HomeMy WebLinkAboutResidential Permit Card (2) CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 07/06/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#PR22-000071
ADDRESS : 5800 3RD ST NE
PIN: 233024230061
LEGAL DESC:LOTS 14& 15 BLK 22 HYDE PARK,SUBJ TO EASE OF REC
PERMIT TYPE: Plumbing Residential Permit
PROPERTY TYPE:Remodel
CONSTRUCTION TYPE: Remodel
VALUATION: 0
NOTES: PLUMBING FOR BATHROOM ALTERATION.REPLACING BATHTUB WITH A SHOWER.ALSO
RELOCATING TOILET AND BATH SINK/LAV.
CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
APPLICANT
Description Total Cost
Permit Fee 35.00
Plumbing Contractor-MH State Surcharge Fee 1.00
Plumbing,Inc. TOTAL 36.00
6725 277th Ave.NW
Isanti,MN 55040
Payment(s)
Credit-PR22-000071 -7930309119YZI/z36
OWNER
RENTERIA BRANDON FLORES
5800 3RD ST NE
FRIDLEY,MN 55432
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction
authorized is not commenced witin 180 days or if
construction or work is suspended or abandoned for a
period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this
application and know the same to be true and correct.All
provisions of laws and ordinances governing this type of
work will be complied with whether specified herein or
not.The granting of a permit does not presume to give
authority to violate or cancel the provisions of any other
state or local law regulating construction or the
performance of construction.
07/05
Applicant Date /2022
07/06
Bldg Insp Date /2022
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 07/06/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#PR22-000071
ADDRESS : 5800 3RD ST NE PERMIT APPLICANT:
PIN: 233024230061 Plumbing Contractor-MH Plumbing,Inc.
LOTS 14&15 BLK 22 HYDE 6725 277th Ave.NW
LEGAL DESC: PARK,SUBJ TO EASE OF REC Isanti,MN 55040
PERMIT TYPE : Remodel
PROPERTY TYPE: Remodel
Bathroom remodel-
CONSTRUCTION TYPE: change out tub with a
shower;Move&replace
toilet&lav
NOTES:PLUMBING FOR BATHROOM ALTERATION.REPLACING BATHTUB WITH A SHOWER.ALSO
RELOCATING TOILET AND BATH SINK/LAV.
CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS: 8 AM TO 4:30 PM
Inspection type Date Inspector Status Comments
Plumbing Rough In
Inspection
Plumbing Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.