HomeMy WebLinkAboutA2 Floor Plan-Model 16'-0" 17'-4" J# 7'-0 J# 43'-4"
3'-4" 3'-4" 3'-4"
38'-8" 3'-4"
9 9
00 GYP. BD. SOFFIT 3 SIM 3
\ TOP OF 8" MASONRY AT
DOOR OPNGS. EL.99.67
4" CONCRETE SLAB W/6X6-10/10 WWF
\ / \ I 10 MIL VAPOR BA FRIER
- O.H.CAB. O.H.CAB. O.H.CAB. 4" CONCRETE SLAB W/6X6-10/10 WWF
I ao 2" RIGID INSULATI N
4'00 1 " BACKSPLASH 6" COMPACTED SA D
/ \ / 10 MIL VAPOR BARRIER
2" RIGID INSULATION
6" COMPACTED SAND
III I \ \ / I CONTRACTION JOINTS
TOP OF AT 11' O.C. (MAX)
_N \ / / I 1'—g" CONC.SLAB SPACE EQUALLY IN 1'-8" 1'-8" TOP OF
EL. 100.00
BOTH DIRECTIONS CONC.SLAB
_ EL. 100.00
0 0 wQ�
I / — \L/ L, I " � ��
2'-O 1 -4 3 -4 1 -6 1'-10" 6'-0 ;.,� N N
REFRIG. BASE BASE CAB. DISH SINK STORAGE CABINETS o
1 COURSE 6" CONC. BLK. a
CAB. WASH. CAB. I 1 COURSE 6" »CONC BILK. 4 COURSES 8" CONC. BILK. �4 w
3 KITCHENETTE ELEVATION I 4 COURSES 8 CONC. BLK. � Q w
TOP OF MASONRY L.100.33 (TOP OF MASONRY EL.100.33) CONTRACTION JOINTS
( ) AT 14' O.C. (MAX) �
SPACE EQUALLY IN �-
A2 3/8" = 1'-0" I 1'-8" X 10" CONCRETE FTG. o 1'-8" X 10" CONCRETE FTG. BOTH DIRECTIONS o NN
W/(2) #5 REINFOR ING-CON'T. W/(2) #5 REINFORCING-CON'T. x w
7'-7" (BOTTOM OF FOOTING EL.96.16) (BOTTOM OF FOOTING EL.96.16) Q ° "
BUILDING A
TOP OF 8" MASONRY AT
ri
W W
'Ile
D102 B U I L ING B �n DOOR OPNGS. EL.99.67 TOP OF 8" MASONRY AT
—GYP. BD.� I i� I O.H. DOOR OPNGS. EL.99.67
---- L9' X 7' O.H. DOOR 9' X 7' O.H. DOOR 9' X 7' O.H. O0R 9' X 7' O.H. DOOR J
FOLD DOWN
DIAPER i / \\\ / 3'-6" 12"
CHANGING —
TABLE i i 5 \ 012" U
i Lo
i \ / �
91
5'-0" DIAMETER J8 A2 6 120" MIN in �I / - 18 GRAB BAR FOUNDATION PLAN 9 -° -4 9 -°ll 2'-
-p 9 -°ll -4 9 -° U
UNOBSTRUCTED 00 /
TURNING SPACE 3 R BAR
\ 7 — - / = A2 Ids 1/4"
\ / z w \
SIN o \ o
r - \� 17'-4" 7'-0" 43'-4"
0 I O
Of \ N 8'-8" 8'-8" 14'-8" 14$-0" 11'-8"
D101
w •'�
U
7
TOILET PAPER 4" COVED BASE
HOLDER 13 3 3 �a a
\ O _ � � o:)
W1 W1 TYP TYP W1 � �-I Q o
4 HANDICAP TOILET PLAN 5 ELEVATION I 6' WHITE�I�BOARD D105
A2 3/8" = 1'-0" A2 3/8" = 1'-0" I - \ - MECH I I O U w M
0o I PROJECTIOi SCREEN I •
102
7,-6„ 7'-7" D201 \ 00 I STORAGE I WALL TRACK / N
\ CABINETS I 0j
UTILITY I I / 00
SINK
CO D102
_ I I� FUTURE I /
-GYP. BD. � GYP. BD.� 9
2'-0" I GAGAGE WALL
3 4 3 Is I I I SPACE 2 w1
Jim 3 �'-o" 3 I I 105 ,
6" 3'-0" PAPER TOWEL/ \ 11 TOILET '-- I�lw I I VINYL FLOOR 2
SOAP DISPENSOR I L I I I I 11
2'X3' o \ \ 3 Y MULTI-U.. E SPACE 6 101 �`�I SOFFIT ABOVE ASSEMBLY 3�1 9 -3 1/2 3 - 2
CERAMIC I _ o AND STORAGE o
18 GRAB TILE MIRROR \ 8 l l I KITCHENETTE SPACE. 1— — — IFY VERIFY )fYP I 3
3 AR GR B BAR 00 \ 3 N W1 2 0 W1 INK i 103 1 4 I 5'-3" N H
00 D101 / 'c0U TER \
sq = O D101 I I I FOLDING w
O / IO CA N BASE I WALL 6' WHIT BOARD W
0o SINK I w SINK / = P OJECTI N SCREEN
BUILDI G B - I 9
0 o I ENTRY_I I R�F. I BUIL ING A 3
N i / / 400 SQ.FT. (GROSS) 100 L J I 1000 SQ.FI . (GROSS) I
N I I N Q CO l >
_ I N > _
`.J
N J v _ / l "00 8'-3 1/2" 2'-s 1/2" I STORE �_ r a
TOILET PAPER 4" COVED BASE 8N 4" COVED BASE I - 106
FINISHED C° D106 I \ I >
HOLDER 2'-3" 3'-6" 2'-6" 2'-0
" D200 D100 / ,� I I WALL w
7'-6" 1'-5" MIN" _l _l I I > I Q
ELEVATION 7 ELEVATION �_ -
6 a ° a a 9' X 7' O.H. DOOR 9' X 7' O.H. DOOR 9' X 7' O.H. DOOR'o w
v 9 X 7 O.H. DOOR a ° a. v . v
A2 3/8" = 1'-0" A2 3/8" = 1'-0» %. a v. a d' a Q.
CONCRETE APRON — v. _Q a I W
3 v a a . v d a d
7'-6" 1'-4" ° ° - r�
ROOM FINISH SCHEDULE F FLOOR DOOR SCHEDULE 9'-°" '-4' 9'-0" 2'-0" 9'-0" '-4' 9'-0"
F1 CARPET
I— F2 CERAMIC TILE FRAME DOOR U NOTE 13 10 2 FLOOR PLAN
U F3 CONCRETE (SEALED) z
O = F4 VINYL 1. FOLDING WALL TO BE PROVIDED AND INSTALLED BY OTHERS. 5 N Q
—GYP. BD.- z A2 1/4"
CD CD0 < VERIFY DIMENSIONS, INSTALLATION DETAILS AND STRUCTURAL
ROOM m U) z z U) B BASE SUPPORT WITH QUALIFIED STRUCTURAL ENGINEER.
o NAME o L J J J � B1 WOOD Y � w w w A
FOLD DOWN O OJ Q Q W W O B2 CERAMIC TILE Q 0 >_ >_ N ~O g,-p„ o
m L� m U U z B3 VINYL 3'-4" 5 -4 2'-8" 3'-0" 2'-4" 3'-0"
DIAPER CHANGING ASSEMBLY BUILDING A � m � � � � z
TABLE- B4 CARPET
CERAMIC TILE i - 100 ENTRY F4 B1 W1 C1 CH1 1 B6 MASONRY D100 100 2 A S1 1 HR 1,2 HM HM HM HM HM WOOD ALUMINUM 5 -10 1/2
W1 D101 101 1 C S1 1,3
ao 101 TOILET F2 B2 C1 CH1 2 W WALLS
102 MECHANICAL F3 63 W1V2 Cl CH1 W1 GYPSUM BOARD-PAINT D102 102 3 B S2 1 HR 1 INSUL. ALUMINUM
w W2 CERAMIC TILE D105 105 1 A S1 1 HR 1,2 _ TEMP.
_ J 103 KITCHENETTE F4 B1 W1 C1 CH2 3,4 N N GLASS N 0 0 0 N rn
0 C CEILING D106 106 1 C S1 1,3 I l I I I I I I
104 ASSEMBLY SPACE 1 F1 B1 W1 Cl CH1
Cl GYPSUM BOARD-PAINT � W1 AWNING
105 ASSEMBLY SPACE 2 F1 B1 W1 Cl CH1 D200 200 1 A S1 1 HR 1,2
Q M DRAWN CHECKED
w 106 STORAGE F4 B1 W1 Cl CH1 CH CEILING HEIGHT D201 200 1 A S1 1 HR 1,2 PELLA WINDOWS (3016CA21 ) RWF RWF
CH1 8'-4" S SIZE VERIFY WINDOW DIMENSIONS & DATE PROJECT NO.
' DETAILS WITH SELECTED WINDOW 5-12-2022
4" C.T. COVED BASE CH2 7 -8 S1 3 -0 x 7 -0 S2 2'-4 x 7'-0
200 STORAGE BUILDING B F3 B3 W1 C1 CH1 1 2 3 MANUFACTURER.
NOTES A B C GARAGE DOOR
g ELEVATION NOTES 1. PROVIDE ALL DOOR HARDWARE, LOCKS, AND 9 FRAME TYPES �o DOOR TYPES
1. PROVIDE WALK-OFF FLOOR MAT SECURITY SYSTEMS AS REQUIRED. COMPLY WITH � � WINDOW TYPE
A2 3/8" = 1'-0" 2. CERAMIC WALL TILE TO 4'-0" - GYP. BD. ABOVE ALL HANDICAP AND EXIT CODE REQUIREMENTS. A2 1/4" = 1'0" A2 1/4" = 1'0" A2 1/4" = 1'0"
3. VINYL FLOOR OUT 24" FROM BASE CABN'T. (SEE PLAN) 2. THERMAL INSULATED DOOR AND FRAME. A2
4. 8" SOFFIT ABOVE UPPER CABINETS 3. SOLID CORE WOOD DOORS W/OAK FINISH VENEER.
2 OF 4 SHEETS