Loading...
HomeMy WebLinkAboutChartraw Final Insurance Scope VL Builders Vt: 1601 37th Ave NE Minneapolis,MN 888-972-5096 Insured: Chartraw,Daniele Property: 5156 Hughes Ave Fridley,MN 55421 Claim Number: 046658867-01 Policy Number: Type of Loss: <NONE> Date of Loss: Date Received: Date Inspected: Date Entered: 10/12/2021 1:03 PM Price List: MNMN8X SEP21 Restoration/Service/Remodel Estimate: 046658867-01 We have prepared a comparative estimate to assist all parties involved in this claim. Items changed from the original Scope of Loss have been bolded for easy comparison.Most changes will have an explanation, photo or code language directly attached to the line item explaining why it has been changed. Additional photos,measurements,reports,and even the ESX export of this estimate are available by request to assist you. Code information pertinent to this claim. Minnesota Rules,chapter 1309—Minnesota Residential Code Mandatory chapters of the 2012 International Residential Code include chapters 2 through 10,chapter 44, Section P2904,and Apendix K. Makeup of the Minnesota State Building Code Required Enforcement Chapter 1300 Minnesota Building Code Administration Chapter 1301 Building Official Certification Chapter 1302 State Building Code Construction Approvals Chapter 1303 Special Provisions Chapter 1305 Minnesota Building Code •Chapter 1307 Elevators and Related Devices Chapter 1309 Minnesota Residential Code Chapter 1311 Minnesota Conservation Code for Existing Buildings •Chapter 1315 Minnesota Electrical Code Chapter 1322 Residential Energy Code Chapter 1323 Commercial Energy Code VL Builders Vt: 1601 37th Ave NE Minneapolis,MN 888-972-5096 046658867-01 Upstairs Hallway DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 1. Vinyl plank flooring 2.00 SF NOT COMP. Supplemental Items 2. Snaplock Laminate-simulated wood 2.00 SF 6.45 0.43 2.66 15.99 (0.00) 15.99 flooring Totals: Upstairs Hallway 0.43 2.66 15.99 0.00 15.99 Bathroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 3. Batt insulation- 10"-R30-unfaced 8.00 SF 1.57 0.57 2.64 15.77 (0.00) 15.77 batt 4. 1/2"-drywall per LF-up to 2'tall 13.75 LF 10.10 1.35 28.06 168.29 (0.00) 168.29 5. Drywall tape joint/repair-per LF 13.75 LF 8.20 0.35 22.64 135.74 (0.00) 135.74 6. Paneling 302.67 SF 2.70 14.66 166.38 998.25 (0.00) 998.25 7. Baseboard-2 1/4" 31.17 LF 3.15 2.38 20.12 120.69 (0.00) 120.69 8. Stain&finish baseboard 31.17 LF 1.52 0.42 9.56 57.36 (0.00) 57.36 9. Angle stop valve 2.00 EA 55.79 1.02 22.52 135.12 (0.00) 135.12 10. Toilet-Reset 1.00 EA 260.90 0.46 52.28 313.64 (0.00) 313.64 11. Vanity 4.50 LF 214.41 54.75 203.94 1,223.54 (0.00) 1,223.54 12. Heat/AC register-Floor register- 1.00 EA 6.07 0.00 1.22 7.29 (0.00) 7.29 Detach&reset 13. Clean floor and prep for overlay of 43.83 SF 0.59 0.03 5.18 31.07 (0.00) 31.07 subfloor 14. Vinyl floor covering(sheet goods) 52.00 SF 3.83 7.41 41.32 247.89 (0.00) 247.89 15. Light fixture 1.00 EA 85.98 2.60 17.72 106.30 (0.00) 106.30 16. Bathroom mirror-Detach&reset 12.00 SF 11.51 0.00 27.62 165.74 (0.00) 165.74 17. Switch 1.00 EA 20.15 0.15 4.08 24.38 (0.00) 24.38 18. Outlet 1.00 EA 19.78 0.12 3.98 23.88 (0.00) 23.88 Supplemental Items 19. R&R 1/2"drywall-hung&fire 302.67 SF 2.49 11.43 153.00 918.08 (0.00) 918.08 taped only Drywall has hardened glue from previous paneling installation, unable to install new glue and paneling over existing glue and drywall or it will create a non-uniform surface, all needs replaced. 20. Install Light fixture-Detach&reset 1.00 EA 127.92 0.00 25.58 153.50 (0.00) 153.50 -Vanity Lights* 21. Light fixture-High grade 2.00 EA 123.56 8.01 51.02 306.15 (0.00) 306.15 22. R&R Laundry chute door-Custom 1.00 EA 307.71 11.23 63.78 382.72 (0.00) 382.72 Built* 23. Install Casing-21/4"stain grade- 6.00 LF 1.13 0.00 1.36 8.14 (0.00) 8.14 Chute Trim* 046658867-01 11/9/2021 Page: 2 VL Builders Vt: 1601 37th Ave NE Minneapolis,MN 888-972-5096 CONTINUED-Bathroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 24. R&R Sheathing-plywood-1/2"- 20.00 SF 5.48 3.79 22.68 136.07 (0.00) 136.07 treated Need to replace for reasonable access to install our flooring upon completion. 25. Vanity top-Detach&reset 5.00 LF 70.61 0.07 70.64 423.76 (0.00) 423.76 26. Sink faucet-Detach&reset 1.00 EA 214.51 0.00 42.90 257.41 (0.00) 257.41 27. Install Window Casing-31/4"stain 20.00 LF 1.13 0.00 4.52 27.12 (0.00) 27.12 grade* 28. Seal/prime then paint walls&ceiling 360.67 SF 0.93 4.37 67.96 407.75 (0.00) 407.75 (2 coats)* Totals: Bathroom 125.17 1,132.70 6,795.65 0.00 6,795.65 Basement Bathroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 29. Acoustic ceiling tile 33.00 SF 3.81 3.69 25.88 155.30 (0.00) 155.30 30. Remove Paneling* 105.13 SF 0.41 0.00 8.62 51.72 (0.00) 51.72 31. Paneling* 105.13 SF 2.51 3.67 53.52 321.07 (0.00) 321.07 32. 1/2"-drywall per LF-up to 2'tall 33.00 LF 10.10 3.24 67.30 403.84 (0.00) 403.84 33. Mask and prep for paint-plastic, 47.50 LF 1.37 0.88 13.20 79.16 (0.00) 79.16 paper,tape(per LF) 34. Seal/prime then paint part of the 246.25 SF 0.93 2.98 46.40 278.39 (0.00) 278.39 walls(2 coats)* 35. Bathroom mirror-Detach&reset 4.00 SF 11.51 0.00 9.20 55.24 (0.00) 55.24 36. Re-skin toe kick 4.00 LF 8.98 1.01 7.38 44.31 (0.00) 44.31 Supplemental Items 37. Vanity-High grade 3.75 LF 290.66 66.00 231.20 1,387.18 (0.00) 1,387.18 38. Countertop-post formed plastic 4.25 LF 51.38 10.52 45.78 274.67 (0.00) 274.67 laminate 39. Mirror-1/4"plate glass 16.00 SF 17.99 13.45 60.26 361.55 (0.00) 361.55 40. Drywall patch/small repair,ready 2.00 EA 79.69 0.48 31.98 191.84 (0.00) 191.84 for paint Dyrwall paper torn above wainscot paneling, upon installation of paneling drywall repair and painting will need to be performed. 41. Bid Item-Custom Built-In Cabinet 1.00 EA 813.20 57.94 174.22 1,045.36 (0.00) 1,045.36 Fabricate and install custom built in cabinet T wide,7'6"T,2'deep solid oak Removed and disposed during mitigation. Totals: Basement Bathroom 163.86 774.94 4,649.63 0.00 4,649.63 046658867-01 11/9/2021 Page: 3 VL Builders Vt: 1601 37th Ave NE Minneapolis,MN 888-972-5096 Basement Hallway DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 42. 1/2"drywall-hung,taped,floated, 224.56 SF 2.51 9.44 114.62 687.71 (0.00) 687.71 ready for paint 43. Drywall tape joint/repair-per LF 73.17 LF 8.20 1.88 120.38 722.25 (0.00) 722.25 44. Paneling 182.92 SF 2.70 8.86 100.56 603.30 (0.00) 603.30 45. Mask and prep for paint-plastic, 73.17 LF 1.37 1.36 20.32 121.92 (0.00) 121.92 paper,tape(per LF) 46. Seal/prime then paint part of the walls 292.67 SF 0.93 3.54 55.14 330.86 (0.00) 330.86 (2 coats)* 47. Vinyl floor covering(sheet goods)* 282.67 SF 3.07 24.97 178.56 1,071.33 (0.00) 1,071.33 Supplemental Items 48. Remove Casing-31/4"stain grade 18.00 LF 0.67 0.00 2.42 14.48 (0.00) 14.48 49. Casing-31/4"stain grade 105.00 LF 3.52 17.88 77.50 464.98 (0.00) 464.98 50. Jamb- Pocket door* 21.00 LF 9.36 10.29 41.38 248.23 (0.00) 248.23 Jamb pocket door, 21 LF Jamb broken during casing removal when mitigation work performed,need to replace. Totals: Basement Hallway 78.22 710.88 4,265.06 0.00 4,265.06 Laundry Room DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 51. Vinyl floor covering(sheet goods)* 186.42 SF 3.07 16.47 117.76 706.54 (0.00) 706.54 52. Content Manipulation charge-per 1.00 FIR 45.57 0.00 9.12 54.69 (0.00) 54.69 hour Supplemental Items 53. Install 1/2"water rock(greenboard) 4.00 SF 1.64 0.00 1.32 7.88 (0.00) 7.88 * Cut out during mitigation. Totals: Laundry Room 16.47 128.20 769.11 0.00 769.11 Bedroom DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 54. Contents-move out then reset-Large 1.00 EA 100.32 0.00 20.06 120.38 (0.00) 120.38 room 55. Remove Vinyl floor covering(sheet 165.05 SF 1.24 0.00 40.94 245.60 (0.00) 245.60 goods)* 56. Vinyl floor covering(sheet goods)* 259.33 SF 3.07 22.91 163.80 982.85 (0.00) 982.85 Totals: Bedroom 22.91 224.80 1,348.83 0.00 1,348.83 046658867-01 11/9/2021 Page:4 VL Builders Vt: 1601 37th Ave NE Minneapolis,MN 888-972-5096 Office DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 57. Contents-move out then reset-Large 1.00 EA 100.32 0.00 20.06 120.38 (0.00) 120.38 room 58. Remove Vinyl floor covering(sheet 83.26 SF 1.24 0.00 20.64 123.88 (0.00) 123.88 goods)* 59. Vinyl floor covering(sheet goods)* 212.25 SF 3.07 18.75 134.08 804.44 (0.00) 804.44 Totals: Office 18.75 174.78 1,048.70 0.00 1,048.70 Debris Removal DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 60. Debris disposal-(Bid Item) 1.00 EA 100.00 0.00 20.00 120.00 (0.00) 120.00 Totals: Debris Removal 0.00 20.00 120.00 0.00 120.00 Labor Minimums Applied DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV 61. Misc.Equipment-Commercial labor 1.00 EA 65.09 0.00 13.02 78.11 (0.00) 78.11 min 62. Wood floor covering labor minimum 1.00 EA 237.94 0.00 47.58 285.52 (0.00) 285.52 63. Insulation labor minimum 1.00 EA 192.05 0.00 38.42 230.47 (0.00) 230.47 64. Tile/marble labor minimum 1.00 EA 54.99 0.00 11.00 65.99 (0.00) 65.99 65. Mirror/shower door labor minimum 1.00 EA 78.82 0.00 15.76 94.58 (0.00) 94.58 Totals: Labor Minimums Applied 0.00 125.78 754.67 0.00 754.67 Line Item Totals: 046658867-01 425.81 3,294.74 19,767.64 0.00 19,767.64 046658867-01 11/9/2021 Page: 5 VL Builders Vt: 1601 37th Ave NE Minneapolis,MN 888-972-5096 Summary for Dwelling Line Item Total 16,047.09 Mad Sales Tax Reimb 425.81 Subtotal 16,472.90 Overhead 1,647.37 Profit 1,647.37 Replacement Cost Value $19,767.64 Net Claim $19,767.64 General Contractor Overhead and Profit. Your insured has hired a general contractor.In this event it is necessary to include these additional monies to allow a general contractor to perform the functions of scheduling,managing,and coordinating the many trades involved in the repair of this property.This may be due to your insured's lack of construction knowledge or available time.It is not appropriate to require a property owner assume this unpaid work and time burden because of an insurance claim. A factor of overhead and profit for individual trades are included in estimate line items but there is no allowance for the general contractor to be paid for their necessary work outside of GC O&P.This explanation can be found on the Xactware web site at: https:Heservice.xactware.com/esc/pdf/overhead-and-profit-20110601.pdf ------------------------------------------------------------------------------------------------------------------------------------------ This Xactimate estimate is not an offer of work on an individual line item basis. It is a bid and offer only on the lump sum price. The pricing detail is provided as an accommodation to allow for comparison of this estimate with market rate bids from other contractors in the area. Xactimate does not include or account for many of the added costs or considerations of expenses incurred by disaster recovery contractors,nor does it include various general and specific costs that have been spent to date or will be spent in the future in performing this work, such as travel and remote and emergency staging of personnel and materials. Therefore,the line items reflected in this proposal are for comparison purposes only and may not reflect the actual costs that may be incurred in performing this work,including unit pricing, subcontracted work,outside and general expenses,charges or credits for costs above or below market rates,or compensation for unrecoverable expenses and/or the actual overall profit or loss that may be realized in performing this work and is relevant to Contractor's cost to perform this work. Authorization to perform the work reflected above shall constitute a binding bilateral obligation wherein Contractor takes on the risk to guarantee work and pricing on the scope provided in exchange for promise of payment of the lump sum pricing offered above.If the currently defined scope of the repair or replacement changes,Contractor reserves the right to supplement. Credit for work eliminated from this estimate is subject to separate pricing and may not be calculated at the unit rates reflected above. 046658867-01 11/9/2021 Page: 6