HomeMy WebLinkAboutFinal review 235 logan Pkwy ASCHIMNOWSKI CRITERIUM" ENGINEERS This letter shall be @ job site for all inspections. April 20, 2022 Marc Nelsen Submitted via email to: nelsenmarc@gmail.com RE: Proposed Modifications to Existing Structural Elements Project Location: 235 Logan Pkwy. NE, Fridley, MN 55432 Project No. 22-6172 Dear Mr. Nelsen: This letter is being sent to discuss the proposed revisions to the existing house at the above address as related to: the proposed removal of wall between kitchen and dining room along with the infilling the existing stairway and providing a new stairway in a different location. The inspection and report were completed by Steve Eiker, P.E. The scope work includes the following: 1. An interview of you regarding a history of the property and performance of the structure 2. Requesting from you any other information relevant to the evaluation of the structure 3. Visual observations during a physical walk-through on April 18, 2022. 4. Observe factors influencing the performance of the structure 5. Provide a written report containing the following: a. Scope of services b. Observations, site characteristics, and data deemed pertinent by me c. Discussion of major factors influencing structural performance and rationale in reaching conclusions concerning the subject residence d. Preliminary conclusions regarding feasibility of proposed renovations or structural modification. e. Final engineered design is not included. 6. This inspection is limited to: An assessment of the structural characteristics of the existing wood stud wall and the main floor framing to be modified/removed and the nearby, or related, structural elements as determined by the engineer. 7. Please note that this assessment is considered preliminary due to concealed conditions and should be verified after the removal of surface materials and final architectural plans are submitted. SUMMARY In my professional opinion, the wall between the kitchen and dining room is a primary load-bearing wall. It may be removed, or portions may be removed with added structural support. The new opening(s)will need to be supported with a header or structural post and beam system such as a laminated veneer lumber (LVL) beam structural system. The exact size of the beam can be designed should you decide to proceed. Refer to the Recommendations section of this letter for further information. In my professional opinion, the proposed floor infill of the existing stairs and the proposed new location of the stairs is structurally possible with some new framing to accomplish those tasks. Independently Owned and Operated 161 Dunbar Way/Mahtomedi, MN 55115 O: 651.779.7700/criterium-schimnowski.com 235 Logan Pkwy. NE, Fridley, MN April 20, 2022 Page 12 This conclusion is preliminary and is based on visible evidence at time of inspection and should be verified once framing is exposed and a final remodel plan is decided on. INSPECTION DETAILS • Our client, to whom this report is addressed, is the homeowner. • The client was present during our site visit. • The following areas were inaccessible or not visible, and this limited the extent of our structural inspection: o Portions of the attic area o Most of the foundation system and slab (underground and/or concealed due to finished conditions) o Wall and floor framing (concealed) DESCRIPTION OF STRUCTURE • This building is a one-story single-family home. • The house has a full basement. • The structure was constructed in 1954 with an addition in 2002. • The front of the house faces south. DOCUMENT REVIEW No documents were provided. SITE OBSERVATIONS An opening or openings are planned between the existing kitchen and dining room. The proposed spans are to be determined at a later date. The width of the uniformly distributed load from the roof framing (tributary width) is approximately 14 feet. The basement evaluation is limited to the area related to the modification above. The first-floor joists in the corresponding area of the basement are supported by a wood beam and an interior wall in good condition. The first-floor joists in that same area of the basement are in good condition. The attic space is in good structural condition. There is no flooring in place. The roof rafters and attic floor joists are in good condition. RECOMMENDATIONS The interior wall between the kitchen and dining room may be removed. The opening(s)will need to be supported with a header or structural post and beam system such as a 2.0E Microllam, or equivalent, laminated veneer lumber(LVL) beam structural system. The size of the headers or beams can be determined when the final locations of proposed openings are decided. A general rule of thumb for beam depth is approximately 1 inch of beam depth for each foot of beam span. This is only an estimate. Actual designed sizes will vary. Creating a new stair opening in the main floor will involve some new beams to header off the existing joists (to create the opening in the floor) and either posts or a wood stud wall for bearing. The posts or bearing wall will require new concrete footings to be poured. Please note that this assessment is considered preliminary. When proposed plans are determined, final beam and post sizes can be designed. Independently Owned and Operated 161 Dunbar Way/Mahtomedi, MN 55115 O: 651.779.7700/criterium-schimnowski.com 235 Logan Pkwy. NE, Fridley, MN April 20, 2022 Page 13 Compared with similar size sections, the Microllam LVL beams that I am recommending can support heavier loads and allow greater spans than conventional lumber. Failure to follow good procedures for storage, handling and installation could result in unsatisfactory performance and unsafe structures. Generally, the schedule of work will include the construction of temporary support wall for the removal of existing framing, installation the beam and posts, and removal of the temporary support. If a different product or project layout is proposed, please contact me for additional information. Criterium- Schimnowski Engineers is available to provide the engineered design for the support beam should you decide to proceed. DESCRIPTION OF TERMS Terms used in this report to describe the condition of observable components and systems are listed and defined below. It should be noted that a term applied to an overall system does not preclude that a part or a section of the system or component may be in different condition: Excellent- Component or system is in "as new" condition, requiring no rehabilitation, and should perform in full accordance with expected performance. Good- Component or system is sound and performing its function. Although it may show signs of normal wear and tear, some minor rehabilitation work may be required. Fair- Component or system falls into one or more of the following categories: a) Evidence of previous repairs not in compliance with commonly accepted standards, b) Workmanship not in compliance with commonly accepted standards, c) Component or system is obsolete, d) Component or system approaching end of expected performance. Repair or replacement is required to prevent further deterioration or to prolong expected life. Poor- Component or system has either failed or cannot be relied upon to continue performing its original function as a result of having exceeded its expected performance, excessive deferred maintenance, or state of disrepair. Present condition could contribute or cause the deterioration of other adjoining elements or systems. Repair or replacement is required. SCOPE OF SERVICES and LIMITATIONS The purpose of this inspection and report/design is to evaluate the current condition of the structural system of this building as related to the proposed modifications, revisions, or repairs. The report is not to be considered a guarantee of condition and no warranty is implied. Our evaluation of this structure is based on many indirect observations. Examination of the foundation is completed without excavation; therefore, we cannot be certain of the condition below grade. Additionally, we cannot certify that the footings extend below the frost line. We cannot see most of the framing. We look for cracks, bulges, and other evidence of distress or deterioration to help us evaluate the condition. In addition, often, construction details cannot be known, and we then assess that system with typical construction practices for our area in mind. As with any limited inspection, it is possible that there are structural deficiencies that cannot be known. In addition, it is possible that a final structural analysis and, therefore the design details, will require exposure of concealed conditions (i.e. removal of drywall). This scope of this inspection does not include a comprehensive evaluation for code compliance, governmental regulation compliance, fire safety, or hazardous materials in or around this building. It does not include an inspection of heating, cooling, plumbing and electrical systems or repair designs. Inspecting for mold is not included in the scope of a structural inspection. Our services do not include determining the presence of a virus in this building. Evidence of any moisture-related problems in the Independently Owned and Operated 161 Dunbar Way/Mahtomedi, MN 55115 O: 651.779.7700/criterium-schimnowski.com 235 Logan Pkwy. NE, Fridley, MN April 20, 2022 Page 14 home is not always visible. We cannot be responsible for any such conditions that might be discovered later. This report is not a termite inspection, and no responsibility is assumed for any damage caused by wood-destroying organisms. This report/design is based on an examination of the structural system and is an opinion about the condition of the structural system of the building. It is based on evidence available during a diligent inspection of all reasonably accessible areas. No surface materials were removed, no destructive testing undertaken, nor furnishings moved. This report is not an exhaustive technical evaluation. As Professional Engineers, it is our responsibility to evaluate available evidence relevant to the purpose of this inspection. We are not, however, responsible for conditions that could not be seen or were not within the scope of our service at the time of the inspection. CLOSING Opinions and recommendations in this report are limited to the scope of work. This report has been prepared in strict confidence with you as our client. Reliance upon our report by other parties is strictly prohibited. If you choose to share our report, you agree to indemnify, defend and hold harmless the Engineer from any third-party action. No reproduction or re-use is permitted without express written consent. Further, we will not release this report to anyone without your permission. If project conditions or other parameters vary from that assumed or stated, a revised analysis may be needed. If additional documentation or information is made available for review, I reserve the right to amend or add to the opinions and observations presented in this report. Please call with any additional questions you may have. Thank you for the opportunity to be of assistance to you. Sincerely, I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Steve Eiker, P.E. MN#52681 Steve Eiker, P.E. Date: April 20, 2022 License#: 52681 (MN) Independently Owned and Operated 161 Dunbar Way/Mahtomedi, MN 55115 O: 651.779.7700/criterium-schimnowski.com ! }+ QSr�s a'•e 1� jy 181 J� �4 side of house Stairway wall in basement ` 1 Location Photos Taken by: Inspection Date: SCHIMNOWSKI 235 Logan Pkwy.NE, Steve Eiker,PE April 18,2022 C R ITE RI U M Fridley,Minnesota ENGINEERS New.stair opening in this area 7 Existing basement area where new stair is 8 Existing wood beam and column in middle of planned to be basement for support of floor joists 9 End of one of the wood beams in the basement 10 Existing 12" CMU foundation walls throughout for the main floor joist support basement t y 11 Wall between dining room and kitchen/stairway 12 Existing hand framed roof framing above dining to the basement-portions to be removed room- 2A roof rafters and 2x6 ceiling joists Location Photos Taken by: Inspection Date: SCHIMNOWSKI 235 Logan Pkwy.NE, Steve Eiker,PE April 18,2022 C R ITE RI U M Fridley,Minnesota ENGINEERS r' OP w 4 7 s • TSB` 8 Hand framed roof framing above kitchen 9 Existing kickers/braces supporting roof rafters onto existing ceiling joists typical