HomeMy WebLinkAboutResidential Permit Card CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 05/09/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#RB22-000156
ADDRESS : 5419 4TH ST NE
PIN: 233024340019
LEGAL DESC:HAMILTONS ADDITION TO MECHANICSVILLE CITY OF FRIDLEY THE S 35 FT OF LOT 19&ALL
OF LOT 18 BLK 11 HAMILTONS ADDITION TO MECHANICSVILLE ANOKA CNTY,MN ACCORDING TO THE DULY
RECORDED PLAT THEREOF
PERMIT TYPE:Residential Building Permit
PROPERTY TYPE: Residential
CONSTRUCTION TYPE: Solar Array System
VALUATION: 24800.00
NOTE:INSTALLING A 21.2 KW ROOFTOP SOLAR PV ARRAY FLUSH MOUNTED SYSTEM PER APPROVED PLANS
(ATTACHED).
-SPEPERATE PERMIT REQUIRED FOR ELECTRICAL WORK.
-CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
APPLICANT
Description Total Cost
Building Permit Fee 391.25
Plan Review Fee 254.31
Cedar Creek Energy Fire Surcharge Fee 24.80
10361 Jamestown St NE State Surcharge Fee 12.40
Blaine,MN 55449 Contractor Fee 5.00
763-450-9767 TOTAL 687.76
Payment(s)
Credit-RB22-000156-7763784454i�'/z687.76
OWNER
HANSON,JACOB
5419 4TH ST NE APT 2
FRIDLEY,MN 55421
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction
authorized is not commenced witin 180 days or if
construction or work is suspended or abandoned for a
period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this
application and know the same to be true and correct.All
provisions of laws and ordinances governing this type of
work will be complied with whether specified herein or
not.The granting of a permit does not presume to give
authority to violate or cancel the provisions of any other
state or local law regulating construction or the
performance of construction.
05/03
Applicant Date /2022
05/09
Bldg Insp Date /2022
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 05/09/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#RB22-000156
ADDRESS : 5419 4TH ST NE PERMIT APPLICANT:
PIN: 233024340019 Cedar Creek Energy
HAMIL.TONS ADDITION TO
MECHANICSVILLE CITY
OF FRIDLEY THE S 35 FT
OF LOT 19&ALL OF LOT
18 BLK 11 HAMIL.TONS 10361 Jamestown St NE
LEGAL DESC : ADDITION TO Blaine,MN 55449
MECHANICSVILLE ANOKA
CNTY,MN ACCORDING TO
THE DULY RECORDED
PLAT THEREOF
PERMIT TYPE: Solar Array System 763-450-9767
PROPERTY TYPE: Residential
CONSTRUCTION TYPE: Installation of a 21.2kW Roof
mounted solar array
NOTE:INSTALLING A 21.2 KW ROOFTOP SOLAR PV ARRAY FLUSH MOUNTED SYSTEM PER APPROVED PLANS
(ATTACHED).
-SPEPERATE PERMIT REQUIRED FOR ELECTRICAL WORK.
-CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS:8 AM TO 4:30 PM
Inspection type Date Inspector Status Comments
Electrical Final Inspection
Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE
OCCUPIED UNTIL ALL WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY
THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.