HomeMy WebLinkAboutGelhar scope I
Contract Proposal—Page 1 of 10
Btlllt�lll I"GaG'iiYlefl Job Number:8710
g g Date: 3.1.2022
IfIIA
1613 93rd Lane N.E.
MURPHY BROS,. Minneapolis, MN 55449
�; _.., : t; +:._,,- s:i r• : ;;j�. t:, �. (763)780-3262
(763)780-0550 Fax
We herewith submit proposal for materials and labor to be supplied at the sole request and order of:
Client: -- ------ -- ------- -- Job Address: -- -----
Robyn & Justin Gelhar (Robyn) 612.251.3452 7392 Memory Lane NE
Fridley, MN 55432
f Hereinafter referred to as owner, for work to be performed at premises set forth above,
according to the "General Scope of Work" and the following General Terms and Specifications:
SEE SELECTION DOCUMENT FOR DETAILS AND SPECIFICATIONS ON MATERIAL SELECTIONS
PROJECT SCOPE
The general scope of this project is to completely remodel the existing kitchen and adjoining areas
consisting of the dining and living room. Additional flooring and millwork will also be addressed in this
project.
GENERAL CONDITIONS
1. Murphy Bros. will secure the general building permit.
2. Trade partners of Murphy Bros. will obtain permit(s) associated with their trade(s).
3. Project management and costs for returns and deliveries included.
4. Design work and drafting services included.
5. Building permit costs are included in this agreement
WORK/ITEMS PROVIDED BY HOMEOWNER
1. Remove all personal items from construction and staging areas
2. Homeowners are responsible for purchase and delivery of appliances, Murphy Brothers will
provide installation services
3. Light fixtures provided by owner, installed by contractor-Recessed and under counter tight
fixtures provided by electrician
4. Final cleaning by owner
SITE PREPARATION
1. Provide dumpster for construction related materials—Set dumpster in street if possible *new
concrete driveway*
2. Location of electrical panel— Lower-level mechanical room, storage area
3. Temporary location of refrigerator— Lower-Level Living area
4. Location of existing appliances and other salvaged items - Lower-Level Living area
3/1/26221:19 PM
Murphy Bros Design I Build
Owner.1nitials �
Owner Initial I
Contract Proposal—Page 2 of W
Project budget
A- Options included in this agreement
1. Refinish existing railings (Paint grade)
2. Wrap beam between kitchen and living room
3. Replace the (2) two existing ceiling supplies at the upper level of the home with insulated supply
lines
B -Options not included in this agreement
1. Add additional insulation to bedroom level ceiling
PROJECT SPECIFICATIONS
1. Demolition
Remove and Save
a. Refrigerator and microwave— Use for temporary kitchen
b. Dishwasher and range--to be hauled away by others
c. Appliances for temporary kitchen set up
d. Section of base cabinet and countertop for temporary kitchen as directed by owner
Remove and Dispose
a. Kitchen Cabinets, Countertop, tile, and hardware
b. Remove kitchen soffits
i. Note: Furnace flue framing to.remain but will be modified per the approved
plans
c. Lighting on the main floor,
d. Vacuum out existing blown insulation at kitchen and living room level
e. Remove ceiling at kitchen/living room level
f. Remove existing common wall and header between kitchen and living room
g. Drywall at kitchen perimeter to a height of 48" (Allowing access for electrical and
plumbing updates)
h. Baseboard water heat register at common wall to living room
i. Carpet and pad at living room, hallway and both flights of stairs
j. Baseboards on main level
k. Casing on all main level windows and door
1. Living room bay window
m. Kitchen sink window
2. Framing
a. See framing plan for details
b. Temporary framing to support roof structure prior to removing common wall between kitchen
and living room
c. New "flush" (Above the existing ceiling) structural header spanning the opening between
kitchen and living room
d. Construct"False"header below and in-line new structural header. Extending down 9"(+
(Final height TBD by the client) between kitchen and living area
e. Add additional framing below bay window in order to add insulation
f. Install Countertop support brackets six (6), see selection schedule for details
g. Install new living room window in existing location
h. Install new kitchen window in existing location
i. Add backing for beverage center floating shelves
j. Misc. framing repairs related to this project
1
3/1120221:19 PM I
Murphy Bros Design I Build �
Owner Initials
Owner Initial
Contract Proposal—Page 3 of 10
3. Windows - Marvin
a. See selection document for details
a. Kitchen— Elevate Casement Assembly RO 41"X 40"
b. Living room— BOW WINDOW Elevate Casement Bow Assembly RO 97 25/64"X 59
13/16"4wd unit, center 2 units are fixed Same configuration as existing
4. Siding repairs
a. Repair siding at kitchen window
b. Repair siding at bay window
5. HVAC
a. Kitchen exhaust—vented through wall behind stove /
b. REMOVE EXISTING AIR HANDLER IN ATTIC INCLUDING AND ALL ASSOCIATED
PARTS, DUCTING AND VENTS.
c. SUPPLY & INSTALL GOODMAN GARUF25614 2 TON AIR HANDLER W/GOODMAN
GSX130241 CONDENSER, COIL, PAD, AND LINESET
d. INCLUDES PANIC TRAY BELOW AIR HANDLER IN ATTIC *Does not includes alarms or
moisture sensors"
e. INSTALL INSULATED DUCT IN ATTIC
f. SUPPLY & INSTALL (1) EMBASSY HAV-48-3 TOE KICK SPACE HEATER CONNECTED
TO RADIANT
g. REMOVE EXISTING RADIATOR BETWEEN LIVING ROOM & KITCHEN
h. Provide new ceiling registers
i. Provide new ducting to wall register at bedroom to better regulate air flow
6. Plumbing
a. Remove baseboard hot water heater from kitchen common wall
b. Rework plumbing at kitchen per plan
c. Hook up new fixtures
i. Sink, installed by countertop fabricators
ii. Faucet
iii. Garbage disposal
iv. Dishwasher
V. Refrigerator
3/l/20221:19 PM
Murphy Bros Design I Build
Owner Initials.
Owner Initial
Contract Proposal—Page 4 of 10
7. Electrical
a. KITCHEN (Ceiling taken down)
• Demo existing kitchen for wall removal and soffit removal
• Demo existing wiring for new layout, relocate thermostat
• Furnish and install 3- LED recessed cans on new relocated single pole switch- Dimmered
• Furnish and install 2- LED recessed cans on new relocated single pole switch - Dimmered
• Dimmed Wire for 2 -pendants over island on new, relocated single pole
• Furnish and install LED thin channel undercabinet lights in 4- locations on single pole
switch, dimmed Rewire 1 -light over sink on single pole switch
• Furnish and install 3- island outlets-turned horizontal
• Furnish and install 1 - outlet in pantry
• Furnish and install or rework 6-countertop outlet- update to AFCl/GFI protection
• Wire power to island microwave
• Furnish and install outlet for fridge
• Furnish and install power to electric range
• Wire vent hood
Wire for dishwasher
• Rewire for garbage disposal
• Add AFCI protection on any revamped circuits
b. BUFFET AREA
• Furnish and install 2-general outlets at countertop
• Furnish and install 2-outlets for beverage fridge on 15A circuit
• Furnish and install 1 -20-amp circuit,
• AFCl/GFI protected for outlets
c. LIVING ROOM (Gutted down ceiling)
• Furnish and install 4- LED recessed cans in living room on new single pole switch, dimmed
• Wire for 1 - paddle fan on new single pole switch
• Add outlet at east wall—location to be determined
• Redevice all remaining outlets- add AFCI protection per code
d. LOWER-LEVEL FAMILY ROOM
• Replace the ceiling box lights with surface mounted lights—Lights provided by owner
1. Note: Remove existing fixtures at time of updating
8. Insulation
a. Repair wall insulation disturbed by this project
b. Remove existing ceiling insulation at main level
c. Replace ceiling insulation at main level. Update to current code requirements
3/l/20221:19 PM
Murphy Bros Design I Build AV
Owner Initiais,
Owner Initials
Contract Proposal—Page 5 of 10
9. Drywall
a. New drywall at kitchen walls as needed
b. New drywall at main level ceiling
c. Blend new drywall into existing
d. Tape, sand and prep drywall and patches
e. Install medium (popcorn) ceiling texture to match existing
f. Skim coat stair common wall to bedroom
10. Flooring
a. Tie in new wood to existing floor in the kitchen area
b. Sand, Stain, and refinish floors on the main level, upper hall, and both staircases
c. Stain to blend with master bedroom floors (Dura Seal Special Walnut)
d. Stain and finish treads and risers to match wood floor
11. Millwork
a. See selection document and plans for finishes and profiles
b. New Paint grade base and casing on Main level
c. Opening between kitchen and living room includes wrapped opening. See plans.
12. Cabinetry
a. See selections & approved cabinet drawings for kitchen
b. Does not include toe space drawers on beverage center
c. Floating shelves for bar area included in cabinetry details
13. Countertops
a. See selections and approved plans
b. Kitchen: Quartz Tops, no perimeter splash, island splash per plans
c. Beverage Center Top: no splash & no tile. Note: clean edge needed where the top meets
the back wall as there will be no backsplash installed.
14. Tile
a. See selections and approved plans
b. Backsplash tile with inlay behind range
c. No tile behind beverage center
15.Appliances
a. Provided by homeowner, Installed by contractor
b. Homeowner to coordinate delivery—Uncrate and set-in-place
c. See selection document for model numbers and appliance list
{
16. Painting/Staining
a. See selection document and plan for colors and locations
b. Prime walls & Paint walls
c. No ceiling prime or paint required per medium (popcorn) texture
d. Finish Cabinetry and millwork per selections
e. Paint countertop support brackets cabinet color white to match perimeter cabinets
f. Prep and paint stair railings, balusters, newel posts, skirt boards and related railing trim 1
17. Hardware
a. See selections document for hardware selections
b. Cabinet hardware included
r
3/I/20221:19 PM
Murphy Bros Design I Build
Owner Initials i
Owner Initials—�