Loading...
HomeMy WebLinkAboutScope_7144RiverTerr_Materials • C O M P L E T E B U I L D I N G S O L U T I O N S • Option 1 Beam (Preferred): W18x21, A36 or A992 Steel; 16'-0" max length between supports • Post: HSS 4x0.22; A36 or A992 Steel; 8'-0"max floor-to-floor height o New footing is required to support post loads • Option 2 Beam: (2) 1.75 x 16; LVL, 1.9E, 2850Fb; 16'-0" max length between supports • Post: (3) 2x4; Spruce-Pine-Fir; 8'-0"max floor-to-floor height o New footing is required to support post loads. • Post Footing: 3,000psi Concrete, 60ksi Rebar o Footing Dimensions: ■ D: 12"; W: 2'-X6"; L: 2'-6" o Rebar Layout: ■ (4) #4 Bars; each way (3.5" min clear depth) • Option 3 Beam: (3) 1.75 x 14; LVL, 1.9E, 2850Fb; 16'-0" max length between supports • Post: (2) 2x6; Spruce-Pine-Fir; 8'-0"max floor-to-floor height. cu o Footing Dimensions: ■ D: 12"; W: 2'-X6"; L: 2'-6" o Rebar Layout: ■ (4) #4 Bars; each way (3.5" min clear depth). • Option 4 Beam: tea Beams Spaced at 8' Garage Openings. (2) 1.75 x 9.5; LVL, 1.9E, 2850Fb; 8'-0" max length between supports • Post: (2) 2x4; Spruce-Pine-Fir; 8'-0"max floor-to-floor height (each end of both posts) o Footing Dimension at Center of Spans ■ D: 8", L=2', W=2' o Rebar Layout: ■ (2) #4 Bars; each way (3.5" min clear depth). o Existing Footings are Adequate at Outside Beam Ends. Cut existing footing at least 18" inside of each outside post. Complete Building Solutions • 2525 Nevada Ave North ■ Suite 302 ■ Golden Valley, MN 55427