Loading...
HomeMy WebLinkAbout24 x 48 204 PLEASE VERIFY I-BEAM SPREAD AND HOUSE MEASUREMENTS. PIERS ARE NOT REQUIRED AT 36" EXTERIOR DOORS WHEN 44'-0"HOME LENGTH "PIER SAVERS" ARE UTILIZED. 7'-7"ELECT STUBBED THRU SIDEWALL 24'-8"DRAIN DROP 6'-4"WATER 24'-0"GAS INLET 4.3'4- 1 1'-5" 20' 1'-0"GAS INLET , o --- -----`C —————-0------0----- WATER —Ek-! o 5-6" INLET M S 00 N `�' DRAIN ADDITIONAL F \ B rn = BELOW FLOOR DRAIN ON DROP BLOCKING SEE o L HALF rn NOTE 2 BELOW _ N () SITE PER SP95.03.01 BY OTHERS 2 Crnn _____CO M _LO__ +_____ : i5 L NCATIO NSTALL MANUAL MA —TE LINE 20": Z 11'-7" 11' 0" 6-9" 11'-3" _= N -- ---- -- — --- ————— ————— INT RMEDIATE PIERS N TYPICAL UNIT SPACING PER INSTALL MANUAL 00 i� I-BEAM 4'-3" QUANTITY PER INSTALL MANUAL rn LOCATION DRAIN FOOTER SIZE PER INSTALL MANUAL q CP o �--- �-----�--�--�---DR�-----�----� HALF 20„L0 777 ```"`777777 1 4-4- 4-4-4� � 23'-4" DRAIN DROP 991/2" 8,_0„ 8-4- 8-4- 8-4- 8,_0„ AXLE SPREAD 2'-O" 2'-O" 2'-0" PIER SPACING IS FOR ILLUSTRATION IMPORTANT:When a home is ordered with an optional 80"frame, the frame will be inset from sidewalls and ONLY.ACTUAL PIER SPACING mating walls 40". VERIFY measurements before starting foundation design. SHOULD BE DETERMINED USING THE INSTALLATION MANUAL 1) THE MANUFACTURER ASSUMES NO RESPONSIBILITY FOR ACTUAL 5) IT WILL BE THE RESPONSIBILITY OF THE SITE CONTRACTOR FOUNDATION DESIGN AND CONSTRUCTION. TO VERIFY THE PROPER LOCATION OF COLUMN SUPPORT 2) ADDITIONAL BLOCKING IS REQUIRED AT EACH SIDE OF EXTERIOR BLOCKING AND TO VERIFY THE PROPER MATING LINE GROWTH PERMANENT FOUNDATIONS:CHECK LOCAL BUILDING CODES AND REGULATIONS DOORS AND AT EACH SIDE OF SIDEWALL OPENINGS GREATER THAN 4 DIMENSIONS BASED UPON ACTUAL SITE CONDITIONS AND AND CONSULT A REGISTERED PROFESSIONAL OR STRUCTURAL ENGINEER WHEN FEET IN WIDTH(I.E.,PATIO DOORS,PICTURE WINDOWS,ETC.). REQUIREMENTS(DOUBLE WIDES ONLY). YOU ARE SITING YOUR HOME ON A PERMANENT FOUNDATION(SUCH AS A FULL 3) FOR PIER REQUIREMENTS AT ENDWALL SEE FIGURE 8 IN THE 6) ALLOW 1/2"AT MATING LINE FOR MATE UP GROWTH. BASEMENT,CRAWL SPACE,OR LOAD BEARING PERIMETER FOUNDATION). INSTALLATION MANUAL. 7) SEE SET-UP AND INSTALLATION MANUAL FOR PERIMETER 4) ALL DWV,PLUMBING,GAS SUPPLY,ETC.,DIMENSIONS ON PRINT BLOCKING REQUIREMENTS. MAY BE+OR-12". MANUFACTURER DISCLAIMER NOTICE:(THIS PIER PRINT IS FOR HOMES PRODUCED ON OR AFTER JUNE 1ST 2006) PLEASE READ AND UNDERSTAND THE FOLLOWING INFORMATION.THE MANUFACTURER DOES NOT DO FOUNDATION INSTALLATION OF HOMES. IT WILL BE THE RESPONSIBILITY OF THE DEALER/SITE CONTRACTOR TO INSURE THAT ALL SITE WORK WILL CORRELATE WITH THE UNIT MODEL NO. MANUFACTURER DATE: ORDERED. 2448 204 2/1/2019 (C ZJJVLJ L �OO REV: HAVING E- NOTICE XPERIENCE,ERI NICE,KNOWLEDGE,ANACTURED HOMES WEIGH SEVERAL TONS.DO NOT ATTEMPT TO D UNDERSTANDING OF ALL INSTALLATION REQUIREMENTS.FAILURE ALL ANY TO MEETOME ON T ESE REQTE WITHOUT UIREMENTS EME TS DRAWING N0. _ 2448 204 PB MAY RESULT IN SERIOUS INJURY OR DEATH TO AN INEXPERIENCED INSTALLER.INSTALLERS:PLEASE READ AND UNDERSTAND THE SET-UP AND INSTALLATION MANUAL SUPPLIED WITH THE HOME BEFORE ATTEMPTING ANY INSTALLATION OF ANY MANUFACTURED HOME.