HomeMy WebLinkAboutElevation Diagram - Berger, Blair (1) 12
47 Random collar ties installed throughout 6
As per the attached Structural Letter,
6'
we will be 'sistering'the rafters on the
western roof under the solar array.
24
West Elevation
Western Truss
01
En
6'
o Random vertical supports installed throughout 6
South Elevation
24
Detached Garage: Eastern Truss
No setbacks required
Roof Construction Details:
- Panels are flush mounted 5" from roof
surface.
- 2 X 4 Top Chord
- 16" and 24" OC Rafter Spacing East Elevation
- 5/16" Lag Bolts, 2.5" of Embedment
- Plank and OSB Decking
- Shingle Roof Cover
*See structural and loading document for additional information
Project: BLAIR J BERGER Equipment
Location: 5771 West Moore Lake Drive Northeast,Fridley,MN DC Power Optimizers:
TruNorth Solar 55432 22-SolarEdge P401 DC Power Optimizers DOC TITLE. ELEVATION
Phone: (763)574-1365 Inverter: DIAGRAM
Size: 8.36 kW DC/7.6 kW AC 1-SolarEdge SE7600-US Single Phase Inverter AUTHOR: JOSEPI I BECK
3735 DunlapStreet N Building Service: 120/240 V, 10,3 Wire
DATE: 10/12/2021
Arden Hills, MN 55112 Utility:Xcel Energy Panels:
Account: 51-6617775-9 ID#: 22- Q-cells:Q.PEAK DUO BEK ME-G9+, REVISION: 0
(612) 888-9599 Premise:303305125 38OW
Meter: 49555680