HomeMy WebLinkAboutFinal Review 161 Rickard Proposed Plan �1 APPRO ED
}�p Ha rail JensenD03/15 022
_ SEPA ATE PERIITS FOR: EtF-CT, UMB. MECH.
cf
d Smo etectors in ach
sleeping room and oli�each vel
of the.Wk use per R3111
Protect under staff fay with in. CO de otion per R31'5�
_ 1/2 drywall 2020 I F ._ .�
Min. ceilin heigh n
basem 6'-4"
ProvidXtrStted bottom plate in
basements and proper sized amiIA
'V nails.
30" FAN! S.D. �+
CLE MEC a
Z � PER
�- ;; - 2
CLEAR'
nmbustion Air! G
O
cc ac Do not conceal a;,ffr steel g,-!§ i g
lobobg
ints, others. t>
Gas-air-line-test
required S ��
.7 S>
l U �
s