HomeMy WebLinkAboutResidential Permit Card CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 05/26/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#PR22-000024
ADDRESS : 4706 2ND ST NE
PIN: 263024320066
LEGAL DESC:PLYMOUTH CITY OF FRIDLEY S 30 FT OF LOT 12,ALL OF LOT 13 &N 5 FT OF LOT 14 BLK 5
PLYMOUTH
PERMIT TYPE: Plumbing Residential Permit
PROPERTY TYPE: Remodel
CONSTRUCTION TYPE: Remodel
VALUATION: 0
NOTES: REMOVE TUB AND VALVE.INSTALING NEW SHOWER AND SHOWER VALVE.
CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
APPLICANT
Description Total Cost
Permit Fee 35.00
State Surcharge Fee 1.00
Ed Brown Plumbing LLC
328 County Road E TOTAL 36.00
Houlton,WI 54082
Payment(s)
Credit-PR22-000024-7818486373YZI/z36
OWNER
DREWS BRADLEY R&
BRIDGET M
4706 2ND ST NE
FRIDLEY,MN 55421
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction
authorized is not commenced witin 180 days or if
construction or work is suspended or abandoned for a
period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this
application and know the same to be true and correct.All
provisions of laws and ordinances governing this type of
work will be complied with whether specified herein or
not.The granting of a permit does not presume to give
authority to violate or cancel the provisions of any other
state or local law regulating construction or the
performance of construction.
05/26
Applicant Date /2022
05/26
Bldg Insp Date /2022
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 05/26/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#PR22-000024
ADDRESS : 4706 2ND ST NE PERMIT APPLICANT:
PIN: 263024320066 Ed Brown Plumbing LLC
PLYMOUTH CITY OF
FRIDLEY S 30 Fr OF LOT 12, 328 County Road E
LEGAL DESC: ALL OF LOT 13&N 5 Fr OF Houlton,WI 54082
LOT 14 BLK 5 PLYMOUTH
PERMIT TYPE : Remodel
PROPERTY TYPE: Remodel
Remove tub and valve and
CONSTRUCTION TYPE: install new shower and
shower valve
NOTES:REMOVE TUB AND VALVE.INSTALING NEW SHOWER AND SHOWER VALVE.
CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS:S AM TO 4:30 PM
Inspection type Date Inspector Status Comments
Plumbing Rough In
Inspection
Plumbing Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.