HomeMy WebLinkAboutResidential Permit Card with Standard Notes (Under Construction) (2) BUILDING INSPECTIONS DEPARTMENT PERMIT NUMBER' MR22-000224
7071 UNIVERSITY AVE NE
FRIDLEY,MN 55432 ISSUE DATE: 10/11/2022
PHONE: (763)572-3604
ADDRESS: 6205 HEATHER PL NE
PERMIT TYPE:Mechanical Residential Permit
PROPERTY TYPE: Replacement
CONSTRUCTION TYPE: Replacement
VALUATION: 0
NOTE:REPLACING.CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
APPLICANT PROPERTY OWNER
CENTERPOINT ENERGY MOHAMED,SEYNAB SHARMARKE
6161 GOLDEN VALLEY ROAD BLDG A
GOLDEN VALLEY,MN 55422 6205 HEATHER PL NE
(763)512-2765 FRIDLEY,MN 55432
PAYMENT INFORMATION
Description Total Cost
Mechanical Permit Fee 3.5.00
State Surcharge Fee 1.00
TOTAL 36.00
Payment(s)
Credit-MR22-000224-8189222815 36
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or
work is suspended or abandoned for a period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit
does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the
performance of construction.
Applicant Date: 10/10/2022
Bldg Insp Date 10/11/2022
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 10/11/2022
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#MR22-000224
ADDRESS : 6205 HEATHER PL NE PERMIT APPLICANT:
PIN: 133024430101 CENTERPOINT ENERGY
LOT 3A BLOCK I
LEGAL DESC : HEATHER HILLS NORTH 6161 GOLDEN VALLEY ROAD BLDG A
PLAT 2 GOLDEN VALLEY,MN 55422
PERMIT TYPE : Replacement (763)512-2765
PROPERTY TYPE: Replacement
CONSTRUCTION TYPE: INSTALL GAS DRYER
NOTES:
NOTE: REPLACING.CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS: 8 AM TO 4:30 PM
Inspection type Date Inspector Status Comments
Heating Rough In Inspection
Gas Piping/Air Test
Heating Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.