Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Matt Ferguson Solar Drawings wStamp 07 26 2022
GENERAL NOTES SHEET INDEX CONTRACTOR 1. All electrical materials shall be new and listed by recognized SITE MAP & PV LAYOUT PV 1.0 Address:101 Isanti Parkway WOL 01VER electrical testing laboratory ELECTRICAL 1-LINE DIAGRAM PV 2.0 NE, Isanti, MN 55040 Custom made equipment shall have complete test data submitted SYSTEM LABELING DETAIL PV 3.1 I HEREBY CERTIFY THAT THIS PLAN, Phone number: (763)229-6662LECTRIC by the manufacturer attesting to its safety PLACARD PV 3.2 SPECIFICATION, FY REPORT WAS PREPARED E-mail: contact�wolfriverelectric.com 2. Outdoor equipment shall be NEMA 3R rated or equivalent PROPERTY PLAN PV 4.0 ATTACHMENT LAYOUT PV 5.1 BY ME OR UNDER MY DIRECT SUPERVISION Xcel Energy Application#05175093 3. All metallic equipment shall be grounded AND THAT I AM A DULY LICENSED 4. Contractor shall obtain electrical permits prior to installation and ATTACHMENT DETAIL PV 5.2 PROFESSIONAL ENGINEER UNDER THE LAWS INVERTER DATA SHEET D 6.0 OF THE STAT NESOTA Owner: Matt Ferguson shall coordinate all inspections, testing commissioning and . Property Address: 1350 Hillcrest Dr NE Fridley, MN 55432 acceptance with the client, ENPHASE RAPID SHUTDOWN D 7.0 SIGNATURE: Property Type: Single Family Residence utility co. and city inspectors as needed. MODULE DATA SHEET D 8.0 Drawn by: New@engineerinc.io 5. The electrical contractor shall verify the exact locations of service NAME: MANOUCHEHR HAKH ANESHI points and service sizes with the serving utility companyand RACKING DATA SHEET D 9.0 Date: 07/25/2022 p g y ATTACHMENT DATA SHEET DATE:_ LICENSE NUMBER: 58881 comply with all utility companies requirements. D 10.0 6. Drawings are diagrammatic only, routing of raceways shall be MONITORING DATA SHEET D 11.0 Date Certified and VICINITY MAP (SCALE: NTS) option of the contractor unless otherwise noted and shall be INVERTER CERTIFICATION D 12.0 Signed: 07/25/2022 coordinated with other trades. SURGE PROTECTION D 13.0 7. If the roof material or the roof structure not adequate for PV WITNESS TEST PROCEDURE D 14.0 installation, call the engineer of record print to installation. The PV INSPECTION CHECKLIST-D 15.0 contractor is responsible to verify that the roof is capable of withstanding the extra weight. GOVERNING CODES 3 8. If the distances for cable runs are different than shown, the contractor shall notify the electrical engineer to validate the wire THE INSTALLATION OF SOLAR ARRAYS AND size. Final drawings will be red-lined and updated as appropriate. PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH 9. Whenever a discrepancy in quality of equipment arises on the THE FOLLOWING CODES: ,3T HI'Icrost Dr HE, drawing or specifications, the contractor shall be responsible for • 2020 National Electrical Code c HH//,er4 'F`�dey,MN6543z°&A providing and installing all materials and services required by the • 2018 International Building Code strictest conditions noted on the drawings or in the specifications • 2018 International Residential Code Hillc.�,o NE to ensure complete compliance and longevity of the operable • 2020 Minnesota Residential Code O - H111-m Dr HE system required by the engineer of record. • 2020 Minnesota Building Code Synergy Ver4ures • 2020 Minnesota Energy Code e • 2020 Minnesota Accessibility Code m PHOTOVOLTAIC NOTES: . 2020 Minnesota State Fire Code • 2018 International Fire Code 1. Rooftop mounted photovoltaic panels and modules shall be tested, • 2018 International Energy Conservation Code listed and identified by recognized testing laboratory • 2018 Mechanical Code 2. Solar system shall not cover any plumbing or mechanical vents AS ADOPTED BY THE STATE OF MINNESOTA 3. Modules and support structures shall be grounded ALL OTHER ORDINANCE ADOPTED BY THE unless racking has integrated ground. LOCAL GOVERNING AGENCIES 4. Removal of an interactive inverter or other equipment shall not SATELLITE VIEW (SCALE: NTS) disconnect the bonding connection between the grounding SYSTEM RATING electrode conductor and the photovoltaic source and/or output DC 25.60 KW STC circuit grounded conductors. 1 �r.k,. ,: , + F 5. All PV modules and associated equipment and wiring shall be AC 18.56 KW STC _ a. protected from physical damage. EQUIPMENT SUMMARY 6. Live parts of PV source circuits and PV output circuits over 150v toql ground shall not be accessible to other than qualified persons 64 HANWHA 400 WATT MODULES t7 while energized. g 7. Inverter is equipped with integrated DC disconnect, thus providing WITH IQ8+ MICROINVERTERS ground fault protection ELECTRICAL INFORMATION 8. All conductors shall be copper and 75 deg rated 9. A single conductor shall be permitted to be used to perform the EXISTING multiple functions of do grounding, AC grounding and bonding MAIN SERVICE PANEL BUS SIZE:100A between AC and DC systems. 10.Non-current carrying metal parts of equipment shall be effectively MAIN SERVICE BREAKER SIZE:100A bonded together. Bond both ends of raceways. MOUNTING SYSTEM: SNAPNRACK - BUILDING INFORMATION CNGI NCC;Z 1 NC CONSTRUCTION TYPE: V-B f ;` Engineerinc.io, OCCUPANCY: R3 303 N Glenoaks Blvd ROOF:COMP SHINGLE t Burbank, CA 91502 Truss 2 x 6 @ 16" O.C. (747) 333-5991 new(cDengineerinc.io N INDEX Woody Ln NE 'NF SECONDARY INTERCONNECTION NOTE:A 36-inchwide pathway o° a shall be provided to the emergency � Q MSP (E)100A Main Service Panel escape and rescue opening. D MM........................(E) Main Meter Total Roof Area: 2202 *Roof access is not located in areas that n PVS..........(N) 125A PV Sub Panel require placement of ground ladders over W lJ E AC.................... (N)60A Utility AC 3 Total Module Area:1408 exterior wall openings (R324.6.1) 270 o so° PVCB........................(N) PVC Box 63.94% of Coverage JB.......................(N)Junction Box D [�........................(N) Microinverter • d = Solar Module H7k`"st Aso° —.............EMT type Conduit w orNf SCALE: 3/32" = 1'-0" a� "rHorestDrNE Fire Setback Line Q Hillcrest Dr NE y ............. FMT type Conduit Synergy ventures s a z m s� SOLAR MODULES 64 Hanwha 400 Watt UTILITY AC DISCONNECT LOCKABLE Model#Q.PEAK DUO BLK ML-G10+ r� AND READILY ACCESSIBLE ar° Philippine Scholars yLUlctest Or NE INVERTER Tem pod,closed VC AC INVERTER TYPE: Micro: P B NE VC PVS 64 Enphase IQ8PLUS MM Roof Access Model#IQ8PLUS-72-2-US(240V) MSP PVCB EQUIPMENT ELEVATION 36 fire pathway CONTRACTOR a D a a DE:KD a D a a D a D WOLF RIVER a D a D a D a D ELECTRIC JB1 0 Xcel Energy Application lication#05175093 o` `o From roof C D C D C D C D D b DMain o J B3 w Utility AC Meter C D C+ ❑ C+ ❑ b D D b ❑ Disconnect PVC N Wolf River Electirc PVC Box Box W Address:101 Isanti Parkway Pvs O C D C D C D b D D b D b D NE, Isanti, MN 55040 10" 8 ❑ e Phone number: (763)229-6662 r= 1 Main JB2 O E-mail:contact@wolfriverelectric.com Service C] e Panel d D D O O KE11 �����dD dD dD dD dD eD eD ❑ e K�El. SITE MAP & PV �� ❑ e ❑ e LAYOUT dD dD dD dD eD eD ����� :ED]��� Solar PV Array 1 Solar PV Array 2 ENGINEEr-:aINC 57- Hanwha 400 W Modules 7- Hanwha 400 W Modules Drawn by:New@engineerinc.io DATE: 07/25/2022 NOTE: No clearance issue 57 - IQ8+ Microinverters 7 - IQ8+ Microinverters Project Name Distance between all equipments is maximum 10" Pitch: 18 Deg Pitch: 18 Deg Matt Ferguson Property Acre" Xcel Energy Application#05175093 Orientation: 271 Deg Orientation: 91 De 1350 Hillcrest Dr NE Note: 24/ 7 Unescorted keyless access is to be Fridley, MN 55432 provided for ALL UTILITY EQUIPMENT Project Scale: NOTE: Conduit in attic shall Hillcrest Dr NE PV SYSTEM AS INDICATED be minimum 18 inches from roof sheating EPV 1 .0 64 REC 400 WATT MODULES REFERENCE POINT OF APPLICABILITY MAIN METER 64 ENPHASE IQ8PLUS MICROINVERTERS SECONDARY INTERCONNECTION 12x6 PVC BOX 120/240V, ENPHASE IQ8PLUS MICROINVERTERS 1 PHASE 290VA Cell Kit 0 1 P,3W MAXIMUM OUTPUT CURRENT 1.21A Comm Kit AC PORT BACKFEED CURRENT OA 12x6 PVC Box DC SHORT CIRCUIT CURRENT 15A PV MONITORING DEVICE 125A PV SUB PANEL 120/24OV, NEMA 3R NOTE:AC DISCONNECT VISIBLE AND LOCKABLE 1-PHASE MICRO-INVERTER UL1741 2 #14 AWG THWN/THWN-2 20A 2-POLE 100A FUSED AC DISCONNECT NON CENTER 100A WITH 100A FUSES, 15.73 UTILITY AC DISCONNECT VISIBLE-OPEN MAIN C/B J BOX1 LOCKABLE,READILY ACCESSIBLE NEMA3R NEMA3R 120/240V 1 P 3W - - - + INSTALL 5 20A PV x tZ ❑00❑ 0000 0000 (6)#10 AWG THWN/THWN-2 ( ) O _ 0000 0000 0000 2-POLE C/B (3)#3AWG THWN/THWN-2 Z Z) 0000 0000 0000 (1)#8 AWG GND Q O 0000 0000 0000 1 1/4" EMT 2 FEET of Of 0000 0000 0000 3/4"EMT 7 FEET EXISTING m - 0000 0000 0000 100A MAIN U 1-iinm 000 2�000 3000 77.44A SERVICE 77.44A 15.73A a PANEL 000 0000 F1 120/24OV, R 1 P,3W x C0W10molmon 0 ❑00❑ U 0 0000 Z Z) 0 0000 Q U0 0000 0 000o Surge Protection "� o m - 0 0000 (NEW)GEC U00 000 MNSPD-300-AC 3 Add 2nd Ground rod and g (6)#10 AWG THWN/THWN-2 15.73A (1)#8 AWG GND (3)#3AWG THWN/THWN-2 tie it to the existinground rod. 3/4"FMT 20 FEET (1)#6 AWG GND0(4)#10 AWG THWN/THWN-2 1 1/4"EMT 2 FEET x U 0000 0000 ❑00❑ 1 #8 AWG GND 1 #6 AWG GND j?-_GEC (E)GROUNDING U � 0000 0000 0000 ( ) ELECTRODE SYSTEM Z Z) 0000 0000 0000 3/4"EMT 7 FEET Q U 0000 0000 0000 PVARRAYRATING WIRE SIZE CALCULATION 0000 0000 0000 0000 0000 0000 CONTRACTOR m - 0000 0000 000o BRANCH CIRCUIT-A BRANCH CIRCUIT A U 1�000 2�o00 3000 15r�05AJ 73 a NumberModules 13 Type Q.PEAK DUO BLKMUG10+ Hanwha400Watt Number OF Microinverters in Circuit 13 NumberMicrolnverters 13 Type EnphaselQ8+Microinverters I08PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 R Total DC Wattage(Watts) Watts STC,(Watts/Module)13*4C0=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 x oUU 0 ❑00❑ Array Currents ISC 11.14 A IMP 10.77 A Breaker Size Per Branch Circuit(A) 20 WOL�RIVER U � 0 0000 Z Z) 0 000o Module Voltage V-OC 45.3 V V-MP 37.13 v ELECTRIC Q U0 0000 W W0 0000 BRANCH CIRCUIT-B BRANCH CIRCUIT-B m - 00 0000 U00 3000 (4)#10 AWG THWN/THWN-2 NumberModules 13 Type Q.PEAKDUOBLKML G10+ Hanwha400Watt Number OF Microinverters in Circuit 13 Xcel Energy Application#05175093 (1)#8 AWG GND NumberMicrolnverters 13 Type I EnphaselQ8+Microinverters IQ8PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 3/4"FMT 20 FEET Total X Wattage(Watts) Watts STC,(Watts/Module)13*400=52Q7 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 - - - Array Currents I-SC 11.14 A I-MP 10.77 A Breaker Size Per Branch Circuit(A) 20 x0J 0000 0000 0000 U ❑000 0000 000o In locations where there is no Moduk Voltage V-OC 45.3 V V-MP 37.13 V Wolf River Electirc Z Z) 0000 0000 000o Address:101 Isanti Parkway Q U 0000 0000 0000 I local Public Authority, the BRANCH CIRCUIT-C BRANCH CIRCUIT-C y W W 0000 0000 000o NE, Isanti, MN 55040 m - 0000 0000 0000 customer is exempt from NumberModules 13 T e Q.PEAKDUOBLKML-G10+ Hanwha400Watt Number OF Microinverters in Circuit 13 U 1n000 2�000 5'1000 p yP Phone number: (763)229-6662 8.47A inspection, and/or the service has NumberMicrolnverters 13 IType I EnphaselQ8+Microinverters I08PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 E-mail:contact(a)_wolfriverelectric.com NEMA3R been shut off or disconnected for Total DC Wattage(Watts) Watts STC,(Watts/Module)13*400=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 - more than 365 days (1 year), Array Currents I-SC 11.14 A I-MP 10.77 A BreakerSize Per Branch Circuit(A) 20 x 0Jit 0000 Module Voltage V-OC 45.3 V V-MP 37.13 V U ❑00❑ the licensed electrician or Z Z) 0000 BRANCH CIRCUIT-D BRANCH CIRCUIT-D < 0 °°°O°°°0 ENPHASE Q CABLE wireman shall submit a signed ELECTRICAL 1-LINE m - 0000 (2)#12 AWG PV WIRE NumberModules 13 Type Q.PE4KDUOBLKML-G10+ Hanwho 400 Watt Number OF Microinverters in Circuit 13 U 7�000 (1)#6AWGEGC and dated Xcel Energy Electrical NumberMicrolnverters 13 Type EnphaselQ8+Microinverters IQ8PLUS-722US(240VJ MicroinverterMaximum0utputCurrent(AJ 1.21 DIAGRAM SYSTEM RATING AND DER POWER OUTPUT FREE IN THE AIR Inspection Certificate to the Total DC Wattage(Watts) Watts STC,(Watts/Module)13*400=52Q7 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 DC 25.60 KW STC Company's Builders Call Line Array Currents I-SC 11.14 JA I I-MP 10.77 JA Breaker Size Per Branch Circuit(A) 20 AC 18.56 KW STC INVERTER:ENPHASE IO7PLUS-72-2-US attesting that the electrical Module Voltage V-OC 45.3 V V-MP 37.13 V IN INVERTER MAXIMUM CONTINUOUS OUTPUT:290VA installation BRANCH CIRCUIT-E BRANCH CIRCUIT-E ENGINEER INC SYSTEM POWER OUTPUT:64 x 290=18.56 NumberModules 12 Type Q.PEAKDUOBLKML-G10+ Hanwh040OWatt Number OF Microinverters in Circuit 12 has been completed and installed Drawn by:New@engineerinc.io No loads or energy storage systems shall according to the current National NumberMicrolnverters 12 IType I EnphaselQ8+Microinverters IQ8PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 DATE: 0712512022 be connected on the DER side of the Electrical Code®, the Xcel Total DC Wattage(Watts) Watts STC,(Watts/Module)12*4004800 Branch Circuit Total Current(A) 12*1.21*1.25=18.15 Project Name production meter Array Currents I-SC 11.14 A I-MP 77 A 10. Breaker Size Per Branch Circuit(A) 20 Matt Ferguson Energy Standard for Electric Module Voltage V-Dc 45.3 v V-MP 37.13 V Property Adress: Xcel Energy Application#05175093 Installation and Use, and any FROM JBOX TO ENPHASE COMBINER BOX 1350 Hillcrest Dr NE Note: 24/7 Unescorted keyless access is to be other applicable codes that apply () 1 1 p ri() / Fridley, MN 55432 y Maximum Cantinius Current 19.66 More Than 3CCC Ad�ist.Factor 0.5 Ad�usted ConductorAm aci A 19.66 0.5=39.32 provided for ALL UTILITY EQUIPMENT Raceway Height From Roof(Temp 39+22=61C)131/2" #ofwire(#BC*2) 1 10 1 lAmbiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.71 before Temp.Derate Factor(max.continous current divided ambient tem.Factor(A) 39.32*0.71=55.38 Wire Size from NEC Table 310.15(b)16 6AWG Project Scale Design meet National Electric Code(NEC codes) PV SYSTEM AS INDICATED FROM ENPHASE COMBINER BOX TO MAIN PANEL electric service IS energized.DC . KW STC Total Number Of Microinverters 64 18 TotalAmps From All Microinverters (A) 64*121=77.44 Consider Continuous(A) 77.44*1.25=96.8 ^.O AC .56 KW STC Temp.Derate Fador(0.91 at wall of the Building)(A) 96.8/0.91=106.37 Wire Size from NEC Table 310.15(b)16 3AWG LAmbiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.91 LRY WARNING NOMINAL OPERATING AC VOLTAGE � NOMINAL OPERATING AC FREQUANCY � TURN OF PHOTOVOLTAIC MAXIMUM AC POWER � AC DISCONNECT PRIOR TO MAXIMUM AC CURRENT � WORKING INSIDE PANEL MAXOCERCURRENTDEVICERATING - FOR AC MODULE PROTECTION PV ARRAY Photovoltaic Power Source DO NOT DISCONNECT PV SYSTEM DC DISCONNECT © LABEL2 UNDER LOAD - OPERATING CURRENT • OPERATING VOLTAGE - CAUTION: SOLAR CIRCUIT MAXIMUM SYSTEM VOLTAGE - MAIN PV SYSTEM SHORT CIRCUIT CURRENT - DISCONNECT © WARNINGLABEL10 LABEL20 © ECTRIC SHOCK HAZARD© MAIN PV SYSTEM RATED MAX POWER-FONT CURRENT � PV SUB-PANEL RATED MAX POWER-FONT VOLTAGE � HE DC CONDUCTORS OF THIS AC DISCONNECT MAXIMUM SYSTEM VOLTAGE PHOTOVOLTAIC SYSTEM ARE SHORT CIRCUIT CURRENT � O UNDE,lei ROUNDAND MAY BE ENERGIZED LABEL11MAX RATED OUTPUT CURRENT OF - THE CHARGE CONTROLLER IF INSTALLED © SOLAR DISCONNECT WARNING © ELECTRIC SHOCK HAZARD CAUTIONSOLAR PV SYSTEM EQUIPPED WITH CONTRACTOR DISCONNECTIF GROUND FAULT IS INDICATED SOLAR ELECTRIC SYSTEM RAPID SHUTDOWN ® NORMALLY GROUNDED CONDUCTORS CONNECTED MAY BE UNDERGROUND AND ENERGIZEDTURN RAPID SHUTDOWN LABEL 13 SWITCH TO THE • POSITION TO • SHUT .• © AND HAZARDREDUCE WARNING-DUAL POWER SOURCE SECOND SOURCE IS PV SYSTEM • ••D LLI _ WARNING - • •' © ELECTRIC SHOCK HAZARD LABEL 14 CAUTION BielNOT TOUCH =1Ile1 PHOTOVOLTAIC SYSTEM CIRCUIT TERMINALS ON BOTH LINE AND LOAD IS BACKFEDWolf River Electirc SIDES MAY BE ENERGIZED IN THE OPEN '•• - • POSITIONLABEL 15 NE, Isanti, MN 55040 MAIN SERVICE Phone number: PANEL E-mail: - � _ _ _ PHOTOVOLTAIC AC DISCONNECT • ® LABEL6MAXIMUM AC OPERATING CURRENT WARNING MAXIMUM AC OPERATINGCURRENT � O O © ELECTRIC SHOCK HAZARDLABELING DETAILLABEL 16 SYSTEM DO NOT TOUCH TERMINALS PHOTOVOLTAIC LABEL 17 TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION UTILITY AC DISCONNECT DC VOLTAGE IS ALWAYS PRESENTDrawn _ , _ __ WHEN SOLAR MODULESDATE: 0712512022 Matt Ferguson 1350 Hillcrest Dr NE ARE EXPOSED TO SUNLIGHT PHOTOVOLTAIC DC DISCONNECTFridley, Note: C 690 PV SYSTEM AS INDICATED CAUTION CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: DISCONNECTS LOCATED AS SHOWN: SERVICE 1 OF 2 SERVICE 2 OF 2 PV SYSTEM DISCONNECT PV SYSTEM DISCONNECT FOR UTILITY OPERATION FOR UTILITY OPERATION CONTRACTOR PVC BOX PV SUB PANEL PVC BOX PV SUB PANEL UTILITY METERING PVC BOX UTILITY METERING PVC BOX SERVICE POINT SERVICE POINT WOL�RIVER ELECTRIC Xcel Energy Application#05175093 Wolf River Electirc 0 0 Address:101 Isanti Parkway NE, Isanti, MN 55040 0 0 o 0Phone number: (763)229-6662 E-mail: ;ontact(awolfriverelectric.com 0 00 N o QO N W \ � E W E PLACARD SOLAR PV ARRAY / \ SOLAR PV ARRAY / \ 1350 Hillcrest Dr NE S 1350 Hillcrest Dr NE S E NG I N E Er_:z I NC Drawn Fridley, MN 55432 Fridley, MN 55432 DATE 071252022g�neerinc.io Project Name: Matt Ferguson Property Adress: 1350 Hillcrest Dr NE Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED F_PV 3.2 N o° LEGEND Q Q O MSP................ Main Service Panel o MM........................ Main Meter 0� �^ 7 O1— v o Q UAC.............Utility AC Disconnect 2W U 90° O PROP RTY LINE �' 0 0 0 PVS..........................PV Sub Panel 00 aD a o , °oo o , o • , : ; PVCB PVC Box a � o . . d S CNGINCC�INC ' o , m 180° ram' .� Engineerinc.io, SCALE: 1/16" = 1'-0" C'° "% 303 N Glenoaks Blvd � �� � � . �� i g CA 91 I HEREBY CERTIFY THAT THIS PLAN, Burbank • a - , • , • o0 0 747 33, -59502 SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION O newCcDengineerinc.io AND THAT I AM A DULY LICENSED o PROFESSIONAL ENGINEER UNDER THE LAWS o • • OF THE STAT NESOTA. v Aq • Q SIGNATURE: MSP Pvs P vg o AP • I •• I 0 NAME: MANOUCHEHR HAKHARMANESHI • DATE:_ LICENSE NUMBER: 58681 Date Certified and Qo 0 - • o Signed: 07/25/2022 00 ° �• 7 il ; Q 0 0 �. D�OOODo • •� CONTRACTOR DODO :� P1" r DODO 0 14 '-5 0 o WOLF RIVER 0�0 Do ELECTRIC 10000000 Xcel Energy Application#05175093 Wolf River Electirc 0 Address:101 Isanti Parkway o NE, Isanti, MN 55040 I I o Phone number: (763)229-6662 O 00 0 E-mail:contact(a_wolfriverelectric.com I � Driveway � a 0 � o o 0 61 - " � V Q PROPERTY PLAN 0 • o O 0 I � � lz� I ENGINEEr-ZINC QP • O O Drawn by.New@engineerinc.io 0o V • • DATE: 0712512022 • • � Project Name: / Matt Ferguson I Property Adress: _ • 1350 Hillcrest Dr NE Hillcrest dr NE �� • Fridley, MN 55432 O Project: Scale: Xcel Energy Application#05175093 PV SYSTEM AS INDICATED Note: 24/ 7 Unescorted keyless access is to be provided for ALL UTILITY EQUIPMENT PV 4.0 MODULES ON ROOF DESIGN CRITERIA POINT LOAD CALCULATION PER ARRAY Prior to the commencement of work, the contractor shall verify the existing roof and framing Solar Module Modules: Module Weight(Ibs) 48.5 conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction. 64 #Of Modules 64 Prior to the commencement of work, the contractor shall inspect framing for any damage Attachment Truss 2 x 6 @ 16"O.C. Max Distributed Load: 3 PSF Total Module Weight(Ibs) 3104 such as water damage, cracked framing, etc. and These Plans are stamped for structural Plywood &Building Felt Rack Weight(Ibs) 620.8 code compliance of the roof framing supporting the proposed PV installation reference only. Microlnverters Weight(Ibs) 152.32 These plans are not stamped for water leakage. PV modules, racking, and attachment 1 Layer of COMP SHINGLE Total System Weight(Ibs) 3877.12 components must follow manufacturer guidelines and requirements. Attachments to be #Of Standoffs 139 installed in a staggered orientation to properly distribute loads. Max Span Between Standoffs (in) 48 Xcel EnergyApplication#05175093 Loading Per Standoff(Ibs) 27.89 pp Total Area (sq.ft.) 1408 Note: 24/7 Unescorted keyless access is to be Loading (PSF) 2.75 provided for ALL UTILITY EQUIPMENT I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STAT NESOTA. SIGNATURE: NAME: MANOUCHEHR HAKHA ANESHI ATTACHMENT DATE: LICENSE NUMBER: 58681 RAIL Date Certified and — — — — — — — — — — — — — — — — Truss 2 x 6 @ 16" O.C. Signed: 07/25/2022 SNAPNRACK,ULTRA RAIL SPEEDSEALT"--'FOOT CONTRACTOR PARTS LIST — — — — — I 1.86" 1.D8"-1.37" ITEM QTI DESCRIPTION I— (`�,�IQ' '0.38" 1 1 SNAPNRACK,SPEEDSEAL FOOT,BASE,SEALING,SILVER/BLACK — — — — — — — — — — WOLF RIVER 2 1 BOLT,FLANGE,SERRATED,5/16IN-18 X 2IN,SS ELECTRIC 1" 3 1 SNAPNRACK,RL UNIVERSAL,MOUNT SPRING,SS — — — — — — — — — — — 3. 5" 8" 4 1 SNAPNRACK,ULTRA RAIL MOUNT THRU PRC,CLEAR/BLACK - — — — — — — — — — — — — — — — — Xcel Energy Application#05175093 1 78" 5 1 SNAPNRACK,ULTRA RAIL MOUNTTAPPED PRC,CLEAR/BLACK — _11— — — — — — — — — — — — 0.25" MATERIALS: DIE CAST A380 ALUMINUM,6000 SERIES ALUMINUM,STAINESS STEEL �— — — I - I DESIGN LOAD(LBS): 802 UP,1333 DOWN,357 SIDE OPTIONS: MIA I _ _ _ _ _ _ _ _ 2.24" — 3.20" ULTIMATE LOAD(LBS): 2118 UP,4006 DOWN,1331 SIDE CLEAR/BLACK — Wolf River EI2CtICC TORQUE SPECIFICATION: 12 LB-FT 0.17" 2.58" — — — — — — — CERTIFICATION: UL 2703,FILE E359313;WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 _ = Address:101 Isanti Parkway _ _ _ _ _ NE, Isanti, MN 55040 R 1.12.33" WEIGHT(LBS): 0.45 Phone number: (763)229-6662 1. 1" R 0.82" — — — E-mail:contact(a)_wolfriverelectric.com 5 - — — -D - — 1. 9" 5'-6" 3' ATTACHMENT 4 1 3 ° 49 14'-7' LAYOUT -1.50"- 4 CNGINCC�INC 2 1 Drawn by:New@engineerinc.io DATE: 0712512022 Project Name: =NGINCC�INC Matt Ferguson Property Adress: 1350 Hillcrest Dr NE Engineerinc.io, Fridley, MN 55432 303 N Glenoaks Blvd Project: Scale: Burbank, CA 91502 PV SYSTEM AS INDICATED (747) 333 - 5991 new(@engineerinc.io PV 5. 1 SNAPNRACK UR SPEEDSEAL FOOT FOR MODULE HEIGHT OFF ROOF,RANGE: COMPOSTION ROOF MOUNTING UR-40:3%"-�,4. COMP SHINGLE ROOFING,TYP. REFER TO SNAPNRACK ENGINEERING CHARTS UR-60:4"-5" SNAPNRACK UR SPEEDSEAL FOOT FOR APPLICABLE RAIL SPANS. ROOF DECKING,TYP. SI6`0 S.S. LAG SCREW MUST EMBED A MIN. SNAPNRACK, SNAPNRACK,�/16"O S.S. OF 21A" INTO STRUCTURAL MEMBER ULTRA RAIL LAG SCREW,TYP. STRUCUTRAL MEMBER, REFER TO SNAPNRACK INSTALLATION WOOD RAFTER,TYP. MANUAL FOR Ye'0 HARDWARE TORQUE SPECIFICATIONS STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE= SPF#2 MINIMUM SPECIFIC GRAVITY= 0.42 ALLOWABLE FASTENER UPLIFT =820 LBS CONTRACTOR ALLOWABLE FASTENER LATERAL= 2S0 LBS MINIMUM FASTENER EDGE DISTANCE= 0.5" MINIMUM FASTENER END DISTANCE= 2.2" WOL�RIVER 21!" MIN.EMBEDMENT INTO WOOD MEMBER ELECTRIC Xcel Energy Application#05175093 SNAPNRACK,ULTRA. RAIL MOUNT, TAPPED Vi6"WASHER,S.S. (MAY INCLUDE NEOPRENE TYPE GASKET) Wolf River Electirc PENETRATION DETAIL Address:101 Isanti Parkway NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail: ;ontact(awolfriverelectric.com SNAPNRACK, ULTRA COIL SPRING FOR 3 "0 BOLT, S.S. RAIL MOUNT,THRU �� OPTIONAL CAVITY IN UR SPEEDSEAL FOOT IS FILLED WITH SEALANT TO ENCAPSULATE AND PROTECT THE ROOF PENETRATION ATTACHMENT 5/16"0-18 X 2"BOLT, FROM MOISTURE DETAIL C SERRATED FLANGE,S.S. SNAPNRACK, SPEEDSEAL FOOT, BASE,SEALING ENGI NEEr-:Z INC EXPLODED Drawn by.New@engineerinc.io DATE: 0712512022 SEALANT Project Name: Matt Ferguson Properly Adr- 2% 1350 Hillcrest Dr NE 1 ROOF DECKING; Fridley, MN 55432 Ll Project: Scale: PvSYSTEM L AS INDICATED UR-40 RAIL I UR-60 RAIL STRUCTURAL MEMBER(RAFTER)FOR USE WITH SNAPNRACK ULTRA SERIES RAILS - — FPV 5.2 '=k ENPHASE amom IQ8 and IQ8+ Microinverters I 1 1•. Commonly used module pairings' w 235-350 235-440 Module compatibility 60-celIA20 half-cell 60-cell/120 half-cell and 72-cell/144 half-cell MPPT voltage range V 27-37 29-45 Operating range V 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC currentz[module[so] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array:No additional DC side protection required:AC side protection requires max 20A per branch circuit OUTPUT 1 ,1 Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal(Ivoltage/range3 V 240/211-264 CONTRACTOR Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 IQ8 and IQ8+ Microinverters Extended frequency range Hz 50-68 Max units per 20 A(I branch circuit' 16 13 WO L�R 1 V E R Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- Total harmonic distortion <5% ELECTRIC defined microinverters with split-phase power conversion capability to convert DC Overvoltage class AC port III power to AC power efficiently.The brain of the semiconductor-based microinverter Easyto install is our proprietary application-specific integrated circuit(ASIC)which enables the Lightweight and compact with AC port backfeed current ma 3o Xcel Energy Application#05175093 microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced plug-n-play connectors Power factor setting 1.0 55nm technology with high speed digital logic and has super-fast response times Power Line Communication Grid-tied power factor(adjustable) 0.85 leading-0.85lagging to changing loads and grid events,alleviating constraints on battery sizing for home (PLC)between components Peak efficiency % 97.5 97.6 energy systems. • Faster installation with simple CEC weighted efficiency °6 97 97 Wolf River EleCtiCC two-wire cabling Night-time power consumption mw 60 Address:101 Isanti Parkway Enphase MECHANICAL DATA NE, Isanti, MN 55040 -. Phone number: (763)229-6662 High productivity and rellal71117y Ambient temperature range -40°C to•600C(-40°F to+740°F) E-mail:contact(a�wolfriverelectric.com • Produce polder even when the Relative humidity range 4%to 100%(condensing) grid is down 1- L DC Connector type MC4 More than one million cumulative Dimensions(HxWxD) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") Part of the Enphase Energy System,IQ8 Series IQ8 Series Microinverters redefinereliability hours Of testing Microinverters integrate with the Enphase IQ standards with more than one million Weight 1.08kg(2.38lbs) INVERTER Battery.En phase IQ Gateway,and the Enphase cumulative hours of power-on testing. • Class lldouble-insulated Appmonitoring and analysis software. enabling an industry-leading limited warranty enclosure Cooling Natural convection-nofans DATA SHEET of up to 25 years. Approved for wet locations Yes • Optimized for the latest high- powered PV modules Acoustic noise at 1m -60 dBA Pollution degree PD3 ep::r CERTIFIED Microgrid-forming Enclosure Class II double-insulated.corrosion resistant polymeric enclosure ENG 1 NEEn-:2 INC Complies with the latest Environ.category/UV exposure rating NEMA Type 6/outdoor advanced grid support moil Drawn by:New@engineerinc.io Connect PV modules quickly and easily to IQ8 Series Microinverters are UL Listed as DATE: 0712512022 q Y ry Remote automatic updates for CA Rule 21(UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B.ICES-0003 Class B.CAN/CSA-C22.2 N0.107.1-01 IQ8 Series Microinverters using the included PV Rapid Shut Down Equipment and conform project Name: Q-DCC-2 adapter cable with lu n- la MC4 with various regulations, installed the latest grid requirements P P 9- P Y e9 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conformswith NEC 2014.NEC 2017.and NEC 2020 section Matt Ferguson connectors. according to manufacturer's instructions. Configurable to support a wide 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors.when installed accordingto range of grid profiles manufacturers instructions. Property Adress: 1350 Hillcrest Dr NE ®2021 Enphase Energy.All rights reserved.Enphasa the Enphase logo.IQ8 microinverters. Meets CA Rule 21(UL 1741-SA) (1)No enforced DC/AC ratio.Seethe compatibility calculator at httpsJ/Iink.enphase.com/ Fridley, MN 55432 and other names are trademarks of Enphase Energy.Inc.Data subject to change requirements module-compatibility(2)Maximum continuous input DC current is 10.6A(3)Nominal voltage range can be extended beyond nominal if required by the utility.(4)Limits may vary.Refer to Project: scale: IQ8SP-DS-0002-01-EN-11S-2021-10-19 local requirements to define the number of microinverters per branch in your area. I08SP-DS-0002-01-EN-US-2021-10-19 I PV SYSTEM I AS INDICATED F- D 6.0 • � ENPHASE Install the Enphase IQ8 Series Microinverter To install Enphase IQ8 Series Microinverters,read and follow all warnings and instructions in this guide and in the Enphase IQ8 Series Microinverter Enphase Energy//Rapid Shutdown Installation and Operation Manual at aelnhase-com/stnprt Safety warnings are listed on the back page of this guide. The Enphase Microinverter models listed in this guide do not require grounding electrode conductors(GEC),equipment grounding conductors(EGC),or grounded conductor(neutral).The microinverter has a Class II double-insulated rating,which includes ground fault protection(GFP).To support GFP,use only PV modules equipped with DC cables labeled PV Wire or PV Cable Rapid shutdown is built-in IMPORTANT:Enphase IQ8 Series Microinverters require the IQ Cable.An IQ Gateway is required to monitor performance of the IQ Microinverters.The Q Accessories work only with Enphase IQ8 Series Microinverters. Note:After you log in to your Enphase Installer Platform account from Enphase Installer app,Scan the microinverter QR code and connect to the Enphase IQ Gateway to track the system installation progress. The 2014 edition of the National Electrical Code(NEC 2014)added What's new in NEC 2014? new rapid shutdown requirements for PV systems installed on buildings. NEC 2014,Section 690.12 applies PREPARATION Enphase Microinverters full meet rapid shutdown requirements in the to PV conductors over 10 feetfrom p y p q A Download the pp and o te Enphase Installer A n it to to ) s: the PV array and requires that the ) p � g D Check that you have these other item e ��.� e new code without the need to install any additional electrical equipment. in to your Enphase Installer Platform account.With this r+,,� ACjunction box. conductors power down to 30 volts t.. �} app,scan the microinverter QR code and connect to x Tools:screwdrivers,wire cutter,voltmeter,torque wrench,sockets, and 240 volt-amperes within 10 the Enphase IQ Gateway to track system installation r�' and wrenches for mounting hardware seconds of rapid shutdown initiation. progress.To download,go to enphase.com/toolkit or scan the QR code at right. E) Protect your system with lightning and/or surge suppression devices.It is also important to have insurance that protects against lightning and String inverters require work arounds for rapid shutdown B) Referto the foseco /table en-uandcheckPVmle-cQmlectricalcompati electrical surges. bility at:Qpphase.com/en-uc_/suonort/modulezom com/en-us/sur)pr)rt/module-cQmpalbAily. Model DC connector Typical PV module*cell count IF Plan your AC branch circuits to meet the following limits for maximum CONTRACTOR MC 4lockin number of microinverters per branch when protected with a 20-amp Work around. Work around. IQ8-60-2-US g type Pair with 60 cell/120-half-cell over-current protection device(OCPD) Specialized Rapid Shutdown String Inverter Installed modules electrical box installed on the on roof,a hostile 18PLUS-72-2-US IVIC-4 locking type Pair with 60 cell/120-half-cell 66 Maximum* IQ8 Series Microinverters per AC branch circuit(sin- roof cell,or 72 cell/144-hhalf--cell le- hase roof within 10 feet of array. environment that string g P ' WOLR 1 V E R IQ8A-72-2-US IQ8(240V IQ8+ 240V IQ8M(240V) o live irs are not built ) ( ) IQ8F+240-72-2-US MC-0 locking type Pair with 60 cell/120-half-cell,66 Work around. to live in. IQSH-208-72-2-Us cell,or72 cell/144-half--cell 16 13 11 ELECTRIC Shutoff switch that Is `Enphase IQ8 Series Micrdnverters are compatible with bi-facial PV modules if IQ8A(240V) IQ8H(240V) IQ8H(208V) the temperature adjusted electrical parameters(maximum power,voltage and 11 10 9 easily accessible to first current)ofthemodules,consideri the front side electrical arameters I.e.,M6 Xcel Energy Application#05175093 It9 P ( Limits may vary.Referto local requirerrents to defne the numberof responders on the ground. back side gain),are within the allowable microirrverter input parameters range. microinverters per branch in your area. w it C) In addition to the Enphase Microinverters,PV modules and racking, G) Size the AC wire gauge to account for voltage rise.Select the correct you will need these Enphase IQ8 Series Microinverters: wire size based on the distance from the beginning ofthe Enphase IQ Work around. Enphase IQ Gateway(model ENV-IQ-AM 1-240)communications Cable to the breaker in the load center.Design for a voltage rise total Extra conduit in Installation. Residential String Inverter Commercial String Inverter gateway or Enphase IQ Combiner(check enphase.com for models): of less than 2%for these sections.Refer to the Voltage Rise Technical Wolf River ElectlrC is required to monitor solar production. Brief at ennhase_com/support for more information. Address:101 Isanti Parkway Tie wraps or cable clips(Q-CU P-100) NE, Isanti, MN 55040 Enphase Sealing Caps(Q-SEAL-10):for any unused connectors on Best practice:Center-feed the branch circuit to minimize voltage rise in Phone number: (763)229-6662 the Enphase IQ Cable a fully-populated branch. Enphase Terminator(Q-TERM-10):one needed at the end of each E-mail:contactt_wolfriyerelectric.com Enphase comes standard with rapid shutdown capability AC cable segment Enphase Disconnect Tool(Q-DISC-10) Enphase IQ Cable: ENPHASE RAPID Cable model Connector PV module Connectors SHUTDOWN All Enphase microln- Enphase microinverters spacing* orientation per box r verters,even those that can safely shut down Q-12-10-240 1.3m Portrait(al 1) 240 Terminator COMPATIBILITY were previously installed, automatjcally,leaving Q-12-17-240 2.0m Landscape(60-and 66-cell) 240 WITH PV inherently meet rapid only low-voltage DC Q-12-20-200 2.3m Landscape(72-cel1) 200 shutdown requirements, electricity isolated to *Allows for 30cm of cable slack no additional equipment the PV module E CNGINCCIZINC or workarounds needed Enphase IQ Cable Drawn by.New@engineerinc.io AC connector DATE: 0712512022 DC connector 02021 Enphase Energy All rights reserved. Enphase,the Enphase logo,Enphase IQ8 Proiect Name: Residential Microinverter Commercial Microinverter R Series micranverters(IQ8,IQ8+,IQ8A,IQ8H Matt Ferguson `Tie wraps or cable clips and IQ8M),Enphase Installer Platform, Property Adress: Enphase IQ Gateway,and other trademarks 1350 Hillcrest Dr NE or service names are the trademarks of Fridley, MN 55432 Enphase En Inc.Data subecttochan a y, �—Enphase IQ8 Series Microinverter P Energy, 1 9 r1l enphase� (horizontal installation shown,vertical Rev02-10-23-2021. Project: scale: To learn more,visit enphase.com C�J E N E R G Y installation also allowed). III 11111111111111111111111111111111111111111111111 PV SYSTEM AS INDICATED AC junction box 14"0195-02 D 7.0 P-red by MECHANICAL SPECIFICATION Format 74.Dinx41.11nx126in(including frame) (1879mm x 1045mm x 32mm) t<.om,amm� tn.,rataam,ro Nat µa9amm, Weight 48.5 Ibs(22.0 kg) Front Cover 0.131n(3.2mm)thermally pre-stressed glass with - anti-reflection technology _ --- - Back Cover Composite film ��.IrPo„•„I Frame Black anodized aluminum Cell 6 x 22 monocrystallne O.ANTUM solar half cells Junction Box 2.093.98inx1.26-2.36inx0.59-0.711n (53-101 man x 32-60 min x15-18 mm),IP67,with by pass diodes 44tl� arsamml Cable 4mm2 Solar cable:(.)>_49.21n(1250mm),(-)>_49.21n(1250mm) tc,..xsm.mrw•a >E Connector Stiklbli MC4:IP68 J LL 'I ruacmmmi orris•�u,,.,n oa'a.s T Iot.rarmM . • : , ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 305 400 405 MINIMU M PERFORMANCE AT STANDARD TEST CONDITIONS,STC1(POWER TO LE RANCE*SW/-0 W) powerst MPPs P_ IW] 385 390 395 400 405 R Short Circuit Current' Isc [Al 11.04 11.07 11.10 U14 11.17 � E Open Ctrcutt Voltages V [VJ 45.19 4523 45.27 45.30 45.34 r II� S Current at MPP I- [A] 10.59 10.65 10,71 10.77 10.83 Tor enAND Rt Voltage at MPP V_ [VJ 36.36 36.62 36.8E 1 37.13 37.39 CONTRACTOR ' Efficiency- q [%] z19.6 a19.9 z20.1 e20.4 >_20.6 5 raa�.r MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT' Warranty 2UZ1 QCELL$ Power at MPP Pap, [W] 288.8 292.6 296.3 3001 303.a Yleld S6eudty E Short Circuit Current Isc [A] 8.90 8.92 8.95 8.97 9.00 :E Open Circuit Voltage Voc [VJ 42.82 42.65 42.69 42.72 42.76 WO L RIVE R BREAKING THE 20%EFFICIENCY BARRIER 2 Current at MPP I_ [A] 8.35 8.41 8.46 8.51 8.57 Q.ANTUM DUO Z Technology with zero gap cell layout Voltage at MPP V_ [A 34.59 34.81 35.03 35.25 35.46 ELECTRIC boosts module efficiency up to 20.9%. `Measurement tolerances P.,.a 3%;6 Vats5%atSTC:1000W/W,25x21C,AM1.5 according to I EC 60904-3•1800W/mt,N MOT,spectrum AM 15 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE Xcel Energy Application#05175093 THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY Lim °•,, At least98%ofnomhelpowerduring -ue -- ] r r -r � Q CELLS is the first solar module manufacturer to ass the most eom rehen- I I I I p p 3i Post year.Thereafter max.0.5% sive quality programme in the industry:The new'Quality Controlled PV'of - - degradationper year.At least 93.5% of nominal power up to 10 years.At the independent certification institute TUV Rheinland. least 86%of nominal power rp to " ----. ---'------- 25 yeas. ❑ a --r-----r----t-----r----�' z Wolf River Electirc INNOVATIVE ALL-WEATHER TECHNOLOGY Al data within measurementtoleranc- m I I i o Address:101 Isantl Parkway Optimal yields,whatever the weather with excellent es.Full warranties In accordance with thewartenty terms oftheQ CELLS '°°,a�ptm (w,muao NE, Isanti, MN 55040 low-light and temperature behavior. salesorganisanonofyolrrespective R Phone number: (763)229-6662 " r courtly. a ranns Typlcalmodule performance undertow lnedlancecondltlons In 14 ENDURING HIGH PERFORMANCE " ° g' comparison tosrc conditions(25°C,1000W/W) E-mail: ontact@wolfriverelectric.com Long-term yield security with Anti LID Technology,Ant(PID TEMPERATURE COEFFICIENTS o Technology',Hot-Spot Protect and Traceable QualityTra.Q' . Temperature Coefficient on a [%/K] .0.04 Temperature Coefficient of V_ [%/K] -0.27 Temperature Coefficient of P, y [%/K] -0.34 Nominal Module Operating Temperature NMOT [°F] 109t5.4f43i3°C) EXTREME WEATHER RATING MODULE High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN high snow(5400 Pa)and wind loads(4000 Pa). DATA SHEET Maximum System Voltage Vs,s IVI 1000(IEC)/1000(UL) PV module classification Clwsll p Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 A RELIABLE INVESTMENT o Max.Design Load,Push/Pull' Ilbs/ftj 75(3600Pa)/55(2660Pa) Permitted Module Temperature -40°F up to+185T p Inclusive25-year product warranty and25-year on Continuous Duty (-40°Cupto 85'C) j( linear performance warranty2. Max.Test Load,Push/Pull' jlbs/ft9 113(5400Pa)/B4(4000Pa) 'See lmuilatlon Manual 'APT tea conditions acmfding to IEC/TS 62B041:2015,rnethod A(-1500V,96h) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION E N G I N E Er 'See data sheet on rear for further information Drawn by:New@engineerincJo ciumn, mucwmclaa. 5t' UL617 0.CE etl ft rl. flnmmmJ, �/ e .Uiic y DATE: 0712512022 o-o I....I IEC 61215.2016,IEC 617302016, THE IDEAL SOLUTION FOR Us.Palest N.9.893.215(soa caul. • [♦ r/' a...e Horizontal 76.4in 43.3 in 48.01n 1656lbs 24 24 32 71 Project Name: OCPVCerltlreuon mgtlng O US ♦ ` packaging 1940mm 1100mm 1220mm 751kg pallets pallets modules ¢ Matt Ferguson Rooftopansyson `_'_'" unuumi resltlentia bulldings & Property Adress: 1350 Hillcrest Dr NE Note:Installation Instrucnons must be followed.See the instalauon and operaunu manual or contact our technical service department for further Information on approved Im1aletlonand use of �ducL Fridley, MN 55432 CELLS - Project: Scale: Hanwha OCELLS America Inc. PV SYSTEM AS INDICATED Eng]neered in Germany 40U SGecuum,:;erde�Gnve.Suite 1400,Irvine.CA 92618,USA I TEL fl 949 748 59 96 1 EMAIL Inquiry@us.p-cels.com I WEB www gcel5.us LE 8.0 Snap rack- UR-40 SnapNrack Ultra Rail UR-60 A sleek, straightforward rail solution for mounting solar modules .. types. Ultra Rail Solar Mounting Solutions features two rail profiles; , • is a lightweight rail profile suitable • •st geographic Ultra Rail • - •• • rail . . . . .. . . . .. .. . ... :. compatible with all . . . . clamps, . . . of install. The Entire System is a Snap to Install • New Ultra Rail Mounts include snap-in brackets for attaching rail • Compatible with all the SnapNrack Mid Clamps and End Clamps customers love • Universal End Clamps and snap-in End Caps provide a clean look to the array edge CONTRACTOR Unparalleled Wire Management • Open rail channel provides room for running wires resulting in a long-lasting quality install WOL�RIVER • Industry best wire management offering ELECTRIC includes Junction Boxes, Universal Wire Clamps, MLPE Attachment Kits, and Conduit Xcel Energy Application#05175093 Clamps • System is fully bonded and listed to UL 2703 The Ultimate Value in Rooftop Solar Standard Wolf River Electirc Address:101 Isanti Parkway NE, Isanti, MN 55040 • Phone number: (763)229-6662 Industry ' • • • Wire Mounts • • E-mail: ;ontact(a)_wolfriverelectric.com Management Heavy Duty UR-60 Rail • • • • • _ • UR-60 rail profile provides increased span capabilities for high wind speeds and snow Single loads ��� � RACKING • • • • • • • Taller, stronger rail profile includes profile- Clamps : Accessories specific rail splice and end cap DATA SHEET _ compatible • All existing mounts, module clamps, and accessories are retained for the same great both rail profiles install experience CNGINCC�INC Drawn by.New@engineerinc.io DATE: 0712512022 • - • • - • • Ultra • Project Name: Matt Ferguson Quality. Inn .ovative Superiorr Poperty Adress: RESOURCES snapnrack.com/resources � 135o Hill°rest Dr NE SnapNrack Solar • • Solutions •re engineered to optimize material _ • Fridley, MN 55432 DESIGN snapnrack.com/configurator Project Scale: labor re • and improve overall installationquality and safety. PV SYSTEM AS INDICATED WHERE TO BUY snapnrack.com/where-to-buy 877-732-2860 • • • • D 9.0 DESCRIPTION: DRAWN BY: DESCRIPTION: DRAWN BY: SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins 5flapHruck" SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins Sfla NN ack- REVISION: Solar Mounting Solutions REVISION: Solar Mo unting Solutions PART NUMBER(S): PART NUMBER(S): 595 MARKET STREET,29TH FLOOR.SAN FRANCISCO,LA 96105 USA 595 MARKET STREET,29TH FLOOR.SAN FRANLISOO,CA 94105 USA A PHONE(415)5W0 900.FAX(415)500.0902 PHONE(415)500b900•FAX(415)5MM2 242-02163, 242-02167 �ENFo.MroKNTHIsoF 9HosoKF9LN� �oaROPRI .a. N. 242-02163, 242-02167 E .o. �=C""'a�,µo�aoaP. . �.�r 1.37 .30 .38 1.86- 1.08 1.00 v�5a SLOT 3.05 CONTRACTOR 2.78 5 mpNmck 1.78 .25 WOL�ELECTRIC RIVER L 17 _ Q52.24� -�3.20�- Xcel Energy Application#05175093 2.58 4 3 Wolf River Electirc 0.33 Address:101 Isanti Parkway R1.12 NE, Isanti, MN 55040 Phone number: (763)229-6662 1.21 R•82 E-mail:contacta_wolfriverelectric.com 2 1 ATTACHMENT DATA SHEET PARTS LIST 1.99 ITEM QTY DESCRIPTION 1 1 SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER/ BLACK 2 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SS 11 ENGINEEZINC 3 1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS 4 1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR/ BLACK Drawn by:New@engineerinc.io DATE: 0712512022 5 1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR/ BLACK 1.50 MATERIALS: DIE CAST A380 ALUMINUM, 6000 SERIES ALUMINUM, STAINLESS STEEL Project Name: Matt Ferguson DESIGN LOAD (LBS): 802 UP, 1333 DOWN, 357 SIDE OPTIONS: Property Adre99: ULTIMATE LOAD (LBS): 2118 UP, 4006 DOWN, 1331 SIDE CLEAR/ BLACK 1350 Hillcrest Dr NE TORQUE SPECIFICATION: 12 LB-FT Fridley, MN 55432 Project: I Scale: CERTIFICATION: UL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 PV SYSTEM AS INDICATED WEIGHT(LBS): 0.45 ALL DIMENSIONS IN INCHES FD 10.0 Data Sheet Enphase Networking Enphase IQ Envoy MODELNUMBERS Enphase IQ Envoy"' Enphase IQ Envoy communications gateway with integrated revenue grade PV production ENV-IQ-AM1-240 metering(ANSI C12.20+/-0.5%)and optional consumption monitoring(+/-2.5%).Includes one 200A continuous rated Droduction CT. ACCESSORIES order separately) Enphase IQ Envoy The Enphase IQ Envoy' communications gateway Enphase Mobile Connect' CELLMODEM-03(413/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 delivers solar production and energy consumption CELLMODEM-01(313/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, data to Enphase Enlighten"' monitoring and analysis CELLMODEM-M1(413 based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Consumption Monitoring CT Split-core current transformers enable whole home metering. software for comprehensive,remote maintenance and CT-200-SPLIT POWER REQUIREMENTS management of the Enphase IQ System. Power requirements 120/240VAC split-phase. Max 20 A overcurrent protection required. CAPACITY With integrated revenue grade production metering and Number of microinverters polled Up to600 optional consumption monitoring,the Envoy IQ is the MECHANICAL DATA 5 cm x.6 4 x Dimensions(WxHxD) 21.3 x 12 . (8.4" 5'x 1.8') platform for total energy management and integrates Weight 17.6 oz .6 CONTRACTOR with the Enphase IQ Battery-. Ambient temperature range -40'to 65'C(-40"to 149'F) -40-to 46-C(-40"to 115'F)if installed in an enclosure Environmental rating IP30.For installation indoors or in an NRTL-certified,NEMA type 3R enclosure. Altitude To 2000 meters(6,560 feet) WO L�R I V E R Production CT Is limited to 200A of continuous current/250A OCPD-72kW AC ELECTRIC Internal aperture measures 19.36mm to support 250MCM THWN conductors(max) Smart Consumption CT For electrical services to 250A with parallel runs up to 500A Internal aperture measures 0.84'x 0.96"(21.33mm x 24.38mm)to support Xcel Energy Application#05175093 ENPHASE Enables web-based monitoring 3/0 THWN conductor and control -CT wire insulation rating of 600V INTERNET CONNECTION OPTIONS Bidirectional communications for Integrated Wi-Fi 802.11b/g/n remote upgrades Ethernet 802.3,Cat5E(or Cat 6)UTP Ethernet cable,not included Supports power export limiting and zero- Mobile Optional,CELLMODEM-01(3G)or CELLMODEM-03(4G), not included Wolf River Electirc export applications COMPLIANCE Address:101 Isanti Parkway Compliance UL916 NE, Isanti, MN 55040 CAN/CSA C22.2 No.61010-1 Phone number: (763)229-6662 Simple 47 CFR,Part 15,Class B,ICES 003 E-mail: :ontact@wolfriverelectric.com IEC/EN 61010-1:2010, Easy system configuration using EN50065-1,EN61000-4-5,EN61000.6-1,EN61 0 0 0-6-2 Enphase Installer Toolkit"mobile app Metering:ANSI C12.20 accuracy class 0.5 Flexible networking with Wi-Fi, Ethernet,or cellular MONITORING DATASHEET Reliable Designed for installation indoors or outdoors Five-year warranty ENG IN E Er-4 INC Drawn by.New@engineerinc.io DATE: 0712512022 Project Name: Matt Ferguson U■ Property Adress L 1350 Hillcrest Dr NE To learn more about Enphase offerings,visit enphase.com Fridley, MN 55432 LISTED EN P H AS E. 2018 Enphase Energy All rights reserved All irademaiks or er nde:used ate;he,rerty o` ase Energy,Inc EN P H AS E. Project Scale To learn more about Enphase offerings,visit enphase.com �/ 2018-12-1D V PV SYSTEM AS INDICATED D 11 .0 CERTIFICATE OF COMPLIANCE CERTIFICATE OF COMPLIANCE Certificate Number 20180530-E341165 Certificate Number 20180530-E341165 Report Reference E341165-20171030 Report Reference E341165-20171030 Issue Date 2018-MAY-30 Issue Date 2018-MAY-30 Issued to: ENPHASE ENERGY INC This is to certify that representative samples of the product as specified on this certificate were tested 1420 N McDowell Blvd according to the current UL requirements. Petaluma CA 94954-6515 Permanently-connected, Grid Support utility Interactive,208V single-phase,240V single phase evaluated for use on a split phase system, distributed resource power system. This is to certify that STATIC INVERTERS, CONVERTERS AND representative samples of ACCESSORIES FOR USE IN INDEPENDENT POWER Models 2-2-U,land IQ7 -72, and IQ7X 96,followed by 2,-5, B,or ACM,followed by US+. Models IQ7PD-72-2-US and IQ7PD-842-US. SYSTEMS, PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM EQUIPMENT USUCNL—Photovoltaic Rapid Shutdown Equipment. See Addendum Models IQ7-60,IQ7PLUS-72, and IQ7X-96,followed by-2,-5,-B,or-ACM,followed by-US+. Models CONTRACTOR IQ7PD-72-2-US and IQ7PD-84-2-US. Have been investigated by UL in accordance with the +may be followed by additional characters not affecting safety Standard(s) indicated on this Certificate. WOL�RIVER Standard(s)for Safety: ELECTRIC Standard(s)for Safety: See Addendum UL 62109-1,SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER Xcel Energy Application#05175093 Additional Information: See the UL Online Certifications Directory at SYSTEMS-PART 1: GENERAL REQUIREMENTS www.u1.com/database for additional information CSA C22.2 NO. 107.1-01, GENERAL USE POWER SUPPLIES IEEE 1547 INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Wolf River Electirc Only those products bearing the UL Certification Mark should be considered as being covered by UL's Address:101 Isanti Parkway Certification and Follow-Up Service. IEEE 1547.1 IEEE STANDARD CONFORMANCE TEST PROCEDURES FOR EQUIPMENT NE, Isanti, MN 55040 INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Phone number: (763)229-6662 Look for the UL Certification Mark on the product. E-mail: .:ontact(a�wolfriverelectric.com UL 1741. INVERTERS,CONVERTERS,CONTROLLERS AND INTERCONNECTION SYSTEM EQUIPMENT FOR USE WITH DISTRIBUTED ENERGY RESOURCES CEC-300-2011-005,-CMF GUIDELINES FOR CALIFORNIA'S SOLAR ELECTRIC INCENTIVE PROGRAMS PURSUANT TO SENATE BILL 1 INVERTER CERTIFICATION ENGINEEw-;ZINC Drawn by.New@engineerinc.io DATE: 0712512022 Project Name: &uo.MMr A,dt 0.. N—h All—C.lU61-1 Plogmn &uc.MaM.rJldc Ur.ctm N.nll Anroncan C-1fl ua1 Ploymn Matt Ferguson UL LLC ` UL LLC L Property Adress: AnylMorm wenddocvm.mdlw nvdmgULMlMs.rvk.sereprowd.donU 1.foIUL LLC(UL)mm1Ya 11m�z.dl—m-WULForµnsborls.Al AirylMmmuimmiddoam.ndi--dwngULMaks.rwc —prowdedonb.hml.1UL LLC(UL Iamry--..dY�ense.MULForquastbns.plaaw 1350 Hillcrest Dr NE c.Mmla1-M UL CuSm—R.pr.smtmly.at IJW l:d bcm UL(.Il.tol Sm .R.p.smt—m 11RuLc dr.ulutloc.— Fridley, MN 55432 Page 1 of 2 Page 2 of 2 mjed I scale: PV SYSTEM AS INDICATED Created by UL Document Assembler 2018-07-05 15:07:07-05.00 Created by UL Document Assembler 2018-07-05 15:07:07-05.00 Lp 12.0 I 101 f I I I N a♦ " Surge Protection RT NUMRER MNSPD-115 MNSPD-300-AC MNSPD-300-DC MNSPD-600 Nominal Voltage 0 to 90 VAC 0 to 250 VAC 0 to 300 VDC 0 to 480 VAC 0 to 115 VDC 0 to 600 VDC - MCOV 180V 470V 470V 780V Surge Protection You Can VPRLinetoGround 600V 1200V 1200V 1800V ' Suggested Placement Up to 90VAC circuits, 120/240 VAC circuits Off-grid PV combiners 316V/480VAC circuits Count 4n• 12V,24V,48VDC battery Charge controller inputs Grid-tie PV combiners f circuits up to 30OVDC Grid-tie inverter input Non-Isolated Inverters MidNite Solar Surge Protection Devices are type 1 devices, designed for indoor and outdoorType UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 g .4 _ rr - A'.a' applications. Engineered for both AC and PV +� Diagnostic Blue LED MNSPD 300 AC DC electrical systems, the rOVld@ protection LED indicates when voltage is present between Ll +ground and L2+ground Y Y P P MNSPD-115,MNSPD-300-DC and MNSPD-600: to service panels, load centers or electronic LED indicates when voltage is present between Ll +L2(PV+PV-) devices that are directly connected to a MidNite Thermal Disconnector Internal Fuse Surge Protection Device (SPD). Response Time <1 micro sec. I n CONTRACTOR MidNite's SPDs are offered in four models to protect a variety of different voltage ranges. They achieve this protection by clamping surge MNSPD300ACFM (Cut-in box) WOL�RIVER voltage to a level that your system can sustain (MNSPD-300-AC included) ELECTRIC without damaging the components of the Performance system. Surge Current Rating per Phase 80kA Xcel Energy Application#05175093 03.527" Short Circuit Current Rating 10kA Compare our SPDs against other surge protec- Fusing Individually fused MOVs tion devices. You will see there is no com an- Thermal Fusing Yes P + Over current Fusing Yes Wolf River Electirc son in both our price and features. All our SPDs Operating Frequency 0 to 500 Hz Address:101 Isanti Parkway are made in the USA and have a 5 year warranty. Mechanical Description NE, Isanti, MN 55040 Enclosure Polycarbonate UL94V-0 Phone number: (763)229-6662 Environmental Rating Type4X E-mail: ;ontact(awolfriverelectric.com Connection Method #12 AWG With lightning you only get one Weight 1 lb. Mounting Method 1/2"Conduit Knockout Operating Altitude Sea Level- 12,000'(3,658 Meters) chance, so get the best! 3 82„ 4.425" Storage Temp -401 Fto+185 F(-40°Cto+85°Q SURGE PROTECTION Operating Temp -40,F to+185,F(-40°C to+85,C) Diagnostics Blue status LED,one per leg Four Models: Listings and Performance 24"Wires.AtI MNSPD-115 UL Standard for Safety,UL 1449 Surge Protective Devices-Fourth Edition ENGINEER INC CSA C22.2 No.8-M1986 Electromangetic Interference(EMI)Filters,Fourth Edition Drawn by.New@engineerinc.io MNSPD-300-AC DATE: 0712512022 MNSPD-300-DC Project Name MNSPD-600 Model No. Max Operating Surge Current Configuration MCOV SCCR VPR 60OV/3kA Matt Ferguson r i Voltage per Phase L_G Prope yAdress: MNSPD-115 100 VAC/1 50VDC 80kA 3 wire 2Legs) , 180VL-N �tOkA 600V 1350 Hillcrest Dr NE MNSPD-300-AC 300VAC 80! 1 3-wire(2 Legs) 470V L-N 10kA 1200V rk_ffij� _l _ I Fridley, MN 55432 MNSPD 300 DC r 385VDC 80kA1,P13 wire(2 Legs) t 470V L-N 10kA 1200VMNSPD-600 480VAC/60OVDC 80kA 1/3-wire(2 Le s) 780V L-N 1 OkA 1800V Project scaewww.midnitesolar.comispd I PV SYSTEM AS INDICATED 17722 67th Ave.NE.,Arlington,WA.360-403-7207 FAX:360-691-6862 www.midnitesolar.com/spd 17722-67th Ave NE.Arlington,WA 98223 PH. 360-403-7207 FAX 360-691-6862 D 13.0 Matt Ferguson WITNESS TEST PROCEDURE A TEST PROCEDURE THAT WILL BE USED TO VERIFYTHE PROTECTION AND OPERATION OF THE SYSTEM SHALL BE SUBMITTED TO XCEL ENERGY FOR APPROVAL.THE PROCEDURE INCLUDES AN ANTI-ISLANDING TEST(FOR ALL SYSTEMS)TO VERIFYTHE SYSTEM CEASES GENERATING IN PARALLEL WITH THE XCEL ENERGY 1350 Hillcrest Dr NE DISTRIBUTION SYSTEM WHEN THE UTILITY SOURCE IS LOST.EACH SYSTEM IS UNIQUE AND WILL REQUIRE A CUSTOM TEST PROCEDURE BASED ON THE INVERTER Fridley,MN 55432 MANUFACTURER'S RECOMENDATIONS FOR COMISSIONIND AND ANTI-ISLANDING.IN ADDITION TO THE MANUFACTURER'S RECOMENDATIONS. UTILITY:XCEL ENERGY ALLTESTING SHALL BE PERFORMED BY QUALIFIED PERSONELL ONLY PHOTOVOLTAIC PROJECT INFO PV MODULE:(64)Hanwha 40OW STEPSTO VERIFY PV SYSTEM IS READYTO BE ENERGIZED: INVERTER: 1.SITE SECURITY 1-PHASE 120/240 -SITE SHOULD HAVE 24/7 KEYLESS ENTRY AND DRIVABLE ACCESS IF XCEL EQUIPMENT IS PRESENT WITHIN THE SITE FENCE (64)IQ8+MICROINVERTERS -IF APPLICABLE,SITE SHOULD HAVE 24/7 DRIVABLE ACCESS TO ANY XCEL EQUIPMENT INSTALLED OUTSIDE OF THE SITE FENCE THAT IS USED FOR THE SOLE 25.60Kw(DC) PURPOSE OF FEEDI NG THE PV SYSTEM ARRAY 1 AZIMUT:271(57) ARRAY 2 AZIMUT:91(7) 2.PROPER LABELLING VERIFY LABELING FOR THE MAIN SERVICE PANEL,PV SYSTEM CIRCUIT BREAKER,DC DISCONNECT(WHEN APPLICABLE),UTILITYAC DISCONNECT,PRODUCTION METER AND OTHER RELEVANT LABELLING AND SIGNAGE. ARRAY TI LT:18 3.ENERGIZETHE PV SYSTEM BY CLOSING THE UTILITY DISCONNECT.PLEASE ALLOW 5-MINUTE FORTHE INVERTERTO BOOT-UP. NEC 2020/IRC 2018/IBC 2018 WOLF RIVER ELECTRIC COMPANY 4.WHILE IN NORMAL OPERATION,REFER TO THE REFERENCE POI NTOFAPPLICABILITYTO VERIFY THE VOLTAGES ATTHE I NVERTER AC OUTPUT ARE WITHIN 5%OF THE COMBINED INVERTED AC VOLTAGE RATINGS AND ALL I NVERTER LED'S,ALARMS,AND/OR LCD CODES ARE"NORMAL." 101 ISANTI PARKWAY NE#G CONTRACTOR ISANTI,MN 55040 5.WHI LE IN NORMAL OPERATION,VERI FY THAT ALL I NVERTERS ARE OPERATIONAL AN D PRODUCING POWER.VERI FY THAT SYSTEM IS GENERATI NG AT FULLEST CONTACT@WOLFRIVERELECTRIC.COM REASONABLE CAPACITY.WHILE I N NORMAL OPERATION VERI FY THE VOLTAGES AT THE DER AC TERMINALS ARE WITHI N 5%OF THE COMBI N ED DER AC VOLTAGE WOLF RIVERELECTRIC.COM RATINGS AND ALL LEDs,ALARMS AND/OR LCD CODES ARE"NORMAL" WOL�RIVER 6.SIMULATETHE LOSS OF UTILITY SOURCE FOR THE ANTI-ISLANDING TEST BY OPENING THE"UTILILITYAC DISCONNECT". ELECTRIC Matt Ferguson Xcel Energy Application lication#05175093 7.USING A VOLTMETER,VERIFYTHE VOLTAGE ATTHE INVERTER SIDE OF THE AC DISCONNECT HAS DROPPED TO ZERO WOLF RIVER SOLAR CASE#05175093 Wolf River Electirc NOTE:ONLY CUSTOMER-OWNED EQUIPMENT SHALL BE USED FOR THIS VERIFICATION. Address:101 Isanti Parkway 24/7 UNESCORTED ACCESS SHALL BE NE, Isanti, MN 55040 8.USING AN AMMETER ORTHE INVERTER'S DISPLAY,VERIFY THE DER OUTPUTOF THE INVERTER HAS CEASED WITHIN TWO SECONDS. PROVIDED FOR THE METERS&AC Phone number: (763)229-6662 DISCONNECT E-mail:contact(a)_wolfriverelectric.com 9.VERIFY INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE APPROPRIATE FOR LOSS OF UTILITY SOURCE METERS&UTILITY DISCONNECTWITHIN 10.RESTORE THE LOST UTILITY SOURCE BYCLOSING THE"UTILITY AC DISCONNECT" 10'&LINE OF SIGHT WITNESS TEST 11.VERIFYTHATTHE INVERTER SYSTEM DELAYS 5 MINUTES BEFORE RESUMING POWER OUTPUTAFTERTHE UTILITYSOURCE IS RESTORED UTILITY AC DISCONNECT IS VISIBLE PROCEDURE LOCKABLE&READILY ACCESSIBLE 12.VERIFY FIXED POWER FACTOR SETTINGS FOR EACH INVERTER MEETTHE PROJECT REQUIREMENTS GROUND SNOW:50PSF 13.METERTECH HAS VERIFIED METERING EQUIPMENT WIND SPEED:115MPH ENGI NEE rZINC EXPOSURE CATEGORY:B Drawn by.New@engineerinc.io 14.SYSTEM RESUMED DELIVERY OF POWER NO LESS THAN 5 MI NUTES AFTER UTILITY SOURCE IS RESTORED PV ARRAY:2.75 PSF DATE: 0712512022 Project Name: PRODUCTS: Matt Ferguson RA I LS:S N A P N RACK Property Adre- MOUNTS:SNAPNRACK 1350 Hillcrest Dr NE ROOF-MOUNT Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED D 14.0 h MDEPARTMENT OF Y LABOR AND INDUSTRY Wiring Methods and Disconnecting Means ❑ Are the conductor and cable ampacities determined at 125%before adjustment factors?690.8(B) Solar PV Inspection Checklist ❑ How are the PV Source and Output Circuit protected from overcurrent?690.9 ❑ Do AC or DC OCPD's have the appropriate voltage,current and interrupt ratings?690.9 Solar PV Inspection Checklist for REI #ELE- Installer Wolf Rlver Electric Job Address1350 Hillcrest Dr NE City/Township Fridley, MN 55432 ❑ Has arc-fault circuit protection been provided for DC source and/or output circuits?690.11 Required Documentation ❑ Is a rapid shutdown required and if so, how is it accomplished and identified?690.12&690.56(C) •Manufacturer's specifications for the inverter Q Is the PV disconnect permanently marked and installed in a readily accessible location?690.13 •Manufacturer's specifications for the module •Manufacturer's specifications for the optimizer(if used) Q Are the Isolating devices or equipment disconnecting means installed in circuits connected to •Verification that the racking system grounding and bonding is listed equipment at a location within the equipment,or within sight and 10 feet of the equipment?(Where PV Inverter the maximum circuit current is greater than 30 amperes an equipment disconnecting means shall be CONTRACTOR provided for isolation.)690.15 ❑ Is the PV system utility-interactive,stand alone or multimode?690.2 Q Has the fuse disconnecting means, if required, been installed?690.15 and 240.40 ❑ Is all the equipment listed for PV application?690.4 ❑ Are PV source or output circuits>30 volts in a raceway or guarded if readily accessible?690.31 WOL�RIVER ❑ Is the system grounded, ungrounded or(functionally grounded)?690.2 and 690.41 ❑ Is single conductor cable used outdoors Type USE-2 or listed &labeled PV wire?690.31 ELECTRIC ❑ Has DC Ground-Fault Protection been provided and properly labeled?690.41(B)? ❑ Are PV source or output circuits on or inside a building in a metal raceway and marked?690.31 Xcel Energy Application#05175093 ❑ What is the maximum PV system voltage?690.7 ❑ Is all listed equipment rated for the maximum voltage?690.7 Interconnection Wolf River Electirc ❑ Determine the maximum circuit current for the PV Source and Output Circuit; Inverter Output Circuit; Q Has a plaque or directory been installed at each disconnecting means(capable of interconnection) Address:101 Isanti Parkway Inverter Input Circuit; and DC to DC Converter Output(refer to inverter documentation). 690.8 NE, Isanti, MN 55040 denoting all electric power sources&power production sources. 705.10 Phone number: (763)229-6662 ❑ Has the point of connection to other sources been installed per 705.12? E-mail:contact(a_wolfriverelectric.com System Grounding ❑ Is the supply side disconnect readily accessible and within 10'of the connection point?705.11 ❑ Are all exposed non-current carrying metal parts of the PV system grounded?690.43 and 690.47 Q Are the utility interactive inverters connected to the system through a dedicated circuit breaker or PV INSPECTION ❑ Are the mounting structures or systems used for equipment grounding?690.43 fusible disconnecting means?705.12 CHECKLIST ❑ Does the bus or conductor ampacity comply with 705.12? ❑ Are the interconnecting devices used for equipment grounding listed and identified?690.43 ❑ Are the EGC properly sized and protected if exposed and not smaller than#6?690.45,690.46, Q Have all the required labels been applied? (See separate label list.) 690.50, 250.122, 250.120(C) ENGINEEr-:2INC Drawn by.New@engineerinc.io ❑ Has the grounding electrode system been installed?690.47 DATE: 0712512022 ❑ If both are present, has the DC grounding electrode system been bonded to the AC GES?690.47(A) Project Name: Matt Ferguson Property Adress: 1350 Hillcrest Dr NE 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.gov Fridley, MN 55432 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.Qov solar-checklist NEC20205olar_Checklist_Checked 20200317 Project: Scale: 1 2 PV SYSTEM AS INDICATED D 15.0