Subject: Demolition Permit Review Comments I D22-000001
March 10, 2022
Engineering Department:
• If more than 7 days between the end of demolition activities and start of construction,
temporary site stabilization (mulching) must be in place. 2. Access drive to site must be
swept every day of demolition operations,and whenever debris is left in the drive area. 3.
Sewer and Water disconnect permit may be required. Contractor to meet with City of Fridley
Utility Department prior to disconnect of utilities if needed. 4. Site erosion control must be in
place prior to start of work and refreshed at the end of the demolition work. 5. If existing
driveway and apron are to be removed,a Driveway permit will be required, but a fee will not
be charged. General Conditions: Parking must be contained on the site. • No trailers
overnight on the street. • Storage of dumpsters,trailers,etc. need to be on the property,they
are not allowed to be parked/stored on the street. •All unloading, including equipment and
fill material,should be done at the property. Equipment should not be driven down the road
or sidewalks because it can cause damage. You are responsible for any damage that
happens to the public right of way caused by your construction work (except for the
University Avenue Service Road currently closed). • If you have a portable toilet at the
construction site it must be on the property (cannot be on the right of way) and should be
cleaned regularly. • Blowing trash and dust/debris can be a problem at construction sites. All
trash and construction debris needs to be placed in a dumpster and monitored to make sure
trash is not blowing around the neighborhood • Grass must be mowed,and noxious weeds
controlled during demolition and construction in compliance with the City's vegetation
ordinance. It will be the responsibility of the general contractor to 1. Maintain the entrance
and silt fence in working condition. 2. Provide Dust Control 3. Ensure that all sub-contractors
and suppliers use the rock construction entrance only. 4. Keep the silt fence and the rock
construction entrance in operation until final grading and sodding have been completed and
the driveway paved.
Fire Department:
• No comments received.
Building Department:
• REMOVAL OF COMPLETE STRUCTURE AND DISPOSAL OF STRUCTURE TO THE CORRECT
DISPOSAL FAUCILITY DUST CONTROL AT ALL TIME DURING DEMOLITION OF STRUCTURE
RETURN SPACE TO GREEN SPACE OR REPLACE STRUCTURE WITH SAME SIZE STRUCTURE
• FINAL INSPECTION ONCE SITE IS CLEAN AND FREE OF STRUCTURE
7071 University Ave N.E. Fridley, MN 55432 • 763-571-3450• FAX: 763-571-1287 • FridleyMN.gov