HomeMy WebLinkAboutSite Diagram, REV01 - Berger, Blair (UTILITY INTERCONNECTION):
SECONDARY SIDE
Y ' l � ,,ham i j YD ift
L w.y
r ,{
2tt
E t ! aft
y
r
r LEGEND:
r r B -Bi-directional Meter
PD -Production Meter Disconnect
Detached Garage: C -Production Meter
No setbacks required D -Utility AC Disconnect
E-DC Power Optimizer(one behind
each module)
Buried DC, PV Conductors
r
}P 1 A r' A • — — — — Buried Power Lines
r NOTES:
s S�. ,,. _ ���' -Secondary Interconnection
jar' -Utility Disconnect and Production Meter are
readily accessible
i `� + "r ~ 't •.•� ` -24/ unescorted keyless access shall be
r •. provided for all Xcel Energy Equipment
•• No clearance issues
�. • .v r, . �, ''
NE
Project: BLAIR J BERGER Equipment
Location: 5771 West Moore Lake Drive Northeast,Fridley,MN DC Power Optimizers:
14TuNor,h Solar 55432 22-SolarEdge P401 DC Power Optimizers DOC TITLE: SITE DIAGRAM
Phone: (763)574-1365 AUTHOR: BEN FERKINHOFF
Size: 8.36 kW DC/7.6 kW AC Inverter:
Building Service: 120/240 V, 10,3 Wire 1-SolarEdge SE7600-US Single Phase Inverter DATE; 11/17/2021
3735 Dunlap Street N Utility:Xcel EnergyREVISION: 1
Panels:
Arden Hills, MN 55112
Account: 51-6617775-9 ID#: 22- Q-Cells:Q.PEAK DUO BLK ML-G9+,
(612) 888-9599 Premise:303305125 38OW
Meter: 49555680