Loading...
HomeMy WebLinkAboutFinal Review 7392 Memory Lane & ELHAR REMODEL 000 o TABLE OF CONTENT m TITLE APPROVED SHEET # COVER PAGE _ JensenD06/01/2022 2 EIXTING MAIN FLOOR a-m z `rl 3 EXISTING LOWER LEVEL ?Z 4 PROP05ED KITCHEN 5 FRAMING PLAN W o 6 FRAMING CRO55-5ECTION - FRAMING REPORT W/ ROOF LOAD WIN C 8 MECHANICAL PLAN q FLOORING PLAN 10 CABINET PLAN 11 KITCHEN CABINET - ELEVATIONS ua w � � 12 ISLAND ELEVATIONS v z N I t t ' 13 BEVERAGE CENTER w w C "t _ Q _j ,ten i � - r t _ 14 MILLWORK PLAN �•�� _ t; 15 PAINT / STAIN PLAN w o Z: 16 COUNTERTOP PLAN5 tu rZ 1 TILE ELEVATION5 } 73 5YMBOL5 LEGEND `' _J " � m r DATE I DRAWING 8Y 111"V21 EXISTING MJ Smoke detectors in each 1211121 PTION5 ALH 1215121 OPTIONS ALH SEPARATE PERMITS FOR: ELECT, PLUMB. MECH. sleeping room and on each level 12221121 UPDATES ALH of the house per R314 ,1"2022 REVISED MDJ e%15TING maga 111 112 0 2 2 Flans ALH 1/1812022 TIM.Flora ALH KX2112022 11Tmx ALH r ears F IFen ec ALH CO detection per R315 PECANS MDJ CONTRACT CLIENT SIGNATURE: 2020 IRC. A" rep E6rs ALH FF IH MDJ SIGN OFF DATE: o�2 av 03 CLIENT SIGNATURE: &�� Provide proper sized supply and 1. )These plans and specifications are the property of Murphy Bros.Any reproduction of these plans and/or specifications are prohibited without written return air ducts to rooms JOB#: B710 consent. DATE: 2. )All dimensions to be site verified. DRAWN BY: MDJlALH Exterior/Overall dimensions (if needed for project)are to be off the exterior side of the framing on the exterior walls. On the Interior walls on the APPROVED: NOTES: Exterior/Overall dimensions will be to interior wall centers and centers on wall openings. As NOTED FILE: Added interior dimensions would be to the wall finishes. Unless otherwise noted. PILE: xxxxxxx Dimensions on Cross-Sections&Wall Elevations would be to the wall finishes. Unless otherwise noted. SHEET 3.)The information, specifications and plans contained on these pages are a result of job site measurements, sub-contractor recommendations, and client 7 # 1 consultations.Any unforeseen pre-existing conditions may require change orders and the alteration of the proposed construction plans. I o J W T-q 7/16" 3'-4 112" ° APPROVED �w W VINYL DUTCH LAP ROUGHLY b"FROM M� 51DINO W/BRICK BASE OF WINDOW UNIT Jensen D06/01/2022 W ALONG THE FRONT OF TO TOP OF BRICK THE HOUSE ' tu Ul z in �Z z - - - I Gw — 1I G o 73 •5 6'b" Q W-2 1/4" 6' 10 5/16" m I I � ALL EXI5TING 5 _ I CEILING REGISTERS ARE ROUND ON NOT MEASURED AREA ATTIC ACCESS FOR MAIN 319 5Q FT `fi I I LEVEL ABOVE STAIRS m N AG FORGED AIR SYSTEM LIVING I I 15 IN TH15 ATTIC AREA Z 250 5Q FT J (L .tu W v 2668 _ z CV -2666 z (� _ HALL:� 13 � 4 5Q FT Q J if) 9'-1 l/8" 6'-10 1/2" 3' , .b m 11'b 13/161, „ Z LU 2)Z -- — — -—92610_ 3/4" _9068_ 2468 2668 _ ® 19'-0 3/6" 2 TV' '-2 3/4" 1'2 w o J s1 I I Htu I o >r 5 FT W r m E3 KITCHEN E1 I 122 5Q FT NOT MEASURED AREA 213 50 FT E2 I DATE vw4w BY 1112W21 EXISTING MJ DINING _ I 1215121 OPTIONS ALH 94 5Q FT - - Z� .l I 12121 211 UPDATES ALH 111ED A 1/1112022 MS CNG MDJ OVERHEAD 9,2,1 `Q 12-0 5/1 b"D 1/1112022 pb"„s ALH 1 - - 111812022 irate Flocs ALH POWER T 112612022 rise Ear ALH II II Ha 2/2nozz FNeI F en eaa ALH 5 8 342 1DG I I 2/v2o2z FruesG MDJ I 2I1012022 ee. ALH 4'-9 1/4" 5'-2�/16" �'2 3/8" ALUM.BROWN FA5CIA& 2/1 1120 2 2 nice ee ALH I I FRh 11NG I I I I SOFFIT v212Dz2 FUNS MVJ 9'-10 1/4" �a—u '-4 13/16" VINYL DUTCH LAP SIDING 4.5"REVEAL og I I J-CHANNEL FOR I I I EXTERIOR CASING JOB#: 8710 I I DATE: 2/2112022 I I I W DRAN BY: MDJ/ALH I I I I HOT-TUB 15 SET IN DECK APPROVED: I I I I I SCALE: A5 NOTED FILE: XxCXXXX EXISTING MAIN F R SHEET SCALE: 1/4" = 1'-0" # 2 i � I APPROVED 111 o° Jensen D06/01/2022 _ _ _ o �- tn ° ' NOT Q,m z ►n NOT MEA5URED ENTRY ; 7 MEA5URED AREA UP 3� 5Q FT In ca AREA 1 o9 50 FT Es c Q L 136 50 FT UP 4068 '` � ff) c 2X8 J5T iV.O.G. EXI5TIN6 DROOPED STEEL 3'-2 3/4" 12'-0 3/4" d3 STEEL BEAM COLUMN ON 8 X4 l Il NOT MEASUR D AREA � 5195QF lU W W 2868 > uzN II o z W Q J Ln JU VENT STACK FOR BOILER&WATER _( HEATER r 5TORAGE UTILITY z = 18 50 FT 120 50 FT W V- 11 X r F W 6'9 5/8" ky "- DATE DRAWIN 5Y 11 281 AW 11129121 EXISTING MJ COPPER DRAIN 12/1/21 ROP05E ALH LINES FOR 1215121 01rION5 ALH KITCHEN SINK 12/21/21 UPDATES ALH 11912022 RE 5EG MDJ �snm1/11/2022 Me`9 Fh . ALH 111OW22 h�Fl— ALH 1/2612022 Posk'= ALH Welk Eats LIVING AREA y022 r� ALH 1 141 5Q FT 2tr/2022 `P AN56 MDJ F1 I Pie" ALH 2/10/2022 Ee. '1"'22 Mee Eab ALH 2J2112022 FR ING FLAN5 MDJ JOB#: 8110 DATE: 2/2l/2022 DRAWN BY: MDJ/ALH APPROVED: SCALE: AS NOTED FILE: XXX1000X EXI5TING LOWER LEVEL SHEET #5GALE: 1/4" = 11-0" nn rr e J V/w 00 ° l'-q Ill6,, LL w M w W� ly APPR V D Tj D _ 218 5/16'41FX ensenDO /01/2022 �-m z Ln L � � Z w II ° 7 Q II is 6' b" V-2 1/4" 6'-10 5/161, m 36 1/2" LIVING � II 250 5Q FT I I 3' I' bloc=propera ath NOT MEASURED AREA m I I 31 q 5Q FT II J I� 138" Q- v Z CV ROUGHLY 21'-b"CE TO CENTER 5PAN _ 2666 _ z z 7668 � lLl C d- K HALL v -4 � ry - . uP 34 5Q FT �- Z I, ry 2'-4 3/4' 16'-5 516" 6' 114" m 11 6 13/16'I m /� E Q V J —16571_ _ _ _ _ — — — — 2468 2668 — LU N r- - I I w U- ►L m I H 3 5 FT Max 400 CF - - - m make-up air pm code. 'I NOT MEASURED AREA 213 50 FT DATE DRAWIN 5Y I r1211/2i EXI5TING MJ II ROPOSE ALH 2115(2 FT r OPTIONS ALH ALH UPDATES MDJ R V15E°F�sa ALH '-613116" I I � � I. I vlarzozz bete Flbn ALH i 1 Peat Tm" ALH/26l2022 Y1dk E M 2/2/2022 F>Ed-b ALH =l NSr 3421100 HB vv F R 2o2z FUN MDJ I I I I F_" ALH Spu,A 1 2JI012022 Ed6 —lob 1/8" 151 3/16" 2JI V2022 Z VN Ed. ALH I 5'-l" 4'-q 1/4" 5'-2 7/16' 7'2 3!8" FF4 9 2/2112022 F1.aMs MDJ II II II T-10 1/4" 12'4 13/1b" I la I I JOB#: 8710 I I I I DATE: 2/21/2022 DRAWN BY: MDJ/ALH I I II APPROVED: 56ALE: A5 NOTED FILE: XXXX>O(X PROPOSED KITGHEN PLAN SHEET 5GALE: 1/4" = 1'-0" 4 Add 6" of framing below Siding is Metal clad to blend O W bay window on exterior for with existing, TBD on site �° W additional insulation (0 �-° 0m wLn Z z z 1&'-3 5/1 b" is � X 1141FX W o 73 O 2-PL 1-3/4" 1 Y FLU5H BEAM 5HOWN ON SHEET #6 Plan review beam load 22'x12'x15 lb s per sf= 3960 Ibs per 50 Ibs per s ft= 13,200 Ibs NOT MEASURE: ua w zzzN Add backing for floating shelves ry < w 60.'15" on center (OFF FINISHED FLOOR) � o- Q -i in 10.25" on center (OFF FINISHED FLOOR) 3'-59116" �'91/4' 131 16„ � W �Z See cabinet drawingfor placement R U LY 21'-8 CENTER TO CENTER SPAN = = _ z O x- 21'-713/16" HALL N m 2 lL J N 'L Half 1Nalls for the Island 16 m 3'-5 15/lb" 11'-7 5/1b" n LLl fn U- height is 41.5" (OFF _ _ _ '— FINI5HED FLOOR) ��-4'-7 1/4" N 1'-2 5/16' BATH Install 5upports for `r fV DATE DRAWIN BY rl�2121121 EXISTING MJ bar height countertop m , ROP05E ALH V-10 11/16" 7 10 3/8"— m NOT 1 0 4'-7 1/4" UPD�E5 ALH REY15E0MDJ KITCHENEX ST NG engALH TM�M— ALH N I Trade 1126/2022 Y1dk Eats ALH 21212022 I M Plan Ed. ALH 21112022 FNg MDJ 2/10/2022 Ed. ALH FZ a " ALH 2/,112022 Maa&g ESb 2/2112022 FN9a MDJ 9421106 JOB#: 6710 DATE: 212112022 DRAWN BY: MDJIALH APPROVED: 511 A5 NOTED FILE: XX,X000X SHEET FRAMING PLAN New Nall # 5GALE: 114" = 1 '-0" e J Ifjo IU APPROVEDo�yy° EXISTING 2X6 COLLAR TIES @ LL.u ON EVERY OTHER RAFTER EXISTING 2X6 HAND FRAMED o RAFTERS TO BE ATTACHED TO = d- 03 111 U1 FLUSH BEAM WITH HANGER5 z Z LL z u Q � ul 2-PLY 1-3/4"X lb"2.0E 0 73 Q MICROLLAM LVL V414.511 m BRG. ON EACH END 1` m c COLUMNS ON BOTH ENDS. ON TH15 SIDE TO BE SET ON THE INTERIOR 51DE ON THE EXTERIOR WALL z �e® v z z QMLn ADD 50LID BLOCKING IN W Ln G' FLOOR SYSTEM TO (K 07 FOUNDATION WALL BELOW V (L/ N (SAME AREA WHERE _ ADD SOLID BLOCKING IN z J cV 'L FLOOR SYSTEM TO EXISTING STEEL BEAM LL1 m U- BEARS ON) rU r FOUNDATION WALL BELOW (5AME AREA WHERE L — — — — — — — — — — — — — — — — — — — — — — � EXISTING GMU � EXISTING STEEL BEAM I I EXISTING 4"X FOUNDATION WALL BEARS ON) I 8"STEEL BEAM DATE DRANIN6 BY 11129f21 EXI5TING MJ 1211121 ROP05E ALH I I EXISTING 1215121 OPTIONS ALH STEEL P05T 12121121 UPDATES ALH YTI0 MDJ 1f2022 EM Ex19 CNG vt11r2ozz Yerg d Flans ALH I IM12022 Try R— ALH Posl T d= 1126f2022 r�k EATs ALH I I 2/212022 FSE� ALH FKI4ING I I 21712022 FUNS MDJ f4Ed Flan 2110I2022 Eoss ALH Pc:l6 ge 211712022 reetirq Ears ALH W2112022 FWkMING FLiNS MDJ JOB#: 8710 DATE: 2/21/2022 DRAWN BY: MDJ/ALH APPROVED: 5GALE: A5 NOTED FILE: XXXX)UCX GROSS SECTION SHEET SCALE: 31b" = 1'-011 # 6 i � IFORTE•CM MEMBER REPORT PASSED 0 CI O° No Roof Load,Revised Kitchen Beam No Roof Load O 2 piece(s)13/4"x 18"2.0E Microllam@ LVL M w W� Overall Length:22' o D am w � + zz ° �0 Q � N c� APPROVED D L Q m 22' JensenD06/01/2022 Z v All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Design Results Actual @ Location Allowed Result LDF Load:Combination(Pattern) System:Floor Member Reaction(Ibs) 4162 @ 3" 6694(4.50") Passed(62%) 1.0 D+1.0 L(All Spans) Member Type:Drop Beam Q Building Use:Residential Shear(Ibs) 3453 @ 1'10 1/2" 11970 Passed(29%) 1.00 1.0 D+1.0 L(All Spans) Building Code:IBC 2018 Moment(Ft-Ibs) 21863 @ 11' 38753 Passed(56%) 1.00 1.0 D+1.0 L(All Spans) Design Methodology:Aso —� Live Load Defl.(in) 0.365 @ 11' 0.717 Passed(L/708) 1.0 D+1.0 L(All Spans) 1L U W Total Load Defl.(in) 0.575 @ 11' 1.075 Passed(L/449) 1.0 D+1.0 L(All Spans) O Z Z •Defection criteria:LL(L/360)and TL(U240). •Allowed moment does not reflect the adjustment for the beam stability factor. IJL L Q Bearing Length Loads to Supports(Ibs) J � Supports Total Available Required Dead Floor Live Total Accessories Lj 2)7- 1-Stud wall-SPF 4.50" 4.50" 1 2.80" 1522 2640 4162 1 Blocking 43 2-Stud wall-SPF 4.50" 4.50" 1 2.80" 1522 2640 4162 1 Blocking Q •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. (L < IU Lateral Bracing Bracing Intervals Comments V Top Edge(Lu) 0'6"o/c Z IV Bottom Edge(Lu) 22'o/c -Maximum allowable bracing Intervals based on applied load. Multiple Member Connections Type I Location Fastener L Placement Rows O.C. #of Fasteners Details uniform 0 to 22' 10d Nail(0.128"x 3") One Side 3 12" L17 DATE DRNKN BY Dead Floor Live 11/2W21 EXISTING MJ Vertical Loads Location(Side) Tributary Width (0.90) (1.00) Comments 1211121 FROPOSE4 AL11 0-Self Weight(PLF) 0 to 22' N/A 18.4 -- 1215121 OPTIONS ALH 1-Uniform(PSF) 0 to 22'(Front) 12' 10.0 20.0 Floor Joists 12/21121 UPDATES ALH 11412022 REnSE° MDJ E%IST NG 111112022 F`i',9„� ALH Weyerhaeuser Notes Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.Weyerhaeuser expressly disclaims any other warranties kF 2 * r1 ALH related to the software.Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer Is rnk T"x 2 ram Eav ALH responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at FWl F Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 Eaa ALH and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to FR.1'_FaRS MDJ www.weyerhaeuser.com/woDdproducts/document-library. ` P� ALH z EddsThe product application,Input design loads,dimensions and support information have been provided by ForteWEB Software Operator 2 N«wA EQis ALH FRAMINGPlAN5 MDJ 8'110 2f2112022 DRAWN BY: MDJIALH APPROVED: SCALE: AS NOTED ForteWEB Software Operator Job Notes 2/21/2022 3:33:22 PM UTC Tim Rocheford Gelhar Residence PILE: Shaw/Stewart Lumber Company 7392 Memory Lane N AForteWEB v3.2,Engine:V8.2.0.17,Data:V8.1.0.16 (612)238-4204 Fridley,MN 55432 SHEET trocheford@shawstewart.com Weyerhaeuser File Name:020422.1 Gelhar #Page 1/1 In J All ceiling registers to be 4" round, not rectangular as 17 shown I Of -Final locations TBD on site I } ENTRY d- aD z in AP OV Z Q) 7- J nsenD06/01/2022 D'n J N W o � o = m fl- a- � LIVING Gold air return to remain, TBD on size and location OT MEA5URED AREA I O I z w C "t R ROUGHLY�1'-8"CENTER TO CENTER 5* — Q q U1 Han r it }- —3 —1 to 2,Ln v z / DM DM DM IL / T _- - — - - = = - - - - - - -% - - 1- Z 73 PROP05ED LL MECHANICAL PLAN 5GALE: 1/4" = 1'-011 I / R 1 / DATE 11-1. BY 11129121 EXISTING MJ - 1211121 ROPOSE ALH KLGHEN R m 1215121 OPTIONS ALH 12121121 UPDATE5 ALH R REVISED 1I9I2022 MDJ r EzlsnRa 1111/2022 P`e ALH 1M42022 T'Me m_ ALH 3 � D I �' 1I2W2022 YjytEms ALH 21212022 Eat ALH 2/112022 FF4VISG MDJ Frel Flan ALH 211012022 EQ 70'-2 11l16" 4'-5 318" 2'-4 5/8" 4'-b 118" 2117120.72 n�n�9 a: ALH 2/2112022 FFLANSG MDJ JOB#: 8110 DATE: 2/21/2022 Add hydronic toe space DRAWN BY: MDJ/ALH APPROVED: heater under sink cabinet 5GALE: A5NOTED FILE: XXXX>oCX UPPER LEVELS MECHANICAL PLAN 5GALE: 1/4" = 1'-0" S# a—] HEET 218 5/16" - v/w 00 a0, U,w Sand and stain wood ledge to blend with m flooring �- i In w u, 36 1/2" Z N Ul L.L Z LIVING , W -4 NOT MEASURED AREA �0 m m � 13 81I WN ROUGHLY 21'-8"CENTER TO CENTER SPAN - �- kr HALL Q i _ Lu W - - - Z z Z cV THIS ROOM HAS THE FLOOR awn z I STAIN COLOR WE ARE LOOKING —I U) BATH TO BLEND WITH z o � 3: L NOT MEASURED AREA —► J m _ t KITGH- EN- -- Existing Wood Transition to remain - - I 1112W21 EXISTING MJ 108 1/8" I 12I 151 3116" I I I 12lN512121 OPTIONS ASH iION5 ALH 12121121 UPDATES ALH 1/912022 REVISED MDJ EXI5i1NG II II Ill 112022 Pi",°,,, ALH 111812022 tmee p^^+ ALH 1/26/2022 Pv"= ALH 21212022 ALH Flooring Top Notch, Material & Install N5 7/7/2022 FRAMING MDJ Kitchen (Main floor) Tied in and refinished to blend with Master Bedroom (Stain used was Dura Seal Special Walnut) "F� 2/10/2022 W 1 !LLH 2117=22 N mg EdU ALH Hallway to bedrooms Refinished to blend with Master Bedroom (Stain used was Dura Seal Special Walnut) 2(2112022 FRFLMS AMING Hallway Stairs to entry and BR's Refinished to blend with Master Bedroom (Stain used was Dura Seal Special Walnut) JOB#: 6110 DATE: 2/21/2022 DRAWN BY: MDJ/ALH T&R Sand & APPROVED: Tie into existing SCALE: AS NOTED Refinish PALE: )0000= FLOORING PLAN wood New Wood # Sand & Refinish SHEET SCALE: 1/4" = 1'-0" q Existing Transitions )J W O° O �W W LIVING I � _J a- I ON L.L m W l�[1 zz Cabinetry Custom Cabinetry I, E Kitchen Framed - Full Overlay, White Melamine - " I W 73 ID interior, soft close doors/drawers I I ° m Perimeter Painted SW7004 Snowbound m Island Valspar Otter on Cherry Zvi Hood Accent Valspar Otter on Cherry Hood Base Valspar Otter on Cherry ROUGHLY 21'-8" GENTER TO CENTER SPAN Door Style F403, Shaker I Drawer Style F403 - 5 Piece Shaker, small and large { fronts ' Millwork Pieces Crown F9003 3/4" x 3 1/4" Shoe: to w Shaw 105 3/4"x 3/4" No base - _ _ - - - - - - - - - - - - - --- - - — — z zN molding around island — — — — — — — — — — — —--_ — - - - - - z w Q � Accessories Double trash( HR CDM-WBMD50WH), in rollouts pantry (4), adjustable tray dividers, Q- ua o z 5" pullout filler (HR BP02-5SC), Towel , I w E pullout filler (Rev 432TB-BFBBSC-3C), 2 - Wood Shelf Susan Spinners (HR LSK28) I MF7 I I Beverage Center Framed - Full Overlay, White Melamine I: I I I v L interior, soft close doors/drawers IJ - - - - - Uppers Painted SW7004 Snowbound Base Painted SW7004 Snowbound Door Style F403, Shaker Drawer Style F403 - 5 Piece Shaker, small and large " fronts KITCHEN " DATE DRAWING 1112 I N21 EXISTING MJ 1211121 ROPOSE ALH Accents -Floating Shelves Valspar Otter on Cherry i- --- - 1215121 OPTIONS ALH Accessories 6 Pullouts (2 - 5" high, 4 -3" high) -- J ,212,12, "R�"E°5 ALH —�-- 11512022 PxIsnNG MDJ __. - - �_.- II 1 Mcrged I 1 111112022 p1w. ALH 1116/2022 Tree-Flea ALH Pml IEF li -_ •I I __ 1126l2022 relk E T.e is ALH II 21212022 ed� ALH FRhMING I 21112022 LntaS MDJ 'l__ Peal Plan ALH 20012022 EA.ts 211112112 HeelWg eel= ALH 2/2112022 F—K& PUNS MDJ JOB#: all DATE: 2121/2022 DRAWN BY: MDJ/ALH APPROVED: 50ALE: A5 NOTED FILE: XXXXXXX CABINET PLAN ##HEFT 50ALE: 3/5" = V-0" O v/w 121 3/4' 163 3/1 b" O O 0 3/4" o 16" 15" 36"— 2'11. 2l" 3 1/4" 3 1/4" 2 2'1" 32" 43 /16"— 12" 30" 12" l8 w _ Zia W ,n `� in lo m m — qNr 3 m = N- m JU Ln 0 2 5 6 m b l S 1 1 m �m zz m O � Z I- W a o - - -. m J w :L4-L - 1 I__i .I I I -I 1 _L —I '.I_�I_- .L__!- 1 -- Zvi ®®O®<D® I N F, (V 2 m L' / -1 r=J 1 - 1 1 0) w w Ir 3/4" 3y, 14 L241/8"�—3 ' 15" 3 " 21" — 33" 3 4" — Z N M 54 1/8" 30" 52" ~ ll-1 M d" Lo 4815/16" 1213/16" � Ce � � Q J Z lU 121 3/4" LLU Outlet 15" Above finished Floor w 5 Wall Cabinet 1O Hood Cabinet Wood Accent Full Height Sink Base I 1O Tall Pantry Cabinet II II II 5 36" W x 34.5" H x 24" D v r 16" Wxg2" Hx10" 0 2�1" Wx3YHx12" 0 30 Wxq.S Hx18 D D Oak Material 5" Extended Cabinet Face behind 1" Extended Stile Left, shim to fit on doors to cover sink front site © L Corner Upper 1x2 molding on bottom face of oak Adjustable shelves only Cabinet box 1 1 Full Height Filler Pullout PATE DRAWIN BY O Wall Cabinet 9 Out in outlet 15" AFF by electrician 2�1" W x 3Y H x 21" D 1 12" W x 38" H x 12" D 6 4" W x 34.5" H x 24" D 11/29121 EXISTING MJ 1211121 ROPOSE ALH O2 Tall Pantry Cabinet O Wall Cabinet Flush Finished End Towel Holder Pullout 112112 OPTIONS ALH 12121121 UPDATE5 ALH 15" W x q2" H x 25" D 32" W x 3&" H x 12" D REY9EG Riht Rev #432TB— ,1912022 EXISt NG MDJ g 1I1112022 pjryis ALH 4 Rollouts on base, 1 adjustable shelf Flush Finished End 10 3 Drawer Base BFBB5C-3C 112612022 TrmaFlare ALH Fo t ade 1l26I2022 1-t�t Eens ALH Flush Finished end right Right 2 21" W x 34.5" H x 24" O 3 Drawer Base 21212022 FE ] ALH FRAHING 2/7I2022 FUNS MDJ ® Wall Cabinet D 7 15" W x 34.5" H x 24" F"°IF� 2/)0l2022 Ems ALH 211-112022 Nee Eeas ALH Refrigerator Cabinet 12" W x 3b" H x 12" D 1O L Susan Cabinet D 212,l2022 F"NS. MDJ 36" W x 21" H x 25" Flush Finished End 3 33" W x 34.5" H x 33" D O Tray Base D Left (2) 5helf Spinners HR b 15" W x 34.5" H x 24" D ® JOB 8710 Refrigerator End ® Hood Cabinet #L5K28 DATE:: 212 OSA p, 1 Full Height Base Flush Finished End Right DRAWN BY: MJlALH Panel 30" W x 15" H x 1 b" O APPROVED: 3/4" W x q3" H x 25" D 4 Pullout 2 Adjustable vertical SCALE: AS NOTED D FILE: )UCXXXXX q" W x 34.5" H x 24" D dividers SHEET KITCHEN ELEVATIONS Pullout HR #BP02-55 # 11 5GALE: 31b 1 -0 _ _ I W W O❑O W m W W� �i 10 1/2" } ° _D d- ��� Q,m z u 21 1/4 �Z ---- I N 15" W - o '6 7j5 m �- m � m o . . 0 4 - - 33 1/4" 25" 16 3/4" \I 4 1/2" z u z \� 3/4 721 - � 50 3/4" z m LU 4 1/2 } A J w tu oZ 1 LU 3 Drawer Base 4 z J N 0 Base End Panel m w 33.25" 1N x 34.5" H x 24" 44" W x 34.5" H x 3/4" D y r D 2 Equal door panels 1 .25" Extended Style left No to kick, no base Top drawer is full width! molding OQuarter round only DATE DRAYNIN BY 2 Microwave Base N ® 1112W21 EXISTING MJ 33" 1N x 34.5" H x 24" D O5 3 Drawer Base 1211121 ROPOSE ALH 121"21 OPTIONS ALH 21" W x 34.5" H x 24" o ,1g1202 U=nKC, ALH 1111f2022 rs� o ALH J Sharp Built in 24 microwave Yer9� drawerSMD24ggFS D (V ION2022 'Y"ZRn ALH 1I26f2022 Poll Trade YIKk Edis p',-H 1" Extended Style right 21212022 FalFan Edns ALH 21i12022 FPLANS MDJ Flush Toe Fl"°'Flt ° .'0'022 Edits ALH 21 M2022 Meeting Edtr ALH Double Trash Base FR>MING 212112022 PLANS MDJ 1 F IN x 34.5" H x 24" D 44" HR #GDM- 10 V4BMD501NH JOB 8T20 DATE:: 2/21f2022 DRAWN BY: MDJIALH APPROVED: 5GALE: A5 NOTED PILE: >WCXXX)< ISLAND ELEVATIONS #FIEET 12 SCALE: 5/4" = 1'-0" 152 1/4" (n W �0 0 20" 5411 18"- 60 1/4" W m� a m w ►!1 \ aZ N z iy lJ.. N N Z47 Ln - v O/ N m m 9 N N c�V z O � l71 � _ H } wvzry z tu w oz LU �* V w 2 a 20" 12" —30" 12"t 1 S" 60 1 l4" J j m ►i 1 " 39 11/16" 4 7/6 97 11/161, w m 152 1/4" DATE DRAWING BY 11(2N21 EXISTING MJ \ Upper Cabinet to Countertop 0 Upper Cabinet to Gountertop 3 Drawer Base Full Height Door Base 1211121 ROP05E ALH 20" W x 56.25" H x 12" D 12" i^l x 34.5" H x 24" D 1 Y 1N x 34.5" H x 24" D 1215121 OPTIONS ALH 1 S" 1N x 56.25" H x 12" D 12121121 UPDATES ALH 1(W2022 EwsnN MDJ 2" Extended Style Left Flush Finished end right & Flush Finished end right Flush finished end left 1/1 11202 2 F ;° AL„ r2(1012022 Trax Ft�s ALH Flush Finished end right left 'Gang built with Cabinet 2 regular sized rollout F E� . Wm't EQ�ls ALH �eu ALH No finished bottom in No finished bottom in cabinet 4 1 Tall Rollout on bottom FF ING MDJ FWIFIan ALH cabinet * Gang built with Cabinet Fos B r 5Fa Bau ALH FFIP.NIs ® Floating Shelves (2) ® Full Height Door Base © 3 Drawer Base 6 212112022 MDJ Cherry Otter - Valspar Stain 20" Yq x 34.5" H x 24" D 12" YV x 34.5" H x 24" D color 2" extended stile left Flush Finished end left JOB#: 5110 PATE: 2/21/2022 54" W x 2.5" H x 12" D 2 regular sized rollout *Gang built with Cabinet DRAWN BY: MOJIALH APPROVED: Backing provided by Mbros 1 Tall Rollout on bottom SCALE: A5NOTED FILE: XX XJOC< BEVERAGE CENTER ELEVATION Gang built with Cabinet SHEET 13 # _• W W O O O n/W 7 LL W 1V-3 5/16" I �Ty 1147PX ENTRY (1 m W UII up z Z / InIn o 75 o LIVING L� No millwork changes to Hall or entry included ROUGHLY 21'-b"CENTER TO CENTER 5PAN — �_ 31/6. Z z _ Z N 21'7 LU 13/16" HALL A M Ln z 3'-5 15/16" 11'-7 5/16" iv O � O tJ_ iv 1'-b 31b" BATH �— 1'-2 5/16" Y 7 Ll 8'-10 11/16" 7'-10 31b" v m NOT MEASURED AREA 0 4'-7 1/4" KITCHEN DATE DRAWING BY 11124121 EXISTING MJ 1211121 ROP05E ALH Ill 12/5121 OPTIONS ALH 12/21121 UPDATES ALH 11512022 REYISEO MD.I E%r5 NG 11111202T Fens ALH 111812022,irMe Ftau ALH 112812022 PO�r1°" ALH rWt Et. 34211 DG MUM C'.0 ALH 21'-7 13/16" 2/7no23 P Un MDJ Millwork Shaw Stewart Lumber 2/10/2022 �2en ALH W1112022 Ytt' Etta ALH Painted Base Ranch - F206 Maple 3/8" x 2 3/4 2/2112022 FF AN'SG MDJ Painted Casing Princeston - F118 Maple 1/2" x 2 1/4" Stair parts All to remain, paint on site JOB#: 8'110 Hand Rail New Paint grade, F231 DATE: 2/21/2022 Wrapped Header Murphy Bros Millwork APR PROVED: MDJIALH Beam Wrap Materials Knotty Cherry with Valspar Otter Stain, 1 x4 or equivalent SCALFILE:E: AS NXO�TED MILLWORK PLAN SHEET 14 5GALE: 1/411 = 1'-011 Ledge and stair bottom rail connecting to wall cap to be painted -- ` black o � MMW 216 5/16" = W ENTRY 6 UP =ID ID a w ►Ln z L 'Z C � P W 3b 1/2" °- m a Ledge Stained LIVING � m with Flooringto Paint Skirt boards `� blend zt ON m lte-` 138" Paint Existing '�i �r�� ,�l ,g ,�r�� ��,� _ w w Black HALL N z. V z N UP r -A w E m z tji -3U z - - -- ) z - - - - - - BATH w In r m NOT MEA5URED AREA - KITCHEN 1Nhite Base and casing on this DATE DRAY41N Wr level 1112V21 EX15TING MJ 1211121 PROPOSEQ ALH 1215121 OPTIONS ALH _ 1212l/21 UPDATES ALH - . -- -- --- - - 11WO22 MST,v MDJ Ex15 NG 1/11/2022 P= ALH I 1ne2oa2 *�Ae ALH 108 / , 1513/1b" 112612022 ALHYEa 21212022 P'1e1P'e1 Ens ALH Paint/Stain Muprhy Bros Millwork 71712022 P LANSG MDJ F'u Peen ALH 2FI012022 Ears Base - Kit/LR Painted SW7004 Snowbound 211112022 McBeyEats ALH Casing in LR/Dining Painted SW7004 Snowbound ® ?@,@022 P`�'NSG MDJ Stair Skirting Painted SW7004 Snowbound Hand rails Painted SW6258 Tricorn Black JOB#: a„o Stair parts Painted SW6258 Tricorn Black DATE:RAH BY: Mo ALH Kitchen/Main Floors Walls Painted SW7023 Requisite Gray APPROVED: SGALE: A5 NOTED Entry Wall -to entry door Painted SW7023 Requisite Gray FILE: PAINT/5TAIN PLAN Main Level Ceiling Texture: Popcorn Painted Contractor Selected Flat White 5HEET 5GALE: 1/411 = 1'-011 # '� �J W ©0 G � W W PURPLE AREA 15 RA15ED UP 5.5" HIGHER ON HALF b L brackets are needed to hold up bar height countertop m WALL = m w u� z ►n BACK5PLA5H TO BE FULL HEIGHT ALONG THE WALL5 TO THE UPPER Z QL) z COUNTERTOP D 0 cc W J cA - l0 1/4 22 1/4 NO 13ACK5PLA5H, GLEAN GUT BACK s Q , EDGE 10 1/21, I i IW. _ 55 1/2" I I d in ry I I I '-•- I i I I 15" 17 1/2" I < v z -! ►n w Q-• Q J Uhl KITCHEN I - - - - - - ° W �z V o � < I; ;I O w mlL Ln IE_— t- II I BEVERAGE I`- CENTER 12" 3011 _ 9610, I 2511 I I DATE DRAWIN BY 11/25121 EXI5TING MJ 1211121 PROP05ED ALH 1215121 OPTION5 ALH 12121/21 UPDATES ALH WV2022 REV15Eo MDJ 50" FREE 1f1 V2022 5TANDING 33" UNDERMOUNT E"9�G ALH F=V2022 nede M— ALH RANGE 51 N K Yidk Edis ALH FWIPIen Edl� ALH FRiMING Puus MDJ FirEd Fly ALH Edts Post Eudgel ALH Noting EdU Countertops Granite Tops Plumbing Fixtures '=",' MDJ Kitchen Corian Quartz Kitchen Build.com/Ferguson Perimeter Ventia Cream Polished Sink Kraus 32-3/4", Undermount Stainless Steel Island Ventia Cream Polished with 50/50 Split, high divide #KHU102-33 JOB#: 5110 2022 Edge Style 1/8" rounded edge, square corners Sink Faucet Delta Essa Pull-Down Kitchen Faucet with DATE: 2l2 DRAWN BY: MPJIDJlALH Beverage Center Corian Quartz On/Off Touch Activation in Arctic Stainless APPROVED: NOTED Perimeter Ventia Cream Polished #9113T-AR-DST FILE: xXX>XXX COUNTERTOP PLANS Edge Style 1/8" rounded edge, square corners Faucet Power Supply #EP73954 SHEET SCALE: 3I8" = 1'-0" # 16 0J W O° I.L 00 w M W W of 0" a in w uu'i 16" 15" 36" 3/4 L21" 27" 1'-3 3/16" r z 5'-2 1/4" 3'-� 11 116" 2-6 1 0 �N 73 43 L. oL iT�q / _ 1 -- { f 1—_.--I - _ I�I i i - - L I -1 C_ i I1j w w I Z v z N I z � m i - o u, - - - - W to LU tu -a DATE DRAYVN BY 11M21 EXISTING MJ 1211121 PROPOSED ALH 1215121 OPTIONS ALH Tile STONER TILE 12121121 UPDATES ALH 1M022 REVISED MDJ Kitchen CTW/Daltile 111112022Swn„G ALH Y<rge4 Field Tile CTW Spendours Equipe White 3x12 EQUSPL3X12WHIT - 3/8" thick 111812022, Tr�Fa ALH POSE 71ede ALH Ff k EAb Accent Tile Daltile Choreo Encaustic Ch34 Starlet 10x10 matte tile (4 pieces)- 3/8" thick Edb ALH FRAMNS Fl 5 MDJ Grout TEC Sterling W10120 EaFM r ALHroKWgelALH reewgEel:Edging Schluter Jolly Trendline Matte White FRnw15G MDJ -t-r JOB#: 8110 DATE: 2121/2022 DRAWN BY: MDJ/ALH APPROVED: SCALE: AS NOTED FILE: >0000= TILE ELEVATION5 SHEET SCALE: 1/2 11 = 1'-011 # 1