HomeMy WebLinkAboutMPCA Notification m1 CONTROL
AGENCY N POLLUTION Deconstruction� renovation, or
C A
520 Lafayette Road North demolition notification form
St.Paul,MN 55155-4194
Asbestos Program
Doc Type:Asbestos&Demolition/Amendments
Type of notification: ® Original ❑ Amended ❑ Project cancellation
Notification is required for all NESHAP-regulated facilities,as defined in 40 CFR S 61.141,and the notification must be
postmarked or received ten(10)working days before renovation,deconstruction, or demolition begins. See Item 5 for
emergency demolition projects. If the project dates change, submit an amended form with an updated start and end dates to reflect
current project dates.
Submittal: Notifications may be made electronically(preferred)or by paper copy.To submit this form electronically, save the form
to your computer and send the form to the Minnesota Pollution Control Agency(MPCA)by attaching the form to an email message,
using Deconstruction, renovation, or demolition notification form(w-sw4-21)as the subject line to asbestos.demolition.pca state.mn.i.is.
To submit the form by paper copy, please mail to the Asbestos Program at the address above. If you have any questions, contact
the MPCA Asbestos Program Coordinator, Colin Boysen at colin.bovsen(W-state.mmus or 507-206-2644.
Important Note: Ensure you are in compliance with Minn. R.7035.0805 prior to the commencement of the deconstruction,
renovation or demolition project.This rule requires that the following items be removed two days prior to demolition: mixed
municipal solid waste;household hazardous waste;industrial or hazardous waste;waste tires;major appliances; items containing
elemental mercury, Poly-Chlorinated BiPhenyls(PCBs),and chlorofluorocarbons(CFCs);oil; lead;electronics;and other prohibited
items. See MPCA website at http://www.pca.state.mn.us/publications/w-sw4-20.pdf for a Pre-Renovation/Demolition Environmental
Checklist Guidance Document to assist with completion of this rule.
"Demolition waste must be disposed of at a permitted solid waste facility. MPCA encourages consideration of building material
reuse and recycling before demolition/disposal at a permitted solid waste facility,as outlined in in Minn. Stat. 115A.02,which
establishes preferred management methods based on environmental impact.
Note that some questions are optional. For more information on deconstruction/material salvage and reuse, please contact
MPCA Sustainable Building Material Management staff:demo.mpca(d)_state.mn.us.
Renovation, deconstruction, and/or demolition contractor
If there is more than one contractor, please see last page(optional).
Contractor
Name of firm or organization:
Mailing address:
City: State: Zip code:
Contact: Phone: Email:
Building owner
Name of owner: Caleb Petersen
Mailing address: 6271 Central Ave NE
City: Fridley State: MN Zip code: 55432
Contact: Phone: 7636140635 Email:_professionalgrade71 @gmail.com
Building information
Name of building, if applicable:
Address/location: 6271 Central Ave NE County: Anoka
City: Fridley State: MN Zip code: 55432
Contact: Caleb Petersen Phone: 7636140635 Email:prof essionalgrade71 @gmail.com
Year built ? Size of building: 264 Sq.ft. Number of floors, including basement level(s): 1
Prior use of building
Detached Garage
https://www.pca.state.mn.us 651-296-6300 • 800-657-3864 Use your preferred relay service • Available in alternative formats
w-sw4-21 • 9121121 Page 1 of 4
Present use of building Detached Garage
Future use of building, if applicable:
Dates of renovation, deconstruction or demolition: Start date: 3/30/2022 End date: 3/31/2022
(mm/dd/yyyy) (mm/dd%")
Provide a brief description of the planned demolition or renovation&anticipated removal method(s):
Optional for deconstruction
Demolish with hand tools and power tools. Hand load into dump trailer. Haul to waste facility.
If the activity was ordered by a government agency, please identify the agency and attach a copy of the order:
Name: Title:
Authority:
Date of order(mm/dd/yy): Start date(mm/dd/yy):
Notification for an emergency demolition must be submitted as early as possible before demolition begins,but not later than the following working
day.A demolition is considered an emergency only when the facility has been deemed structurally unsound and in danger of imminent collapse. If
the structurally unsound building is known to contain any regulated Asbestos Containing Material(ACM)or is suspected to contain any regulated
ACM, special procedures must be followed. If you are unaware of the special procedures,instructions/regulations can be obtained by contacting
the MPCA at the phone numbers listed below.Refer to 40 CFR 61.145(a)(3)for additional information.
If the ACM will become crumbled,pulverized,or reduced to powder during the demolition process it must be removed prior to
demolition activities.
Is nonfriable ACM present in the structure to be demolished? ❑Yes ® No
Will nonfriable ACM be present in the structure at the time of demolition? ❑Yes ® No
If Yes to either question above, complete Items 1-9. If No to both questions, complete Items 3-9.
1. If ACM will be left in place, indicate the amount of Category I and/or Category II nonfriable ACM left in place.
Category I: Linear feet Category II Linear feet
Square feet
Cubic feet Square feet
Cubic feet
Category I nonfriable ACM means asbestos-
containing packings,gaskets, resilient floor covering, Category II nonfriable ACM means any material,excluding
and asphalt roofing products containing more than Category I nonfriable ACM,containing more than one percent
one percent asbestos. Asbestos that,when dry,cannot be crumbled,pulverized,or
Category I nonfriable ACM is not allowed to remain reduced to a powder by hand pressure.
in place for demolition if it is in poor condition. Category II nonfriable ACM is not allowed to remain in place
for demolition if it has a high probability of becoming
crumbled,pulverized,or reduced to a powder during
demolition,transport,or disposal(e.g.,transite,cement,
slate roofing).
2. Description and location of ACM remaining in place(including number of floors and rooms):
3. Company and/or individual that conducted the building inspection and the procedure used to determine the presence
or absence of ACM (including analytic method).
Note:Prior to demolition all structures must be inspected by a licensed asbestos inspector who has been certified through the
Minnesota Department of Health.
North Central Inspection Service LLC
James Starry#All 1065
Report Attached
https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service • Available in alternative formats
w-sw4-21 • 9121121 Page 2 of 4
4. Description of procedure to be followed in the event that unexpected RACM is found or Category II nonfriable ACM
becomes crumbled, pulverized or reduced to powder:
Not Applicable, No RCAM was found in the entire structure
5. a. Were any materials assessed for salvaging/reuse or for recycling?(optional)❑ Yes ® No
b. If yes, which ones?
c. Structurelbuilding material management methods(optional). Use this section to describe the destination or end use
of the materials
Management method Location
Material (Reused/salvaged,recycled,sent to landfill,etc. Company/Organization fCit /township, State)
Concrete:
Masonry:
Ferrous metals:
Non-ferrous
metals
Whole items* _
Wood
Miscellaneous**
*Example:fixtures, whole doors, etc.
**Miscellaneous materials include shingles, drywall, carpet, etc.
6. Waste transporter information
Transporter name: Homeowner is transporting waste.
Mailing address
City: State: Zip code:
Contact: Phone: Email:
7. Permitted waste disposal site information (*see below for more information)
Facility name: WM Maple Grove Transfer Station
Mailing address: 10633 89'h Ave N
City: Maple Grove State: MN Zip code: 55369
Contact: Phone: 9528901100 Email:
Contractor signature: By typing my name below, I certify that the above information is correct and I am a bonafide representative
of the demolition contractor or building owner and have authority to enter into agreements for my employer.
By typing/signing my name below,I certify the above statements to be true and correct, to the best of my knowledge, and that this
information can be used for the purpose of processing this form.
Signature: _ Title:
(This document has been electronically signed.) Date (mm/dd/yyyy):
Building owner signature optional: By typing my name below, I certify that I approve of the building material management
system outlined by the contractor.
By typing/signing my name below,I certify the above statements to be true and correct, to the best of my knowledge, and that this
information can be used for the purpose of processing this form.
Signature: Caleb Petersen Title: Homeowner
(This document has been electronically signed.) Date(mm/dd/yyyy): 2/28/2022
https://www.pca.state.mn.us • 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats
w-sw4-21 • 9121121 Page 3 of 4
A copy of this form should be sent to the local governing authority.Has a copy been sent? ®Yes ❑ No
Check local ordinances if submittal is required,otherwise optional.
"Minn. R. 7035.0805 states lead paint not firmly adhered to the substrate is required to be removed prior to demolition or renovation.
For purposes of this item, 'lead paint"means a coating that contains one-half of one percent(0.5 percent)or more or 5,000 parts
per million(5,000 ppm)or more of total lead by weight in the dried film, as determined by acid digestion and analysis, or contains
one milligram per square centimeter(1.0 mg/cm2)or more of lead, as determined by X-ray fluorescence analyzer, MPCA
encourages the proper management of lead based paint.
If there's more than one contractor on this project, please list them here(optional).
Contractor
Name of firm or organization:
Mailing address:
City: State: Zip code:
Contact: Phone: Email
Contractor
Name of firm or organization:
Mailing address:
City: State: Zip code:
Contact: Phone: Email:
https://www.pca.state.mn.us 651-296-6300 800-657-3864 • Use your preferred relay service • Available in alternative formats
w-sw4-21 • 9121121 Page 4 of 4