Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MARTINSON - FRIDLEY
': fl 1 I 11 uJ i I I 1 { ��N` 1nn1 �aF9l. m \ _ ,f n1w.-.,` ,__ .� ® � ,,, =�,; � y - . �+ 1 ��' -^, �'� �,r `,_ .- ___ � .� �.; - ..�,. - i" . Noma ii MI Y w� �4 i 1 n a Date: ff, r )I--A7 Yi' Customer Name:�Il�r h%.r�L�`wist' PL T Inspector: ` , )% t-'v�l�l— II Address:t t 1 ►%��r� �� i Bath Inspection: • 3 7�5 tr�n N Parking access for truck/trailer yes ❑ no(explanation) Garage/warm cutting area yes ❑ no(explanation) Bathroom level 1st ❑ 2nd ❑ 3rd 71 basement Bath to be remodeled is only bath in home M yes no Crawl space only below bath ❑ yes no (if yes)access point Drain exposed ® yes ❑ no (if no,choose) I J drywall covered ❑ drop ceiling Access Panel to valve yes ❑ no Water shut off location ���.;t-P,.t4t;{- (jje�—, - w,\� Condo ❑ yes no Maintenance/water shut off contact Shut off works U yes U no U sticky ❑ currently leaks Plumbing compositior �� copper pvcv,,) U galy ❑ cpvc ❑ pex ❑ !ead _ abs Existing plumbing has venting through the roof yes ❑ no Pre-install drain functi G slow Xi good ❑ doesn't drain Pre-install water pressure ❑ slow 12J good ❑ no pressure Flooring has in floor heat ❑ yes © no Floor framing wood ❑ concrete ❑ spancrete _ stem Floor integrity L/--j- solid ❑ soft ❑ rotted Floor covering ❑ vinyl ❑ hardwood 19 tile ❑ carpet �_ laminate Wall framing wood ❑ concrete ❑ steel Wall coverings drywall ❑ the ❑ lath/plaster I paneling Left wall rV plumb ❑ leans in ❑ Icons out "in Right wall ® plumb ❑ leans in ❑ leans out in Back wall FX] plumb ❑ leans in ❑ leans out "in Floor left to right © level ❑ slopes left ❑ slopes right in " Floor back to front ® level ❑ slopes back ❑ slopes forward _"in Ceiling left to right level ❑ slopes left ❑ slopes right " in_" Doorway accessibility / door 1 width door 2 with door 3%vidth Hall accesibility b width Tight turns - yes ❑ no Obstructions ❑ yes D�l no (If yes,list below): Sizing and accessories: Y Contract calls for pan size _width GO length Customer Signature Contract size meets customer's expectation yes no(explaln below) Customer Signature Actual size to install- Length (Leh to Right) Width(Front to Back-viewe from exterio dsd wall) >G Skirt Height(Tub) Customer Signature �,,`r/ Distance from skirt to center of toilet if parallel Distance from skirt to front of toilet if perpendicular Currently finished-length(finish to finish+1") X width Initial Adding/moving wall-length(finish to new stud wall +1/2") X width Initial Already deomoed-length(stud to stud) X width + Initial Accessory Color: CH BN ORB MB Customer Signature If differs from contract,pleas note reason why: Shower Door: Glass: CLEAR 71 RAIN OBSCURED Swing doors: Hinge side: H3ntle side: Inline location: *Will be ordered by the pan size minus::" :o-tomer Signature California glass:will be 6"-10"from ceiling hPig"t and no less than 30" wide(36"glass Is preferred)to allow enough room for the opening and to minimize water outside of wet area(only available on and 60"or longer) Glass width Glass height Customer Signature Options: Will cover current Flooring yes no Customer Signature &,�_� Trim needed to cover flooring 1/4 round C lattice custom cut waif section New drain location I ght L� center Lj custom Customer Signature '� Custom drain location in "from left stud "from right stud "from back stud Corner trim city Herring bone city Wainscoting city Wainscoting corners inside city outside city Installing fan/light replacing existing ❑ new Fan vent will vent to Customer Signature Pics taken drain/plumbing shower from all angles current damages / access areas water shut offs / parking areas of concern breaker box *Customer understands some baths based on extra accessories,options,complexity and unforseen Issues may be scheduled for more than or could take longer than one day. 1 Customer Signature Inspector: i ' 1 Date: M f 0:v71 Special notes section: _LC,dclAr�cJ1� vu, v Sketch area v J 3 S� 51 �•1� �nQ�UUrN` ..N�� C) m 0 G) n z EI 0 " CL c V L (A r x -1 2) 0 0 fD (0 .................................................................. 3 ....................................... A- 0 F. rMOL :3 CL CD a) O (n c CD ......... O rn 0 z CD G) CL x 0 OL) I f fD o 0- Ln CD 0 ou CIL 0 0- :33 rD M M nz ...................................... ....................................... .......... cn El -9 El 4................................................................. ---------------- ..................... t F7_1 CD Ml ET m CD CL. CL O WON J'� Tnn•A.D.L,, I T)r Bath Labor Measure Assessment Form lob Name:1�1; 4 �11! ��U'i"1t%�K%!L Installer Name: Address: City: r Install Date Demo-Fiberglass shell,shower board,drywall system/backer Each Demo-Cast tub,file wails,lath and plaster,concrete wall system/backer Fach Bust concrete/restructure joists-need pits&need mngr approval Each Build and Install valve/d-ain/wate-shutoffs Each Install tub/shower pan/barrier free/whirlpool Each Install wa k in tub-A'exis Each Wall prep includes all drywall/p:y/insulation Each Install neo angle wall system Each Install 3 wall system smooth lEach Install 3 wall system ti'e/impressiors -a:h Install tall 3 wall system with herringbone smcot or We ---ach Install ceiling panel or extra wall `ach Install corner shelf/surface self/caddie/foot ped Each Install bench/corner/folding/fo-coed corner seat/win kit Each Install grab bar Each Install shower rod Each Install Stan Jard/s-curve Each Install Swing door-includes inline panel Each Install Swing door W/inline&returr panel or neo arg'e Each Install Cayman door Each Install shower head and all cover trims Each Install Kauai/slide bar hand held and all cover trims Each R&R toilet or vanity to install tub/shower Each Remove or build wall/remove or build drop soffit Each R&R door and trimwork to bring unit into room Each Remove old and install new vent fan/light and connect Each Trip charge 25.50 from shop Each Trip charge 50-75 from shop Each Trip charge 75+from shop Each There will be no write ins allowed.All prices listed are non negotiable Total Invoice: Any work not authorized with management and photos will not be pald Dat of Involce: This invoice will be paid only on complete and collected jobs i Invoices must be submitted dai y Mea re T ch Signature of Pre Inspection Invoices may not he submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization