Review Comment,
v O �
sawcut so transition Ln i N
Ln
�I
j - to curb is z o 1D
straightened
rI C z
l
MillfrVAIMM
.� NIr
� aa
au►• N
� N
O
N
Sawcut & Remove concrete approach
RESIDENTIAL DRIVEWAY PERMIT APPLICATION STIPULATIONS !♦
READ BEFORE SIGNING APPLICATION Fridley
1. Operations shall be limited to 7am to 7pm and shall not interfere with the health and safety of
surrounding residents and the premises shall be maintained at all times so as not to create a
nuisance.
2. At the end of each day's operations, the site is to be left in a neat and orderly condition, and
all adjacent streetsswept clean of dirt.
3. Curb placed in City ROW must meet the requirements of the attached standard detail.
4. The Contractor completing the work must be registered with the City of Fridley. Call 763-572-
3604 for more information on registration.
5. The Contractor, or Owner, will call the City at 763-572-3554 to arrange for an inspection of the
forms prior to placing concrete or asphalt on site. Twenty-four hour notice is required for
inspections and will be provided between 8:30 am and 2:30 pm Monday through Friday.
6. Repair to the bituminous surface on the roadway side of the curb will be the responsibility of the
owner/contractor. Bituminous pavement removed will be saw cut and the replacement area
sub-cut two feet and filled with class V aggregate compacted in six inch liftsto 95 percent
standard proctor density. Sub-cut area must be inspected by City of Fridley prior to placement of
class V aggregate. Call 763-572-3554 to schedule the inspection. Bituminous patch will match
the existing pavement, or a minimum of 3 inches compacted wear course bituminous.
7. Erosion and Sediment Control is required during work. Streets and gutters are to remain free of
dirt at all time. Street sweeping required each day and all disturbed areas planted with suitable
vegetation and protected to preventerosion.
8. Upon completion of paving operations or expiration of this permit, an inspection will be made
by the City of the premises and adjoining streets. Any damage found to have been caused
by these operations will be corrected by the applicant upon notification by the City.
RESIDENTIAL DRIVEWAY PERMIT FEES
No curb or sidewalk replacement No Fee/ No Escrow
Concrete curb with bituminous apron $50.00
Concrete curb with concrete apron $75.00
Concrete curb with concrete sidewalk in driveway $150.00
Escrow(3) $500.00
Note 1 : Land Alteration Permit required separately in moving more than 10 Cubic
Yards of dirt with project.
Note 2 :Commercial Driveway requires Land Alteration Permit.
Note(3): Escrow to be returned if work is completed according to the permit
requirements. If City is required to complete, repair or replace any of the work,the
escrow will be forfeited.
WIDTH(MIN.12'-MAX.26')
PROPERTY LINE
CONCRETE OR BITUMINOUS
_ __AL
aua�aucua�au � �„nuxu�Kn�uuaaratt
GUTTER LINE
(TYP.)
3'
EXPANSION JOINT WHERE NEW CONCRETE
DRIVEWAY ABUTS EXISTING CURB OPENING
CONCRETE CURB&GUTTER
PLAN
1"LIP EXISTING OR FUTURE
(SEE DETAIL) BOULEVARD AREA SIDEWALK AREA(6')
w
GUTTER LINE 1/4"/FT.SLOPE J
T(SEE NOTE 2)
w
a
CONC.CURB
&GUTTER
EXPANSION JOINT WHERE NEW CONCRETE
DRIVEWAY ABUTS EXISTING CURB OPENING
SECTION ON (�DRIVEWAY
NOTES: LIP DETAIL
1.WHERE EXISTING CURB,CURB&GUTTER OR SIDEWALK SECTIONS ARE
REMOVED TO FACILITATE CONSTRUCTION OF NEW DRIVEWAY,SAID
SECTIONS SHALL BE REMOVED TO THE NEAREST JOINT.WHERE SAID
NEAREST JOINT IS MORE THAN THREE(3) FEET BEYOND THE PROJECTED
EDGE OF THE NEW DRIVE,A CLEAN SAW-CUT WILL BE PERMITTED, A
BONDING AGENT APPLIED TO THE CUT FACE,AND THE NEW SECTIONS
POURED.
2. DRIVEWAY THICKNESS(T)SHALL BE 6" FOR CONCRETE WITH 4"CL.V
BASE.AND 2 1/2" FOR BITUMINOUS WITH 6"CL.V BASE.
3. EXPANSION/CONTRACTION JOINT REQUIRED ON DRIVEWAY CENTERLINE
WHEN WIDTH EXCEEDS 16 FEET.
STANDARD DETAILS LAST REVISION:
J U N E 2019
- DRIVEWAY ENTRANCE DETAIL
(NOT TO SCALE)
Fridley CITY PLATE NO.