Loading...
HomeMy WebLinkAboutResidential Permit Card CITY OF FRIDLEY 7071 UNIVERSITY AVENUE NE ISSUED: 05/26/2022 FRIDLEY,MN 55432 (763)572-3604 FAX: (763)502-4977 Permit#PR22-000022 ADDRESS : 5620 WEST BAVARIAN PASS NE PIN: 243024410255 LEGAL DESC:LOT 1 BLK 1 INSBRUCK VILLAGES 3RD ADDITION SUBJ TO EASE OF RECORD PERMIT TYPE: Plumbing Residential Permit PROPERTY TYPE:Remodel CONSTRUCTION TYPE: Remodel VALUATION: 0 NOTES:TUB TO SHOWER CONVERSION. SETTING NEW TOILET AND INSTALLING NEW VANITY. CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION. APPLICANT Description Total Cost Permit Fee 35.00 State Surcharge Fee 1.00 Bartylla Plumbing&Heating Inc 15657 Forest Blvd N TOTAL 36.00 Hugo,MN 55038 Payment(s) Credit-PR22-000022-7818061719iL1/z36 OWNER MORAN JOSEPH 5620 W BAVARIAN PASS NE FRIDLEY,MN 55432 AGREEMENT AND SWORN STATEMENT This permit becomes null and void if work or construction authorized is not commenced witin 180 days or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. 05/26 Applicant Date /2022 05/26 Bldg Insp Date /2022 SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. CITY OF FRIDLEY 7071 UNIVERSITY AVENUE NE ISSUED: 05/26/2022 FRIDLEY,MN 55432 (763)572-3604 FAX: (763)502-4977 Permit#PR22-000022 ADDRESS : 5620 WEST BAVARIAN PERMIT APPLICANT: PASS NE PIN: 243024410255 Bartylla Plumbing&Heating Inc LOT 1 BLK 1 INSBRUCK VILLAGES 15657 Forest Blvd N LEGAL DESC: 3RD ADDITION SUBJ Hugo,MN 55038 TO EASE OF RECORD PERMIT TYPE : Remodel PROPERTY TYPE: Remodel Tub to shower conversion, CONSTRUCTION TYPE: setting new toilet, installing new vanity NOTES:TUB TO SHOWER CONVERSION.SETTING NEW TOILET AND INSTALLING NEW VANITY. CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION. BUILDING INSPECTION RECORD 24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS. CALL FOR INSPECTIONS WEEKDAYS:8 AM TO 4:30 PM Inspection type Date Inspector Status Comments Plumbing Rough In Inspection Plumbing Final Inspection INSPECTION COMMENTS: IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT. THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.