Loading...
HomeMy WebLinkAboutPlan Clarification email Lindahl, Trisha From: Ashley Bachler <ashley@intrepidremodeling.com> Sent: Friday, May 13, 2022 1:32 PM To: Lindahl, Trisha Subject: Re: Plan Questions IYou don't often get email from ashley@intrepidremodeling.com. Learn why this is important Hi Trisha, The layouts are ultimately staying the same, it's new fixture replacement for the bath and kitchen fixtures along with kitchen cabinets. I haven't worked in Fridley before so wasn't sure what was required but it does state a building permit is needed for"remodel".The floor plan labeled proposed, shows minor changes,for example the WIC in Floor 1, we are closing the opening from the living room side and putting the door from the bedroom side, same with the other bedroom in the basement, we are utilizing extra space in the basement bathroom to be a closet from the bedroom side. Outside of those items,the rest of the remodel is paint and flooring. Please let me know if you have further questions as I'd be happy to talk over the phone if that helps. On Fri, May 13, 2022 at 1:05 PM <Trisha.Lindahl@fridleymn.gov>wrote: Hello, As I was reviewing the plan documents, I noticed they are exatly the same. Could you please clarify which section is existing and which is the proposed. I see they both show a Floor 1 and a Floor 2. Are both floors being remodeled or is one floor showing existing and one floor is showing proposed? Thank you, Trisha Lindahl License & Permit Coordinator City of Fridley 763-572-3601 trisha.lindahlo_fridleymn.gov 1