Loading...
HomeMy WebLinkAboutFinal review-7379 Memory Lane NE (4) Proposal is Provided By: Jack Pixley Sweeps, Inc. Kurt Adler 8201 Central Ave NE Unit H. Spring Lake Park, Mn. 55432 763-422-0481 Kadler@jackpixleysweeps.com APPROVED Proposal is Provided To: Jensen D03/07/2022 Eladio Saldivar 7379 Memory Ln NE. Fridley,MN. 55432 Call for the required inspections 651-245-4456 June 28, 2021 To: Eladio Saldivar, Brickwork£t Liner We hereby propose to furnish materials and labor necessary to: Remove all flue tile liner materials and reline masonry chimney for—fireplace, using 10"round stainless steel Liner system (U.L. Listed with manufacturer's lifetime limited warranty); remove concrete wash and 10 courses of brick on chimney; rebuild to current day code requirements using"best match brick"; provide concrete crown with overhang and drip ledge as outlined in article"TOPS TO LAST A LIFETIME"by Jack Pixley;install a top mount damper in main level fireplace, repair smoke chamber void. INCLUDES: -Ground 8 roof protection -Scaffold and equipment setup Et removal -Existing concrete wash, tile, and brick removal -Access into chimney -Debris disposal -Install stainless steel liner Et insulation -Retile chimney top -Concrete crown at top -Install stainless steel rain cover -Cleanup/landfill/recycle/travel/unload/remove forms -Building permits Et inspection Conditions: All material is guaranteed to be as specified.All work will be completed professionally and in accordance with the IRC 2006 and manufacturers' warranty. If we find a code violation during repair work; We reserve the option to stop work, show owner and/or consult with the building inspector.This may result in additional costs for completion of the job.All agreements are contingent upon weather or delays beyond our control. Our company is fully insured and employees are covered by Liability and Workman's Compensation Insurance. Acceptance and Payment Terms: We require 25%downpayment with signed proposal. The remaining balance is due upon completion of the described work. Checks shall be made payable to Jack Pixley Sweeps, Inc. We accept Visa,Master card and Discover with a 3% processing fee. Finance charges of 0.7942%applied after 15 days of open invoice due. Invoices that are over 45 days from job completion will be submitted to collections. (Additional legal fees may be included.) Discrepancies: Please notify Jack Pixley Sweeps, Inc. with any deficiencies regarding your installation within 72 hours so that we may address any concerns regarding the work.Otherwise,we will assume everything is in satisfactory condition and acceptable.Winter Inclement weather delays for masonry repairs are soon upon us. Jack Pixley Sweeps cannot commit to completing your accepted chimney work before winter. Winter work continues on certain "Winter Friendly"repair jobs. However, you are welcome to take advantage of the opportunity to get on the upcoming spring repair schedule early. For customers that choose to wait for spring,we ask only for a$100.00 non-refundable deposit with the remaining 25%down payment due March 1st. Our repair scheduling is planned on a first come first serve basis. Proposal Project Total: $9,104.17 1 am authorized to offer, on behalf of my company,to ACCEPTANCE OF PROPOSAL: The above prices, provide the goods and services specified in this specifications and conditions are satisfactory and are proposal. 1 agree to all terms specified in this hereby accepted. You are authorized to do the work proposal.This proposal can be withdrawn by us after as specified. Payment will be made as follows; 25%at 30 days of being sent. acceptance and remained at completion of job. Checks should be payable to Jack Pixley Sweeps Inc. Visa,Master card or Discover only and will have a 3% / l _ surcharge. 5/28/20 �fi3 SdPy Date Kurt Adler Eladio Saldivar Jack Pixley Sweeps, Inc. lZeWVej �r __7 Ian