HomeMy WebLinkAboutResidential Permit Card (3) CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 05/18/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#MR22-000005
ADDRESS : 6589 FRIDLEY ST NE
PIN: 133024140108
LEGAL DESC:LOTS 1 &2 BLK 6 OAK GROVE ADD TO FRIDLEY PARK,TOG/W W 1/2 OF ADJ VAC ALLEY, SUBJ
TO EASE OF REC
PERMIT TYPE:Mechanical Residential Permit
PROPERTY TYPE: Air Conditioning
CONSTRUCTION TYPE: Air Conditioning
VALUATION: 0
NOTE: REPLACE AIR CONDITIONER.
-AIR CONDITIONERS MAY ONLY BE INSTALLED IN SIDE OR REAR YARDS.
-CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
APPLICANT
Description Total Cost
Mechanical Permit Fee 35.00
State Surcharge Fee 1.00
Michael Colenso
6589 Fridley St NE TOTAL 36.00
Fridley,MN 55432
Payment(s)
Credit-MR22-000005-7798148267 �1/z36
OWNER
GARDNER SAMANTHA
6589 FRIDLEY ST NE
FRIDLEY,MN 55432
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction
authorized is not commenced witin 180 days or if
construction or work is suspended or abandoned for a
period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this
application and know the same to be true and correct.All
provisions of laws and ordinances governing this type of
work will be complied with whether specified herein or
not.The granting of a permit does not presume to give
authority to violate or cancel the provisions of any other
state or local law regulating construction or the
performance of construction.
05/16
Applicant Date /2022
05/18
Bldg Insp Date /2022
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 05/18/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#MR22-000005
ADDRESS : 6589 FRIDLEY ST NE PERMIT APPLICANT:
PIN: 133024140108 Michael Colenso
LOTS 1 &2 BLK 6 OAK
GROVE ADD TO
FRIDLEY PARK,TOG/W 6589 Fridley St NE
LEGAL DESC : W 1/2 OF ADJ VAC Fridley,MN 55432
ALLEY,SUBJ TO EASE
OF REC
PERMIT TYPE: Air Conditioning
PROPERTY TYPE: Air Conditioning
CONSTRUCTION TYPE: Installing new air conditioner
NOTE:REPLACE AIR CONDITIONER.
-AIR CONDITIONERS MAY ONLY BE INSTALLED IN SIDE OR REAR YARDS.
-CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS:8 AM TO 4:30 PM
Inspection type Date linspector Istatus Comments
Air Conditioning Final
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE
OCCUPIED UNTIL ALL WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY
THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.