SafeBasements of Minnesota has performed an evaluation of your home.Any issues observed may have been caused by multiple sources that will
need to be addressed.SafeBasements of Minnesota approaches these repairs using a comprehensive solution that addresses the source of the
problem.We take pride in assuring that our scheduled installation dates are as accurate as possible.Below,are the services and/or repairs we
recommend and the associated cost.
Bid Items
Name Qty/Ft/Lbs
Install carbon fiber wall support strap,secured to floor joists at top and attached to footing at bottom 3.00
Installation of SafeBase Wall Anchors per manufacturers specifications 4.00
Payment Terms
Down Payment: 10%
Bid Acceptance Down Payment:$490.00
Project Completion:$4,410.00
Tax:
Total:$4,900.00
Financing Options are available.Ask your sales consultant for more details.
If you would like to approve your bid electronically,click here.
If the above link is not working,please copy and paste this link into your browser:
https://bidreview.secure.force.con/?id=OQ02E000005ZGmVSAW
Important Project Notes
Owner is responsible for moving everything off the wall 10 feet.The anchors will be installed on the walls where the exterior works for the
plates.The carbon fiber installed on the wall with no access to exterior.The kitchen is an addition slab on grade and no footing.The owner has
decided to go with a smaller fix then originally quoted.He knows this smaller fix will need to added to fix everything.There may need to be
wiring,HVAC,or plumbing to be moved to install carbon fiber or anchors this needs to be done by owner.