Loading...
HomeMy WebLinkAboutResidential Permit Card with Standard Notes (Under Construction) (2) BUILDING INSPECTIONS DEPARTMENT PERMIT NUMBER' MR22-000224 7071 UNIVERSITY AVE NE FRIDLEY,MN 55432 ISSUE DATE: 10/11/2022 PHONE: (763)572-3604 ADDRESS: 6205 HEATHER PL NE PERMIT TYPE:Mechanical Residential Permit PROPERTY TYPE: Replacement CONSTRUCTION TYPE: Replacement VALUATION: 0 NOTE:REPLACING.CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION. APPLICANT PROPERTY OWNER CENTERPOINT ENERGY MOHAMED,SEYNAB SHARMARKE 6161 GOLDEN VALLEY ROAD BLDG A GOLDEN VALLEY,MN 55422 6205 HEATHER PL NE (763)512-2765 FRIDLEY,MN 55432 PAYMENT INFORMATION Description Total Cost Mechanical Permit Fee 3.5.00 State Surcharge Fee 1.00 TOTAL 36.00 Payment(s) Credit-MR22-000224-8189222815 36 AGREEMENT AND SWORN STATEMENT This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Applicant Date: 10/10/2022 Bldg Insp Date 10/11/2022 SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. CITY OF FRIDLEY 7071 UNIVERSITY AVENUE NE ISSUED: 10/11/2022 FRIDLEY,MN 55432 (763)572-3604 FAX: (763)502-4977 Permit#MR22-000224 ADDRESS : 6205 HEATHER PL NE PERMIT APPLICANT: PIN: 133024430101 CENTERPOINT ENERGY LOT 3A BLOCK I LEGAL DESC : HEATHER HILLS NORTH 6161 GOLDEN VALLEY ROAD BLDG A PLAT 2 GOLDEN VALLEY,MN 55422 PERMIT TYPE : Replacement (763)512-2765 PROPERTY TYPE: Replacement CONSTRUCTION TYPE: INSTALL GAS DRYER NOTES: NOTE: REPLACING.CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION. BUILDING INSPECTION RECORD 24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS. CALL FOR INSPECTIONS WEEKDAYS: 8 AM TO 4:30 PM Inspection type Date Inspector Status Comments Heating Rough In Inspection Gas Piping/Air Test Heating Final Inspection INSPECTION COMMENTS: IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT. THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.