Loading...
HomeMy WebLinkAboutElevation Diagram - Berger, Blair 12 47 Random collar ties installed throughout 6 As per the attached Structural Letter, 6' we will be 'sistering'the rafters on the western roof under the solar array. 24 West Elevation Western Truss 01 En 6' o Random vertical supports installed throughout 6 South Elevation 24 Detached Garage: Eastern Truss No setbacks required Roof Construction Details: - Panels are flush mounted 5" from roof surface. - 2 X 4 Top Chord - 16" and 24" OC Rafter Spacing East Elevation - 5/16" Lag Bolts, 2.5" of Embedment - Plank and OSB Decking - Shingle Roof Cover *See structural and loading document for additional information Project: BLAIR J BERGER Equipment Location: 5771 West Moore Lake Drive Northeast,Fridley,MN DC Power Optimizers: TruNorth Solar 55432 22-SolarEdge P401 DC Power Optimizers DOC TITLE. ELEVATION Phone: (763)574-1365 Inverter: DIAGRAM Size: 8.36 kW DC/7.6 kW AC 1-SolarEdge SE7600-US Single Phase Inverter AUTHOR: JOSEPI I BECK 3735 DunlapStreet N Building Service: 120/240 V, 10,3 Wire DATE: 10/12/2021 Arden Hills, MN 55112 Utility:Xcel Energy Panels: Account: 51-6617775-9 ID#: 22- Q-cells:Q.PEAK DUO BEK ME-G9+, REVISION: 0 (612) 888-9599 Premise:303305125 38OW Meter: 49555680