HomeMy WebLinkAboutSite Diagram - Smith, Alex 1% . (UTILITY INTERCONNECTION):
SECONDARY SIDE
k Awl
PLANVIEW AREA IS 2609 SQUARE FT % _
ARRAY AREA 814 SQUARE FT '
ARRAY IS 31% OF PLANVIEW AREA ',' - '?, �` PD 21ft
- 18" Setback from ridge
- 36" Pathway2ft
to ridge ' �` ` w
r�`` r
3ft
1 ,
y LEGEND:
�Lr• •,;� 1 t+ jam, t` B -Bi-directional Meter
�.�:�f v � 1�• •�" ,�, � __ '�; - PD -Production Meter Disconnect
C =Production Meter
�• -� D Utility AC Disconnect
f•� •1 --' .� K
• E -DC Power Optimizer(one behind
each module)
I -Inverter
— — — — Buried Power Lines
4T f� :; •.�� Q No Clearance Issues
NOTES:
-Secondary Interconnection
-Utility Disconnect and Production Meter are
' readily accessible
-24/7 unescorted keyless access shall be
provided for all Xcel Energy Equipment
Project:ALEX N SMITH Equipment
Location: 5906 Benjamin St,Fridley,MN 55432 DC Power Optimizers:
TruNorth Solar Phone: 9898542748 37-SolarEdge P401 DC Power DOC TITLE: SITE DIAGRAM
Size: 14.615 kW DC/11.4 kW AC Optimizers AUTHOR: JOSEPH BECK
Building Service: 120/240 V, 10,3 Wire 1 -SolarEdge SE11400-US HD Wave DATE: 2/23/2021
3735 Dunlap Street N Utility:Xcel Energy SetApp Inverter REVISION: 1
Arden Hills, MN 55112 Account: 51-0011474124-6 ID: '04793927
(612) 888-9599 Premise: 302978818 Panels:
Meter: 27693869 37- Q-Cell PEAK DUO ML-G10+395W