Final Review 1313 Hillwind Road
GENERAL NOTES 1. All electrical materials shall be new and listed by recognized SITE MAP &PV LAYOUT PV 1.0 CONTRACTOR electrical testing laboratory ELECTRICAL 1-LINE DIAGRAM PV 2.0 Address:101 Isanti Parkway WOLSff IVER Custom made equipment shall have complete test data submitted SYSTEM LABELING DETAIL PV 3.1 NE, Isanti, MN 55040 by the manufacturer attesting to its safety PLACARD PV 3.2 Phone number: (763)229-6662 LECTR I C 2. Outdoor equipment shall be NEMA 3R rated or equivalent PROPERTY PLAN PV 4.0 E-mail: contact(cD_woIf rive reIectric.com 3. All metallic equipment shall be grounded ATTACHMENT LAYOUT PV 5.1 Xcel Energy Application#05006880 4. Contractor shall obtain electrical permits prior to installation and ATTACHMENT DETAIL PV 5.2 shall coordinate all inspections, testing commissioning and INVERTER DATA SHEET D 6.0 Owner: Ray Hatchett acceptance with the client, ENPHASE RAPID SHUTDOWN D 7.0 Property Address: 1313 Hillwind Rd NE Fridley, MN 55432 utility co. and city inspectors as needed. Property T Single Family Residence 5. The electrical contractor shall verify the exact locations of service MODULE DATA SHEET D 8.0 p y Type: g y Drawn by: New@engineerinc.io points and service sizes with the serving utility company and RACKING DATA SHEET D 9.0 Date: 0511912022 comply with all utility companies requirements. ATTACHMENT DATA SHEET -D Drawings are diagrammatic only, routing of raceways shall be D 10.0 ENPHASE AC COMBINER BOX option of the contractor unless otherwise noted and shall be D 11.0 VICINITY MAP (SCALE: NTS) coordinated with other trades. INVERTER CERTIFICATION D 12.0 7. If the roof material or the roof structure not adequate for PV SURGE PROTECTION D 13.0 installation, call the engineer of record print to installation. The WITNESS TEST PROCEDURE D 14.0 of ccess uesign+euua o contractor is responsible to verify that the roof is capable of PV INSPECTION CHECKLIST-D 15.0 m withstanding the extra weight. _ Q 8. If the distances for cable runs are different than shown, the GOVERNING CODES F111 eCIr NE contractor shall notify the electrical engineer to validate the wire THE INSTALLATION OF SOLAR ARRAYS AND m size. Final drawings will be red-lined and updated as appropriate. Qaa 9. Whenever a discrepancy in quality of equipment arises on the PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH drawing or specifications, the contractor shall be responsible for THE FOLLOWING CODES: o providing and installing all materials and services required by the • 2020 National Electrical Code 9 Regis EN NE m ` strictest conditions noted on the drawings or in the specifications • 2018 International Building Code Qr«ty Repo NE Regis Ln NE m to ensure complete compliance and longevity of the operable • 2018 International Residential Code 1313• 2020 Minnesota Residential Code •FNdey,Illwind Rd MN 55432,USA system required by the engineer of record. Good NewsFimaag • 2020 Minnesota Building Code Baptist CZrchv • 2020 Minnesota Energy Code 411 q_rm NE Eo • 2020 Minnesota Accessibility Code 3 • 2020 Minnesota State Fire Code '*41 ERC NE • 2018 International Fire Code �� FflfWny�NE 9 • 2018 International Energy Conservation Code PHOTOVOLTAIC NOTES: 2018 Mechanical Code __ • AS ADOPTED BY THE STATE OF MINNESOTA 1. Rooftop mounted photovoltaic panels and modules shall be tested, ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES listed and identified by recognized testing laboratory SATELLITE VIEW (SCALE: NTS) 2. Solar system shall not cover any plumbing or mechanical vents SYSTEM MATING 3. Modules and support structures shall be grounded unless racking has integrated ground. DC 11.200 KW STC ; 4. Removal of an interactive inverter or other equipment shall not AC 8.120 KW STC �f I - _ disconnect the bonding connection between the grounding EQUIPMENT SUMMARY F electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 28 HANWHA 400 WATT MODULES '" 5. All PV modules and associated equipment and wiring shall be t protected from physical damage. WITH IQ8+ MICROINVERTERS �Ln r ,> 6. Live parts of PV source circuits and PV output circuits over 150v tower , f F ground shall not be accessible to other than qualified persons r_LECTRICAL INFORMATION while energized. F' Y 7. Inverter is equipped with integrated DC disconnect, thus providing EXISTING ground fault protection MAIN SERVICE PANEL BUS SIZE:100A - 8. All conductors shall be copper and 75 deg rated MOUNTING SYSTEM'. SNAPNRACK I 9. A single conductor shall be permitted to be used to perform the x_•_ multiple functions of do grounding, AC grounding and bonding between AC and DC systems. BUILDING INFORMATION 10.Non-current carrying metal parts of equipment shall be effectively ' bonded together. Bond both ends of raceways. CONSTRUCTION TYPE: V-B OCCUPANCY: R3 ROOF:COMP SHINGLE r Rafter 2 x 4 @ 24" O.C. N INDEX o° SECONDARY INTERCONNECTION MSP (E)100A Main Service Panel r vccess ueslgn+Walla o MM. ......................(E) Main Meter Total Roof Area: 2602 D ECB....(N) Enphase Combiner Box Fil link:c�Cir rlf W D� �� E UAC.................. (N)60A Utility AC m Total Module Area:616 270 D n so° JB.......................(N)Junction Box k`9s 23.67% of Coverage ��/ C]........................(N) Microinverter CF NE a c o Solar Module Regis In NE m o mor Insurance APPROVED 'nneSOtd Regfe Ln NE Regis Ln NE � """"""'EMT type Conduit P 1313HiIlwindRdNE, z 180° — Fire Setback Line •Fridl y,MN 55432,LISA Good NFimong JensenD05/19/2022 SCALE: 3/32 = T-0" Baptist Church V ............. FMT type Conduit *RwinCRONE 3 SEPARATE PERMITS FOR: ELECT W.,RO NE SOLAR MODULES r#A m Per ExistingBuilding the 28 mo ules shall and more 28 HANWHA 400 Watt as g than 5 percent to the total roof I ad. Model#Q.PEAK DUO BLK ML-G10+ INVERTER 0 INVERTER TYPE: Micro: 28 Enphase IQ8PLUS ECB 0 Model#IQ8PLUS-72-2-US(240V) UAC 0 o UTILITY AC DISCONNECT LOCKABLE CONTRACTOR EQUIPMENT ELEVATION AND READILY ACCESSIBLE o M t$"fire setback O MS P o 0 a ❑ ❑ WOLF RIVER a ❑ a ELECTRIC ® YY I B1 a ❑a ® Xcel Energy Application#05006880 From roof O Q �Q 6) D IJ se 6 Main JB2 I dc� Meter Main Wolf River Electirc Service O O ❑ Address:101 Isanti Parkway ECB Panel NE, Isanti, MN 55040 0. 13 y Phone number: (763)229-6662 E-mail:contact(a)_wolfriverelectric.com Windot in ❑C a Ci ❑C ISolar PV Array 1 7 10' Oc O 15- Hanwha 400 W Modules SITE MAP & PV I ❑c 15 - IQ7+ Microinverters LAYOUT Pitch: 20 Deg I C3 Orientation: 188 De ac oc c CNGINCCr"4INC Solar PV Array 2 Drawn by.New@engineerinc.io 13- Hanwha 400 W Modules DATE. 0511912022 o clearance Issue Project Name:13 - IQ7+ Microinverters Ray Hatchett Distance between all equipments is maximum 10" Hl// Pray atc Xcel Energy Application#05006880 wind Rd NE Pitch: 22 Deg 1313 Hillwind Rd NE Note: 24/7 Unescorted keyless access is to be Orientation: 98 De Fridley, MN 55432 provided for ALL UTILITY EQUIPMENT Project Scale NOTE: Conduit in attic shall PV SYSTEM AS INDICATED be minimum 18 inches from roof sheating FPV 1 .0 28 HANWHA 400 WATT MODULES REFERENCE POINT OF APPLICABILITY NOTE: Service Panel does not contain center fed Main Breaker: MAIN METER 28 ENPHASE IQ8PLUS MICROINVERTERS SECONDARY INTERCONNECTION ENPHASE IQ8PLUS MICROINVERTERS 120/24OV, 1 PHASE 290VA 0 1 P,3W MAXIMUM OUTPUT CURRENT 1.21A AC PORT BACKFEED CURRENT OA DC SHORT CIRCUIT CURRENT 15A ENPHASE AC COMBINER 4 Supply Side Tap 120/24OV, NEMA 3R PV MONITORING DEVICE 2 #14 AWG THWN/THWN-2 60A FUSED AC DISCONNECT 1OA 2-POLE WITH 50A FUSES, UTILITY AC DISCONNECT VISIBLE-OPEN LOCKABLE,READILY ACCESSIBLE NEMA3R (6)#10 AWG THWN/THWN-2 INSTALL(3)20A PV 120/240V 1 P 3W (3)#6AWG THWN/THWN-2 (1)#8 AWG GND 2-POLE C/B (1)#8 AWG GND 3/4"EMT 7 FEET 3/4"EMT 2 FEET 1-PHASE MICRO-INVERTER UL1741 EXISTING 33.88A 100A MAIN 21 33.88A SERVICE 9.68A a XPANEL J BOX1 �� 120/240V, NEMA3R _ aA 1 P,3W 0000 0000 00000000 0000 0000z Z) ❑000 0000 0000 Surge ProteQ U 0000 0000 0000o 0000 0000 0000 MNSPD-30 m - 0000 0000 0000 _ (NEW)GEC o U "1000 '1000 '1000 = 1 2 8 (3)#8AWG THWN/THWN-2 Add 2nd Ground rod and g (6)#10 AWG THWN/THWN-2 8.47A (1)#8 AWG GND (1)#8 AWG GND tie it to the existing round rod. I I 3/4"FMT 20 FEET 3/4" EMT 2 FEET - GEC t° - + 1 #6 AWG GND = (E)GROUNDING x 0000 0000 0000 0 I_ 0000 0000 0000 In locations where there is no local Public Authority, the customer is exempt from ELECTRODE SYSTEM z Z) ❑000 0000 0000 Q 0 0000 0000 0000 inspection, and/or the service has been shut off or disconnected for more than 365 days (1 year), 0000 0000 0000 CONTRACTOR m 1n000000 2-,000000 -,000 the licensed electrician or wireman shall submit a signed and dated Xcel Energy Electrical 15.73 Inspection Certificate to the Company's Builders Call Line attesting that the electrical installation NEM 3R has been completed and installed according to the current National Electrical Code@, the Xcel - + Energy Standard for Electric Installation and Use, and any other applicable codes that apply before WOL�RIVER 2 U0000 0000 electric service is energized. z Z) 000o ELECTRIC Q O0000 \(1) ENPHASE Q CABLE NOTE:AC DISCONNECT VISIBLE AND LOCKABLE o 0000 m - 0000 (2)#12 AWG PV WI RE Olit3000 PVARRAYRATING WIRE SIZE CALCULATION Xcel Energy Application#05006880 #6 AWG EGC FREE IN THE AIR BRANCH CIRCUIT-A BRANCH CIRCUIT-A Number Modules 8 Type Q.PEAK DUO BLK ML-G10+ Hanwha 400 Watt Number OF Microinverters in Circuit 8 SYSTEM RATING AND DER POWER OUTPUT Number Microinverters 8 Type Enphase IQ8+Microinverters IQ8PLUS-72-2-US(24OV) Microinverter Maximum Output Current(A) 1.21 DC 11.200 KW STC AC 8.120 KW STC Total DC Wattage(Watts) Watts STC,(Watts/Module)8*400=3200 Branch Circuit Total Current(A) 8*1.21*1.25=12.1 Wolf River Electi rc INVERTER:ENPHASEIQ7PLUS-72-2-US Array Currents 1-SC 11.14 A 1-MP 1a77 A Breaker Size Per Branch Circuit(A) 201Address:1011santiParkway INVERTER MAXIMUM CONTINUOUS OUTPUT:290VA Module Voltage V-O 45.3 V V-MP 37.13 v NE, Isanti, MN 55040 SYSTEM POWER OUTPUT:28 x 290=8.120 C BRANCH CIRCUIT-8 BRANCH CIRCUIT-8 Phone number: (763)229-6662E-mail:contact@wolfriverelectric.com Number Modules 7 Type Q.PEAK DUO BLK ML-G10+ Hanwha 400 Watt Number OF Microinverters in Circuit 7 No loads or energy storage systems shall Number Microinverters 7 Type EnphaselQ8+Microinverters IQ8PLUS-72-2-US(24OV) Microinverter Maximum Output Current(A) 1.21 be connected on the DER side of the Total DC Wattage(Watts) Watts STC,(Watts/Module)?*400=2800 Branch Circuit Total Current (A) 7*1.21*1.25=10.59 production meter Array Currents 1-SC 11.14 A 1-MP 1a77 A Breaker Size Per Branch Circuit(A) 20 ELECTRICAL 1-LINE Module Voltage V-OC 45.3 V V-MP 37.13 v DIAGRAM For smaller DERs, using the PoC as the BRANCH CIRCUIT-C BRANCH CIRCUIT-C Reference Point of Applicability allows the DER Number Modules 13 Type Q.PEAK DUO BLK ML-G10+ Hanwho 400 Watt Number OF Microinverters in Circuit 13 equipment type testing certification to be utilized Number Microinverters 13 Type EnphaselQ8+Microinverters IQ8PLUS-72-2-US(24OV) Microinverter Maximum Output Current(A) 1.21 as the main method by which compliance Total DC Wattage(Watts) Watts STC,(Watts/Module)13*400=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 with the Standard is verified. The POC might be Array Currents 1-SC 11.14 A 1-MP 1a77 A Breaker Size Per Branch Circuit(A) 20 CNGINCGr':Z INC the terminals of an inverter, for example, Module Voltage voC 45.3 V V-MP 37.13 V Drawn by:New@engineerinc.io and utilizing a UL 1741 certified and listed inverter FROM JBOX TO ENPHASE COMBINER BOX DATE:0511912022 would be sufficient to demonstrate More Than a8 Adjusted Conductor 19.66/0.8=24.58 Project Name: Maximum Continius Current(AJ Ray Hatchett Standard compliance. 19.66 Xcel Energy Application#05006880 Raceway Height From Roof(Temp 39422=61 Q 31/2" #of wire(#BC*2) 6 Ambient Tem Factor Per NEC Table 310.15(b)(2)(a) 71 Property Adress 0 : Note: 24/7 Unescorted keyless access is to be Temp.Derate Factor(max.continous current divided ambient tem.Factor(A) 24.58*0.71=34.61 Wire Sizefrom NEC Table 310.15(b)16 10AWG 1313 Hil MN Rd NE Fridley, MN 55432 provided for ALL UTILITY EQUIPMENT FROM ENPHASE COMBINER BOX TO MAIN PANEL r Project: Scale: Design meet National Electric Code(NEC codes) Total Number Of Microinverters 1 28 TotalAmpsFromAllMicroinverters (A) 28*1.21=33.88 Consider Continuous (A) 33.88*1.25=42.35 PV SYSTEM AS INDICATED DC 11.200 KW STC Temp.Derate Factor(0.91 at wall of the Building)(A) 42.35/0.91=46.54 Wire Size from NEC Table 310.15(b)16 16AWG LPV 2.0 AC 8.120 KW STC Ambient Tem Factor Per NEC Table 310.15(b)(2)(a) 0.91 WARNING NOMINAL OPERATING AC VOLTAGE � NOMINAL OPERATING AC FREQUANCY � TURN OF PHOTOVOLTAIC MAXIMUM AC POWER � AC DISCONNECT PRIOR TO MAXIMUM AC CURRENT � WORKING INSIDE PANEL MAXOCERCURRENTDEVICERATING - FOR AC MODULE PROTECTION PV ARRAY Photovoltaic Power Source DO NOT DISCONNECT PV SYSTEM DC DISCONNECT © LABEL2 UNDER LOAD — OPERATING CURRENT • OPERATING VOLTAGE - CAUTION: SOLAR CIRCUIT MAXIMUM SYSTEM VOLTAGE - MAIN PV SYSTEM SHORT CIRCUIT CURRENT - DISCONNECT © WARNINGLABEL10 LABEL20 © ELECTRIC SHOCK HAZARD© MAIN PV SYSTEM RATED MAX POWER-FONT CURRENT � PV SUB-PANEL AC DISCONNECT RATED MAX POWER-FONT VOLTAGE � THE DC CONDUCTORS OF THIS MAXIMUM SYSTEM VOLTAGE PHOTOVOLTAIC SYSTEM ARE SHORT CIRCUIT CURRENT � O UNDERGROUND AND MAY BE ENERGIZEDLABEL11MAxRAreDourPurcuRRENroF THE CHARGE CONTROLLER IF INSTALLED © LABEL4SOLAR DISCONNECT WARNING © ELECTRIC SHOCK HAZARD CAUTIONSOLAR PV SYSTEM EQUIPPED WITH CONTRACTOR DISCONNECT D FAULT IS INDICATED SOLAR ELECTRIC SYSTEM � • • • 0�) NORMALLY GROUNDED CONDUCTORS CONNECTED MAY BE UNDER G ROUND AND ENERGIZED TURN RAPID SHUTDOWN LABEL 13 SWITCH TO THE • POSITION TO WOLFJRIVER SHUT DOWN PV SYSTEM —.30ELECTRIC © LABEL5 AND REDUCELLI SECOND SOURCE IS PV SYSTEM • HAZARD WARNING EnergyIN THE ARRAY. • •••"• LABEL 14© ELECTRIC SHOCK HAZARD© CAUTION DO NOT TOUCH TERMINIle ALS PHOTOVOLTAIC SYSTEM CIRCUIT TERMINALS ON BOTH LINE AND LOAD IS BACKFED Wolf River SIDES MAY BE ENERGIZED IN THE OPEN '•• - • POSITIONLABEL 15 NE, Isanti, MN 55040 MAIN SERVICE Phone number: PANEL E-mail:contact@wolfriverelectric.com PHOTOVOLTAIC AC DISCONNECT • ® LABEL6. MAXIMUM AC OPERATING CURRENT O4�O © ELECTRIC SHOCK HAZARD© MAXIMUM AC OPERATING CURRENT ABEL 16 SYSTEM LABELING DETAIL DO NOT TOUCH TERMINALS PHOTOVOLTAIC TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION UTILITY AC DISCONNECT DC VOLTAGE IS ALWAYS PRESENT rawn _ __ LABEL WHEN SOLAR MODULES DATE:0511912022 Project Name Ray Hatchett ARE EXPOSED TO SUNLIGHT PHOTOVOLTAIC Property Adress: 1313 . -. NE DC DISCONNECT -Fridley, Note: C 690 PV SY AS INDICATED CAUTION CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: DISCONNECTS LOCATED AS SHOWN: SERVICE 1 OF 2 SERVICE 2 OF 2 ENPHASE COMBINER BOX ENPHASE COMBINER BOX CONTRACTOR PV SYSTEM DISCONNEC 0 0 PV SYSTEM DISCONNEC 0 FOR UTILITY OPERATION o o . FOR UTILITY OPERATION o WOL�RIVER 0 0 o ELECTRIC SERVICE POINT & C o SERVICE POINT & UTILITY METERING UTILITY METERING Xcel Energy Application#05006880 0 0 SOLAR PV ARRAYS 0 SOLAR PV ARRAYS Wolf River Electirc O O Address:101 Isanti Parkway NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail:contact@wolfriverelectric.com N N PLACARD 1313 Hillwind Rd NE 1313 Hillwind Rd NE E14GINEEr-.'aINC� Fridley, MN 55432 S Fridley, MN 55432 S DATE:05119 022Drawn g�neerinc.io Project Name: Ray Hatchett Property Adr- 1313 Hillwind Rd NE Fridley, MN 55432 Project: Scale: Pv SYSTEM AS INDICATED F_PV 3.2 =_ N 0° LEGEND Q MSP................ Main Service Panel MM........................ Main Meter UAC.............Utility AC Disconnect W IJ E Q ECB..........Enphase Combiner Box 270 n n 90, n 03'-5" a O \ o� d d � � a �• 'o � �� o o� S o — 180° ��o r �, a• •. o SCALE: 1/16" = T-0" >• • PROPERTY LINEGo- oa Q o� !°_ ''' •' " o Q I r • o I / o f a• '• O a 232'-1 ; CONTRACTOR ® I ECB UAC °°° I WOL�RIVER � � o ELECTRIC 5' 0 1 '-9" Xcel Energy Application#05006880 59'-7" ° o I Q O Q 2t-9",/ Wolf River Electirc Address:101 Isanti Parkway O/ NE, Isanti, MN 55040 ° ° DRIVEWAY Phone number: (763)229-6662 • .• a O E-mail:contact@wolfriverelectric.com �• o 0 •r � •� Qo . f° I PROPERTY PLAN Qo a' •, • o � e ° ' o •r °. ' "°• ENGINEEAZINC 0 • e ° �• "' ` Drawn by.New@engineerinc.io "•• Q� �. DATE:0511912022 Project Name: _ G Ray Hatchett 29'-9 t Property Adress 1313 Hillwind Rd NE Fridley, MN 55432 H►iiwinq Rd Project Scale NE Xcel Energy Application#05006880 PV SYSTEM AS INDICATED Note: 24/7 Unescorted keyless access is to be provided for ALL UTILITY EQUIPMENT F_PV 4.0 MODULES ON ROOF _ DESIGN CRITERIA POINT LOAD CALCULATION PER ARRAY Prior to the commencement of work, the contractor shall verify the existing roof and framing Solar Module Blocking 2x Modules: Module Weight(Ibs) 48.5 conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction.Attachment Rafter 2 x 4 @ 24"O.C. 28 #Of Modules 2$ Prior to the commencement of work, the contractor shall inspect framing for any damage Max Distributed Load: 3 PSF Total Module Weight(Ibs) 1358 such as water damage, cracked framing, etc. and These Plans are stamped for structural Plywood &Building Felt Rack Weight(Ibs) 271.6 code compliance of the roof framing supporting the proposed PV installation reference only. �� (Ibs)Microlnverters Wei 66.64 9 ( ) These plans are not stamped for water leakage. PV modules, racking, and attachment 1 Layer of COMP SHINGLE Total System Weight(Ibs) 1696.24 components must follow manufacturer guidelines and requirements. Attachments to be #Of Standoffs 102 installed in a staggered orientation to properly distribute loads. Max Span Between Standoffs (in) 48 Xcel EnergyApplication#05006880 Loading Per Standoff(Ibs) 16.62 pp Total Area (sq.ft.) 616 Note: 24/7 Unescorted keyless access is to be Loading (PSF) 3.19 provided for ALL UTILITY EQUIPMENT ATTACHMENT RAIL — — — — — — — — — — — — — — — — — Rafter 2 x 4 @ 24" O.C. O O SNAPNRACK,ULTRA RAIL SPEEDSEAL TM FOOT 0 00NTRACTOR o O O PARTS LIST If 1.86" 1.08" 37 0 38 ITEM QTI DESCRIPTION I I I I I O o WOLF RIVER 1 1 SNAPNRACK,SPEEDSEAL FOOT,BASE,SEALING,SILVER/BLACK �ELECTRIC 2 1 BOLT,FLANGE,SERRATED,5/16IN-18 X 2IN,SS I I ' SNAPNRACK,RL UNIVERSAL,MOUNT SPRING,SS 3. 5" 8" 4 1 SNAPNRACK,ULTRA RAIL MOUNTTHRU PRC,CLEAR/BLACK I O Xcel Energy Application#05006880 1 78" 5 1 SNAPNRACK,ULTRA RAIL MOUNT TAPPED PRC,CLEAR/BLACK '0.25" MATERIALS: DIE CAST A380 ALUMINUM,6000 SERIES ALUMINUM,STAINESS STEEL I DESIGN LOAD(LBS): 802 UP,1333 DOWN,357 SIDE OPTIONS: _ I 3.20" ULTIMATE LOAD(LBS): 2118 UP,4006 DOWN,1331 SIDE CLEAR/BLACK 0 17 2.58 _ 131-411 Wolf River Electirc TORQUE SPECIFICATION: 12 LB-FT � CERTIFICATION: UL 2703,FILE E359313;WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 I I I ' I Address:101 Isanti Parkway 00.33" WEIGHT(LBS): 0.45 _ _ ' ' I 1 ' NE, Isanti, MN 55040 I 1.12" Phone number: (763)229-6662 1. 1" R 0.82" —O E-mail:contact@wolfriverelectric.com 5 1. 9" ATTACHMENT 3 LAYOUT ENGINCEr"4INC 2 1 Drawn by:New@engineerinc.io DATE:05/19/2022 Project Name: Ray Hatchett Property Adress: 1313 Hillwind Rd NE Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED F-PV 5. 1 SNAPNRACK UR SPEEDSEAL FOOT FOR MODULE HEIGHT OFF ROOF, RANGE: COMPOSTION ROOF MOUNTING UR-40:3%" 4%" COMP SHINGLE ROOFING,TYP. REFER TO SNAPNRACK ENGINEERING CHARTS UR-60: 4" -5" SNAPNRACK, UR SPEEDSEAL FOOT FOR APPLICABLE RAIL SPANS. ROOF DECKING,TYP, 146"0 S.S. LAG SCREW MUST EMBED A MIN. SNAPNRACK, SNAPNRACK,Via"O S.S. OF 21A"INTO STRUCTURAL MEMBER ULTRA RAIL LAG SCREW` STRUCUTRAL MEMBER, REFER TO SNAPNRACK INSTALLATION WOOD RAFTER,TYP. MANUAL FOR YL6"0 HARDWARE TORQUE SPECIFICATIONS STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE= SPF#2 MINIMUM SPECIFIC GRAVITY= 0.42 CONTRACTOR ALLOWABLE FASTENER UPLIFT =820 LBS ALLOWABLE FASTENER LATERAL= 2S0 LBS MINIMUM FASTENER EDGE DISTANCE = 0.5" MINIMUM FASTENER END DISTANCE= 2.2" WOL�RIVER 21,1�"MIN.EMBEDMENT INTO WOOD MEMBER ELECTRIC Xcel Energy Application#05006880 SNAPNRACK,ULTRA RAIL MOUNT, TAPPED SIi6"WASHER„S.S. (MAY INCLUDE NEOPRENE TYPE GASKET) Wolf River Electirc PENETRATION DETAIL Address:101 Isanti Parkway NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail:contact@wolfriverelectric.com SNAPNRACK, ULTRA COIL SPRING FOR BOLT, S.S. CAVITY IN UR SPEEDSEAL FOOT RAIL MOUNT,THRU OPTIONAL IS FILLED WITH SEALANT TO ENCAPSULATE AND PROTECT THE ROOF PENETRATION ATTACHMENT 5/ie"0-18 X 2" BOLT, FROM M0 5TURE DETAIL SERRATED FLANGE,S.S. SNAPNRACiK, SPEfDSEAL *4,4 FOOT,BASE,SEALING ENG1NEE;zINC EXPLODED Drawn by.New@engineerinc.io I112 DATE:0511912022 SEALANT Project Name: Ray Hatchett Property Ad- 21/., 1313 Hillwind Rd NE I5 ROOF DECKING Fridley, MN 55432 Project: Scale: --- Pv SYSTEM AS INDICATED UR-40 RAIL I UR-60 RAIL STRUCTURAL MEMBER(RAFTER) ----___FOR USE WITH SNAPNRACK ULTRA SERIES RAILS --- FPV 5.2 n ENPHASE CEIMM 1,08 and IQ8+ Microinverters INPUT I I 1' 1 I:' Commonly used module pairings' w 235-350 235-440 Module compatibility 60-celIA20 half-cell 60-cell/120 half-cell and 72-cell/144 half-cell MPPT voltage range v 27-37 29-45 Operating range v 25-48 25-58 Min/max start voltage v 30/48 30/58 Max input DC voltage v 50 60 Max DC current"[module lscl A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration lx1 Ungrounded array:No additional DC side protection required:AC side protection requires max 20A per branch circuit OUTPUT DATA .r Peak output power VA 245 300 Max continuous output power VA 240 290 Nonunal(L-L)voltage/range3 v 240/211-264 CONTRACTOR Max continuous output current A 1.0 to Nomi nal frequency Hz 60 IQ8 and IQ8+ Microinverters Extended frequency range Hz 50-68 Max units per 20 A(L-L)branch circult4 16 13 WO LFR 1 V E R Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- Total harmonic distortion `5 ELECTRIC defined microinverters with split-phase power conversion capability to convert DC Overvoltage class AC port III power to AC power efficiently.The brain of the semiconductor-based microinverter Easyto install is our proprietary application-specific integrated circuit(ASIC)which enablesthe Lightweight and compact with AC port backfeed current mn 3o Xcel Energy Application#05006880 microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced plug-n-play connectors Power factor setting 1.0 55nm technology with high speed digital logic and has super-fast response times Power Line Communication Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging to changing loads and grid events,alleviating constraints on battery sizing for home (PLC)between components Peak efficiency k 97.5 97.6 energy systems. • Faster installation with simple CEC weighted efficiency % 97 97 Wolf River EleCtirC two-wire cabling Night-time power consumption mw 60 Address:101 Isanti Parkway Enphase MECHANICAL DATA z NE, Isanti, MN 55040 —" = High productivity and reliability Phone number: (763)229-6662 Ambient temperature range -400Cto+600C(-40°Fto*1400F) E-mail:contact@wolfriverelectric.com • Produce power even when the Relative humidity range 4%to100%(condensing) grid is down t L .1-111 DC Connector type MC4 More than one million cumulative Dimensions(HxWxD) 212 mm(8.3")x 175 mm(6.91 x 30.2 mm(1.2") Part of the Enphase Energy System.IQ8 Series I08 Series Microinverters redefine reliability hours Of testing Microinverters integrate with the Enphase 10 standards with more than one million Weight 1.08 kg(2.38lbs) INVERTER Battery.En phase IQ Gateway,and the Enphase cumulative hours of power-on testing. Class lldouble-insulated Appmonitoring and analysis software- enabling an industry-leadinglinitedwarranty enclosure Cooling Natural convection-nofans DATA SHEET of up to 25 years. • Optimized for the latest high- Approved for wet locations Yes powered PV modules Acoustic noise at 1 m <60dBA Pollution degree PD3 Microgrid-forming Enclosure Class II double-insulated corrosion resistant polymeric enclosure E N G 1 N E Er"4 1 NC Complies with the latest Environ.category/UV exposure rating NEMA Type 6/outdoor advanced grid support , Drawn by.New@engineerinc.io DATE:0511912022 Connect PV modules quickly and easily to IQ8 Series Microinverters are UL Listed as Remote automatic updates for CA Rule 21(UL 1741-SA).UL 62109-1.UL1741AEEE1547,FCC Part 15 Class B.ICES-0003 Class B.CAN/CSA-C22.2 NO.107.1-01 I08 Series Microinverters using the included PV Rapid Shut Down Equipment and conform Project Name: Q-DCC-2 adapter cable with lu n- la MC4 with various regulations,when installed the latest grid requirements P P 9- P Y e9 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conformswith NEC 2014.NEC 2017,and NEC 2020 section Ray Hatchett connectors. according to manufacturer's instructions. Configurable to support a wide 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown cf PV Systems,for AC and DC conductors.when installed accordingto range of grid profiles manufacturer's instructions. Property Adress: 1313 Hillwind Rd NE 0 2021 Enphase Energy.All rights reserved.Enphase.the Eniphase logo.IQ8 microinverters. MeetSCARUle21(UL1741-SA) (1)No enforced DC/AC ratio.SeethecortpatibilitycalculatorathttpsJ/Iink.enphase.com/ Fridley, MN 55432 and other names are trademarks of Enphase Energy.Inc.Data subject to change requirements module-compatibility(2)Maximum continuous input DC current is 10.6A(3)Nominal voltage range can be extended beyond nominal''rf required by the utility.(4)Limits may vary.Refer to Project: scale: IQ8SP-DS-0002-01-EN-(1S-2021-10-19 local requirements to definethe number of microinverters per branch in your area. IQ8SP-DS-0002-01-EN-US-2021-10-19 PV SYSTEM AS INDICATED F-D 6.0 QUICK INSTALL GUIDE ENPHASE Install the Enphase IQ8 Series Microinverter To install Enphase IQ8 Series Microinverters,read and follow all warnings and instructions in this guide and in the Enphase IQ8 Series Microinverter Enphase Energy//Rapid Shutdown Installation and Operation Manual at eennhase-com/stnprt Safety warnings are listed on the back page of this guide. The Enphase Microinverter models listed in this guide do not require grounding electrode conductors(GEC),equipment grounding conductors(EGC),or grounded conductor(neutral).The microinverter has a Class II double-insulated rating,which includes ground fault protection(GFP).To support GFP,use only PV modules equipped with DC cables labeled PV Wire or PV Cable Rapid shutdown is built-in IMPORTANT:Enphase IQ8 Series Microinverters require the IQ Cable.An IQ Gateway is required to monitor performance of the IQ Microinverters.The Q Accessories work only with Enphase IQ8 Series Microinverters. Note:After you log in to your Enphase Installer Platform account from Enphase Installer app,Scan the microinverter QR code and connect to the Enphase IQ Gateway to track the system installation progress. The 2014 edition of the National Electrical Code(NEC 2014)added What's new in NEC 2014? new rapid shutdown requirements for PV systems installed on buildings. NEC 2014,Section 690.12 applies PREPARATION Enphase Microinverters fully meet rapid shutdown requirements in the to PV conductors over 10 feet from PV array and requires that the A) Download the Enphase Installer App and open it to log a . D) Check that you have these other items: new code without the need to install any additional electrical equipment. in to your Enphase Installer Platform account.With this M. ❑ ACjunction box. conductors power down to 30 volts app,scan the microinverter QR code and connect to • Tools:screwdrivers,wire cutter,voltmeter,torque wrench,sockets, and 240 volt-amperes within 10 the Enphase IQ Gateway to track system installation �� and wrenches for mounting hardware seconds of rapid shutdown initiation. progress.To download,go to enohase.com/toolkrt or ❑ scan the QR code at right. E) Protect your system with lightning and/or surge suppression devices.It is also important to have insurance that protects against lightning and String inverters require work arounds for rapid shutdown B) Referto the foseco /tableen-u /suppockPV moduleinduce electrical compati- electrical surges. bility at:P�ohase_com/en-us/stuy,nrr/m•��com/en-us/supporUmodule-cQmpalLAity. Model DC connector Typical PV module*cell count IF Plan your AC branch circuits to meet the following limits for maximum CONTRACTOR number of microinverters per branch when protected with a 20-amp Work around. Work around. IQ8-60-2-US MC-4 locking type Pair with 60 cell 1120-half--cell over-current protection device(OCPD) Specialized Rapid Shutdown String Inverter Installed modules electrical box installed on the on roof,a hostile IQ8PWS-72-2-US MC-4 locking type Pair with 60 cell/1213-half-cell,66 Maximum* IQ8 Series Microinverters per AC branch circuit(sin- roof within 10 feet of array. g IQ8Mr72-2-US cell,or 72 cell/144-hhalf--cell le- hase i environment are of builin, g p ) WOL�RI VER IQ8A-72-2-US IQ8(240 IQ8+ 240 IQ8M(240V) inverters are not built IQ8F+240-72-2-US MC-0 locking type Pair with 60 cell/120-half-cell,66 Work around. to live in. IQ8H-208-72-2-US cell,or72 cell/144-half--cell 16 13 11 ELECTRIC Shutoff switch that IS *Enphase IQ8 Series Microinverters are compatible with bi-facial PV modules if IQ8A(240V) IQ8H(240V) IQ8H(208V) the temperature adjusted electrical parameters(maximum power,voltage and 1 11 10 9 easily accessible to first current)ofthe modules,consideri the front side electrical parameters(i.e., 1Yo Xcel Energy Application#05006880 n9 P ( Limits may vary.Refer local requirements to define the number of responders on the ground. back side gain),arewithin the allowable microinverter input parameters range. microinverters per branch in your area. w C) In addition to the Enphase Microinverters,PV modules and racking, you will need these Enphase IQ8 Series Microinverters: G) Size the b wire gauge i account for voltage rise.Select the correct Work around. Enphase IQ Gateway(model ENV-IQ-AM1-240)communications wire size based ak the distance from the beginning of the Enphase IQ gateway or Enphase IQ Combiner check en hase.com for models: Cable to the breaker in the load center.Design for a voltage rise total Wolf River Electi rC Extra conduit in Installation. Residential String Inverter Commercial String Inverter 9 y P ( P ) of less than 2%for these sections-Refer to the Voltage Rise Technical is required to monitor solar production. Brief at ennhase_com/support for more information. Address:101 Isanti Parkway Tie wraps or cable clips(Q-CLIP-100) NE, Isanti, MN 55040 Enphase Sealing Caps(Q-SEAL-10):for any unused connectors on Best practice:Center-feed the branch circuit to minimize voltage rise in Phone number: (763)229-6662 the Enphase IQ Cable a fully-populated branch. Enphase Terminator(Q-TERM-10):one needed at the end of each E-mail:contact@wolfriverelectric.com Enphase comes standard with rapid shutdown capability AC cable segment Enphase Disconnect Tool(Q-DISC-10) Enphase IQ Cable: ENPHASE RAPID Cable model Connector PV module Connectors SHUTDOWN All Enphase microin- Enphase microinverters spacing* orientation per box r verters,even those that can safely shut down Q-12-1 G-240 1.3m Portrait(all) 240 Terminator COMPATIBILITY were previously installed, automatically,leaving Q-12-17-240 2.Om Landscape(60-and 66-cell) 240 WITH PV inherently meet rapid only low-voltage DC Q-12-20-200 2.3m Landscape(72-cel1) 200 shutdown requirements, electricity isolated to *Allows for 30cm of cable slack no additional equipment the PV module \ CNGI NCC�1 NC Enphase IQ Cable or workarounds needed Drawn by.New@engineerinc.io LQ AC connector DATE:0511912022 DC connector 0 2021 Enphase Energy.All rights reserved. Enphase,the Enphase logo,Enphase IQ8 Project Name: Series micranverters(IQ8,IQ8+,IQ8A,IQ8H Ray Hatehett Residential Microinverter Commercial Microinverter Tie wraps or cable clips and IQ8M),Enphase Installer Platform Property Adress: Enphase IQ Gateway,and other trademarks 1313 HIIIWind Rd NE or service names are the trademarks of Fridley, MN 55432 Enphase En Inc.Data subject to than y, f--Enphase IQ8 Series Microinverter P &9Y. 1 9e t: Scale To learn more,visit enphase.com ��� enphase°' installato(horizontnlalstolallowed)lation own,vertical Rev02-10-n232021. PVProjecSYSTEM AS INDICATED �llll�l�ll l�l AC junction box 140-00195-02 D 7.0 MECHANICAL SPECIFICATION r QVQ© Format 74.01n x 41.1in x 1.261n(including frame) (1879mm x 1045mm x 32mm) '°+wAmml "+Proemml m-1,11aamnU Weight 48.51bs(22.0kg) Front Cover 013 in(3.2mm)thermally pre-stressed glass with - ......I� ` anti-reflection technology Back Cover Composltefilm sa(eremml Frame Black anodized aluminum Cell 6 x 22 monoaystalline GANTUM solar half cells ® act-uoeem,ro Junction Box 2.09-3.98In x 1.26-2.361n x 0.59-0.71in (53 101 mm x 32-60 mm x 15-18 mm),IP67,with bypass diodes Cable 4mm2 Solar cable;(-I>_49.2 in(1250 mm),(-)z49.2 in(1250 mm) �--�-�GJ •-=� ..mewpre Connector Staubli MC4;IP68 J 'I�11a<.v min OETpi4 pee-(L I nse-P.amml T�In.,a•(mmmt . • : , ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 395 400 405 MINIMUM PERFORMANCE AT STANDARDTEST CONDITIONS,STC1(POWER TOLERANCE+5W/-O W) • Powerat MPP' P_ [WJ 385 390 395 400 405 Short Circuit Current' 11 [A] 11.04 U.07 U10 U.14 11.17 � E •• e E Open Circuit Voltage- Voc [u) 45.19 4523 45.27 45.30 45.34 I ®R" 2 Cunent of MPP I,v� [A] 10.59 10.65 1A.71 10.77 10:83 TO/ORANDFlI Voltage ncyt P V_ 1%] 36.36 36.62 36.88 3713 2 CONTRACTOR Efficiency' q [%] a19.6 z19.9 z20.1 _ . 20.6 MINIMU M PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT-' Warranty Q CELLS Power at MPP Pam: [W] 288.8 292.6 296.3 300.1 303.8 mw°nalertorl,repee Yield Sec ity E Shor t Cl rcu It Curre nt 1x [A] 8.90 8.92 8.95 8.97 9.00 E Open Circuit Voltage Uoc [U) 42.62 42.65 42.69 42.72 42.76 WOLRIVER �1 BREAKING THE 20%EFFICIENCY BARRIER Current at MPP I_ [A] 8.35 8.41 8.46 8.51 8.57 Q.ANTUM DUO Z Technology with zero gap cell layout voltageatMPP v_ M 34.59 34.81 35.03 35.25 35A6 ELECTRIC boosts(nodule efficiency up to 20.9%. `Measurement tolerances P. t3%;I,,;V,r_t5%atSTC:1000W/m',25t2°C,AM1.5accordingto IEC 60904-3-1800W/W.NMOT,spectrum AM 15 O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE Xcel Energy Application#05006880 THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY m x u_ Atlees[98%of romnelpower during r -- -----T----- ---- -----,T , , I -_ is the first solar m u e manufacturer to pass the most compre en- 3. •• first yea.mereafter ma><o.s% sive quality programme in the industry:The new"Quality Controlled PV'of e g •' ------------------------------ degradation per year.Atleast93.5% of nominal power 1p to 10 years.At the independent certification institute TOV Rheinland. 5y_ least 86%ofnominal power LL 25years. p to =g I Wolf River Electirc INNOVATIVE ALL-WEATHER TECHNOLOGY Al data within measurementtoleram- Address:101 Isanti Parkway Optimal yields,whatever the weather with excellent 0 " ea.Fuuwanantles Inaccordancewlth " }0e peD e00 e00 "eD o 92 thewanantytermsoftheQCELLS IPNADNNCEIW/mq NE, Isanti, MN 55040 low-light and temperature behavior. sales aganlsatlon of your respective $ " country. R Phone number: (763)229-6662 �.nnm.na.M+•.�.mw..,n.... YEpRa Typlcal module performance under law irradlance conditions In �{ ENDURING HIGH PERFORMANCE compadsmtoSTccondltions(25•C,100oW/m9 6 E-mail:contact@wolfriverelectric.com Long-term yield security with Anti LID Technology,Anti PID TEMPERATURE COEFFICIENTS V Technology',Hot-Spot Protect and Traceable Quality Tra.Q"". a [%/p p [%/K] -0.27 0«0.04 Temperature Coefficient of V�r 4 Temperature Coefficient of P,.rrp If [%/K] -0.34 Nominal Module Operating Temperature NMOT [°F] 109t5A(43t3°C) q EXTREME WEATHER RATING o `CIL High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN E MODULE nigh Snow(Saco Pay and wino loans(a000Pa). 9 DATA SHEET Maximum System Voltage Vns [VJ 1000(IEC)/100D(UL) PV module classification Class ll p � A RELIABLE INVESTMENT Maximum Series Fuse Rating [ADC] 20 Fire Rating based on ANSI/UL 61730 TYPE2 d Max.Design Load,Push/Pull' (Ibs/ft'J 75(3600Pa)/55(2660Pa) Permitted Module Temperature -40°Fupto.185°F p Inclusive25-year product warranty and25-year Max.Test Load,Push/PuIP (lbs/ft'] 113(5400Pa)/84(4000Pa) on Continuous Duty (-40°Cupto-85°C) linear performance warranty'. 'See Iretalallon Manual 'APT test �tastreetorearfordlngtolEC/T562804-120$methodA(-1500V,98h) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION ENGINEEAZINC 'See data sneer on rear for further hfomfatlort UL61730,CEmmmra. �J� `�[ �{ Drawn by:New@engineerinc.io Quinn C--,ed Pv-TUV Rlenmm, A111 rYVIJ- `7VV/Jf^.'i I11111111111159 DATE:0511912022 IEC 61215.2016,IEC 61730:2016, THE IDEAL SOLUTION FOR Us amanl NP.a.69721st an ce151. s C E loesrri Horizontal 76.4in 43.31n 48.oin 1656lbs 24 24 32 Project Name: • ocPvicenmcaronmyona 0 us packaging 1940mm 1100mm 1220mm 751kg pallets pallets modules Ray Hatchett Roofto reslcYe reSidentan rR ayson ' o nn� ntlel buildings Property Adress: Note Installation Instructions must be followed.See the Installation and operating manual or contact our technical service deperonent for further lnformatlon on approved installation and use of 1313 Hillwind Rd NE this product. - Fridley, MN 55432 ., Project: Scale: l4ar i0C�Amedc'Inc. PV SYSTEM AS INDICATED Engineered In Germany CELLS 400 Spectrum Center Drive,Surte 1400,Irvine.C4 92618,USA I TEL+1 949 748 59 96 1 EMAIL Inqulry@us.gtels.com I WEB www.¢cel5.us D 8.0 Snap rack- UR-40 SnapNrack Ultra Rail UR-60 A sleek' straightforward rail solution for mounting solar modules on all roof .- Solar Mounting Solutions features two rail profiles; , • is a lightweight rail profile suitable • •st geographic Ultra Rail -• • • - •• • rail profile . . .. . . . .. .. . ... :. compatible with all . . module The Entire System is a Snap to Install • New Ultra Rail Mounts include snap-in brackets for attaching rail • Compatible with all the SnapNrack Mid Clamps and End Clamps customers love • Universal End Clamps and snap-in End Caps provide a clean look to the array edge CONTRACTOR R. Unparalleled Wire Management • Open rail channel provides room for running s: wires resulting in a long-lasting quality install WOL�RIVER • Industry best wire management offering ELECTRIC includes Junction Boxes, Universal Wire Clamps, MLPE Attachment Kits, and Conduit Xcel Energy Application#05006880 Clamps • System is fully bonded and listed to UL 2703 The Ultimate Value in Rooftop Solar Standard Wolf River Electirc Address:101 Isanti Parkway NE, Isanti, MN 55040 • Phone number: (763)229-6662 Industry ' • • • Wire Mounts • • Heavy Duty UR-60 Rail E-mail:contact@wolfriverelectric.com _ Management • • • • • • UR-60 rail profile provides increased span capabilities for high wind speeds and snow Single • • • • • • loads RACKING • Taller, stronger rail profile includes profile- -- DATA SHEET Clamps • specific rail splice and end cap are compatible with • All existing mounts, module clamps, and accessories are retained for the same great both rail profiles install experience CNGINCC�IN Drawn by:New@engineerincJo DATE:05/19/2022 Inst• • • Ultra • il Today I Project Name: Ray Hatchett Quality. Innovative . Superior Property Ad. ress: RESOURCES snapnrack.com/resources 1313 Hillwind Rd NE p SnapNrack Solar Mounting Solutions are engineered to optimize material use and Fridley, MN 55432 DESIGN snapnrack.com/configurator I Project F Scale: labor re • and improve overall installationquality and safety. PV SYSTEM AS INDICATED WHERE TO BUY snapnrack.com/where-to-buy 877-732-2860 • � FD 9.0 DESCRIPTION: DRAWN BY: DESCRIPTION: DRAWN BY: SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins .53 flapHruch" SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins snapNrack- REVISION: Solar Mounting Solutions REVISION: Solar Mounting Solutions PART NUMBER(S): PART NUMBER(S): 595 MARI(ET STREET,29TH FLOOR.SAN FRANCISCO,LA 94105 USA 595 MARKET STREET,29TH FLOOR.SAN FRANOISOO,CA 94105 USA A PHONE(415)500 0900.FAX(415)500.0902 PHONE(415)500 0900•FAX(415)5MM2 242-02163, 242-02167 E Nro.M roK NTHIsoR 9�s oKrLm��o�oPa a.. K. 242-02163, 242-02167WNG15CONFlOE W=�y 1.37 .30 .38 1.86- 1.08 1.00 SLOT 3.05 CONTRACTOR 2.78 5 mpftck 1.78 .25 WOL�ELECTRIC � RIVER 17 �2.24� -�3.20�- Xcel Energy Application#05006880 2.58 4 3 Wolf River Electirc 0.33 Address:101 Isanti Parkway R1.12 NE, Isanti, MN 55040 Phone number: (763)229-6662 1.21 R.82 E-mail:contact@wolfriverelectric.com 2 1 ATTACHMENT DATA SHEET PARTS LIST 1.99 ITEM QTY DESCRIPTION 1 1 SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER/ BLACK 2 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SS 11 ENGINEER INC 3 1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS 4 1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR/ BLACK Drawn DATE: 5/19/05by.1191@engineerinc.io 2022 5 1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR/ BLACK 1.50 Project Name MATERIALS: DIE CAST A380 ALUMINUM, 6000 SERIES ALUMINUM, STAINLESS STEEL Ray Hatchett DESIGN LOAD (LBS): 802 UP, 1333 DOWN, 357 SIDE OPTIONS: Property Adre99: ULTIMATE LOAD (LBS): 2118 UP, 4006 DOWN, 1331 SIDE CLEAR/ BLACK 1313 Hillwind Rd NE TORQUE SPECIFICATION: 12 LB-FT Fridley, MN 55432 Project: Scale: CERTIFICATION: UL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 PV SYSTEM AS INDICATED WEIGHT(LBS): 0.45 ALL DIMENSIONS IN INCHES FD 10.0 Enphase IQ Combiner 4/4C Data Sheet MODEL NUMBER Enphase Networking IQ Combiner 4(X-1 Q-AM1-240-4) IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and consumption monitoring(+/-2.5%).Includes a silver solar shield to match the IQ Battery system and IQ System Controller 2 and to deflect heat. IQ Combiner 4C(X-IQ-AMl-240-4C) IQ Combiner 4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20+/-0.5%)and consumption monitoring(+/-2.5%).Includes Enphase Mobile Connect cellular modem (CELLMODEM-Ml-06-SP-05),a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,where there is adequate cellular service in Enphase The Enphase IQ Combiner 4/4C with Enphase the installation area)Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. IQ Gateway and integrated LTE-M1 cell ACCESSORIES AND REPLACEMENT PARTS (not included,order separately) Q Combiner 4/4 C Ensemble Communications Kit -Includes COMMS-KIT-01 and CELLMODEM-Mt-06-SP-05 with 5-year Sprint data plan for modem(included only with IQ Combiner 4C) COMMS-CELLMODEM-M1-06 Ensemble sites CELLMODEM-Ml-06-SP-05 -4G based LTE-M1 cellular modem with 5-year Sprint data plan X-IQ-AM1-240-4 consolidates interconnection equipment CELLMODEM-MI -06-AT-05 4G based LTE-Ml cellular modem with 5-year AT&T data plan X'I AM 1-240-4C Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. Q- into a single enclosure and streamlines IQ BRK-10A-2-240V Circuit breaker,2 pole.10A,Eaton BR210 BRK-15A-2-240V Circuit breaker,2 pole,l5A,Eaton BR215 microinverters and storage installations by BRK-20A-2P-240V Circuit breaker,2 pole,20A,Eaton BR220 BRK-15A-2P-240V-B Circuit breaker,2 pole,1 SA,Eaton BR215B with hold down kit support providing a consistent, pre-wired solution for BRK-20A-2P-240V-B Circuit breaker,2 pole,20A,Eaton BR220B with hold down kit support residential applications. It offers up to four EPLC-01 Power line carrier(communication bridge pair),quantity-one pair XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C 2 pole input circuits and Eaton BR series XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C(required for EPLC-01) �ENPHASE busbar assembly.IV y XA-ENV-PCBA-3 Replacement IQ Gateway printed circuit board(PCB)for Combiner 4/4C X-1 Q-NA-H D-125A Hold down kit for Eaton circuit breaker with screws. CONTRACTOR ELECTRICAL SPECIFICATIONS Smart Rating Continuous duty Includes IQ Gateway for communication and control System voltage 120/240 VAC,60 Hz Includes Enphase Mobile Connect cellular modem Eaton BR series busbar rating 125A WO L�R I V E R (CELLMODEM-M1-06-SP-05),Included only with IQ Max continuouscurrent rating 65A ELECTRIC Combiner4C Max.continuous currentrating(irputfromPV/storage) 64A Includes solar shield to match Enphase IQ Battery Max fuse/circuit rating(output) 90 A Xcel Energy Application#05006880 aesthetics and deflect heat Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Flexible networking supports Wi-FI, Max total branch circuit breaker rating(input) 80A of distributed generation/95A with IQ Gateway breaker included Ethernet,or cellular Envoy breaker 10A or 15A rating GE/Sieme ns/Eaton included Optional AC receptacle available for PLC bridge Production metering CT 200 A solid core pre-installed and wired to IQ Gateway • Provides production metering and consumption Wolf River EleCtirC monitoring Consumption monitoring CT(CT-200-SPLIT) A pair of 200 A split core current transformers Address:101 Isanti Parkway MECHANICAL DATA NE, Isanti, MN 55040 Simple Dlmenslons(WxHxD) 37.5x49.5x16.8cm(14.75"x19.5"x6.63').Height Is21.06"(53.5 cm)with mounting brackets. Phone number: (763)229-6662 Weight 7.5 kg(16.5 lbs) E-mail:contact@wolfriverelectric.com Centered mounting brackets support single Ambient temperature range -00"C to+46o C(-400 to 1150 F) stud mounting I Cooling Natural convection,plus heat shield Supports bottom,back and side conduit entry E N PHAS E Up to four 2-pole branch circuits for 240 VAC Enclosure environmental rating Outdoor,NRTLcertihed,NEMA type 3R,polycarbonateconstruction plug-in breakers(not included) Wire sizes 20 Ato 50A breaker inputs l4to 4 AWG copper conductors AC COMBINER BOX X-IQ-AM1-240-4C 80A total PV or storage branch CIfCUitS 60 A breaker branch input:4to 1/0 AWG copper conductors 9 Main lug combined output:10 to 2/0 AWG copper conductors DA TAS H E ET •Neutral and ground:14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Reliable Altitude To 2000 meters(6,560feet) Durable NRTL-certified NEMA type 3R enclosure INTERNET CONNECTION OPTIONS Five-year limited warranty Integrated Wi-Fi 802.11b/g/n ENGINEER INC Two years labor reimbursement program coverage Cellular CELLMODEM-MI-06-SP-05,CELLMODEM-MI-06-AT-05(4G based LTE-Ml cellular modem) Note that an Enphase Drawn by:New@engineerinc.io included for both the IQ Combiner SKUS Mobile Connect cellular modem Is required for all Ensemble installations Ethernet Optional,802.3.Cat5E(or Cat 6)UTP Ethernet cable(not included) DATE:0511912022 UL listed COMPLIANCE Project Name: Compliance,IQ Combiner UL 1741,CAN/CSA C22.2 No.1071, 47 CFR,Part 15,Class B.ICES 003 Ray Hatchett O Production metering:ANSI C12.20 accuracy class 0.5(PV production) Property Ad— Consumption metering:accuracy class2.5 1313 Hlllwind Rd NE Compliance,IQ Gateway UL 60601-1/CANCSA 22.2 No.61010-1 LISTED x-IQ-AM1-2ao-a Fridley, MN 55432 N P H A S E E E N P H A S E To team Project Scale more about Enphase offerings,visit enuhase.com t./ To learn more about Enphase offerings,visit enohase.com u PV SYS EM_J I AS INDICATED Z 2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ Combiner 4/4C,and other names are trademarks of Enphase Energy,Inc.Data subject to change 02-14-2022 D 11 .0 CERTIFICATE OF COMPLIANCE CERTIFICATE OF COMPLIANCE Certificate Number 20180530-E341165 Certificate Number 20180530-E341165 Report Reference E341165-20171030 Report Reference E341165-20171030 Issue Date 2018-MAY-30 Issue Date 2018-MAY-30 Issued to: ENPHASE ENERGY INC This is to certify that representative samples of the product as specified on this certificate were tested 1420 N McDowell Blvd according to the current UL requirements. Petaluma CA 94954-6515 Permanently-connected, Grid Support utility Interactive,208V single-phase,240V single phase evaluated for use on a split phase system, distributed resource power system. This is to certify that STATIC INVERTERS, CONVERTERS AND representative samples of ACCESSORIES FOR USE IN INDEPENDENT POWER Models 2-2-U,land IQ7 -72, and IQ7X 96,followed by 2,-5, B.or ACM,followed by US+. Models IQ7PD-72-2-US and IQ7PD-842-US. SYSTEMS, PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM EQUIPMENT USL/CNL—Photovoltaic Rapid Shutdown Equipment. See Addendum Models IQ7-60,IQ7PLUS-72, and I07X-96,followed by-2,-5,-B,or-ACM,followed by-US+. Models CONTRACTOR IQ7PD-72-2-US and IQ7PD-84-2-US. Have been investigated by UL in accordance with the +may be followed by additional characters not affecting safety Standard(s) indicated on this Certificate. WOL�RIVER Standard(s)for Safety: ELECTRIC Standard(s)for Safety: See Addendum UL 62109-1,SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER Xcel Energy Application#05006880 Additional Information: See the UL Online Certifications Directory at SYSTEMS-PART 1: GENERAL REQUIREMENTS www.u1.com/database for additional information CSA C22.2 NO. 107.1-01, GENERAL USE POWER SUPPLIES IEEE 1547 INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Wolf River Electirc Only those products bearing the UL Certification Mark should be considered as being covered by UL's Address:101 Isanti Parkway Certification and Follow-Up Service. IEEE 1547.1 IEEE STANDARD CONFORMANCE TEST PROCEDURES FOR EQUIPMENT NE, Isanti, MN 55040 Look for the UL Certification Mark on the product. INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Phone number: (763)229-6662 UL 1741. INVERTERS,CONVERTERS,CONTROLLERS AND INTERCONNECTION SYSTEM E-mail:contact@wolfriverelectric.com EQUIPMENT FOR USE WITH DISTRIBUTED ENERGY RESOURCES CEC-300-2011-005,-CMF GUIDELINES FOR CALIFORNIA'S SOLAR ELECTRIC INCENTIVE PROGRAMS PURSUANT TO SENATE BILL 1 INVERTER CERTIFICATION ENGINEER IN Drawn by:New@engineerinc.io DATE:0511912022 /]������ Project Name: Biuw MellartlldL Daecla N—h Annrlcar Cvi41-1 Progan 1 &I.M-91dc Urecfa Nanlr American C-1fl ear P,oyam I Ray Hatchett UL LLC ` UL LLC Property Adre— Arry1MamalmanddecvmemamnlnvdmgULMakservbesereprovldodon We fIfULLLC(UL)aarryallwUodlcerneoofULForµrosbons.pleax Arrylnfmmamnanddo mall,mvdv gULMaks..—a'eprovidedonbeM 1ofULLLC(UL�arartyaJh dYcense.dULFawImbm.plaaw 1313 Hillwind Rd NE coMacf a locd UL Cu-1 Sei RepreSmtalva at NW l:d.can—J:lxaeais: cmfa<f a bcW UL CuSaiv110 Rep 11-1ve a hffol1uL1anir4au1u0ocario Fridley, MN 55432 Page 1 of 2 Page 2 of 2 Project: scale: PV SYSTEM AS INDICATED Created by UL Document Assembler 2018-07-05 15:07:07-05:00 Created by UL Document Assembler 2018-07-05 15:07:07-05.00 D F--1 2.0 ' / I I1 (4011 L#J I N " Surge Protection PArT N.IMIBER MNSPD-115 MNSPD-300-AC MNSPD-300-DC MNSPD-600 Nominal Voltage 0 to 90 VAC 0 to 250 VAC 0 to 300 VDC 0 to 480 VAC 0 to 115 VDC 0 to 600 VDC - MCOV 180V 470V 470V 780V Surge Protection You Can VPRLin'toGround 600V 1200V 1200V 1800V ' Suggested Placement Up to 90VAC circuits, 120/240 VAC circuits Off-grid PV combiners 316V/480VAC circuits Count 4n• 12V,24V,48VDC battery Charge controller inputs Grid-tie PV combiners + circuits up to 30OVDC Grid-tie inverter input +1i Non-Isolated Inverters MidNite Solar Surge Protection Devices are type Type UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 1 devices, designed for indoor and outdoor applications. Engineered for both AC and PV 1 - Diagnostic Blue LED MNSPD-300-AC DC electrical systems, the provide protection - LED indicates when voltage is present between L1 +ground and L2+ground Y Y P P MNSPD-115,MNSPD-300-DC and MNSPD-600: to service panels, load centers or electronic LED indicates when voltage is present between Ll +L2(PV+PV-) devices that are directly connected to a MidNite Thermal Disconnector Internal Fuse Surge Protection Device (SPD). Response Time <1 micro sec. MI CONTRACTOR MidNite's SPDs are offered in four models to protect a variety of different voltage ranges. -- They achieve this protection by clamping surge MNSPD300ACFM (Cut-in box) WOL�RIVER voltage to a level that your system can sustain (MNSPD-300-AC included) ELECTRIC without damaging the components of the Performance System. Surge Current Rating per Phase 80kA Xcel Energy Application#05006880 03.527" Short Circuit Current Rating 10kA Compare our SPDs against other surge protec- Fusing Individually fused MOVs tion devices. You will see there is no an-com Thermal Fusing Yes P Over current Fusing Yes Wolf River Electirc son in both our price and features. All our SPDs Operating Frequency 0 to 500 Hz Address:101 Isanti Parkway are made in the USA and have a 5 year warranty. Mechanical Description NE, Isanti, MN 55040 Enclosure Polycarbonate UL94V-0 Phone number: (763)229-6662 Environmental Rating Type4X E-mail:contact@wolfriverelectric.com Connection Method #12 AWG With lightning you only get one Weight 1 lb. Mounting Method 1/2"Conduit Knockout chance, so get the best! 3,82„ Operating Altitude Sea Level- 12,000'(3,658 Meters) 4.425" Storage Temp -40 Fto+185 F(-40°Cto+85 C) SURGE PROTECTION Operating Temp -40°F to+185°F(-40o C to+85°C) 1 Diagnostics Four Models: Listings and Performance Blue status LED,one per leg 24 Wires ENGI 11 MNSPD-115 UL Standard for Safety,UL 1449 Surge Protective Devices-Fourth Edition NEER INC CSA C22.2 No.8-M1986 Electromangetic Interference(EMI)Filters,Fourth Edition Drawn by:New@engineerinc.io MNSPD-300-AC DATE:0511912022 MNSPD-300-DC Project Name: MNSPD-600 Model No. Max Operating Surge Current Configuration MCOV SCCR VPR 600V/3kA Ray Hatchett Voltage______,_ker Phase 1 L G Property Adre— MNSPD-1 15 100 VAC/150VDC 1 80kA 1 yl 3-wire(2 Legs) F 180V L-N 10kk 4 600V 1313 Hillwind Rd NE MNSPD-300-AC 300VAC 80kA 1 3-wire 2 Le s 470V L N 10kA 1200V Fridley, MN 55432 ETI_ alC- MNSPD-300-DC 385VDC 80kA 1 3-wire 2 Les 470V L-N 10kA 1200V VMNSPD-600 480VAC/600VDC 80kA 1 3-wire 2 Les 780V L-N 10kA 1800V Project: scale: ilx: www.midnitesoiar.comispd PV SYSTEM AS INDICATED www.midnitesolar.com/spd 17722 67th Ave.NE.,Arlington,WA 360-403-7207 FAX:360-691-5882 °` ��� 17722-67th Ave NE.Arlington,WA 98223 PH. 360-403-7207 FAX 360-691-6862 FD 13.0 WITNESS TEST PROCEDURE Ray Hatchett A TEST PROCEDURE THAT WILL BE USED TO VERIFY THE PROTECTION AND OPERATION OF THE SYSTEM SHALL BE SUBMITTED TO XCEL ENERGY FOR APPROVAL.THE PROCEDURE INCLUDES AN ANTI-ISLAN DINGTEST(FOR ALL SYSTEMS)TO VERIFY THE SYSTEM CEASES GENERATING IN PARALLEL WITH THE XCEL ENERGY 1313 Hillwind Rd NE DISTRIBUTION SYSTEM WHEN THE UTILITY SOURCE IS LOST.EACH SYSTEM IS UNIQUE AND WILL REQUIRE A CUSTOM TEST PROCEDURE BASED ON THE INVERTER Fridley, MN 55432 MANUFACTURER'S RECOMENDATIONS FOR COMISSIONIND AND ANTI-ISLANDING. IN ADDITION TOTHE MANUFACTURER'S RECOMENDATIONS. UTILITY:XCEL ENERGY ALLTESTING SHALL BE PERFORMED BY QUALIFIED PERSONELL ONLY PHOTOVOLTAIC PROJECT INFO PV MODULE:(28)HANWHA 40OW STEPS TO VERIFY PV SYSTEM IS READYTO BE ENERGIZED: INVERTER: 1.SITE SECURITY 1-PHASE 120/240 -SITE SHOULD HAVE 24/7 KEYLESS ENTRY AND DRIVABLE ACCESS IF XCEL EQUIPMENT IS PRESENT WITHIN THE SITE FENCE (28) IQ8+MICROINVERTERS -IF APPLICABLE,SITE SHOULD HAVE 24/7 DRIVABLE ACCESS TO ANY XCEL EQUIPMENT INSTALLED OUTSIDE OF THE SITE FENCE THAT IS USED FOR THE SOLE 11.200Kw(DC) PURPOSE OF FEEDING THE PV SYSTEM ARRAY 1 AZIMUT:188(15) ARRAY 2 AZIMUT:98(13) 2.PROPER LABELLING VERIFY LABELING FORTHE MAIN SERVICE PANEL,PV SYSTEM CIRCUIT BREAKER, DC DISCONNECT(WHEN APPLICABLE),UTILITYAC DISCONNECT,PRODUCTION METER AND OTHER RELEVANT LABELLING AND SIGNAGE. ARRAY TILT:22, 20 3.ENERGIZE THE PV SYSTEM BY CLOSING THE UTILITY DISCONNECT. PLEASE ALLOW 5-MINUTE FOR THE INVERTER TO BOOT-UP. NEC 2020/IRC 2018/IBC 2018 WOLF RIVER ELECTRIC COMPANY 4.WHI LE IN NORMAL OPERATION,REFER TO THE REFERENCE POINT OF APPLICABILITY TO VERIFY THE VOLTAGES AT THE INVERTER AC OUTPUT ARE WITHI N 5%OF THE COMBINED INVERTED AC VOLTAGE RATINGS AND ALL INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE"NORMAL." 101 ISANTI PARKWAY NE#G ISANTI, MN 55040 CONTRACTOR 5.WHILE IN NORMAL OPERATION,VERI FY THAT ALL INVERTERS ARE OPERATIONAL AND PRODUCING POWER.VERIFY THAT SYSTEM IS GENERATING AT FULLEST CONTACT@WOLFRIVERELECTRIC.COM REASONABLE CAPACITY.WHILE IN NORMAL OPERATION VERIFYTHE VOLTAGES ATTHE DER AC TERMINALS ARE WITHIN 5%OF THE COMBINED DER AC VOLTAGE WOLFRIVERELECTRIC.COM RATINGS AND ALL LEDs,ALARMS AND/OR LCD CODES ARE"NORMAL" WOLRIVER 6.SIMULATE THE LOSS OF UTILITY SOURCE FOR THE ANTI-ISLANDING TEST BY OPENING THE"UTILILITYAC DISCONNECT". ELECTRIC Ray Hatchett 7.USING A VOLTMETER,VERIFY THE VOLTAGE AT THE INVERTER SIDE OF THE AC DISCONNECT HAS DROPPED TO ZERO WOLF RIVER SOLAR Xcel Energy Application#05006880 CASE#05006880 NOTE:ONLY CUSTOMER-OWNED EQUIPMENT SHALL BE USED FOR THIS VERIFICATION. 24/7 UNESCORTED ACCESS SHALL BE Wolf River Electirc 8.USING AN AMMETER OR THE INVERTER'S DISPLAY,VERIFY THE DER OUTPUT OF THE INVERTER HAS CEASED WITHIN TWO SECONDS. PROVIDED FOR THE METERS&AC Address:101 Isanti Parkway DISCONNECT NE, Isanti, MN 55040 9.VERIFY INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE APPROPRIATE FOR LOSS OF UTILITY SOURCE Phone number: (763)229-6662 METERS&UTILITY DISCONNECT WITHIN E-mail:contact@wolfriverelectric.com 10. RESTORE THE LOST UTILITY SOURCE BY CLOSING THE"UTILITY AC DISCONNECT" 10'&LINE OF SIGHT 11.VERIFYTHATTHE INVERTER SYSTEM DELAYS 5 MINUTES BEFORE RESUMING POWER OUTPUTAFTERTHE UTILITY SOURCE IS RESTORED UTILITYAC DISCONNECT IS VISIBLE WITNESS TEST LOCKABLE&READILY ACCESSIBLE PROCEDURE 12.VERIFY FIXED POWER FACTOR SETTINGS FOR EACH INVERTER MEETTHE PROJECT REQUIREMENTS GROUND SNOW:50PSF 13. METERTECH HAS VERIFIED METERING EQUIPMENT WIND SPEED:115MPH EXPOSURE CATEGORY:B ENGINEEr"4INC 14.SYSTEM RESUMED DELIVERY OF POWER NO LESS THAN 5 MINUTES AFTER UTILITY SOURCE IS RESTORED PV ARRAY:2.75 PSF Drawn by.New@engineerinc.io DATE:0511912022 PRODUCTS: Project Name: RAILS:SNAPNRACK Ray Hatchett MOUNTS:SNAPNRACK Property Adress: ROOF-MOUNT 1313 Hillwind Rd NE Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED F-D 14.0 DEPARTMENT OF LABOR AND INDUSTRY Wiring Methods and Disconnecting Means Q Are the conductor and cable ampacities determined at 125%before adjustment factors?690.8(B) Solar PV Inspection Checklist Q How are the PV Source and Output Circuit protected from overcurrent?690.9 Q Do AC or DC OCPD's have the appropriate voltage,current and interrupt ratings?690.9 Solar PV Inspection Checklist for REI #ELE- Installer Wolf Rlver Electric Job Address1313 Hillwind Rd NE City/Township Fridley, MN 55432 Q Has arc-fault circuit protection been provided for DC source and/or output circuits?690.11 Required Documentation Q Is a rapid shutdown required and if so, how is it accomplished and identified?690.12&690.56(C) •Manufacturer's specifications for the inverter Q Is the PV disconnect permanently marked and installed in a readily accessible location?690.13 •Manufacturer's specifications for the module •Manufacturer's specifications for the optimizer(if used) Q Are the Isolating devices or equipment disconnecting means installed in circuits connected to •Verification that the racking system grounding and bonding is listed equipment at a location within the equipment,or within sight and 10 feet of the equipment?(Where PV Inverter the maximum circuit current is greater than 30 amperes an equipment disconnecting means shall be CONTRACTOR provided for isolation.)690.15 Q Is the PV system utility-interactive,stand alone or multimode?690.2 Q Has the fuse disconnecting means, if required, been installed?690.15 and 240.40 Q Is all the equipment listed for PV application?690.4 Q Are PV source or output circuits>30 volts in a raceway or guarded if readily accessible?690.31 WOLRI VER Q Is the system grounded, ungrounded or(functionally grounded)?690.2 and 690.41 Q Is single conductor cable used outdoors Type USE-2 or listed &labeled PV wire?690.31 ELECTRIC Q Has DC Ground-Fault Protection been provided and properly labeled?690.41(B)? Q Are PV source or output circuits on or inside a building in a metal raceway and marked?690.31 Xcel Energy Application#05006880 Q What is the maximum PV system voltage?690.7 Q Is all listed equipment rated for the maximum voltage?690.7 Interconnection Wolf River Electirc Q Determine the maximum circuit current for the PV Source and Output Circuit; Inverter Output Circuit; Q Has a plaque or directory been installed at each disconnecting means(capable of interconnection) Address:101 Isanti Parkway Inverter Input Circuit; and DC to DC Converter Output(refer to inverter documentation). 690.8 denoting all NE, Isanti, MN 55040 electric power sources&power production sources. 705.10 Phone number: (763)229-6662 Q Has the point of connection to other sources been installed per 705.12? E-mail:contact@wolfriverelectric.com System Grounding Q Is the supply side disconnect readily accessible and within 10'of the connection point?705.11 Q Are all exposed non-current carrying metal parts of the PV system grounded?690.43 and 690.47 Q Are the utility interactive inverters connected to the system through a dedicated circuit breaker or PV INSPECTION Q Are the mounting structures or systems used for equipment grounding?690.43 fusible disconnecting means?705.12 CHECKLIST Q Does the bus or conductor ampacity comply with 705.12? Q Are the interconnecting devices used for equipment grounding listed and identified?690.43 Q Are the EGC properly sized and protected if exposed and not smaller than#6?690.45,690.46, Q Have all the required labels been applied? (See separate label list.) 690.50, 250.122, 250.120(C) ENGINEErAZINC Drawn by.New@engineerinc.io Q Has the grounding electrode system been installed?690.47 DATE:0511912022 Q If both are present, has the DC grounding electrode system been bonded to the AC GES?690.47(A) Project Name: Ray Hatchett Property Adress: 1313 Hillwind Rd NE 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.gov Fridley, MN 55432 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.Qov sclar_cheddst NEC202osolar_Checklst_Checled 2MO317 Project: Scale: 1 2 PV SYSTEM AS INDICATED D 15.0