Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
POHL - FRIDLEY
i p ltn wit Iff No i •i MINE ii�`� :, r,, �: ���. , �� ` - 'I _ • - ' - - %�`�► �i��i�� . ��i����� ���I�•I�j�� �i ♦I� � .. 0 ca (3) -> L 1 � � t 7 , �< : 2�»�»»�f; . a,»«« �^ «© . .��\�2 . \. ? y ���� »/ ° ��� y: �\\` y w ? - � �>d . . . � � .� � � -.�j � . ~ � � �\ .�\�% � ^2�zv a�> �\���-����y r +�t� - \���}��������j �������������� . . \�/�p� ��}d\» \����. ���{ ° ���m Da 1/�� Customer Name: l\ i r In te: 1—1��— .� !. Address: ,, { ,1 /}')i•�i� �. i r(.,. Inspector: Bath Inspection: Parking access for truck/trailer yes ❑ no(explanation) Garage/warm cutting area ❑� yes ❑ no(explanation) Bathroom level 1st El2nd �_ 3rd ❑ basement Bath to be remodeled is only bath in home ❑ yes no Crawl space only below bath F1 yes LR: no (if yes)access point Drain exposed yes ❑ no (if no,choose) [— drywall covered ❑drop ceiling Access Panel to valve n yes u no I Water shut off location K ��r'„1,;t� y`/t i 0X�T%l I�LL� � � `-�`- Condo U yes no Maintenance/water shut off contact Shut off works ® yes I no lJ sticky U currently leaks Plumbing compositior p copper � pvcD galy cPvc P" ❑ lead ❑ abs +� > Existing plumbing has venting through the roof Cl yes no Pre-install drain functi ❑J slow In good doesn't drain Pre-install water pressure ❑ slow good n no pressure Flooring has in floor heat ❑ yes no _ Floor framing E4 wood ❑ concrete ❑ spancrete steel Floor integrity solid ❑ soh ❑ rotted II Floor covering ❑ vinyl ❑ hardwood the u carpet I I laminate Wall framing wood ❑ concrete U steel Wall coverings drywall the ❑ lath/plaster paneling Left wall plumb ❑ leans in ❑ leans out _"in Right wall plumb ❑ leans In ❑ leans out "in Back wall plumb ❑ leans in ❑ leans out " in Floor left to right level U slopes left ❑ slopes right -in Floor back to front ® level ❑ slopes back ❑ slopes forward "in Ceiling left to right F\7/ level ❑ slopes left ❑ slopes right _"in Doorway accessibility door 1 width door 2 with door 3 width Hall accesibility ! ,Z_width Tight turns yes ❑ no Obstructions �� yes no (If yes,list below): Sizing and accessories: \M I G Contract calls for pan size `� width J t� length Customer Signature 1 ' I �/✓u isY Contract size meets customer's expectation Y'+ yes O no(explain below) Customer Signature " �'c` Nov Actual size to install:Length(Left to Right) Width(Front to Back-viewed from exterior to sd w, ^C/ ) 5 Skirt Height(Tub) Customer Signature /�.'4 �� +�` G L Distance from skirt to center of toilet if parallel Distance from skirt to front of toilet if perpendicular Currently finished-length (finish to finish+1") X width Initial Adding/moving wall-length(finish to new stud wall +1/2") X width Initial Already deomoed-length (stud to stud) X width initial Accessory Color: !CH ) BN ORB MB Customer Signature L�_Q.if differs from contract,please note reason why: Shower Door: _ Glass: C CLEAR RAIN OBSCURED Swing doors: Hinge side: Handle side: Inline location: 'Will be ordered by the pan size mina, 2" Customer Signature California glass:will be 6"-10" from ceiling height and no less than 30"wide(36"glass is preferred)to allow enough room for the opening acid to minimize water outside of wet area(only available qn pand 60"or longer) Glass width Glass height Customer Signature Options: I/ Will cover current flooring yes . no Customer Signature 1 Trim needed to cover flooring 1/4 round 2"lattice C custom cut wh section ` New drain location left right center custom Customer Signature '"A Custom drain location in " from left stud "from right stud "from back stud Corner trim city Herring bone city Wainscoting city Wainscoting corners inside city outside city installing fan/light F7 replacing existing new Fan vent will vent to Customer Signature Pics taken drain/plumbing shower from all angles current damages access areas water shut offs parking areas of concern breaker box *Customer understands some baths based on extra accessories,options,complexity and unforseen Issues may be scheduled for more than or could take longer than one day. Customer Signature Inspecto, Date: Li( Mta\\t Special notes section: • o. T%Ne sul-0,ib-A ., Sketch area �L&v-0()m 6 a o � I � x � � 5� `b. �+tawt (�,� V v% rL,onk C� m Z o � D I —I �- D c� El C Z ° -1 co a (A x -+ r A M o 0. '..................• H q cn O O a to 3Cr o N ...................................... ti c -~ 0 T--......--•------------------------- o g m g o o z = - C a O H 1 co 7 w 0 Q O E3 El 2 --4 ....................................... q 0El 0 fM ;; ................:: ----- ........•-;; - ----- ; ........... m c CL OL n� •O _ oz ° ml cn ~ s � — m o ; m - m MAA1 1T)r Bath Labor Measure Assessment Form lob Namc: �rsT 1=1 J /�Ill\ Inil.illr•r N.irnr: Address: / 1 1 lor City: `= J InslallDate Demo.Fiberglass shell,shower board,drywa"system/backer Each Demo•Cact tub,the walls,lath and plaster,concrete wall system/backer Each 6usl concreteJrrstructure Jo'sts•need plcs&need mngr approval Each Build and Install valve/drain/water shutoffs Each Install tub/shower pan/barrier free/whirlpool Each Install%valk in tub-Alex's 11ach Wall prep Includes all drywall/p'y/insulation ( Each Install neo angle wail system Fach Install 3 wall system smooth I Each Install 3 wall system the/impressions Each Install tall 3 wa'I system with herringbone srroot or ti'e Each Install ceiling panel or extra wa l Fach Install corner shelf/surface self/caddie/foot ped Install bench/corner/folding/forred corner seat/win kit Each Install grab bar Each Install shower rod l Each Install Standard/s-curve Each Install Swing door-inrludes inlire panel Each Install Swing door W/inline&return panel or neo angle Each Install Cayman door Each Install shower head and all cover trims Each Install Kauai/slide bar hand held and all cover trims E3ch R&R toilet or vanity to install tub/shower Each Remove or build wall/remove or build drop soffit Each R&R door and tri nwork to bring unit into room Each Remove old and install rew vert fanlight and connect Each Trip charge 2S-SO from shop Each Trip charge-SO.75 from shop I Each Trip charge 75•from shop I Each There will be no write ins allowed.All prices listed are non ncgotlab'e Total Involve: Any work rot authorized with management and photos will not be pa'd Date of I I This invoice will be paid only on complete and collected Jobs i ✓ r Invoices must be submitted da.ly Mea as Tech Signature of Pre inspection Invoices may not be submitted for final payment until a certificate of comp'etlon has been signed by the customer Subcontractor Signature of Completion Manager's Authorization