Loading...
HomeMy WebLinkAboutPermitting Plans Combined 220406 EXIST. ALDLN 4 CONSTRUCTION NOTES HOUSE A102 GENERAL WORK SHALL AL CONFORM TO ALL STATE AND LOCAL BUILDING CODES, EXIST. ASSOCIATES ORDINANCES, REGULATIONS, MANUFACTURER'S INSTRUCTIONS. ETC. GARAGE 2. ALL AREAS USED FOR STAGING, DUMPSTERS,CONTRACTOR PARKING, ETC. ARCHITECTURE SHALL BE DESIGNATED BY OWNER. SPHALT SHINdb IT I I I IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 IT 11 1 1 3. ALL AREAS OF THE JOBSITE MUST BE KEPT BROOM CLEAN. NO DEBRIS SHALL BE LEFT ON SITE EXCEPT IN DESIGNATED AREAS. EXIST. 4. ACCESS TO ALL ENTRANCES AND EXITS MUST BE MAINTAINED IN AN GARAGE ORDERLY AND SAFE MANNER. 5. DESIGN BUILD: A. PLUMBING B. ELECTRICAL Minneapolis, MN 6. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE LG9388@gmail.com ROOF BEARING BEGINNING CONSTRUCTION. NOTIFY OWNER OF ANY DISCREPANCIES. 763-300-2840 8' - 1 7. PROVIDE FALL PROTECTION FOR WINDOW SILLS BELOW 36"AFF. 8. WINDOWS ARE GENERIC IN SIZES SPECIFIED ON DRAWINGS. SEE WINDOW N MANUFACTURER SPECIFICATIONS FOR ROUGH OPENING SIZES. 9. HEADERS ABOVE DOOR AND WINDOW OPENINGS IN WOOD FRAMED BEARING All Federal, State and local codes, ordinances, WALLS ARE 2 2X10 UNLESS NOTED OTHERWISE. EXIST. regulations and manufacturer's instructions, 10. ALL BEARING WALLS TO HAVE DOUBLE TOP PLATES. ALL BUILDING LOADS AND GARAGE ethall be art of the STRUCTURAL MEMBERS TO BE VERIFIED AND SIZED BY MATERIAL SUPPLIER. c. s e considered as p 11. ALL STRUCTURAL LUMBER TO BE SOUTHERN YELLOW PINE GRADE A OR EQUAL. specifications for this building and shall take 00 COMPOSITE LAP SIDING 12. FRAMING:ALL EXTERIOR WALL FRAMING SHALL INCLUDE 1/2"CDX PLYWD. precedence over anything shown, described 13. SHEATHING.SHEATHING IS FLUSH TO OUTSIDE FACE OF FOUNDATION WALL. or implied where same are at variance. CD r` Li 14. TRUSS SUPPLIER: IF ROOF AND FLOOR TRUSS LAYOUTS DIFFER FROM WHAT IS Ll SDID HOWN ON PLANS,NOTIFY THE GENERAL CONTRACTOR TO VERIFY ADEQUATE Contractor is responsible for determining and BEARING CONDITIONS AT ALL AFFECTED FRAMING AND FOUNDATION LOCATIONS. ensuring compliance with all applicable codes and manufacturer's requirements. I FIRST FLOOR THE SUBTRADES WILL BE RESPONSIBLE FOR THE COMPLETE DESIGN OF THEIR 0' - 011 SCOPE OF WORK.ALL DESIGN AND COSTS FOR THE WORK SHALL BE PRESENTED TO THE OWNER FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK. THESE SUBTRADES ARE RESPONSIBLE FOR ALL CONSTRUCTION DOCUMENTATIONAND PERMITS REQUIRED TO COMPLETE THEIR WORK. THESE SUBTRADES ARE RESPONSIBLE FOR ALL COORDINATION WITH RELATED 44' 4 1/2" (VERIFY) TRADES WHEN THE SCOPE OF WORK OVERLAPS, I.E. HVAC WILL PROVIDE PROPOSED EXISTING HOUSE SUFFICIENT COORDINATION WITH ELECTRIAL SUBCONTRACTORS SO THAT ALL DOPOS � - WORK AND CODES NECESSARY TO COMPLETE THIS WORK ARE INCLUDED IN THE PROJECT COST. EXIST. THESE SUBTRADES MUST ENSURE THAT ALL WORK IS COMPLETED ACCORDING TO HOUSE r7 FT ALL CODES ENFORCED IN THE JURISDICTION OF THE PROJECT. BASEMENT - — -T - 8„ w n SOUTH ELEVATION co Z ' N � - - w0 w � � w GLENCOE STREET NE z V) _---_ SITE PLAN 02 1" = 20'-0" NORTH ■ - U .. > w w `l1 LL EXIST.STAIRS I I 32"X80"DR. N II II I I I I I I I DN EXIST.WALLS UPI II I II II I DIN DIN II II y -- -- -- -- LID 20' 8" 13' 41/2" (VERIFY) °D ------ BENCH W/ ----- WH ------ HOOKS "' ------- CIDFURN. x 15'-3" 5'-5" 3'-4" 6'-6" 3'-61/2" ------ N ----- M =� 32°x80°DR. CID 4 EXIST. BASEMENT 4 Cl)(0 _ _ A102 20'-8" A102 NEW WALL(TYP.) 36"X64"SH EGRESS �' r 6'-8"HD. HT. O y�/ D I I in CD 7„ 60"X64"SH DBL. 60"X64"SH DBL. REF. - 6'-8"HID. 6'-8"HD.HT. i- - - — — — — — — — — — — — — — — — - PERMIT SET 6" ,-, 8'-6„- 3 1/2" 2' '0" 3 1/2" 8'-6" _ I ° c=n= N ° o DOWELL 6"INTO EXIST. • Cn 2-1.75"x7.5"LVL HDR. 2 1.75"x7.5"LVL HDR. ° X FOUND.WALL W/#5 @ Q KITCHEN �� 12"VERT. (TYP.) :1 � LID w I } 8'-0"CLG. CO`° w a[ m EXIST.WALLS L- > 8" 19' 4" w BEDROOM 2r o BEDROOM 3 , O C7 DW __ 00 8'-0"CLG. X 8'-0"CLG. o r z N co coCP d LIVING ROOM 4"REINF. CONC. SLAB W/10/10 8'-0"CLG. WWM W/6 MIL. VAPOR BARRIER N +80 X N N ON 2"T-250 INSUL.ON 2500 PSF M 60"X80"BYPASS Q T MIN.SOIL(TYP.) 9 M - - `� 31/2" 10' 11/2" ORIGINAL ISSUE: 04/01/22 co C° NEW FOUNDATION EXISTING FOUNDATION REVISIONS CID co- , w N co No . Description Date CC C) LINEN r _� EXIST.WALLS J m aOOC ° M 2' 3" 31/2"N DINING ROOM = �= N -, . N 8'-0"CLG. x o z �' MASTER BEDROOM 28"X80"DR. 1 �_ w 5'-1" _ 3 1/2" 2' 0'` , 3 1/2" 9' 1"- x 8 RE NF CONC BLK WALL ON N 8' 0"CLG. o �o 20"X10"5,000 PSI CONC. FTG.W/ N 2#5 BOTT.CONT. (TYP.) r — co BATH I CO3 N DOWELL 6"INTO EXIST. EXIST. � 1 N EXIST.WALLS m FOUND.WALL W/#5 @ 6„ 13'-6" 31/2" X 8�O • - r 12 VERT. (TYP.) — — 28"X80"DR. x- - - • , Project Number Lu . 2-1.75"x7.5"LVL HDR. M ih 2 1.75"x7.5"LVL HDR. 00 C PROJECT NUMBER 60"X64"SH D L. EGRESS 36"X48"SH 60"X64"SH DBL. 6'-8"HD.HT. cn 6'-8"HD.HT. 6'-8"HD.HT. — — — — — ~ - 4"REINF. CONC. SLAB W/10/10 NEW REINF.8"CONC.BLK. r Im cn ml FOUND.WALL ON20"X10" Author Checker 111 Io p oI II'I• •� WWM W/6 MIL.VAPOR BARRIER CONC.FTG.W/2#5CONT. DRAWN BY CHECKED BY r iN o - PORCH ON 2500 PSF MIN.SOIL(TYP.) �' ,IN m '� NI 6 O O 6' 0 1/2" 3' 8" 2" LID 117 I1/2"' 9' 6 1/2" N ' -, 1' 3 1/2" 7 1/2 3' 1" , 4' 9 1/2" 2' 11 1/2""7 1/2" '6'-7 1/2" 4' 2 1/2" 7 11/2"I 2" CO TROTT- BINNS =--= 3-2X10 BM. _=-'- ---==� - _�=-3-2X10 BM.-=== --` -== --==---3-2X10 BM.�= — — — — — — — — — — — — — — — — — — — — — — — — — — CONSTRUCTION. LLC _ _ _ _ _ _ _ = _ _ 8X8 P.T.W D. POST(TYP.) -- a 9'-8" 10'-4" 25'-0" (VERIFY) 9'-8" 10'-4" 25'-0" 45' 0" (VERIFY)00 45'-0" PLANS r, N FIRST FLOOR 1 ,092 S.F. FOUNDATION 3 1/4" = V-0" 2 1/4" = V-0" 6 Q" _� TYPICAL ROOF CONSTRUCTION: �`�, ALDLN ——----— _ ASPHALT SHINGLES ON 30#ROOFING 6 ' ASSOCIATES I I I IT 11 11 IT 11 11 IT 11 11 IT 11 11 IT 11 11 IT 11 11 PAPER ON 1/2"CDX PLYWD.ON ENG. BAARRIERS&5/8"GYP. BD.OLY CLGVAPOR ARCHITECTURE SPHALT SHINGLES ROOF BEARING ROOF BEARING - 8, - 1„ 81a. - 1„ - - - - - - - - - ■ ■ ■ -�-- TYPICAL WALL CONSTRUCTION: Minneapolis, MN COMPOSITE LAP SIDING BUILDING \ LG9388@gmail.com PAPER ON 1/2"CDX PLYWD.APPLIED � 763-300-2840 5 VERT.&NAILED W/6D COMMON NAILS 6" g102 O.C.@ PERIM.&12"O.C.@ INTERMED. COMPOSITE LAP SIDING \ SUPPORTS ON 2X6 WD.STUDS @ 16"O.C. All Federal, State and local codes, ordinances, W/R-21 BATT. INSUL.&4 MIL. POLY G VAPOR BARRIER&5/8"GYP.BD regulations and manufacturer's instructions, 4"REINF.CONC.SLAB W/10/10 / WWM W/6 MIL.VAPOR etc. shall be considered as art of the BARRIER ON 2"T 250 INSULT ON / specifications for this building and shall take Ll 2500 PSF MIN.SOIL(TYP.) precedence over anything shown, described _ FIRST FLOOR t �\ FIRST FLOOR or implied where same are at variance. - �� _ 0„ _� 14 of _ off r Contractor is responsible for determining and ensuring compliance with all applicable codes 8"REINF.CONIC. BLK.WALL ON x and manufacturer's requirements. 20"X10"5,000 PSI CONIC. FTG.W/ 2#5 BOTT. CONT. (TYP.) Ll n BUILDING SECTION 1/4" = 1'-0" BASEMENT -T - 8" - - - - - - EAST ELEVATION 1/4" = V-0" J w It Z Q w0 4 L/J V I %?2) z 0 w /� Z M V W z ASPHALT SHINGLES I W 0 � v ROOF BEARINGII z 8' - 1" - - - - W W � J TYPICAL ROOF CONSTRUCTION: Q ASPHALT SHINGLES ON 30#ROOFING V g" PAPER ON 1/2"CDX PLYWD.ON ENG. 17;0„ ROOF TRUSSES @ 24"O.C.W/R-49 \BATT.INSUL.ON 4 MIL. POLY VAPOR COMPOSITE LAP SIDING BARRIER&5/8"GYP.BD.CLG.\ ENERGY HEELLi r LJL1 (D T ROOF BEARING J\ RST FLOOR _ 8' - 1„ FI0, _ 0„ 2'-0" TYPICAL WALL CONSTRUCTION: COMPOSITE LAP SIDING ON BUILDING PAPER ON 1/2"CDX PLYWD.APPLIED VERT.&NAILED W/6D COMMON NAILS 6" O.C.@ PERIM.&12"O.C.@ INTERMED. SUPPORTS ON 2X6 WD.STUDS @ 16"O.C. W/R-21 BATT. INSUL.&4 MIL. POLY BASEMENT - - - - - - - - - - - - - - VAPOR BARRIER&5/8"GYP.BD. \ 7�' - 8" 2 NORTH,ELEVATION PERMIT SET 1/4 = 1 -0 ORIGINAL ISSUE: 04/01/22 " g„ 1r,0„ ASPHALT SHINGLES REVISIONS PL No . Description Date 4"REINF. CONC.SLAB W/10/10 T WWM W/6 MIL.VAPOR 5/8"X7"GALV."J"BOLT @ 48"O.C.& ifl 3"�1'.0 BARRIER ON 2"T-250 INSUL.ON WITHIN 12"OF EACH CORNER IN 2500 PSF MIN.SOIL(TYP.) CONIC.(TYP.) — — — — — — — — — ROOF BEARING FIRST FLOOR 0' - 0" r 4? V ° - ;° COMPOSITE LAP SIDING s, 8"REINF.CONC.BILK WALL ON 20"X10"5,000 PSI CONC. FTG.W/ 4_ 2#5 BOTT.CONT.(TYP.) � Project Number III III PROJECT NUMBER FIRST FLOOR Author Checker DRAWN BY CHECKED BY TROTT-BINNS ° CONSTRUCTION, LLC 0 M BASEMENT ELEVATIONS, SECTIONS n WALL SECTION n WEST ELEVATION U 3/4" = V-0" 1/4" = V-0" Al 02