Loading...
HomeMy WebLinkAboutTate FRIDLEY (2) Xlw S Y l x_ram•* ,+T j l w �U f f I' .� t -T ,f �I 4 I I r ,. � ,, ,�. �- ,C.: '' `� �'� � ,n, E )� �; 1\+ '' I, ,� ���' �� � , f�` ;�^ � �. { � � � �, , �� � � �4;� �� ��� � � . - - . ��. -� . - �, �; I�-� � � h�_ - .,_ p -,a_-r �— — —' 1 . _ _- -_. _- � .� -- +�--- /� � � !�' � .a � 7 Date: --7 , / Customer Name: P. ' l��l /.— �c ,{ Inspector: '�i!'� Address: ��n T 177 tit Bath Inspection: Parking access for truck/trailer yes ❑ no (explanation) Garage/warm cutting area © yes ❑ no (explanation) Bathroom level 1st 2nd 3rd basement Bath to be remodeled is only bath in home yes no Crawl space only below bath yes no (if yes) access point Drain exposed yes no (if no, choose) '� drywall covered drop ceiling Access Panel to valve Yes no �7'' " Water shut off location 01";,(_ c h 1,( Condo yes V1 no Maintenance/water shut off contact Multifamily Flyes Lef�j_no Maintenance/water shut off contact Shut off works yes _ no sticky currently leaks Plumbing composition ,l copper pvc galv 71 cpvc pex nlead abs New Plumbing composition F 1 Pex 3(Shower) Pex 4(Tub) Existing plumbing has venting through the roof yes _ no Pre-install drain function slow good doesn't drain Pre-install water pressure slow lix good no pressure Flooring has in floor heat yes no Floor framing wood concrete Spancrete _1 steel Floor integrity solid U soft L1 rotted Floor covering vinyl hardwood the E71 carpet laminate Wall framing wood concrete steel Wall coverings drywall the lath/plaster paneling Left wall __�g plumb leans in leans out ' in " Right wall U plumb leans in Ll leans out " in " Back wall ® plumb ❑ leans in 0 leans out " in Floor left to right © level slopes left El slopes right " in " Floor back to front level F slopes back 1:1slopes forward " in " Ceiling left to right level F I slopes left El slopes right " in " Doorway accessibility door 1 width door 2 with door 3 width Hall accessibility LA width Tight turns yes no Obstructions U yes no (if yes, list below): Sizing and accessories: j Contract calls for pan size width length Customer Signature Contract size meets customer's expectation X yes �-' no(explain below) Customer Signature y ►— Actual size to install: .7 Length (left to Right) 0 Width(Front to back-viewed from threshold to sd wall) Skirt Height(tub)� Customer Signature Distance from skirt to center of toilet if parallel 1 Distance from skirt to front of toilet if perpendicular Currently finished-length (finish to finish+1") X width Initial Adding/moving wall-length(finish to new stud wall +1/2") X width Initial Already demoed-length (stud to stud) X width Initial Accessory Color: BN ORB MB Customer Signature If differs from contract, please note reason why: Shower Door: Glass: f7 CLEAR RAIN OBSCURED Swing doors: Hinge side: Handle side: Inline location: 'Will be ordered by the pan size minus 2" Customer Signature California glass:will be 6"-10" from ceiling height and no less than 30" wide(36"glass is preferred)to allow enough room for the opening and to minimize water outside of wet area(only availabl 0 60" or longer) Glass width Glass height '_ustomer Signature Options: Will cover current flooring yes no Customer Signature Trim needed to cover flooring , _• 1/4 round 1� 2" lattice _ custom cut wall section New drain location _ left X right center custom Customer Signature �t 7-11Z� Custom drain location in "from left stud "from right stud "from back stud Corner trim qty Herring bone qty Wainscoting qty Wainscoting corners inside city outside city Installing fan/light El replacing existing new Fan vent will vent to Customer Signature Pics taken draln/plumbing shower from all angles / current damages access areas water shut offs parking areas of concern breaker box *Customer understands some baths based on extra accessories, options, complexity and unforeseen issues may be scheduled for more than or could take longer than one day. Customer Signature \N � Date: Inspector: ''/ Special notes section: l C,1� (�RJ, �� s �)��� (•.��17 �1: La Sketch area � D v o v Y y 3\ v c� m z -' 0 G) � c_ -n 0 T D n co ❑ D 1 o a c C Z Q a co = coo N o -------------- ° ? LJ m =r ........ ° M f. Ln 7 C •................................... �_ M1 O 90 g CD p On Oxl cn r (�D J) Cl I W r CD O CL o m m G� 71 Z o' ....................................... ..----•----- CD Cl) v a CL o Z En (D ° C C. o O — m �-1 C CD c� - m 0 m v� y � J m Jl cl Bath Labor Measure Assessment Form Job Name: .�� / !� • Installer Name: Address: I�.e� �'�t ,�kt• l� City: �—+ '+ill t� Install Date i Demo-Fiberglass shell,shower board,drywall system/backer F Demo-Cast tub,the ways,lath and plaster,concrete wall system/backer Each Bust concrete/restructure joists-need pits&need mngr approval Each Build and Install va've/drain/water shutoffs Each Install tub/shower pan/barrier free/whirlpool Each Install walk in tub-Alexis Fach Wall prep includes all drywall/ply/insulation Each Install neo angle wall system Each Install 3 wall system smooth Each Install 3 wall system the/impressions Each Install tall 3 wall system with herringbone smoot or the Each Install ceiling panel or extra wall Each Install co-ner shelf/surface self/caddie/foot ped Each r— Install bench/correr/folding/formed corner seat/win kit Ea- Install grab bar i Each Install shower rod Each Install Standard/s-curve Each Install Swing door-includes Mine panel Eacn Install Swing door W/inline&return panel or neo angle Each Install Cayman doer Each Install shower head and a'I cover trims Each Install Kauai/slide bar hand held and all cover trims Each R&R toilet or vanity to install tub/shower Each Remove or build was'/remove or build drop soffit Each R&R door and trimwork to bring unit into room Each Remove old and install new vent far/light and connect Each Trip charge 25-50 from shop Each 'rip charge 50.75 from shop Each Trip charge 75+from shop Each There will be no write ins a.lowed.All prices listed are non negotiable Total Invoice: Any work not authorized with management and photos will not be paid _� Date of I old: This invoice will be paid only on complete and collected Jobs Invoices must be subrr.tted daisy Mee re ech Signature of Pre Inspection Invoices may not be submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization