Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bath Inspection 1
-4- 2- Date: 2 Customer Name: PAv` S t.X�vf�D N Inspector:•S _1c.W►'S a Address:7 3-7 2 L..r i G Lv�• N� � ��� - MIS SS�3z Bath Inspection: �l Parking access for truck/trailer 0 U yes no(explanation) Garage/warm cutting area ❑Y yes F7 no(explanation) Bathroom level ® 1st 2nd D 3rd basement Bath to be remodeled is only bath In home yes ® no Crawl space only below bath yes © no (if yes)access point Drain exposed yes ® no (if no,choose) ® drywall covered drop ceiling Access Panel to valve F yes no Water shut off location _.6es�S Sys Condo i yes 41 no Maintenance/water shut off contact Shut off works yes1:1 no stkky currently leaks Plumbing composition copper ® pvc ® galy cpvc pex 0 lead 0 abs Existing plumbing has venting through the roof ® yes no Pre-install drain functi slow ® good doesn't drain Pre-install water pressure slow good no pressure Flooring has in floor heat yes ® no Floor framing ® wood concrete U spancrete steel Floor integrity ® solid soft rotted Floor covering vinyl hardwood [X the ❑ carpet L laminate Wall framing © wood ❑ concrete steel Wall coverings ® drywall ® the lath/plaster paneling Left wall ® plumb leans in leans out "in " Right wall © plumb leans in leans out _"in " Back wall © plumb leans in leans out in " Floor left to right level slopes left slopes right In " Floor back to front © level slopes back ❑ slopes forward "in Ceiling left to right © level P slopes left El slopes right in � 1) �ry Doorway accessibility L / door 1 width door 2 with door 3 width Hall accesibility 342 width Tight turns yes no Obstructions yes ® no (if yes,list below): MIwml Il♦