Loading...
HomeMy WebLinkAboutLee- Whitner - FRIDLEY (3) w I ,��iN z�,, I' " a_ ;F r���v j '�.� 1.,.� _ N ������� �. r � 2. a ti:.e .. ..�..< �•.�:�. ,•..•..�•.O'j�'Z.••.•• �►s0�i��i�iO��iO��i�. :oiQi�i,�i������� .. ti I�i�■ryNN■ ��NII■N ■ �N/■■ N '\■■■�■■ it _ 4 i r r r Syy L I�. 1 " door I W ' 1 It t Date 1� _ " �� customer Name: � ri4���1r Address: >1 �'•'.� ril;�, (,r� Lr�(E Inspector: Bath Inspection: � ' 7i!•-1 Parking access for truck/trailer yes ❑ no(explanation) Garage/warm cutting area yes ❑ no(explanation) Bathroom level 1st ® 2nd L1 3rd ❑ basement Bath to be remodeled is only bath in home ❑ yes X. no Crawl space only below bath yes no (if yes)access point Drain exposed yes ® no (if no,choose) LT-A drywall covered drop ceiling Access Panel to valve L yes no Water shut off location _s' cV,1, ,kNi :� �- ( ,"rl�J\1 I't'ntt1 Condo ❑ yes no Maintenance/water shut off contact Multifamily ❑ yesD no Maintenance/water shut off contact Shut off works K yes ❑ no ❑ sticky currently leaks Plumbing composition copper pvc galy cpvc pex lead 1 abs New Plumbing composition Pex 3(Shower) Pex 4(Tub) Existing plumbing has venting throughe roof I� yes U no h t Pre-install drain function ❑ slow ® good ❑ doesn't drain Pre-install water pressure ❑ slow Z good L no pressure Flooring has in floor heat ❑ yes Lj�,S_no r� ancrete steel p wood concrete S Floor framing ,�, ❑ .� Floor integrity — solid ❑ soft rotted Floor covering �� vinyl C� hardwood the ❑ carpet i^ laminate Wall framing wood ❑ concrete ❑ steel Wall coverings drywall ❑ the LJ lath/plaster L paneling Left wall ® plumb ❑ leans In leans out " in " Right wall plumb ❑ leans In ❑ leans out " in " Back wall �C plumb ❑ leans In ❑ leans out " in " Floor left to right level ❑ slopes left ❑ slopes right " in " Floor back to front u level ❑ slopes back ❑ slopes forward " in " Ceiling left to right 7 level ❑ slopes left ❑ slopes right " in " Doorway accessibility door 1 width . door 2 with door 3 width Hall accessibility width Tight turns �, yes ❑ no Obstructions �❑ yes no (If yes, list below): Sizing and accessories: — L Contract calls for pan size ( width �� length Custorer Signature Contract size meets customer's expectation yes no(explaln below) Customer Signature Actual size to install: Length (left to Right) ` Width(Front to back-viewed from threshold to sd/wall) Skirt Height(tub) Customer Signature Distance from skirt to center of toilet if parallel `_� Distance from skirt to front of toilet if perpendicular Currently finished-length (finish to finish +1") X width Initial 1 Adding/moving wall-length(finish to new stud wall+1/2") X width Initial Already demoed-length (stud to stud) X width Initial Accessory Color: CH BN ORB MB Customer Signature If differs from contract, please note reason why: Shower Door: Glass: CLEAR LJ RAIN F OBSCURED Swing doors: Hinge side: LLB-V Handle side: l Inline locat�i n: 'Will be ordered by the pan size minus 2" Customer Signature �—��` M G✓G California glass:will be 6"-10" from ceiling height and no less than 30" wide(36_'glass is preferred)to allow enough room for the opening and to minimize water outside of wet area(only available on pan 60" or longer) Glass width Glass height Customer Signature Options: Will cover current flooring yes no Customer Signature _✓� � ./ ti Trim needed to cover flooring 1/4 round 2" lattice n custom cut wall section New drain location left _ , right center U custom Customer Signature Custom drain location in " from left stud "from right stud "from back stud Cornertrim qty Herring bone city Wainscoting city Wainscoting corners inside qty outside qty Installing fan/light replacing existing new Fan vent will vent to Customer Signature / Pics taken drain/plumbing shower from all angles current damages access areas water shut offs parking areas of concern breaker box *Customer understands some baths based on extra accessorles,options, complexity and unforeseen Issues may be scheduled for more than or could take longer than one day. Customer Signature zll� �� l aL- Inspector: � �� Date: � �-- M f0'v:l Special notes section: lot ` Sketch area 2-Du \I\ro0 o � x s �J CY o _n + Z 0 G) % > 0 > 0 ao IIRI 0 m CL x .... ci rmtL ............................. . 0 Fj 0 m 0 =r ........ D OL % 3 cr 0 V) ...................................... ....................................... 90 0 m m coL x (D cl (A CD 0 0 —71 o 0 )4 X m G) -nz o .....................................: T ....................................... 0 CD 0 ................................................................... 0 cf) CD F CL CL C', � � O rri (4 NIA C6 CITY Bath Labor Measure Assessment Form Job Name: L « •` Instil rr Name Address: r 1 f �� r ck'c City. Install Date Demo Fiberglass shell,shower board,drywall system/backer Each Demo-Cast tub,tale walls,lath and plaster,concrete wall system/backer Each Bust concrete/restructure joists-need p'cs&need mngr approval Each Build and Install valve/drain/water shutoffs Fach Install tub/shower pan/barrier free/whirlpool Each Install walk in tub-Alexis -ach Wall prep includes all drywall/ply/insulation 1 Each Install neo angle wal!system Each Install 3 wall system smooth y Each Install 3 wall system ti'e/impressions Each Install tall 3 wall system with herringbone smoot or the Each Install ceiling panel or extra wall Each Install corner shelf/surface self/cadd a/foot ped Each Install bench/corner/ro'dirg/formed comer seat/win kit Each Install grab bar Each Install shower rod Each Install Standard/s-curve Each Install Sw ng door-includes tnhne panel Each Install Swing door W/inline&return panel or neo angle Each Install Cayman door Each Install shower head and all cover trims 1 Each Install Kauai/slide bar hand held and all cover trims Each R&R toilet or vanity to install tub/shower Each Remove or build wall/remove or bu Id drop soffit Each R&R donr and trimwork to bring unit Into room Each Remove old and install new vent fan/light and connect Each Trip charge 25-50 from shop Each Trip charge 50-75 from shop Each Trip charge 75+from shop Each There will be no write Ins allowed.All prices listed are non negotiable Total Invoice: Any work not authorized with management and photos will not be paid Date of I v c This invoice wil'be paid only on complete and collected Jobs �"�� Invoices must be submitted daily Measure Tech Signature of Pre Inspection Invoices may not be submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization