HomeMy WebLinkAbout3-9-2026
City Council Conference Meeting
March 9, 2026 at 5:30 p.m.
7071 University Avenue NE
Agenda
1.Met Council L32A Lift Station Project Update
2.Update on Attorney Services for Community Development Items
Accessibility Notice:
If you need free interpretation or translation assistance, please contact City staff.
Si necesita ayuda de interpretación o traducción gratis, comuníquese con el personal de la ciudad.
Yog tias koj xav tau kev pab txhais lus los sis txhais ntaub ntawv dawb, ces thov tiv tauj rau Lub Nroog
cove neeg ua hauj lwm.
Haddii aad u baahan tahay tarjumaad bilaash ah ama kaalmo tarjumaad, fadlan la xiriir shaqaalaha
Magaalada.
Upon request, accommodation will be provided to allow individuals with disabilities to participate in any City of
Fridley services, programs or activities. Hearing impaired persons who need an interpreter or other persons who
require auxiliary aids should contact CityClerk@FridleyMN.gov or (763) 572-3450.
AGENDA REPORT
Meeting Date: March 9, 2026
Meeting Type:City Council Conference
Submitted By:James Kosluchar, Public Works Director
Title: Met Council L32A Lift Station Project Update
Background
The Metropolitan Council Environmental Services (MCES) division has been in progress with
plans for the new L32A Sanitary Sewer Lift Station which is planned to be constructed in the City
of Fridley (City) at the former Girl Scout property on East River Road. This lift station will replace
the existing lift station located on the Brooklyn Park side of the Mississippi River.
Met Council staff provided an informational update in December, and a number of questions
were raised. The attached presentation was prepared for that meeting. Met Council staff will
provide further information to the City Council on this project and will have available time for
discussion.
Recommendation
Informational with Q&A.
Attachments and Other Resources
1.Met Council Fridley Presentation
Vision Statement
We believe Fridley will be a safe, vibrant, friendly, and stable home for families and
businesses.
Metropolitan Council
Fridley Lift Station L32A
City Council Conference Meeting, Fridley City Hall
Jeny Baroda, P.E., Met Council, Julie Benadum, P.E., Brown and Caldwell12/22/2025
Agenda
Sanitary Sewer Lift Station L32A
1.Project Drivers
2.Existing System Overview
3.Proposed System Overview
4.Design Influences and Considerations
5.Lift Station Design and Layout
6.Building Architecture
7.Permitting
8.Communication
9.Schedule
7700 Mississippi Ln, Brooklyn Park
10.Questions
1
Project Drivers
Existing Sanitary Sewer
Lift Station L32
¤The lift station is 50 years old and is
at the end of its service life
¤History of failures and basement
backups
¤Northwest service area is expanding
and added capacity is required
¤The station is near capacity
¤Expanding from 43 mgdto 67 mgd
¤System criticality requires
redundancy and resiliency
¤The existing location has space
constraints for expansion
2
Project Location
Project Location
Existing Lift
Station L32
New Lift Station
Brooklyn Park
L32A, Fridley
3
Existing Sanitary Sewer System
Brooklyn Park Fridley
Hennepin Co. Anoka Co.
72Ò Gravity Interceptor
Lift Station L32
2-42Ò Forcemain
Pipes (2014)
Discharge to Gravity
54Ò Gravity
Interceptor
2-42Ò Forcemain
Pipes (1970)
4
Three Main Project Phases
Generators, Generators,
Switchgear, and Switchgear, and
Junction MH
1
TransformersTransformers
Odor ControlOdor Control
42Ò Secondary Pipes C & D
33
New Lift New Lift
Station L32AStation L32A
60-inch Tunnel60-inch Tunnel
Utilidor and Utilidor and
ARV VaultARV Vault
2
Headhouse
TailhouseTailhouse
Rock Box
CleanoutsCleanouts
Flow Meter MH
30Ò Primary Pipes A & B
5
Construct New Lift Station L32A
Fridley Lift Station L32A Project Elements
1
Wetland
Generators,
Infiltration Basin
Switchgear and
Mississippi River
Transformers
ARV Vault
Odor Control
42-inch Secondary Pipes
42-inch FMs
60-inch Tunnel
Tailhouse
6
30-inch Primary Pipes
L32A Fridley Design Influences
Site Characteristics: Natural Character
¤Heavily wooded
¤Variety of deciduous trees and low growth
¤Large wetland area
¤Elevated from River, along bluff line
Wetlands
¤Visible from adjacent residential area
¤Visible from opposite riverbank
Approximate
Project Area
7
View of siteVVVVVVVVVVVVVVVVVVVVVVVVVVVVViiiiiiiiiiiiiiiiiiiiiiieeeeeeeeeeeeeeeeeeeeeewwwwwwwwwwwwwwwwwwwwwwwwww ooooooooooooooooooooooooooooooffffffffffffffffffffff
Residences along south property line
L32A Fridley Design Influences
Project Goal: Minimize Impacts
¤Project within the Mississippi River
Corridor Critical Area (MRCCA)
Exist Bldg.
¤Minimize building impacts
¤Minimize impacts to trees and wildlife
View from B.P.
¤Match plant species
¤Dark-sky compliant
¤Minimize light pollution
Exist Bldg.
¤No reflective materials
8
View of site
View from south Property Line
Design Focus: Resiliency and
Minimal Impacts
Resiliency
¤6 pumps Î2 redundant pumps
¤4 pipes Î1 redundant pipe
¤2 electric power sources Î2 separate substations
¤2 standby generators
¤Each generator can handle all lift station loads
Minimize Impacts
¤Slipliningexisting 42-inch pipes
¤Tunnel 60-inch pipe into Lift Station to preserve
mature trees for screening
¤Slurry diaphragm wall
¤Building mechanical equipment (HVAC) is indoors
¤Window screening to minimize light pollution
¤Screening with vegetation
9
View of site
Lift Station
10
Slurry Diaphragm Wall Construction
Slurry Diaphragm Wall
Panels
Construction Method (D-wall)
Diaphragm Wall
Circumferential panelsthat are excavated and
temporarily supported by bentonite slurry that is
then replaced by concrete to support an
excavation.
D-walls:
¤Reduce excavation volume
¤Reduce shoring requirements
¤Provide watertightness
11
Lift Station Facts
Lift Station ÎUnderground
Structure
¤100-ft inside diameter
¤65-ft deep
¤Capacity 48 mgd, expandable to
67 mgd
65-ft depth
¤Will be constructed using a
slurry diaphragm wall to
Pumps
minimize impacts
100-ft diameter
12
Odor Control System:
Foul Air Extracted from Lift Station
To Address the following:
Isometric View
¤Odor complaints
Biofilters (3)
¤Corrosion prevention
¤Health and safety to workers
¤Protecting the environment and
the public
¤Similar odor control system on
the Brooklyn Park side
¤Dark color scheme to blend in
Carbon Tank
surroundings
13
Four Power Sources: Resiliency
Addressing Emergency Power
Isometric View
Transformers (2)
¤FOUR Power sources
¤Two electrical power sources
¤Two Emergency generators
¤Providing redundancy and
resiliency
¤Protect the publicÓs health and
safety
¤Dark color scheme to blend in
surroundings
¤Closest residence is 300-ft
away
Emergency
Generators (2)
14
Exterior Building Materials and
Colors to Blend In
Exterior Elements
¤Exterior Faade Materials ÎDark Colors
¤Precast concrete
¤Composite cement textured panels
¤Standing seam metal roofing/non-glare
¤Doors, windows w/ light shield and
Precast ConcreteComp. Cement
louvers
¤Exterior lighting
¤Walkway
¤Egress
¤Entrance
¤Area and service
15
Rainscreen Ceramic-coated Composite
Lighting ÎNormal Operations (unoccupied)
and Emergency Operations
Normal Operations
Area and Emergency Lighting
¤Egress and walkway lighting ¤Building utility and area lighting w/
with photocell operationswitched operation
¤Footcandle level less than¤14-ft-high poles at entrance and
1-3 FC at 3-ftgenerators
¤27-ft-high poles at odor control
16
Southeast Entrance Perspective
Overhead Doors South Main BldgElec. Room
17
Dry Well AccessEntranceEntrance
Northeast Perspective
Elec. Room Odor Control
Overhead Doors North
18
EntranceCarbon Tank
Dry Well Access
Northwest Perspective
Screen Room
BiofilterService CorridorWet Well Access
Entrance
19
Southwest Perspective
Screen Room
Control Room
Biofilters (3)
Service Corridor
Entrances (2)
Entrance
20
View from South Residences
21
Work in Mississippi River
Cofferdam
Mississippi River Impacts
¤Excavation in the riverbanks to install new
pipes and connections
¤Installation of cofferdam on both sides
¤Slipliningof existing 42-inch pipes
Sliplining
22
Tunneling: Tailhouseto Lift Station
Microtunneling
¤300 LF of 60-inch tunnel
¤Remotely controlled and guided pipe jacking
¤Minimal impact: no dewatering, minimizes settlements
23
Site Fencing, Security, and Access
Light pole
Camera
General Information
Gate
FD Lock Box
¤Chain link fence
¤Two gates
¤Knox box
¤Four security cameras
¤Three at the lift station
¤One at the Tailhouse
¤Infrared illuminators
Tailhouse
24
Site Restoration ÎSustainable Landscape
¤Ash tree removals
¤Buckthorn treatment
¤Black chain link fence around
facilities
¤Sustainable landscaping
¤Vegetation screening
¤Native plants
¤Bank stabilization below
OHWL
¤Deer deterrent fencing
25
¤Anoka County*
¤City of Brooklyn Park*
¤City of Fridley*
¤Coon Creek Watershed District (CCWD)*
¤Minnesota Department of Natural Resources (DNR)*
¤Minnesota Department of Health (MDH)*
¤Minnesota Pollution Control Agency (MPCA)*
Regulatory
¤Mississippi River Corridor Critical Area (MRCCA)
Requirements
¤U.S. National Park Service (NPS)
¤State Historic Preservation Office (SHPO)
¤U.S. Army Corps of Engineers (USACE)*
¤U.S. Fish and Wildlife Service (USFWS)
¤West Mississippi Watershed Commission (WMWC)*
* Indicates anticipated permit requirement
26
Project Communication Methods
¤Hotline, email, website
¤Facebook, Postcard
¤Construction updates, public open house,
maps
Visit our project website VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV
VVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVVViiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiisssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss
ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiittttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt
ttttttttttttt ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooouuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuurrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
rrrrrrrrrrrrrr pppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppp
ppppppppprrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrooooooooooooooooooooooooooo
ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooojjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccctttttttttttttttttttt
ttttttttttttttttttttttttttttttttttttttttt weebbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbs
¤Video, one-to-one meetings, tailored
for more information and forrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmooooooooooooooooooooooooooooooooooorrrrrrrrrrrr
rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrreeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeee iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiinnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn
nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff
ffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffoooooooooooooooooooooooooooooooooooormmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmaaaaaaaaaaaaaaaaaaaaaaaaaaaatttttttttttttt
ttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttioooooooooooooooooooooooooooonn a
stakeholder materials Îyard sign, door
hangers, etc.
t sign up to receive our tttt sssssiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiggggnnnn uuuupppp ttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt
tttttttttttttttttttttttttttttttttttttttttttttttttttttttoooo rrrreeeecccceeeeiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiivvvveeee ooooooooou
project email updates.ppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppp
ppppppppppppppppppppppppppppppppppppppppppppppppppppppppppprrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
ooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooojjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjj
jjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjjeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc
ccccccccccttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeemmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaiii
iiiiilllllllll uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuupppppppppppppppppppppppppppppppppppppppppppppppppppppp
ppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppp
pppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppppdddddddddddddddddddddddddddddddd
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaattttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt
ttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttt
ttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttttteeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeees
27
Project Communication
Website
metrocouncil.org/sewerconstruction/fridley
Phone
(763) 520-8650
Email
info@fridleyarealiftstation.com
28
ProjectSchedule
Milestone Date
PublicHearingDecember 2020
Project
PublicOutreachFebruary-March 2026
Schedule
BiddingSummer 2026
Approx.StartofConstructionWinter 2026
Approx.EndofConstruction2031
29
Thank You
Questions?
Jeny Baroda, P.E.
Principal Engineer
Metropolitan Council Environmental Services
Jeny.Baroda@metc.state.mn.us
651.602.4507
AGENDA REPORT
Meeting Date: March 9, 2026
Meeting Type:City Council Conference
Submitted By:Stacy Stromberg, Assistant Community Development Director/HRA
Title: Update on Attorney Services for Community Development Items
Background
Staff will provide the City Council with an update on changes being made to prosecution
services for code enforcement and rental housing violations.
Recommendation
Attachments and Other Resources
Vision Statement
We believe Fridley will be a safe, vibrant, friendly, and stable home for families and