HomeMy WebLinkAboutResidential Permit Card (2) CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED:08/11/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#ER22-000154
ADDRESS : 5457 EAST DANUBE RD NE
PIN: 243024430040
LEGAL DESC:INNSBRUCK NORTH 2ND ADDITION LOT 9 BLK 1 INNSBRUCK NORTH 2ND ADD(SUBJ TO EASE
AS SHOWN ON PLAT)
PERMIT TYPE:Electrical Residential Permit
PROPERTY TYPE:Furnace and Air Conditioning
CONSTRUCTION TYPE:Furnace and Air Conditioning
VALUATION: 0
NOTES:
CONSTRUCTION IN THE CITY IS UNLAWFUL EXCEPT BETWEEN THE HOURS OF 7:00 AM AND 9:00 PM,MONDAY
THROUGH FRIDAY AND BETWEEN THE HOURS OF 9:00 AM AND 9:00 PM ON SATURDAYS.NO WORK IS ALLOWED
ON SUNDAYS OR ANY LEGAL HOLIDAY UNLESS AN ALTERNATE WORK HOUR PERMIT HAS FIRST BEEN ISSUED.
CALL FOR FINAL INSPECTION WITHIN 10 DAYS AFTER WORK COMPLETION.
CALL ROBERT CLAUSON AT 651-777-7885 WEEKDAYS FROM 7-8:30 AM FOR REQUIRED INSPECTIONS.
APPLICANT
Description Total Cost
CENTERPOINT ENERGY Minimum Permit Fee 40.00
6161 GOLDEN VALLEY ROAD State Surcharge Fee 1.00
BLDG A
GOLDEN VALLEY,MN 55422 TOTAL 41.00
(763)512-2765 Payment(s)
Credit-ER22-000154-8028522570i�'/z41
OWNER
MILLER AFFELDT ABIGAIL
ROSE
5457E DANUBE RD NE
FRIDLEY,MN 55432
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction
authorized is not commenced witin 180 days or if
construction or work is suspended or abandoned for a
period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this
application and know the same to be true and correct.All
provisions of laws and ordinances governing this type of
work will be complied with whether specified herein or
not.The granting of a permit does not presume to give
authority to violate or cancel the provisions of any other
state or local law regulating construction or the
performance of construction.
08/11
Applicant Date /2022
08/11
Bldg Insp Date /2022
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 08/11/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#ER22-000154
ADDRESS : 5457 EAST DANUBE RD PERMIT APPLICANT:
NE
PIN: 243024430040 CENTERPOINT ENERGY
INNSBRUCK NORTH 2ND
ADDITION LOT 9 BLK 1
LEGAL DESC: INNSBRUCK NORTH 2ND 6161 GOLDEN VALLEY ROAD BLDG A
ADD(SUBJ TO EASE AS GOLDEN VALLEY,MN 55422
SHOWN ON PLAT)
PERMIT TYPE : Furnace and Air (763)512-2765
Conditioning
PROPERTY TYPE: Furnace and Air
Conditioning
WIRE/RECONNECT
CONSTRUCTION TYPE: DAIKIN FURNACE AND
AIR CONDITIONER
NOTES:
CONSTRUCTION IN THE CITY IS UNLAWFUL EXCEPT BETWEEN THE HOURS OF 7:00 AM AND 9:00 PM,MONDAY
THROUGH FRIDAY AND BETWEEN THE HOURS OF 9:00 AM AND 9:00 PM ON SATURDAYS.NO WORK IS ALLOWED ON
SUNDAYS OR ANY LEGAL HOLIDAY UNLESS AN ALTERNATE WORK HOUR PERMIT HAS FIRST BEEN ISSUED.
CALL FOR FINAL INSPECTION WITHIN 10 DAYS AFTER WORK COMPLETION.
CALL ROBERT CLAUSON AT 651-777-7885 WEEKDAYS FROM 7-8:30 AM FOR REQUIRED INSPECTIONS.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS:8 AM TO 4:30 PM
Inspection type jDate linspector Istatus lcomments
Electrical Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.