reflects painted products.
*Additional fees may apply for products to be powdercoated.
*Any surface finishes shown on renders are conceptual and provided by others.
*Level mounting area required for all products.
*Recommended Pool Water Depths:
-Do not exceed 6Ñ water depth on our underwater bubbler and structures up to 24Ñ tall
-Do not exceed 12Ñ water depth on structures up to 48Ñ
-Do not exceed 18Ñ water depth on structures taller than 48Ñ
-Do not exceed 12Ñ water depth on Multi Level platforms . No water spray or crawl tunnels to be underwater.
39
Mechanical Components
Jufn!5/
Domestic Water System:$4
Aquavator
1
To consist of an stainless steel activation bollard with bulldog touch sensor that will signal a control panel to activate
feature supply system for set duration of time.
1Control Panel - Sequencing
To be a UL listed control panel with integrated color touchscreen that will provide complete operating system power
and controls. Programmable features allow customization of hours of operation, feature sequencing, and activate
water flow via a touch enabled activation device. System is also internet enabled to allow remote access (requires
network connection, by others). Typical electrical requirements for sequencing domestic systems are 120v 1/Ph
60htz
3Drain Box
To consist of a 13Ñ diameter PVC sump and HDPE grate top. Each collector box has a nominal capacity of 120 gpm
gravity supply to waste outlet
1Distribution Manifold - Sequencing
To consist of a Sch. 80 PVC distribution manifold with electric solenoid valves for sequencing on / off of water play
elements and manual valves for adjusting water flows to water play elements. Solonoids and valves provided for field
installation.
1Aboveground Mechanical Enclosure
To consist of metal structure with hinged access panels mounted on a concrete pad. Above ground equipment
enclosures house the control panel and water distribution manifold. Enclosure is vented to allow for air movement
and lower screened drain openings. Enclosure size (L x W x H): 118" x 42" x 46"
Mechanical system design notes:
¤All mechanical components are per the described products above. If there are code requirements that have different product capabilities,
Aquatix will need to be notified for a revised proposal. Aquatix is not responsible for specific code related requirements.
3:
Services
Jufn!5/
$4,
Design & Construction drawings:
Including: All design and construction drawings for splash pad project construction to consist of construction of
concrete pad, mechanical system, electrical and control systems, inbed spray fixtures / collector box installation
details, water plays structure assembly / installation on concrete splash pad, equipment systems installation and
hookups.
Splash Pad Design Notes:
1.Aquatix by Landscape Structures design services are based on ideal site locations and conditions.
2.Aquatix by Landscape Structures design services do not include soil corrections, demolition planning, site
elevation plans, utility planning / design or relocation of utilities. (i.e. based on water, waste and power being
available at designed areaÓs of splash pad by others.)
3.All permits and costs of permits are not included in our splash pad design package.
4.Design package will be prepared based on AquatixÓs interpretation of Local health code.
5.The fee for design services is non-comissionable.
6.Any additional drawings associated with project outside of splash pad to be made by others. (sidewalks,
landscaping, electrical)
Sealed Engineer Stamp:$2,5
Aquatix by Landscape Structures to have drawings stamped by a licensed PE in the State of project. The fee for
design services is non-comissionable.
Please note: Subsequent requests for additional revisions and PE Stamps can result in additional charges ranging
between $1,500-$4,000 per stamp.
Lead times for revisions will vary based on timing and detail.
Pricing Summary
Total Price for Equipment as Described Above:$28
FOB Delano:
$3,
Optional Services (Non-Commissionable):
System Startup and TrainingAdd:750 Per Day
Aquatix by Landscape Structures to provide (1) factory direct technician for (2) day of system startup, balancing, and
owner training. Aquatix requires 2-4 weeks advance notice depending on seasonal demand.
*Aquatix by Landscape Structures offers on-site supervision and startup services at additional costs.
41
General Conditions
Jufn!5/
*Terms of payment are Net 30. A deposit may be required dependent on receiving an LSI signed credit agreement
and credit review
*Proposal is subject to the attached terms and conditions.
*Proposal and pricing valid for 30 days.
*All pricing provided is in USD.
*This proposal and pricing is based on our interpretation of the sections of the RFP or specification that have been
made available to us. Exceptions have been noted where ever possible. In the event of a conflict between the
language in the specification and the proposal, the language in the proposal takes precedence and is the basis of
the proposed pricing. Aquatix by Landscape Structures reserves the right to reject any order based on differences in
pricing. Aquatix by Landscape Structures reserves the right to reject any order based on differences in interpretation
of the specification, or for any reason, at the time an order is tendered.
*Aquatix by Landscape Structures will not initiate work with out a fully executed contract or purchase order.
Fabrication will not be initiated until complete submittal approvals have been received.
*Submittals will be provided upon receipt of a fully executed contract or purchase order.
*The proposed equipment can generally be shipped within 10-12 weeks after receipt of completely approved
submittals. Lead time will be updated at the time of order execution.*
*Custom equipment is subject to longer lead times.
*Sales tax is not included in the prices quoted. All applicable Federal, State and Local sales or use taxes must be
paid by the customer.
*Freight is FOB Delano, MN.
*RETURN POLICY: As an indication of our commitment to our customers, Aquatix by Landscape Structures will
accept returns of new structures and/or new equipment purchased within 60 days of the original invoice date.
Advance notification is necessary to ensure proper credit. Parts not included in this return policy are custom parts,
as well as used or damaged parts. A 20% restock fee plus all return freight charges will apply to all product returns.
NOTE: All parts are subject to inspection upon return. Parts returned damaged may not receive a full credit. For this
reason, it is important that all returned parts are properly packaged to prevent damage while in transit.
If you have any questions or comments concerning this information, please feel free to call me at 763-972-4978.
Thank you for the opportunity to bid on this project.
Sincerely,
Aaron Skogen
General Manager
42
/
to
5
!
3
4
n
f
2/21/2024
u
J
By Others:
10' of pad & All backflow prevention and pressure reduction
NotesState Contract Discount 9ƭƷźƒğƷĻķ Ή CźƓğƌ ƨǒƚƷĻ Ǟźƌƌ ĬĻ ƦƩƚǝźķĻķ ǒƦƚƓ ŅźƓğƌ ķĻƭźŭƓ5źƭƦƚƭğƌ ƚŅ ƦğĭƉğŭźƓŭ ƒğƷĻƩźğƌ LƓĭƌǒķĻƭ ĻǣĭğǝğƷźƚƓ ε ĬĻķķźƓŭ ŅƚƩ Ʀğķ ğƓķ ĻƨǒźƦƒĻƓƷ ǝğǒƌƷƭ͵ DƩğǤ
ĭƚƓĭƩĻƷĻ ǞĻƷ Ʀğķ ğƓķ ķƩǤ ğƦƩƚƓ ǞΉ ĬƩƚƚƒ ŅźƓźƭŷ ƦĻƩ ƭƦĻĭ͵ Domestic water supply & waste water connection to be stubbed withinbe compleed by utility contractorTotal w/ Additions & Reductions
530,974.99
5%
QTY
0.00
Possible
Reductions
Total Reductions
0.00
Total Additions
Possible Additions
0.00
530,974.99
Budget Total
City of Fridley 7071 University Ave. NEFridley, MN 55432Mike Maher - Parks & Recreation Director
Preliminary Budget
{ğƌĻƭ ğǣ Ώ źŅ ğƦƦƌźĭğĬƌĻ
THIS IS AN ESTIMATE & NOT A FORMAL QUOTE
PRELIMINARY BUDGET -
Play Equipment Commons Park Splash Pad Domestic System (1183176-01-01)234,364.002024 List Price of Equipment State Contract Discount (11,718.20)Mechanical 47,595.00Design Services 4,096.00Stamped
Engineered Plan3,447.47Delivery of Play equipment3,000.00State of MN Health Department Permit2,000.00Mobilization750.00Dumpster(s) - 30 Yard750.00Installation of the Splash Pad235,466.67Payment
& Performance Bonds 11,224.05
Jufn!6/
AGENDA REPORT
Meeting Date:March25, 2024 Meeting Type:City Council
Submitted By:Korrie Johnson, Assistant Finance Director
Title
Resolution No. 2024-40, Approving Gifts, Donations and Sponsorships Received Between
February 15, 2024, and March 15,2024
Background
Each month, the City of Fridley (City) receives various donations and gifts to support City
operations, programs and projects. Pursuant to Minnesota Statute § 465.03, the City may accept
these donations and gifts for the benefit of residents. For specific donations or gifts, the donor
may prescribe certain requirements, such as for a specific activity or department.
Consistent with the abovementioned statute, staff prepared Schedule No. 1 (Exhibit A), which
outlines the various donations, gifts and/or sponsorships received by the City betweenFebruary
15, 2024, and March 15,2024.To accept the same, the Council must adopt the attached resolution
by a twothird majority vote.
Lastly, for each donation, gift or sponsorship, staff ensure it meets an identified need, does not
create a quidproquo or longterm maintenance obligation, and the donor received an
acknowledgment of their gift through a letter or publication.
Financial Impact
finances.
Recommendation
Staff recommend the approval of Resolution No. 2024-40,Approving Gifts, Donations and
Sponsorships Received BetweenFebruary 15, 2024, and March 15,2024
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
X Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
Organizational Excellence
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
44
Jufn!6/
Attachments and Other Resources
!Resolution No. 2024-40
!Exhibit A: Schedule No. 1
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
45
Jufn!6/
Resolution No. 2024-40
Approving Gifts, Donations and Sponsorships for the City of Fridley
Whereas, throughout the year the City of Fridley (City) receives various gifts and donations; and
Whereas, the City is sincerely grateful for the support it receives from an array of organizations
and individuals; and
Whereas, without this support, the continuation of different events or programs would be difficult
to sustain; and
Whereas, the attached schedule (Exhibit A) lists all of the donations and gifts received by various
City departments between February 15, 2024, and March 15, 2024; and
Whereas, all of the items listed on the attached schedule (Exhibit A) are required to be accepted
by the City Council by a two-thirds majority vote; and
Whereas, all items have been determined to be donated free of any quid-pro-quo expectation
by the donor.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves and
accepts the various donations, gifts and sponsorships made between February 15, 2024, and
March 15, 2024.
Passed and adopted by the City Council of the City of Fridley this 25th day of March 2024.
_______________________________________
Scott J. Lund Mayor
Attest:
Melissa Moore City Clerk
46
/
6
!
7
4
n
f
u
J
Fund
Schedule No. 1
Value
Amount/
Donor Name,
if not anonymous
Report to Date Total$61,767.30
Donation for Patient MemorialDawn Fennig$600.00101Donation for WinterfestFridley Lions Club$800.00101Donation for Patient MemorialDawn Fennig$600.00101
Department or DivisionProgram
Public Safety - PoliceParks and RecreationPublic Safety - Fire
Date
1/3/2024Public Safety - PoliceDonation for 'Night to Unite' SuppliesMINCO$1,000.001012/2/2024SNCDonation Box ContentsVarious$142.00270
Received
3/1/2024Parks and RecreationMemorial BenchOwen and Kathleen$2,500.001013/8/2024SNCDonation Box ContentsVarious$218.002703/8/2024Public Safety - PoliceGeneral DonationDenise Larson$1,000.00101
1/12/2024SNCDonation Box ContentsVarious$190.002701/18/20241/18/2024SNCGeneral DonationMarvin Kolling$25.002701/24/20241/18/20241/26/2024SNCInternational Paper Grant Reimbursement (SNCF)SNCF$3,000.00
2702/14/2024SNCFireplace Donation at SNCSpringbrook Foundation$28,192.30407
12/21/2023Public Safety - PoliceDonation to Safety CampMaduro Distributors Inc$15,000.0010112/29/2023SNCSNCF Grant ReimbursementXcel Energy$7,500.0027012/31/2023Public Safety - FireDonation
for Fire Prevention ActivitiesMINCO$1,000.00101
Gifts, Donations, and Sponsorships - City of Fridley
Jufn!7/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By:Walter T. Wysopal, City Manager
Title
Resolution No. 2024-41,Approving and Authorizing the Signing of a Settlement Agreement Between
the City of Fridley and Stephen A. Ling and Stephanie Ling
Background
Attached is a Settlement Agreement between the City of Fridley and Stephen and Stephanie Ling relating
to the claims and defenses raised in the lawsuit they filed in Anoka County District Court. The lawsuit
in the amount of $3,400
No. ST-2022-01. A settlement was reached between the parties in the amount of $1,700.
The City was originally going to receive $311,964 through the special assessments on this project. The
Settlement Agreement will reduce the funding received by the amount of $1,700 and lower the total
reduction in the assessment.
FinancialImpact
Absorbed.
Recommendation
Staff recommend the approval of Resolution No. 2024-41, Approving and Authorizing the Signing of a
Settlement Agreement Between the City of Fridley and Stephen A. Ling and Stephanie Ling.
Focus on Fridley Strategic Alignment
X Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
Organizational Excellence
Attachments and Other Resources
Resolution No. 2024-41
Settlement Agreement
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
48
Jufn!7/
Resolution No. 2024-41
Approving and Authorizing the Signing of a Settlement Agreement Between
the City of Fridley and Stephen A. Ling and Stephanie Ling
Whereas, pursuant to Minnesota Statute, Chapter 429, the Fridley City Council (Council) conducted
(City) 2022 Street Rehabilitation Project
No. ST-2022-01 (Project); and
Whereas, on July 24, 2023, the Council adopted Resolution No. 2023-81 approving the assessment
for the Project, and the City Clerk was directed to transmit the assessment to the Anoka County
Auditor to be put on the property tax lists of Anoka County; and
Whereas, pursuant to Minnesota Statute, Chapter 429, an appeal of the special assessment was
filed by Stephen A. Ling and Stephanie Ling in Anoka County District Court as District Court File No.
02-CV-23-4466; and
Whereas a settlement between the parties has been mutually agreed upon, which resulted in the
preparation of the attached Settlement Agreement (Exhibit A).
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves said
agreement, and the Mayor and City Clerk are hereby authorized to execute the attached Settlement
Agreement.
Be it further resolved, the City Attorney is hereby authorized to process the settlement pursuant
to the terms of the Settlement Agreement and to file a Stipulation and Order of Dismissal with
Prejudice with the Anoka County District Court.
Passed and adopted by the City Council of the City of Fridley this 25th day of March, 2024.
_________________________________________
Scott J. Lund Mayor
Attest:
_______________________________________
Melissa Moore City Clerk
49
Jufn!7/
4:
Jufn!7/
51
Jufn!7/
52
Jufn!7/
53
Jufn!8/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By: Beth Kondrick, Deputy City Clerk
Title
Resolution No. 2024-37, Approving Fridley Historical Society Gambling Permit
Background
Pursuant to sections of the Fridley City Code (Code), certain business licensing activities require approval
of theFridleyCity Council(Council), includingTemporary Lawful Gambling permits.
The City received an application from Mary Sue Meyersof the Fridley Historical Society for a Lawful
Gambling permit for a Raffle event to be held atthe Fridley Community Center on October 5, 2024.
Staff have performed the required verification steps spelled out in the Lawful Gambling Chapterof the
Code. Upon approval of the Council,the City permit and associated certifications will be forwardedto
the State for issuance.
Financial Impact
All revenues for similarlicenses were anticipated as part of the 2024Budget.
Recommendation
Staff recommend the approval of Resolution No. 2024-37, Approving Fridley Historical Society
Gambling Permit.
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &Places X Community Identity &Relationship Building
Financial Stability & Commercial Prosperity X Public Safety & Environmental Stewardship
Organizational Excellence
Attachments
Resolution No. 2024-37
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
54
Jufn!8/
Resolution No. 2024-37
Approving Temporary Lawful Gambling Permit for Fridley Historical Society
Whereas, the Fridley City Code (Code) and various sections of Minnesota Statute (M.S.) direct
licensing requirements for certain business activities within the City of Fridley (City); and
Whereas, pursuant to the Lawful Gambling Chapter of the Code, the City Council must approve
exempt lawful gambling permits; and
Whereas, a Temporary Lawful Gambling permit application was submitted by Mary Sue Meyers
for a raffle event to be held at the Fridley Community Center on October 5, 2024; and
Whereas, permit
and have recommended the permit for approval.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves the
Temporary Lawful Gambling permit to be issued to Mary Sue Meyers for a raffle event to be held
on October 5, 2024 at the Fridley Community Center.
Passed and adopted by the City Council of the City of Fridley this 25th day of March, 2024.
_______________________________________
Scott Lund - Mayor
Attest:
___________________________________
Melissa Moore City Clerk
55
Jufn!9/
AGENDA REPORT
Meeting Date:March 25, 2024 Meeting Type:City Council
Submitted By:Roberta Collins, Assistant to the City Manager
Title
Resolution No. 2024-39,Approving Claims for the Period Ending March 20,2024
Background
Attached is Resolution No. 2024-39and the claims report for the period endingMarch 20, 2024.
Financial Impact
Included in the budget.
Recommendation
Staff recommend the approval of Resolution No. 2024-39, Approving Claims for the Period Ending
March 20, 2024.
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
X Financial Stability & Commercial ProsperityPublic Safety & Environmental Stewardship
Organizational Excellence
Attachments and Other Resources
Resolution No. 2024-39
City Council Claims Report
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
56
Jufn!9/
Resolution No. 2024-39
Approving Claims for the Period Ending March 20, 2024
Whereas, Minnesota Statute § 412.271 generally requires the City Council to review and approve
claims for goods and services prior to the release of payment; and
Whereas, a list of such claims for the period ending March 20, 2024, was reviewed by the City
Council.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves the
payment of the claims as presented.
th
Passed and adopted by the City Council of the City of Fridley this 25 day of March, 2024.
_______________________________________
Scott J. Lund - Mayor
Attest:
Melissa Moore City Clerk
57
58
Jufn!9/
59
Jufn!9/
5:
Jufn!9/
61
Jufn!9/
62
Jufn!9/
Jufn!:/
AGENDA REPORT
Meeting Date:March25, 2024 Meeting Type:City Council
Submitted By:James Kosluchar, Public Works Director
Brandon Brodhag, Assistant City Engineer
Carl Lind, Graduate Engineer
Title
Resolution No. 2024-38,Approving an Amendment to the 2024 Street RehabilitationProject No.
ST2024-01Feasibility Reportto Address Traffic Calming Measures Along and Adjacent to Channel
Road
Background
Resolution No. 2024-38 approves an amendment to the 2024 Street Rehabilitation Project No.
ST2024-01Feasibility Reportto address traffic calming measures along and adjacent to Channel Road,
as were requested by residents.The original Feasibility Report was approved by the Fridley City
Council (Council) through Resolution No. 2023-142on November 27, 2023.
On December 18, 2023 the Council conducted a Public Hearingregarding the 2024 Street
Rehabilitation Project. Along with comments received by the Council and staff relating to the project
improvements,comments from residents fromthe Channel Road project area expressed concern
regardingtraffic volume and requested traffic calming measures be done in conjunction with the 2024
Street Rehabilitation Project No. ST2024-01.
On February 6, 2024, City staff held an additional project open house for the residents along and
adjacent to Channel Road to gauge interest in the implementation of various traffic calming options.
A total of 63 property owners along Channel Road and the adjacent streets were invited via public
mailing to review traffic calming options, provide feedback to staff and vote on desired options. Those
unable to attend the meeting were encouraged to review the traffic calming options and provide
feedback via an online sur
Meeting materials presented for the six traffic calming options below included typical design,
potential effect on traffic speed/volume and other design considerations:
Option 1: Speed Humps
Option 2: Speed Cushions (Speed Pads)
Option 3: Curb Bump-Outs
Option 4: Realigned Intersection
Option 5: Traffic Circle
th
Option 6: One-Way Conversion (68Avenue).
Vision Statement
We believe Fridley will be a safe, vibrant, friendlyand stable home for families and businesses.
63
Jufn!:/
The materials presented at the meeting were also made available on the project webpage for those
unable to attend.
Meeting attendance included 13 residents from the project area as well as Councilmember-at-Large,
David Ostwald. Five Engineering Division staff were in attendance to answer questions regarding the
various traffic calming measures. The City received five online feedback responses pertaining to the
presented options. Below is a summary of the feedback received by the City regarding the six options
presented to both in-person and online survey participants:
Option Feedback
Option 1: Speed humps along Channel Road Favorable
Option 2: Speed cushions along Channel Road Neutral
Option 3: Installation of curb bump-outs along Channel Road Unfavorable
th
Option 4: Realigned intersection of Channel Road and 66 Avenue Neutral
th
Option 5: Traffic circle at the intersection of Channel Road and 66 Favorable
Avenue
th
Option 6: Conversion of 68 Avenue to a one-way for westbound traffic Unfavorable
only
At the February 26, 2024 City Council Conference Meeting, staff presented feedback on data on the
six options offered. More detailed information pertaining to the proposed additions are outlined in
pages 32-55 of the amended Feasibility Report (attached).
From the discussion with the Council and based on feedback received from the public, staff affirm
that Options 1 and 5 are feasible. Staff are working on preliminary design to incorporate one or both
of these elements. Staff estimate the cost of adding Option 1 will be approximately $15,000 for three
speed humps and Option 5 will be approximately $10,000. The total funding required for adding
traffic calming along Channel Road will be approximately $25,000.
Staff recommend these improvements are paid for through traffic funding included in the Traffic
Safety Upgrades item in the 2024-2028 Capital Investment Plan (CIP), which budgets $30,000 for this
purpose. The CIP has the budget to fund the additional traffic calming measures and staff have
determined in this case that, 1) this street has a high number of vehicles that travel through this
corridor to higher volume roadway connections at Mississippi Street and Trunk Highway 65, and 2)
the 1800 foot length of the straight street without any traffic control is excessive and promotes
increased driver speed.
The amendment to the Feasibility Report includes the CIP as the source of funding for traffic calming
improvements along and adjacent to Channel Road. The amended plan will have no bearing on any
property assessments related to the 2024 Street Rehabilitation Project No. ST2024-01.
Financial Impact
Funding for the additional project components is feasible and provided by the Traffic Safety
Upgrades item in the Capital Investment Program.
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
64
Jufn!:/
Recommendation
Staff recommend the approval of Resolution No. 2024-38, Approving Amendment to the 2024 Street
Rehabilitation Project No. ST2024-01 Feasibility Report to Address Traffic Calming Measures Along
and Adjacent to Channel Road.
Focus on Fridley Strategic Alignment
X Vibrant Neighborhoods & Places Community Identity & Relationship Building
Financial Stability & Commercial Prosperity X Public Safety & Environmental Stewardship
Organizational Excellence
Attachments and Other Resources
!Resolution No. 2024-38
!Amended Feasibility Report
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
65
Jufn!:/
Resolution No. 2024-38
Approving an Amendment to the 2024 Street Rehabilitation Project No. ST2024-01
Feasibility Report to Address Traffic Calming Measure Along and Adjacent to Channel Road
Whereas, the City of Fridley (City) prepares a Capital Investment Program to systematically reconstruct
and rehabilitate streets and utilities within the City to maintain infrastructure quality and performance;
and
Whereas, the construction of certain roadway and utility improvements (Improvements) are included
within the 2024 Street Rehabilitation Project No. ST2024-01 (Project) as identified within the Capital
Investment Program and deemed to be in the interest of the City and adjacent property owners; and
Whereas, the Fridley City Council (Council) adopted Resolution No. 2023-142 on November 27, 2023,
which received the feasibility report and set a public hearing regarding the estimated costs, funding
and construction of the Improvements on December 18, 2023; and
Whereas, at the December 18, 2023 Public Hearing, the Council took comment from residents along
and adjacent to Channel Road who expressed concern regarding traffic volume and requested
additional traffic calming measures be done; and
Whereas, the Engineering Division held an additional project open house on February 6, 2024 for
residents along and adjacent to Channel Road to gauge interest in the implementation of various traffic
calming options; and
Whereas, feedback given was shared with the Council at the February 26, 2024 City Council Conference
Meeting; and
Whereas, the project will be cost-effective, necessary and feasible from an engineering standpoint as
described in the attached amended report; and
Whereas, the Engineering Division recommends this project as cost-effective, necessary and feasible
and at the direction of the Council, has described its recommendation in the amended Feasibility
Report (Exhibit A); and
Whereas, the proposed changes would be funded through Traffic Safety Upgrades allocation in the
Capital Investment Plan.
Now, therefore be it resolved, that the City Council of the City of Fridley hereby approves Approval
Amendment of Feasibility Report for 2024 Street Rehabilitation Project No. ST2024-01.
66
Jufn!:/
th
Passed and adopted by the City Council of the City of Fridley this 25 day of March, 2024.
_______________________________________
Scott J. Lund Mayor
Attest:
Melissa Moore City Clerk
67
Jufn!:/
FeasibilityReportfor
2024StreetRehabilitation
ProjectNo.ST2024-01
68
Jufn!:/
CITY OF FRIDLEY, MINNESOTA
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
FEASIBILITY REPORT
FOR
2024 STREET REHABILITATIONPROJECT
NO. ST2024-01
November2023
I hereby certify that this plan, specifications, or report was preparedby me or under
my direct supervision and that I ama duly licensed Professional Engineer with the laws
ofthe State ofMinnesota.
___________________________________Date: November21, 2023
James P. Kosluchar, P.E.
Registration No. 26460
1
69
Jufn!:/
TABLE OF CONTENTS
DescriptionPage No.
Introduction............................................................................................................................................................... 3
Street Resurfacing Plan.........................................................................................................................................4
Background...............................................................................................................................................................5
Proposed Improvements ...................................................................................................................................... 7
Street Improvements ............................................................................................................................................. 7
Water Utility Improvements .............................................................................................................................. 10
Sanitary Sewer Improvements..........................................................................................................................12
Storm Sewer Improvements.............................................................................................................................. 12
Water Quality Improvements ........................................................................................................................... 12
Private Utility Coordination ............................................................................................................................... 14
Estimated Costs ..................................................................................................................................................... 14
Funding Sources .................................................................................................................................................... 14
Construction ............................................................................................................................................................ 15
Summary .................................................................................................................................................................. 15
Appendices............................................................................................................................................................. 16
Figure A – Project Area Map ............................................................................................................................. 17
Figure B – Opinion of Probable Cost ............................................................................................................. 18
Figure C – Funding Sources Summary .......................................................................................................... 22
Figure D – Project Schedule..............................................................................................................................23
Figure E – Living Streets Worksheet............................................................................................................... 24
Figure F – Typical Roadway Sections ............................................................................................................. 29
Figure – Traffic Calming Memo .................................................................................................................... 32
2
6:
Jufn!:/
Introduction
The City of Fridley has an ongoing obligation to maintain its streets in an efficient manner, and
to provide a high level of service while maintaining a minimum budget. To enable the City to
identify improvements that will provide for an efficient level of service and life-cycle cost, staff
inspect and rate the City’s pavements on a regular basis. The City has also developed a
pavement improvement plan based on resurfacing pavement and base treatment with
intermittent sealcoating. The goal is to provide maintenance improvements at scheduled
intervals. For example:
Activity Schedule
Initial Construction Year 0
SealcoatingYear 8
Sealcoating Year 16
ResurfacingYear 24
Sealcoating Year 32
Sealcoating Year 40
Reconstruction Year 48
This is an ideal and aggressive sequence for street maintenance. Note that the final
reconstruction may be substituted with resurfacing activities if the roadway base is in good
condition, with the intent to extend road life for an additional cycle of 24 years.
Due to the variability with budgets, road configurations, traffic patterns, condition of utilities,
source of funds, other projects, etc., the basic schedule above varies and fluctuates for each
roadway segment.
As part of identifying the best candidate for this year’s pavement resurfacing project, City of
Fridley Engineering Division staff worked with Street Maintenance Division staff to develop a list
of candidate projects. Factors including physical pavement characteristics and budgetary
considerations among others were then considered to assist in selection of the best candidate.
The Engineering Division monitors existing pavements through semi-annual inspections. From
this inspection information, the Engineering Division prepares a Street Resurfacing Plan
consistent with the Street Capital Improvement Plan, which designates candidate street
segments for construction, reconstruction, and rehabilitation. The City of Fridley also performs
preventative surface maintenance (e.g. sealcoating), routine crack sealing and pothole patching
maintenance. The amount of street maintenance on this segment is increasing annually due to
the rapid deterioration of the existing pavements.
The Engineering Division has prepared a Street Resurfacing Plan consistent with the Long-Term
Street Maintenance Program, which designates candidate street segments for construction,
reconstruction, and rehabilitation. The Plan identifies the areas within the city and the
anticipated year for maintenance projects. Please refer to the following map summarizing the
Long-Term Street Maintenance Program.
3
71
Jufn!:/
Street Resurfacing Plan
2024-01
PROJECT
4
72
Jufn!:/
Background
The 2024 Street Rehabilitation Project is composed of three distinct project locations across the
City of Fridley. The proposed project scope includes pavement rehabilitation and miscellaneous
utility improvements across all project locations. The project extents and street segment history
of each project location are included below.
See Figure A in the Appendices for a map of proposed project locations.
th
Lucia Lane/Channel Road/66 Avenue
Street segments selected for rehabilitation include:
TH
PLACE
LUCIA LANE from MISSISSIPPI STREET (CSAH 6) to 68
TH
AVENUE
CHANNEL ROAD from MISSISSIPPI STREET (CSAH 6) to 68
TH
66 AVENUE from PIERCE STREET to CHANNEL ROAD
th
The streets and underground utilities along Lucia Lane, Channel Road and 66 Avenue within
the project limits were initially constructed from the mid-1950s to the late 1970s. Since their
initial construction, the streets have received routine sealcoat treatment, with the latest
occurring in 2016, as well as other preventative surface maintenance.
th
Existing street widths are 30 feet and 35 feet for 66Avenue and Lucia Ln/Channel Rd,
respectively, and all streets provide 2-way traffic with no shoulder striping from Mississippi
Street (CSAH 6) to the neighborhood to the north. Construction records and pavement core
data indicate existing pavement thicknesses ranging from 3 to 5 inches and an underlying
aggregate base of 2 to 4 inches.
Each street is categorized as a local city street with approximate Annual Average Daily Traffic
th
(AADT) of 600, 800 and less than 500 for Lucia, Channel and 66Avenue,respectively. Heavy
traffic along these street segments is considered to be low to typical.
Norton Avenue
Street segments selected for rehabilitation include:
NORTON AVENUE from CENTRAL AVENUE (CSAH 35) to WESTERN TERMINUS
The street and underground utilities along Norton Avenue were originally constructed in the late
1960s. Since its initial construction, the street has received routine sealcoat treatment as part of
the City’s roadway maintenance program, with the last occurring in 2016.
Currently, the street is approximately 35 feet wide and provides 2-way traffic with no shoulder
striping between Central Avenue (CSAH 35) and its western terminus. Construction records and
5
73
Jufn!:/
pavement core data indicate an existing pavement thickness ranging from 3 to 4.5 inches and an
underlying stabilized subgrade of 4 inches.
Norton Avenue is categorized as a local city street with an estimated Annual Average Daily
Traffic of less than 500 vehicles per day. Heavy vehicle traffic along this segment is considered
low to typical.
Buchanan Street
Street segments selected for rehabilitation include:
RD
BUCHANAN STREET from CITY LIMITS to 53 AVENUE
The street and underground utilities along Buchanan Street were originally constructed from the
late 1950s to early 1960s. In 2003, the street was reconstructed as part of the City’s 2003 Street
Improvement Project No. ST2003-1 where it received 3.5 inches of bituminous pavement, 6
inches of aggregate base and concrete curb & gutter. The street has also received routine
maintenance throughout its life, including sealcoat treatment, with the last occurring in 2017.
rd
The street is currently 30 feet wide and provides 2-way traffic with no shoulder striping from 53
Avenue to the City’s boundary with Columbia Heights to the south. Construction records and
pavement core data indicate an existing pavement thickness of 3.5 to 4.5 inches and an
underlying aggregate base thickness of 6 to 8 inches.
Buchanan Street is categorized as a local city street and receives an approximate Annual
Average Daily Traffic of less than 500 vehicles per day. Heavy truck traffic along this segment is
considered low to typical.
6
74
Jufn!:/
Proposed Improvements
Overview
The total project area includes approximately 1.2 miles ofproposed street improvementsacross
threedistinct project areas. The proposed improvements include pavement rehabilitationand
spot replacement of concrete curb & gutter in addition to improvements to the City’s existing
water, sanitary sewer and storm sewer networks.
Due to varying size and scope amongtheproject areas, staff conducted preliminary public
outreach with project residents using acombination ofin-person open house for the Lucia
th
Lane/Channel Road/66Avenueproject area and virtual informational presentation uploaded to
the City’s project webpage for the remaining project areas. Invitations for the open house and
virtual presentation were mailed to residents and property owners in the project areas in
September 2023. A project questionnaire was included with the mailed invitations to encourage
resident feedback and proactively coordinate with residents on future construction. Staff will
compile resident feedback from the open house and questionnaires and address any comments
and concerns in the final design as is feasible.
Staff has also conducted a Living Streets evaluation of the project area and will address the
findings as feasible in the design of the project. The Worksheet has been included as Figure E of
the appendices.
In July 2023, Resolution No. 2023-78 was adopted by the City Council to initiate the 2024 Street
Rehabilitation Project No. ST2024-01 and prepare a preliminary report, plans and specifications.
StreetImprovements
Street and pavement improvementsare
determined based upon severalfactors
including the current pavement condition,
last majorroadwaymaintenance, and the
need for coordinated utility improvements.
The primary pavement rehabilitation
methodsproposed for this projectarefull-
depth reclamation (FDR)and mill& overlay.
Full-depth reclamation grinds and reduces
the existing pavement to aggregate for in-
place reuse in the roadway base. Mill &
overlay preserves some of the existing
Exhibit1.Full-depth pavement reclamation.
pavement, partially grinding and removing
the pavement to a specified depth. In both instances, new asphalt is then installed to match the
existing roadway conditions.In addition to the proposed pavement rehabilitation methods, each
project streetwould also receive spot replacement of severely damaged or heaved concrete curb &
gutter as well asmiscellaneous utility improvements.
7
75
Jufn!:/
To verify existing roadway constructionand evaluate the underlying soil conditions in each project
location, geotechnical exploration was performed by Braun Intertec. Additional pavement coring was
conducted along each project street by Streets Division staff to evaluate existing pavement
thicknesses. The resulting typical roadway sections for each project street have been included as
Figure F of the Appendices.
An overview of the existing roadway conditions and recommended pavement improvements for each
project street are summarized below:
th
Lucia Lane/Channel Road/66Avenue
Construction records and pavement coredata along
th
Lucia Lane, Channel Road and 66Avenue indicate
existingpavement thicknesses ranging from 3 to 5
inches with an underlying aggregate base thickness
of 2 to 4inches. Further geotechnical exploration of
the roadway core by Braun Intertec indicates a
subgrade of sand to silty sand, which provides a
suitable sub-base for roadway construction.
Current pavement distressingas seen in Exhibits 2
and 3indicate advanced pavement deterioration
typical with a roadway of this age. Frequent and
Exhibit2.LuciaLanelooking south.
severe fatigue cracking also indicatespotential
failures in the underlying aggregate base.
Based upon the existing roadway sections, pavement
distressing and underlying soil conditions, staff
recommends a full-depth reclamation and pavement
rehabilitation across all street segments in this
project area. The fortified reclaimed aggregate base
section would be overlayed with a 3.5” bituminous
pavement section, installed in two lifts consistent
with the City’s typical urban roadway section.
Traffic Modifications (Lucia Lane)
Exhibit3.Channel Roadlooking south.
In addition to the proposed pavement rehabilitation
th
along the Lucia Lane/Channel Road/66Avenue
project area, Engineering Division staff evaluated the feasibility of a cul-de-sac conversion of Lucia
Lane and other traffic modifications to address historic traffic volume/speed concerns in area.
Since 2018, Engineering Division and Public Safetystaff have responded to resident concerns on
traffic volume/speed along Lucia Lane. Traffic data has been collected since that time and temporary
traffic modifications, including temporary speed bump installation along Lucia Lane and one-way
th
conversion of the street at 68Place, have been employed to present. With the project’s proposed
8
76
Jufn!:/
street improvements, there exists acost-effective
opportunity to employ permanent traffic measures in
this location.
At the project open house in September 2023,
Engineering Division staff proposed the cul-de-sac
th
conversion of Lucia Lane at 68Place to project
residents along Lucia Lane and Channel Road. The
preliminary cul-de-sac design presented can be seen
in Exhibit 4.Project residents along Lucia Lane south
of the cul-de-sac were largely supportive of the cul-
de-sac conversion. Some road users north of the
proposed cul-de-sac expressed concerns that the
design would be restrictive to traffic north of the cul-
Exhibit4.Lucia Lane cul-de-sac conversion.
de-sac, forcing road users to access those properties
from Central Avenue (Trunk Highway 65).
The Engineering Division will consider all feedback received on the proposed traffic modifications and
address any comments or concerns in the final design as feasible. Additional considerations with the
final design will include improvements to existing surface water quality features and pedestrian routes
in the area.
th
There remains the possibility of implementing additional traffic control measures along 68Avenue
and Channel Road (one-way conversion, speed bumps, etc.) following completion of the project, if
warranted. Following construction, Engineering Division staff will monitor traffic behavior in the
project area and identify volume/speed criteria for the addition of such measures.
Norton Avenue
Construction records and pavement core
data along Norton Avenue indicate an
existing pavement thickness ranging from 3
to 4.5 inches with an underlying stabilized
base thickness of 4 inches. Further
geotechnical exploration of the roadway
core by Braun Intertec indicates a subgrade
of silty sand, suitable for roadway
construction and not requiring subgrade
correction.
The current pavement distressing as seen in
Exhibit 5indicates a significant
deterioration of the existing pavement.
Exhibit5.Norton Avenue looking east.
Additionally, severe fatigue cracking
indicates potential failures in the underlying aggregate base.
9
77
Jufn!:/
In order to address the deteriorating pavement and aggregate base conditions, staff recommends a
full-depth reclamation and pavement rehabilitation. The fortified reclaimed aggregate base section
would be overlayed with a 3.5” bituminous pavement section, installed in two lifts and consistent with
the City’s typical urban roadway section.
Buchanan Street
Construction records and geotechnical data along
Buchanan Street indicate an existing pavement
thickness of 3.5 to 4.5 inches with an underlying
aggregate base thickness of 6 inches. Further
geotechnical exploration of the roadway core by
Braun Intertec indicates a subgrade of silty sand,
which provides a suitable sub-base for roadway
construction.
Present pavement distressing, as visible in Exhibit 6,
indicate a top-down wear of the existing surface
consistent with “stripping” of the existing seal coat
as recently seen in other street segments in the City.
The surface-level distressing shows no indication of
Exhibit6.Buchanan Streetlooking south.
deeper deterioration of the roadway base.
Based upon the existing roadway section, current pavement distress and underlying soil conditions,
staff recommends a 1” mill and pavement overlay along theproject area. It is anticipated that a
pavement mill and overlay should result in a pavement surface lasting 20 years or more. It should be
noted that reflective cracking from the remaining existing pavement is to be expected after such mill
and resurfacing. This distressing cannot be controlled without a full reconstruction of the roadway.
Water Utility Improvements
Coordinated improvements to the City’s water distribution system are an efficient and cost-
effective method of maintaining the City’s existing utility infrastructure and ensuring a resilient,
quality water supply in the future. In preparation for the project, the existing water main, fire
hydrants and other system appurtenances within the project area werereviewed by Utilities
Divisionstaff. Replacement or rehabilitation of these systems was then identified based upon
age and functionality.
The proposed improvements to the water utility system in conjunction with the project include
thereplacement of approximately 1,600lineal feet (LF) of water main, 12 fire hydrants and the
rehabilitationreplacementof other appurtenancesproject-wide.
10
78
Jufn!:/
th
Lucia Lane/Channel Road/66Avenue
Proposed water utility improvements inthe
th
Avenueproject
Lucia Lane/Channel Road/66
area include the removal and replacement of
approximately 1,600lineal feet (LF) of existing
water main along Channel Roadas well as
replacement of sevenfire hydrants andother
miscellaneoussystem improvements. The water
main, fire hydrants and other system
infrastructure to be replaced or rehabilitated
have been identified by Utilities Divisionstaff
due to their age and reduced utility.
Exhibit7.Water main replacement.
Replacement of the existing water main and fire
hydrants would occur in the location of the existing utility and would include replacement of other
system appurtenances such as gate valves.Additionally, the water main replacement work along
Channel Road would include the reconnection of existing water services and replacement of curb
stops on the short side of the water main.
Buchanan Street
Proposed water utility improvements along
the Buchanan Street project area include the
removal and replacement of twofire hydrants
and rehabilitation of threeexisting gate valves.
These hydrants and valveshave been
identified by Public Works staff during
preliminary review due to their age and
reduced utility.
Hydrant assembly replacement would occur in
the location of the existing hydrants and
would additionally include the replacement of
Exhibit8.Fire hydrant assembly replacement.
the hydrant gate valve to the existing water
main. Rehabilitation of the existing gate valves would include the replacement of bolts
throughout the valve assembly and installation of a new valve box to the surface.
Norton Avenue
Proposed water utility improvements along the Norton Avenue project area include the replacement
of threefire hydrants and rehabilitation of oneexisting gate valve.The need for these improvements
were identified by Public Works staff during review for the project due to their age and reduced
utility. Hydrant assembly replacement would occur in the location of the existing hydrants and would
additionally include the replacement of the hydrant gate valve to the existing water main.
Rehabilitation of the existing gate valve would include the replacement of bolts throughout the valve
assembly and installation of a new valve box to the surface.
11
79
Jufn!:/
Sanitary Sewer Improvements
In preparation for the project, Utilities Division staff evaluated the existing sanitary sewer main,
structures and surface facilities across each project location. Staff did not identify any severe
defects with the existing system and there are currently no major proposed improvements to
the sanitary sewer system in any project locations. However, there will be improvements to
system surface features, namely manhole castings, in concurrence with each project area’s street
improvements. Existing surface features will be salvaged or replaced and reset as part of this
work.
In coordination with the project, staff also will provide a complimentary inspection service to
project residents to televise existing sewer service laterals for severe root intrusion, deterioration
or other defects. Property owners have been notified and may coordinate with the Sewer
Division to complete a video inspection of their service line. Any subsequent cleaning or repair
services for resident service laterals are born by and are the responsibility of the property owner,
per City Code.
Storm Sewer Improvements
During review of the existing storm sewer system throughout the project, Utilities Division staff
identified the need for rehabilitation or replacement of three existing block-fabricated drainage
structures along Channel Road and Buchanan Street based upon their existing condition and the
presence of infiltration. Staff will evaluate the existing conditions of the structures and
rehabilitate via spray-in liner or replace with precast concrete structures.
Additional improvements to the existing storm sewer system across all project areas will include
the spot replacement of severely damaged or heaved concrete curb & gutter as well as the
replacement of existing catch basin and manhole castings in poor condition and readjustment
of other surface facilities located in the curb replacements or pavement area.
Water Quality Improvements
In addition to the previously detailed improvements to the City’s underground utility networks,
City project staff evaluated other opportunities to improve stormwater quality through the
addition of various best management practices (BMPs). City project staff has worked closely with
the Anoka Conservation District (ACD) to evaluate the existing drainage networks within the City
and identify potential locations for water quality improvements. The location of proposed water
quality BMPs have been selected based upon the existing drainage network and location of
greatest water quality improvement.
12
7:
Jufn!:/
th
Lucia Lane/Channel Road/66Avenue
Proposed water quality improvements along
th
the Lucia Lane/Channel Road/66Avenue
project area include the construction ofa
hydrodynamic separator structure along
Channel Road and three raingardens
throughout the project area. Other minor
water quality improvements would include
maintenance of the existing surface drainage
swale at the northern terminus of Lucia Lane.
The hydrodynamic separator structure along
Channel Road would be installed downstream
of the street’s inletting catch basins and
would aid in the reduction of phosphorus and
Exhibit9.Raingarden water quality feature.
suspended solids before stormwater
discharging to Rice Creek. Similarly, the addition of rain gardens along the project corridor
would serve as a first line of water quality improvement as stormwater is collected, reducing the
total phosphorus and suspended solids entering the storm sewer system.
The proposed water quality improvements would be eligible for cost-share withthe Rice Creek
Watershed District (RCWD) through their Stormwater Management Grant program. City project
staff will continue to evaluate the feasibility of the proposed BMPs and pursue grant funding for
implementationwith the project.
Buchanan Street
Proposed water quality improvements along the Buchanan Street project area include the
construction of a hydrodynamic separator structure and raingarden, both aimed at the
reduction of total phosphorus and suspended solids entering the storm sewer network.
Selection of the proposed BMPs and their locations are consistent with the future projects
identified in the Mississippi Watershed Management Organization’s (MWMO) Stormwater
Retrofit Analysis of the drainage area in 2019.
The proposed water quality improvements would be eligible for cost-share with the Mississippi
Watershed Management Organization (MWMO) through their Action Grant program. City
project staff will continue to evaluate the feasibility of the proposed BMPs and pursue grant
funding for implementationwith the project.
Norton Avenue
There are currently no proposed water quality improvements within the Norton Avenue project
area.As project design progresses, Engineering Division staff will evaluate the addition of minor
water quality improvements within the project area and implement as feasible.
13
81
Jufn!:/
Private Utility Coordination
The proposed project scope will be provided to private utilities in an effort to coordinate system
repairs and upgrades with the upcoming project construction. At this time, no private utilities have
provided notification of upcoming upgrades or repairs in the proposed project area.
Estimated Costs
The project cost is estimated to be $1,48,00.00. This estimate includes contingency for
minor changes in project scope as well as 5% reserve for project engineering and administrative
services. All costs expressed in this report are preliminary but are expected to stay within the
budgeted amount. An itemized breakdown of estimated project costs can be found on
Figure B of the Appendices.
Funding Sources
Street and utility rehabilitation projects are typically funded through a combination of sources
including the Minnesota State Aid System (MSAS) funding, utility enterprise funds, and special
assessments. Costs associated with the street rehabilitation work are subject to special
assessment; utility work is not proposed to be subject to special assessment. A breakdown of the
preliminary project budget and special assessment funding can be found in Figure C of the
Appendices.
Street Improvements
Proposed street and pavement improvements with the project are estimated at $673,000 and will
be funded using monies from special assessments to benefitting properties as well as funds from
the City’s MSAS account. The City will assess benefitting properties in accordance with its Roadway
Major Maintenance Financing Policy for local streets. In total, special assessments will provide
approximately $445,050 based on the preliminary project scope and is currently only included for
the proposed rehabilitated street segments.
Using the preliminary project scope and previous applications of the City’s assessment policy for
Low Density Residential (single family, duplex, etc.) and Non-Low Density Residential (high density
residential, commercial, etc.) properties, staff have estimated the following preliminary special
assessments: $3,600 per unit and $46.76 per front-foot for low density residential and non-low
th
density residential properties along the Lucia Lane/Channel Road/66 Avenue project area,
respectively, $3,200 per unit for low density residential properties along the Norton Avenue
project area, and $1,350 per unit for low density residential properties along the Buchanan Street
project area. It should be noted that the three project areas were not combined for special benefit
evaluations due to varying proposed improvements and property types as well as the lack of a
combined benefit between distinct project areas. Variances in the preliminary special assessment
rates among project areas are a reflection of these considerations.
14
82
Jufn!:/
The remaining balance of approximately $227,950for proposed pavement improvements will be
reimbursed from the City’s MSAS account. The proposed 2024-2028 Capital Investment Program
(CIP) currently identifies $170,000 in State Aid funding as a capital expenditure in 2024, however,
additional State Aid funds are available as construction costs funded by special assessments are
also eligible for State Aid reimbursement.
Water UtilityImprovements
Proposed improvements to the water main distribution system are estimated at $595,800 and will be
funded using monies from the City’s Water Utility Fund. In 2024, $675,000 in funding is identified within
the CIP as a capital expenditure.
Sanitary Sewer Improvements
Improvements to the sanitary sewer collection system with the project are estimated at $19,600
and will be funded using monies from the City’s Sanitary Sewer Utility Fund. In 2024, $50,000 in
funding is identified within the CIP as a capital expenditure.
Storm Sewer Improvements
Proposed improvements to the storm sewer conveyance network and additional water quality
improvements are estimated at $196,000 and will be funded using monies from the City’s Storm
Water Utility Fund. In 2024, $215,000 in funding is identified within the CIP as a capital
expenditure. An additional $50,000 in funding from the Storm Water Utility Fund is identified in
the CIP for 2024 as a capital expenditure for watershed BMP implementation, which would also
contribute to funding the proposed water quality improvements within the system.
Construction
Construction sequencing will include access considerations for all properties. Minor exceptions to
this may include critical construction items including asphalt and concrete construction, which is
most likely to occur during weekday daytime hours. For all street segments, the project will be
phased in a manner to best preserve access. Similarly, minor disruptions to utility services may
occur during the project but this will be limited to several hours at most.
In order to provide the best access and eliminate conflicts between contractors, the project is
proposed to start in May and conclude by September.
Summary
The work proposed for the 2024 Street Rehabilitation project number ST2024-01 is consistent
with the City of Fridley’s Active Transportation Plan, Long-Term Street Maintenance Program,
2024-2028 Capital Investment Program and can be fully funded by its 2024 Budget. The project is
cost-effective, necessary and feasible from an engineering standpoint as described in this report.
The Engineering Division recommends that the City Council approve this project for final design
as presented.
15
83
Jufn!:/
Appendices
16
84
Jufn!:/
Figure A – Project Area Map
17
85
Figure B - Opinion of Probable Cost
Jufn!:/
2024 STREET REHABILITATION PROJECT
PROJECT NO. ST2024-01
CITY OF FRIDLEY, MN
11/20/2023
MnDOT UNIT TOTAL ESTIMATED
DESCRIPTIONNOTESUNITTOTAL AMOUNT
ITEM NO.
SPEC NO.PRICEQUANTITY
SCHEDULE 1 - LUCIA LANE - CHANNEL ROAD - 66TH AVENUE
Part A - Streets
12021.501MobilizationLS$77,000.000.50$38,500.00
22104.503Sawing Bituminous Pavement (Full Depth)LF$3.00267$801.00
32105.607Common Excavation (P) (Excess Reclaim)CY$20.001459$29,180.00
42112.519Subgrade Preparation (P)RDST$500.0043.5$21,750.00
52215.504Full Depth Reclamation (P)SY$2.0015006$30,012.00
62331.603Bituminous Joint Saw & SealLF$4.004002$16,008.00
72357.506Bituminous Material For Tack CoatGAL$3.50901$3,153.50
82360.509Type SP 9.5 Wearing Course Mix (3,C)TON$90.001424$128,160.00
92360.509Type SP 12.5 Non Wearing Course Mix (3,C)TON$87.001899$165,213.00
102563.601Traffic ControlLS$15,000.000.50$7,500.00
11Traffic CircleLS$10,000.001.00$10,000.00
12Speed HumpsEA$5,000.003.00$15,000.00
Part B- Water
132104.502Remove Hydrant And Gate ValveEA$1,000.007$7,000.00
142104.502Remove Curb Stop & BoxEA$200.0018$3,600.00
152104.502Remove Gate Valve & BoxEA$600.004$2,400.00
162104.503Remove Concrete Curb & GutterLF$6.00500$3,000.00
172104.503Remove Water Service PipeLF$15.00330$4,950.00
182104.503Remove WatermainLF$20.001600$32,000.00
192104.504Remove Bituminous Driveway PavementSY$10.0050$500.00
202104.504Remove Concrete Driveway PavementSY$15.0050$750.00
212360.5043" Bituminous Driveway w/ 6" Class 5 AggregateSY$55.0050$2,750.00
222502.601Repair/Replace Pet Fence Irrigation SystemLS$3,000.001.00$3,000.00
232503.603Repair Sewer Pipe (Sanitary Sewer Lateral)LF$65.00180$11,700.00
242504.601Temporary Water ServiceLS$25,000.001$25,000.00
252504.602Rebuild Gate Valve (Includes Excavation Pit)EA$3,500.001$3,500.00
262504.602Gate Valve Box (Water)EA$1,500.001$1,500.00
272504.602Hydrant with 6" Gate Valve Assembly (Install Only)EA$9,000.007$63,000.00
282504.6026" Gate Valve & BoxEA$3,500.007$24,500.00
292504.602Connect to Existing WatermainEA$1,000.007$7,000.00
302504.6021" Corporation StopEA$750.0036$27,000.00
312504.6021" Curb Stop & BoxEA$750.0018$13,500.00
322504.602Connect to Existing Water ServiceEA$500.0036$18,000.00
332504.6036" Ductile Iron Watermain, CL 52LF$80.001600$128,000.00
342504.6031" Water Service PipeLF$65.00330$21,450.00
352504.608FittingsLB$15.00425$6,375.00
362506.062Adjust Gate Valve Box (Water)EA$500.008$4,000.00
372531.503Concrete Curb & Gutter Design B618LF$30.00500$15,000.00
382531.5046" Concrete Driveway PavementSY$110.0050$5,500.00
392574.507Common Topsoil BorrowCY$50.00121$6,050.00
402574.508Fertilizer Type 3LB$2.0053$106.00
412575.505SeedingAC$5,000.000.15$750.00
422575.508Seed Mixture 25-151LB$7.0018$126.00
432575.508Hydraulic Bonded Fiber MatrixLB$4.00523$2,092.00
Part C- Sanitary Sewer
442506.602Adjust Existing Frame and Ring Casting (Sanitary)EA$850.0014$11,900.00
86
Figure B - Opinion of Probable Cost
Jufn!:/
2024 STREET REHABILITATION PROJECT
PROJECT NO. ST2024-01
CITY OF FRIDLEY, MN
11/20/2023
MnDOT UNIT TOTAL ESTIMATED
DESCRIPTIONNOTESUNITTOTAL AMOUNT
ITEM NO.
SPEC NO.PRICEQUANTITY
Part D- Storm Sewer
452104.503Remove Concrete Curb & Gutter (Spot Replacement)LF$6.001290$7,740.00
462506.502Water Quality Structure/Improvements (Cost-Share)EA$35,000.001$35,000.00
472506.502Rain Guardian TurretEA$1,800.006$10,800.00
482506.602Drainage Structure LinerEA$5,000.001$5,000.00
492531.503Concrete Curb & Gutter Design B618LF$30.001290$38,700.00
502573.501Stabilized Construction ExitEA$1,500.002$3,000.00
512573.502Storm Drain Inlet ProtectionEA$200.002$400.00
522574.507Common Topsoil BorrowCY$50.0072$3,600.00
532574.508Fertilizer Type 3LB$2.0032$64.00
542575.505SeedingAC$5,000.000.09$450.00
552575.508Seed Mixture 25-151LB$7.0011$77.00
562575.508Hydraulic Bonded Fiber MatrixLB$4.00311$1,244.00
SCHEDULE 1 - LUCIA LANE - CHANNEL ROAD - 66TH AVENUE - CONSTRUCTION SUBTOTAL$1,027,351.50
Part A - Streets$465,277.50
Part B- Water$444,099.00
Part C- Sanitary Sewer$11,900.00
Part D- Storm Sewer$106,075.00
Contingency (5%)$51,367.58
Eng/Admin (5%)$51,367.58
SCHEDULE 1 - LUCIA LANE - CHANNEL ROAD - 66TH AVENUE - CONSTRUCTION TOTAL$1,130,086.65
87
Figure B - Opinion of Probable Cost
Jufn!:/
2024 STREET REHABILITATION PROJECT
PROJECT NO. ST2024-01
CITY OF FRIDLEY, MN
11/20/2023
MnDOT UNIT TOTAL ESTIMATED
ITEM NO.DESCRIPTIONNOTESUNITTOTAL AMOUNT
SPEC NO.PRICEQUANTITY
SCHEDULE 2 - BUCHANAN STREET
Part A - Streets
12021.501MobilizationLS$75,000.000.20$15,000.00
22232.504Mill Bituminous Surface (1.0")SY$2.003120$6,240.00
32357.506Bituminous Material For Tack CoatGAL$3.50188$658.00
42360.509Type SP 9.5 Wearing Course Mix (3,C)TON$90.00198$17,820.00
52563.601Traffic ControlLS$15,000.000.20$3,000.00
Part B- Water
62104.502Remove Hydrant And Gate ValveEA$1,000.002$2,000.00
72104.503Remove Concrete Curb & GutterLF$6.0040$240.00
82504.602Rebuild Gate Valve (Includes Excavation Pit)EA$3,500.003$10,500.00
92504.602Gate Valve Box (Water)EA$1,500.003$4,500.00
102504.602Adjust Gate Valve Box (Water)EA$500.003$1,500.00
112504.602Hydrant with 6" Gate Valve Assembly (Install Only)EA$9,000.002$18,000.00
122531.503Concrete Curb & Gutter Design B618LF$30.0040$1,200.00
Part C- Sanitary Sewer
132506.602Adjust Frame and Ring Casting (Sanitary)EA$850.003$2,550.00
Part D- Storm Sewer
142104.502Salvage CastingEA$350.001$350.00
152104.503Remove Concrete Curb & Gutter (Spot Replacement)LF$6.00100$600.00
162502.601Repair/Replace Pet Fence Irrigation SystemLS$1,000.001$1,000.00
172506.502Water Quality Structure/Improvements (Cost-Share)EA$35,000.001$35,000.00
182506.502Rain Guardian TurretEA$1,800.001$1,800.00
192506.602Adjust Frame and Ring Casting (Storm)EA$850.003$2,550.00
202506.602Drainage Structure LinerEA$5,000.002$10,000.00
212531.503Concrete Curb & Gutter Design B618LF$30.00100$3,000.00
222573.501Stabilized Construction ExitEA$1,500.001$1,500.00
232573.502Storm Drain Inlet ProtectionEA$200.0011$2,200.00
242574.507Common Topsoil BorrowCY$50.006$300.00
252574.508Fertilizer Type 3LB$2.003$6.00
262575.505SeedingAC$5,000.000.01$50.00
272575.508Seed Mixture 25-151LB$7.000.81$5.67
2575.508Hydraulic Bonded Fiber MatrixLB$4.0024$96.00
SCHEDULE 2 - BUCHANAN STREET - CONSTRUCTION SUBTOTAL
$141,665.67
Part A - Streets
$42,718.00
Part B- Water
$37,940.00
Part C- Sanitary Sewer
$2,550.00
Part D- Storm Sewer
$58,457.67
Eng/Admin (5%)$7,083.28
SCHEDULE 2 - BUCHANAN STREET - CONSTRUCTION TOTAL
$148,748.95
88
Figure B - Opinion of Probable Cost
Jufn!:/
2024 STREET REHABILITATION PROJECT
PROJECT NO. ST2024-01
CITY OF FRIDLEY, MN
11/20/2023
MnDOT UNIT TOTAL ESTIMATED
DESCRIPTIONNOTESUNITTOTAL AMOUNT
ITEM NO.
SPEC NO.PRICEQUANTITY
SCHEDULE 3 - NORTON AVENUE
Part A - Streets
12021.501MobilizationLS$77,000.000.30$23,100.00
22104.503Sawing Bituminous Pavement (Full Depth)LF$3.0075$225.00
32105.607Common Excavation (P) (Excess Reclaim)CY$20.00337$6,740.00
42112.519Subgrade Preparation (P)RDST$500.009.50$4,750.00
52215.504Full Depth Reclamation (P)SY$2.003462$6,924.00
62331.603Bituminous Joint Saw & SealLF$4.00937$3,748.00
72357.506Bituminous Material For Tack CoatGAL$3.50208$728.00
82360.509Type SP 9.5 Wearing Course Mix (3,C)TON$90.00329$29,610.00
92360.509Type SP 12.5 Non Wearing Course Mix (3,C)TON$87.00438$38,106.00
102563.601Traffic ControlLS$5,000.000.30$1,500.00
Part B- Water
112104.502Remove Hydrant And Gate ValveEA$1,000.003$3,000.00
122104.503Remove Concrete Curb & GutterLF$6.0060$360.00
132504.602Rebuild Gate Valve (Includes Excavation Pit)EA$3,500.001$3,500.00
142504.602Gate Valve Box (Water)EA$1,500.001$1,500.00
152504.602Hydrant with 6" Gate Valve Assembly (Install Only)EA$9,000.003$27,000.00
162504.602Adjust Gate Valve Box (Water)EA$500.001$500.00
172531.503Concrete Curb & Gutter Design B618LF$30.0060$1,800.00
Part C- Sanitary Sewer
182506.602Adjust Existing Frame and Ring Casting (Sanitary)EA$850.005$4,250.00
Part D- Storm Sewer
192104.502Salvage CastingEA$250.003$750.00
202104.503Remove Concrete Curb & Gutter (Spot Replacement)LF$6.00390$2,340.00
212502.601Repair/Replace Pet Fence Irrigation SystemLS$1,000.001$1,000.00
222506.602Adjust Existing Frame and Ring Casting (Storm)EA$850.003$2,550.00
232531.503Concrete Curb & Gutter Design B618LF$30.00390$11,700.00
242573.501Stabilized Construction ExitEA$1,500.001$1,500.00
252573.502Storm Drain Inlet ProtectionEA$200.003$600.00
262574.507Common Topsoil BorrowCY$50.0022$1,100.00
272574.508Fertilizer Type 3LB$2.0010$20.00
282575.505SeedingAC$5,000.000.03$150.00
292575.508Seed Mixture 25-151LB$7.004$28.00
302575.508Hydraulic Bonded Fiber MatrixLB$4.0094$376.00
SCHEDULE 3 - NORTON AVENUE - CONSTRUCTION SUBTOTAL$179,455.00
Part A - Streets$115,431.00
Part B- Water$37,660.00
Part C- Sanitary Sewer$4,250.00
Part D- Storm Sewer$22,114.00
Contingency (10%)$17,945.50
Eng/Admin (5%)$8,972.75
SCHEDULE 3 - NORTON AVENUE - CONSTRUCTION TOTAL$206,373.25
PROJECT SUBTOTALS
SCHEDULE 1 - LUCIA LANE - CHANNEL ROAD - 66TH AVENUE$1,027,351.50
SCHEDULE 2 - BUCHANAN STREET$140,065.67
SCHEDULE 3 - NORTON AVENUE$179,455.00
CONSTRUCTION TOTAL$1,346,872.17
CONTINGENCY$69,313.08
ENGINEERING/ADMINISTRATION (5%)$67,343.61
PROJECT TOAL$1,483,528.85
89
Jufn!:/
Figure C - Funding Sources
2024 STREET REHABILITATION PROJECT
PROJECT NO. ST2024-01
CITY OF FRIDLEY, MN
11/20/2023
Funding Sources
Estimated Construction
Amount2023 Budgeted Amount
No.Description
1Special Assessments*$445,050.00$590,000.00
2Water Fund$595,800.00$675,000.00
3Sanitary Sewer Fund$19,600.00$50,000.00
4Storm Water Fund$196,000.00$215,000.00
5MSA Funding$202,950.00$170,000.00
6Traffic Safety Upgrades$25,000.00$30,000.00
GRAND TOTAL$1,484,400.00$1,730,000.00
*Note that Special Assessments amounts are calculated need for Estimated Amount based on the project estimate, and the
Budgeted Amount is calculated based upon the project scope and property information.
Special Assessment Breakdown
Assessments (Lucia Ln - Channel Rd - 66th Ave)
Low-Density Residential (LDR) - Unit76x$3,600.00=$273,600.00
Non-LDR (Commercial) - Front-Footage250x$46.76=$11,700.00
TOTAL$285,300.00
Assessments (Norton Avenue)
Low-Density Residential (LDR) - Unit42.75x$3,200.00=$136,800.00
TOTAL$136,800.00
Assessments (Buchanan Street)
Low-Density Residential (LDR) - Unit17x$1,350.00=$22,950.00
TOTAL$22,950.00
SPECIAL ASSESSMENT GRAND TOTAL$445,050.00
8:
Jufn!:/
Figure D – Project Schedule
The tentativeschedule for this project is as follows:
PRELIMINARY ACTIVITIES
Neighborhood Informational Meeting: September 2023
Virtual Project Presentation September 2023
Preliminary Assessment Hearing: December 18, 2023
DESIGN AND SUBMITTALS
Agency Submittals Complete:January 2023
Design Completed: January 2023
LETTING, AWARD, AND CONSTRUCTION
Resolution Advertising for Bids: February 2023
First Advertisement for Bids: February 2023
Bid Letting: February 2023
Contract Award: March 2023
Begin Construction (earliest):May 2024
Complete Construction (deadline):September 2024
FINAL ACTIVITIES
Final Assessment Hearing:October 2024
Certified Assessment Roll Complete: November 2024
Note: Subsequent activities may be influenced by changes in schedule of previous activities.
23
91
Jufn!:/
Figure E – Living Streets Worksheet
Project Narrative
1)Project Information:
2024-01: Lucia Ln (Mississippi St to East Service Rd Dr), Channel Rd (Mississippi St to northern
rd
terminus), Norton Avenue (western terminus to Central Avenue), Buchanan Street (53Avenue to
southern terminus)
2)Project Manager:
Brandon Brodhag
3)Is the project area, or streets it intersects, referenced in any of the following plans:
City’s Active Transportation Plan
Safe Routes to School Plan (Hayes, North Park, Stevenson, Fridley Middle)
Roadway Corridor Study (ex: East River Road corridor study, TH 47/65 corridor study)
Transit Overlay District
Fridley Park System Improvement Plan
Local Water Management Plan
Stormwater Retrofit Analysis
4)If so, how does the plan reference Living Street components within the project area or
streets it intersects?
rd
The Highland and Sullivan Lakes SRA proposed biofiltration basins at Buchanan Street and 53
rd
Avenue, north of the Buchanan Street and 53 Avenue intersection, and Buchanan Street and
nd
Lincoln Avenue, as well as a hydrodynamic device at Buchanan Street and 52 Avenue
Existing Conditions
5)Describe existing and projected modal volumes, if available:
Volumes Existing Projected (Year)
Average Daily TrafficN/A
Pedestrian Counts N/A
Bicycle Counts N/A
Truck Volumes N/A
Transit VolumesN/A
24
92
Jufn!:/
Speed Conditions N/A
6)Detail crash data, if available, and known conflict locations:
a.Do crashes tend to be between certain modes?
No
b.Are there known conflict points between specific modes?
No
7)Who are the users of the project area and through what mode do they travel?
The primary users of the project area are residential. Users travel mainly by car as well as
some walking and biking
Through traffic to the E Highway 65 Service Rd NE use Lucia Ln
There is an entrance to the Rice Creek West Regional Trail north of Lucia Ln from the E
Highway 65 Service Dr
8)How does the existing area accommodate different modes travelling north-south and/or
east-west? Are additional routes needed?
All pedestrian and bicyclist traffic is on local roads
9)Are there any problematic or dangerous pedestrian crossings in the area? How can those
crossings be addressed? If so, do they comply with the Local Road Research Board
Uncontrolled Pedestrian Crosswalk Reference Guide?
No
10)Describe any public transit facilities along the project area:
There is a bus stop at the corner of Norton Avenue and Central Avenue that does not have a
bench.
11)Describe any significant destinations along the routes or for which the project area is a
connector (schools, parks, libraries, Civic Campus, commercial corridors):
Lucia Ln, Channel Rd, and Norton Ave have poor park connectivity
25
93
Jufn!:/
12)Are there areas of identified speeding or other dangerous driving? How can these areas be
addressed?
Yes, temporary bump outs on Lucia Ln have been installed to narrow the roadway.
13)Describe any barriers to pedestrian/bicyclist movement in the project area. How can these
barriers be addressed?
Norton Ave and Channel Rd terminate at one end without a connection. Lucia Ln transitions to the
E Highway 65 Service Dr NE which has a connection to the Rice Creek West Regional Trail
14)Are there known water quality or quantity concerns in the project area or downstream of the
project area?
Lucia Ln and Channel Rd drain northward to Rice Creek which has impairments.
Norton Avenue drains to Norton Creek which has known flooding issues.
Buchanan Avenue drains to Highland Lake
15)How does the existing area manage stormwater? How can stormwater management be
improved?
There are a couple of small raingardens on Channel Rd. Stormwater management could be
improved by:
Adding raingardens in targeted locations
nd
Adding hydrodynamic separator at Buchanan St and 52 Avenue as recommended in the
Highland Lake SRA
Adding a hydrodynamic separator at Channel Rd as recommended by Anoka Conservation
District
Collecting Lucia Lane runoff within the public right-of-way
16)Describe the existing landscaping. Any opportunities for enhanced vegetation or water
conservation?
This project is in the 2024 Ash Tree Removal Zone; however, there are no ash trees located in this
area. The boulevard in front of Lucia Lane Apartments is rutted and could be improved.
17)Mark any Living Streets components exist in the project and on streets that it intersects?
_____ Trails, sidewalks, and on-street, striped bike lanes
_____ Median islands
_____ Accessible pedestrian signals
__X_ Curb extensions/bump outs
_____ Narrower travel lanes/road diets
26
94
Jufn!:/
_____ Speed limits and other traffic calming improvements
_____ Safe crossing facilities, including pavement markings
_____ Safe and effective lighting
_____ Diverse tree plantings
X Stormwater management
_____ Pollinator-friendly/water efficient landscaping
_____ Bike racks
_____ Benches
_____ Water fountains
_____ Waste receptacles
_____ Public art
_____ Other components as determined based on latest and best “Living Streets” standards
18)Are there any areas that are “under-lit”?
No
19)Describe any user needs/challenges along the project corridor that you have observed or
been informed of:
Lucia Ln is used as a through street to the E Highway 65 Service Dr NE
Proposed Conditions:
1)What public engagement has been done or is planned related to Living Streets
components?
Residents that were determined to be in an ideal location for rain gardens received a direct mailer
to learn about the curb-cut raingarden program.
2)What modes does the proposed facility accommodate?
No additional modes
3)How does the proposed facility accommodate different modes north-south and/or east-
west?
No additional modes
27
95
Jufn!:/
4) How does the proposed facility assist different modes in reaching significant
destinations?
No additional modes
5) Does the proposed landscaping enhance the urban forest or promote pollinator
habitat/water-efficient landscaping?
Currently, four rain garden locations are being evaluated which could provide enhanced
landscaping.
6) Does the proposed project improve any identified water quality or quantity concerns
within or downstream of the project area?
Staff is investigating the feasibility of installing rain gardens at four locations on Channel
Rd. Sumps at Channel Rd and Buchanan St could be evaluated.
7) Does the proposed project remediate any design challenges that prevent
pedestrian/bicyclist movement?
Modification of Lucia Ln could negatively impact pedestrian/bicyclist movement to the Rice
Creek West Regional Trail
8) Provide an alternative cross section that was considered, list trade-offs associated with
alternative cross-section:
9) If Living Streets components are not included, mark and explain which exception under
the Living Streets policy is the motivation to not include the components:
_____ The project involves a transportation system on which certain modes and users are
prohibited either by law or significant safety reasons.
_____ The street jurisdiction (Anoka County of the State of Minnesota for non-city streets) refuses
suggested plans.
_____ The cost of accommodation is excessively disproportionate to the need or probable use.
_____ The corridor has severe topographic, environmental, historic or natural resource
constraints.
_____ There is a well-documented absence of current and future need.
_____ Other exceptions are allowed when recommended by the Public Works, Building &
Community Standards, Parks and Recreation, and Police and Fire departments, and
approved by the City Council.
28
96
Jufn!:/
Figure F – Typical Roadway Sections
Lucia Lane
Channel Road
29
97
Jufn!:/
th
66Avenue
Norton Avenue
30
98
Jufn!:/
Buchanan Street
31
99
Jufn!:/
Figure G–Traffic Calming Memo
AGENDA REPORT
Meeting Date: March 25, 2024 Meeting Type:City Council
Submitted By: James Kosluchar, Public Works Director
Brandon Brodhag, Assistant City Engineer
Carl Lind, Graduate Engineer
Title
Resolution No. 2024-38 Approve Amendment of Feasibility Report for 2024 Street
Rehabilitation Project No. ST2024-01
Background
On December 18, 2023, the Fridley City Council held a public Hearing on Improvements
regarding the 2024 Street Rehabilitation Project No. ST2024-01. At the hearing, the City
Council and staff heard all those who wished to address the Council regarding the
proposed improvements.
Among the comments received at the hearing, residents from the Channel Road project
area expressed concern over current traffic volume/speed along the street and
requested the implementation of additional traffic calming measures in conjunction with
the project. In addition, the Council was served a petition in 2023 requesting measures
to control speed on Channel Road from residents along its segment.
On February 6, 2024, City staff held an additional project open house meeting for the
residents along and adjacent to Channel Road to gauge interest in the implementation
of various traffic calming options along Channel Road in conjunction with the 2024
Street Rehabilitation Project No. ST2024-01. A total of sixty-three (63) property owners
along Channel Road and the adjacent streets were invited via public mailing to review
traffic calming options, provide feedback to staff and vote on desired options. Those
unable to attend the meeting were encouraged to review the traffic calming options and
provide feedback via an online survey available on the City’s project webpage.
Meeting materials presented for the six (6) traffic calming options below included typical
design, potential effect on traffic speed/volume and other design considerations:
Option 1: Speed Humps
32
9:
Jufn!:/
Option 2: Speed Cushions (Speed Pads)
Option 3: Curb Bump-Outs
Option 4: Realigned Intersection
Option 5: Traffic Circle
th
Option 6: One-Way Conversion (68Avenue)
The materials presented at the meeting were also made available on the project
webpage for those unable to attend.
Meeting attendance included thirteen (13) residents from the project area as well as
Councilmember-at-Large, David Ostwald. Five (5) Engineering Division staff were also in
attendance to answer questions regarding the various traffic calming measures. Of the options
presented, attendees voted in support of a traffic circle at the intersection of Channel Road &
th
66Avenue and the installation of traffic humps along Channel Road. Attendees voted in
th
opposition to the installation of curb bump-outs along Channel Road and the conversion of 68
Avenue to one-way westbound traffic only. Finally, attendees were generally neutral to slightly
opposed to speed cushions along Channel Road and the realigned intersection at Channel Road
th
& 66 Avenue. In addition to the feedback received at the meeting, five (5) online survey
responses have been received to date. The results of the online survey are consistent with the
results of the physical meeting, favoring the traffic circle and speed humps and opposing a one-
th
way conversion at 68Avenue.
Staff presented to City Council at the February 26, 2023, City Council Conference Meeting, the
Channel Road Traffic Calming Options. Staff presented the potential traffic calming options, the
feedback received, and the project schedule.
From the discussion with City Council and from the feedback received from the public, staff
believes the two traffic calming options to be feasible, and is working on preliminary design to
incorporate one or both of these elements. Those two elements are a traffic circle with
th
additional concrete curb and gutter modifications at the intersection of 66Avenue and
Channel Road and adding a set of speed humps along Channel Road between Mississippi Street
and the first curve on Channel Road. Staff have reviewed the costs of adding these traffic
calming measures and have estimated that adding a traffic circle would be approximately
$10,000, and the speed humps would be $5,000 per each. The total funding required for adding
traffic calming along Channel Road would be approximately $25,000.
Staff recommends these improvements are paid for through traffic funding included in the
2024-2028 Capital Investment Plan (CIP) and outside the special assessment to any benefitting
properties. The CIP has the budget to fund the additional traffic calming measures and staff has
determined in this case that 1) this street has a high number of vehicles that travel through this
corridor to higher volume roadway connections at Mississippi Street and Trunk Highway 65, and
2) the XXX’ length of the straight street without any traffic control is excessive and promotes
33
:1
Jufn!:/
increased driver speed.Therefore, the amendment to the feasibility report includes the CIP-
source of funding in lieu of increasing special assessments to any benefitting properties.
Financial Impact
Funding for the additional project components is feasible and provided by the Traffic Safety
Upgradesitem in the Capital Investment Program.
Recommendation
Staff recommends the approval of Resolution No. 2024-38. Approving Amendment of Feasibility
Report for 2024 Street Rehabilitation Project No. ST2024-01.
Focus on Fridley Strategic Alignment
X Vibrant Neighborhoods & PlacesCommunity Identity & Relationship Building
Financial Stability & Commercial Prosperity X Public Safety & Environmental Stewardship
Organizational Excellence
Attachments and Other Resources
Resolution 2024-38
Amended Feasibility Report with Attachments
34
:2
Jufn!:/
AGENDA REPORT
Meeting Date:February26, 2023 Meeting Type:City CouncilConference Meeting
Submitted By:James Kosluchar, Public Works Director
Brandon Brodhag, Assistant City Engineer
Title
2024 Street Rehabilitation Project No. ST2024-01 –Channel Road Traffic CalmingOptions
Background
City staff recently hosted an Open House for residents and propertyowners adjacent to Channel Road,
within the City’s 2024 Street Rehabilitation ProjectST2024-01 area. Attached is a summary of the Open
House. We would like to discuss with the City Council the feedback received, potential traffic calming
options, and project schedule.
Financial Impact
Funding for the additional project components is provided by project funds through the Capital
Investment Program.
Recommendation
Discuss itemspresented.
Focus on Fridley Strategic Alignment
Vibrant Neighborhoods &PlacesCommunity Identity &Relationship Building
Financial Stability & Commercial Prosperity X Public Safety & Environmental Stewardship
Organizational Excellence
Attachments and Other Resources
Open House Summary Memo
Vision Statement
We believe Fridley will be a safe, vibrant, friendly and stable home for families and businesses.
:3
Jufn!:/
MEMORANDUM
Public Works Department
Streets • Parks • Water • Sewer • Stormwater • Fleet • Facilities • Forestry•Engineering
Date:2/09/2024PW24-015
To:Wally Wysopal, City Manager
From:James Kosluchar, Public Works Director
Brandon Brodhag, Assistant City Engineer
Carl Lind, Graduate Engineer
RE:2024 Street Rehabilitation Project No. ST2024-01 -Summary ofChannel Road Traffic
Calming Meeting
On February 6, 2024, City staff held an additionalproject open house meetingfor the residents
along and adjacent to Channel Roadto gauge interest inthe implementation of various traffic
calming options along Channel Roadin conjunction with the2024 Street Rehabilitation Project
No. ST2024-01. A total of sixty-three (63) property owners along Channel Road and the adjacent
streets were invited via public mailing to review trafficcalming options, provide feedback to staff
and vote on desired options(sample letter and meeting sign-in attached). Those unable to attend
the meeting were encouraged to review the traffic calming options and provide feedback via an
online survey available on the City’s project webpage.
Meeting materials presented for the six (6) traffic calming options below included typical design,
potential effect on traffic speed/volume and other design considerations:
Option 1: Speed Humps
Option 2: Speed Cushions (Speed Pads)
Option 3: Curb Bump-Outs
Option 4: Realigned Intersection
Option 5: Traffic Circle
th
Option 6: One-Way Conversion (68Avenue)
The materials presented at the meeting were also made available on the project webpage for
those unable to attend(see attached).
Meeting attendance includedthirteen (13) residentsfrom the project area as well as
Councilmember-at-Large,David Ostwald. Five (5) Engineering Division staff were also in
attendance to answer questions regarding the various traffic calming measures. Of the options
th
presented, attendeesvoted in support ofa traffic circle at the intersection of Channel Road & 66
Avenue and the installation of traffic humps along Channel Road. Attendees voted in opposition
th
to the installation of curb bump-outs along Channel Road and the conversion of 68Avenue to
one-way westbound traffic only. Finally, attendees were generally neutral to slightly opposed to
:4
Jufn!:/
th
speed cushions along Channel Road and the realigned intersection at Channel Road & 66
Avenue. In addition to the feedback received at the meeting, five (5) online survey responses have
been received to date. The results of the online survey are consistent with the results of the
physical meeting, favoring the traffic circle and speed humps and opposing a one-way conversion
th
at 68 Avenue. Results of in-person and online survey voting to date have been attached.
A new suggestion received from a couple of the residents at the meeting expressed interest in
adding concrete sidewalk to the street in conjunction with the project. Improvements to the City’s
pedestrian facilities are currently prioritized in accordance with the City’s Active Transportation
Plan, updated in 2020, targeting highly trafficked routes and high-density residential or
employment areas. The Channel Road corridor is not currently identified in the Plan as a priority
route, however, sidewalk construction could be added to the project scope by way of
neighborhood petition. All costs associated with the sidewalk construction would be assessed to
the benefitting property owners. one side of Channel Road from
th
Mississippi Street to 68 Avenue total to approximately $200,000, with an average special
assessment of $3,300 per benefitting property. Staff will relay the information above
to the interested property owners along the corridor and provide residents with a petition for
pedestrian facilities.
Based upon the public feedback received and internal discussions with City operations personnel,
staff propose further analysis and demonstration, if warranted, of speed hump and traffic circle
traffic calming measures along Channel Road. The results of this analysis and a final
th
recommendation on traffic calming implementation would be presented at the February 26
,
2024 City Council Conference Meeting.
JPK/BJB/CRL/crl
Attachments
:5
Jufn!:/
Fridley Civic Campus
7071 University Ave N.E. Fridley, MN 55432
763-571-3450 |FAX: 763-571-1287 |FridleyMN.gov
R January 26, 2024PW24-006
PropertyOwner/Current Resident
Subject:2024 Street Rehabilitation Project No. ST2024-01– Channel Road TrafficCalming Meeting
DearProperty Owner/Current Resident:
On December 18, 2023, the Fridley City Council held a public Hearing on Improvements regarding the
2024 Street Rehabilitation Project No. ST2024-01. At the hearing, the City Council and staff heard all those
who wished to address the Council regarding the proposed improvements, and subsequently the City
Council authorized the project to proceed.
Based upon comments received at the hearing, an additional meeting will be held by City staff to discuss
traffic calming options along Channel Roadin conjunction with the project. The meeting will be an open
forum where residents and property owners are invited to review the potentialtraffic calming options
and provide feedback to project staff.
When: Tuesday, February 06, 2024; 5:00 p.m – 6:30 p.m.
Where: Fridley Civic Campus, Fireside Room
7071 University Avenue NE, Fridley, MN
Information and options for traffic calming on Channel Roadisposted to the City’s 2024 Street
Rehabilitation project webpage. Property owners unable to attend are encouraged to provide feedback
via the online survey available on the project webpage or using the email addressweb-
StreetProjects@fridleymn.gov and subject “2024 Street Rehabilitation – Channel Road Traffic Calming”
We look forward to seeing you at the meeting. If you have questions, please call the Engineering Division
at 763-572-3554.
Sincerely,
James P. Kosluchar, P.E.
Director of Public Works
VISIT THE PROJECTWEBPAGE!
:6
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
Traffic Speed Data (Channel Road)
Description
Traffic volume and speed data gathered using StatTrak Traffic Data Collector
10/02/2023 –10/10/2023 –Existing Conditions
Average Speed: 23.96 MPH
th
85Percentile Speed: 28.54 MPH
12/11/2023 –01/01/2024 –Lucia Lane Closed
Average Speed: 24.02 MPH
th
85Percentile Speed: 28.05 MPH
:8
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
Traffic Volume Data (Channel Road)
10/02/2023 –10/10/2023 –Existing Conditions
Average Daily Volume: 360 Vehicles per Day
12/11/2023 –01/01/2024 –Lucia Lane Closed
Average Daily Volume: 343 Vehicles per Day
Other Daily Traffic Volumes
Pierce Street: 200 Vehicles per Day
Lucia Lane: 454 Vehicles per Day
th
Avenue: 700 Vehicles per Day
68
Mississippi Street: 3,925 Vehicles per Day
:9
Jufn!:/
2024 Street RehabilitationProject
Channel Road TrafficCalming
Option 1: Speed Humps
Description
Raised pavement placed lateral to vehicle
traffic to create vertical deflection and reduce
traffic speed
Design
Typically 12feet in length along the full
roadwaywidth,with a 3” vertical deflection
Installed in series with spacings of 200 –500
feetto control speeds for extended lengths
Exhibit 1 Speed Hump Traffic Calming
Delineated by pavement markings or signage
VOTE HERE:
Effect on Traffic
Vehicle speed reduced to 15-20 mph when
traversing speed humps
Anticipated speed reductionof 20% -25% between
speed humps
Can result in slight reductions in thru-traffic volume
Pros & Cons
Speed humps create an unavoidable vertical
impediment to traffic and are an effective
measure for speed control
Speed humps are a permanent addition to the
roadway pavementand cannot be removed
without pavement reconstruction
Create obstacle for snow plowing operations
Minor delay to emergencyvehicleresponse
::
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
Option 2: Speed Cushions (Speed Pads)
Description
Two or more raised pavement areas placed
lateral to vehicle traffic to create vertical
deflection and reduce traffic speed
Design
Typically 12feet in length and 7 feet in width,
with a 3inchvertical deflection
Spacing between cushions/pads designed to
accommodate emergency vehicles bypass
Installed in series with spacings of 200 –500
Exhibit 2 Speed Cushions (Speed Pads)
feet to control speeds for extended lengths
Delineated by pavement markings or signage
VOTE HERE:
Effect on Traffic
Vehicle speed reduced to 15-20 mph when traversing
speed humps
Anticipated speed reduction of 20% -25% between
speed humps
Can result in slight reductions in thru-traffic volume
Pros & Cons
Create an unavoidable vertical impediment to traffic
and are an effective measure for speed control
Speed cushionsare a permanent addition to the
roadway pavement and cannot be removed without
pavement reconstruction
Create obstacle for snow plowing operations
211
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
Option 3: Curb Bump-Outs
Description
Curb extensions into the roadwayat
intersections ormidblock locations which
narrow the roadway and encourage lower
traffic speeds
Design
Curb extensions restrictroadway width in
select locations, reducing “margin for error”
rd
Exhibit 3 Curb Bump-Outs (3Street NE)
perceived by drivers
Can be installed in series to create speed
VOTE HERE:
control over extended roadway lengths
Effect on Traffic
Reductions in vehicle speed dependent on traffic
volume and distribution
Pros & Cons
Curb bump-outs create protected adjacent
on-street parking
Construction of bump-outs requires loss of
street parkingin select locations
Bump-out design requires additional
considerations for roadway drainage
Without dedicated pedestrian facilities,
bicyclists and pedestrians may have to enter
travel lane to navigate curb bump-outs
212
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
Option 4: Realigned Intersection
Description
Reconfiguration of intersection approaches
using lateral shifts to promote lower traffic
speeds
Design
Lateral shiftof intersection approaches
introduces horizontal deflection, requiring
lower traffic speeds to navigate the
intersection
Exhibit 4 RealignedT-Intersection
Effect on Traffic
Can reduce speeds within intersectionbetween 5
VOTE HERE:
and 13 mph, with speed reductionsin the vicinity
between 1 and 6 mph
Pros & Cons
Horizontal deflection of approaches creates
effective speed control measure at
intersections
Intersection modification requires additional
design considerations for roadway drainage
Only creates speed reduction benefits in a
single location
213
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
Option 5: Traffic Circle
Description
Raised island placed within an unsignalized
intersection, around which traffic circulates
Design
Circulation around traffic circle creates horizontal
deflection of travel lanes, requiring a reduction in
traffic speed to navigate the intersection
Effect on Traffic
Exhibit 5 Traffic Circle
Can reduce speeds within intersectionbetween 5
and 13 mph, with speed reductionsin the vicinity
VOTE HERE:
between 1 and 6 mph
Circulation of traffic can also reduce angle and
turning collisions
Pros & Cons
Traffic circulation results in reductions in
traffic speed and collisions
Increased construction cost compared to
alternative traffic calming measures
Intersection modification requires additional
design considerations for roadway drainage
Only creates speed reduction benefits in a
single location
Tight radius of traffic circle restricts left-turn
movements for large design vehicles
214
Jufn!:/
2024 Street Rehabilitation Project
Channel Road TrafficCalming
th
Option 6: One-Way Conversion (68Avenue)
Description
th
One-way conversion of 68Avenue at Highway
65 East Service Drive, restricting eastbound
access to Channel Drive from the west
Design
th
Curb bump-out and extension along 68
Avenue with permanent signage restricting
eastbound trafficto Channel Road
Effect on Traffic
th
Eliminates eastbound traffic along 68Avenue
th
and access to Channel Road from 68Avenue
No anticipated impacts to traffic speeds on
Channel Road
Pros & Cons
th
Exhibit 6 One-Way Conversion (68Avenue)
Outside street rehabilitation project area and
can be implemented during or following
VOTE HERE:
construction
Eliminates access to Channel Road from Trunk
Highway 65 (Central Avenue) to the west
Elimination of access point to Channel Road
will concentrate traffic volume atentrances
from Mississippi Street and Pierce Street
Does not preclude thru-traffic from Channel
Road west to Trunk Highway 65 and the East
Service Drive
215
Jufn!:/
216
Jufn!:/
217
Jufn!:/
218
Jufn!:/
219
Jufn!:/
21:
Jufn!:/
221
Jufn!:/
20242028
thru
Capital Investment Program
Department Street Capital Projects
City of Fridley, Minnesota
Public Works Director
Contact
Type Improvement
Project #
406-31-24006
20 years
Useful Life
Project Name
Traffic Safety Upgrades (Improvements)
Category PW - Streets
406-3180-635100
Account No.:
Description
This project involves improvements to traffic safety in cooperation with Anoka County and the Minnesota Department of Transportation
(Mn/DOT).
Justification
The City will initiate minor annual traffic safety improvements as well as seek funding for larger safety improvement projects to be identified in
the upcoming year by staff in conjunction with Anoka County and Mn/DOT. Projects may also include traffic calming measures and
pedestrian/bicycle safety measures that are determined to be effective during this budgetary time frame.
Expenditures20242025202620272028Total
Land Acquisition 5,0005,000
Construction/Maintenance
30,00035,00035,00040,00040,000180,000
30,00040,00035,00040,00040,000185,000
Total
Funding Sources20242025202620272028Total
Streets Impr. Fund Reserves 30,00040,00035,00040,00040,000185,000
30,00040,00035,00040,00040,000185,000
Total
222
Page 33