Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
REBECCA A WEAVER- LANG Solar Drawings (3)
GENERAL NOTES 1. All electrical materials shall be new and listed by recognized SITE MAP& PV LAYOUT PV 1.0 CONTRACTOR electrical testing laboratory ELECTRICAL 1-LINE DIAGRAM PV 2.0 Address:101 Isanti Parkway WOL R 1 VE R Custom made equipment shall have complete test data submitted SYSTEM LABELING DETAIL PV 3.1 NE, Isanti, MN 55040 PACARD PV 3.2 by the manufacturer attesting to its safety Phone number: (763)229-6662 ELECTR I C 2. Outdoor equipment shall be NEMA 3R rated or equivalent E-mail: contactCd_)wolfriverelectric.com 3. All metallic equipment shall be grounded PROPERTY PLAN PV 4.0 Xcel Energy:#05279016 4. Contractor shall obtain electrical permits prior to installation and ATTACHMENT LAYOUT PV 5.1 shall coordinate all inspections, testing commissioning and ATTACHMENT DETAIL PV 5.2 Owner: REBECCA A WEAVER- LANG acceptance with the client, Property Address: 5965 Oakwood M NE Fridley, MN 55432 utility co. and city inspectors as needed. INVERTER DATA SHEET PV 6.0 p y Manor 5. The electrical contractor shall verify the exact locations of service MODULE DATA SHEET D 7.0 Property Type: Single Family ResidenceDrawn by: New@engineerinc.io points and service sizes with the serving utility company and RACKING DATA SHEET D 8.0 Date: 1011312022 comply with all utility companies requirements. ATTACHMENT DATA SHEET 6. Drawings are diagrammatic only, routing of raceways shall be D 9.0 SURGE PROTECTION option of the contractor unless otherwise noted and shall be D 10.0 VICINITY MAP (SCALE: NTS) coordinated with other trades. INVERTER CERTIFICATION D 11.0 7. If the roof material or the roof structure not adequate for PV PV INSPECTION CHECKLIST D 12.0 - installation, call the engineer of record print to installation. The ECU-C DATA SHEET D 13.0 contractor is responsible to verify that the roof is capable of AP SYSTEM CERTIFICATION D 14.0 withstanding the extra weight. MILBANK DATA SHEET D 15.0 8. If the distances for cable runs are different than shown, the GOVERNING CODES lzathLnNw contractor shall notify the electrical engineer to validate the wire 4th Ln NW 124th Ln NW size. Final drawings will be red-lined and updated as appropriate. THE INSTALLATION OF SOLAR ARRAYS AND 9. Whenever a discrepancy in quality of equipment arises on the PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH r, drawing or specifications, the contractor shall be responsible for THE FOLLOWING CODES: providing and installing all materials and services required by the • 2020 National Electrical Code strictest conditions noted on the drawings or in the specifications • 2018 International Building Code • 2018 International Residential Code Ln to ensure complete compliance and longevity of the operable NW NW,Minneapolis,MN... -- system required by the engineer of record. • 2020 Minnesota Residential Code • 2020 Minnesota Building Code • 2020 Minnesota Energy Code • 2020 Minnesota Accessibility Code Z • 2020 Minnesota State Fire Code • 2018 International Fire Code • 2018 International Energy Conservation Code PHOTOVOLTAIC NOTES: • 2018 Mechanical Code AS ADOPTED BY THE STATE OF MINNESOTA 1. Rooftop mounted photovoltaic panels and modules shall be tested, ALL OTHER ORDINANCE ADOPTED BY THE listed and identified by recognized testing laboratory LOCAL GOVERNING AGENCIES 2. Solar system shall not cover any plumbing or mechanical vents SYSTEM RATING SATELLITE VIEW (SCALE: NTS) 3. Modules and support structures shall be grounded unless racking has integrated ground. DC 19.60 KW STC 4. Removal of an interactive inverter or other equipment shall not AC 16.00 KW STC . disconnect the bonding connection between the grounding EQUIPMENT SUMMARY electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 49 REC 400 WATT MODULES ``/ • 5. All PV modules and associated equipment and wiring shall be t protected from physical damage. WITH 25 DS3-S MICROINVERTERS 6. Live parts of PV source circuits and PV output circuits over 150v to ground shall not be accessible to other than qualified persons .CTRICAL INFORMATION while energized. 7. Inverter is equipped with integrated DC disconnect, thus providing EXISTING ground fault protection MAIN SERVICE PANEL BUS SIZE:200A "'• 8. All conductors shall be copper and 75 deg rated MAIN SERVICE BREAKER SIZE:200A 0. 9. A single conductor shall be permitted to be used to perform the MOUNTING SYSTEM SNAPNRACK . multiple functions of do grounding, AC grounding and bonding between AC and DC systems. BUILDING INFORMATION 10.Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways. CONSTRUCTION TYPE: V-B OCCUPANCY: R3 ;�. ROOF:Comp Shingle Truss 2 x 4 @ 24" O.C. N INDEX °° Total Roof Area: 2526 Q MSP (E)200A Main Service Panel Total Module Area: 1078 MM........................(E) Main Meter D 42.67% of Coverage PVS......... (N) 125A PV Sub Panel W E AC ................(N) 100A Utility AC 124thLnNW 270 n a so° MD..............(N) Monitoring Device 1241h Ln NW a D JB.......................(N)Junction Box zz 124thLn ❑.. (N) Microinverter ...................... Minneapolis.MN... Q ..................... Solar Module 9 1so° .............EMT type Conduit SCALE: 3/32" = T-0" "Roof Access" — — ------------- Fire Setback Line .............FMT type Conduit O ' SOLAR MODULES 49 REC 400Watt SECONDARY INTERCONNECTION El El El El El ❑ Model#REC 400AA NOTE: No clearance issue 18"fire setback INVERTER Distance between all equipments is maximum 10" ❑ ❑ ❑ ❑ ❑ INVERTER TYPE: Micro: Xcel Energy:#05279016 b b C C C C 25 AP SYSTEM Note: 24/7 Unescorted keyless access is to be JB5 Model#DC3-S(240V) provided for ALL UTILITY EQUIPMENT ❑ 0 ° ❑ CONTRACTOR NOTE: Conduit in attic shall b b D „ C be minimum 18 inches from roof sheating WOLF RIVER L] ❑ ❑ Solar PV Array 5 3-Rec 40OW Modules EQUIPMENT ELEVATION 0 b bC 2-DS3-S Microinverters ELECTRIC ° Pitch:26 Deg p Orientation:90 DegXcel Energy:#05279016 C a J37 olar PV Array 1 Rec 40OW Modules ❑ E 11-DS3-S Microinverters � Pitch:34 Deg Wolf River Electric From roof ° ° Orientation: 180 De Address:101 Isanti Parkway Ir set ack c NE, Isanti, MN 55040 Main m Phone number: (763)229-6662 Utility ACMeter E J62 E-mail:contact@wolfriverelectric.com Disconnect OMain a Pvs 10' Se vice a �; a b 10" Panel Solar PV Array 2 J B 1>l 2-Rec 40OW Modules oo Y� b Solar PV Array 4 1-DS3-S Microinverters ` 11-Rec 40OW Modules SITE MAP & PV Pitch:34 Deg a a (DI 5-DS3-S Microinverters Orientation: 180 De D fn 0 ` a Pitch:26 Deg LAYOUT Orientation:90 De C] a n Solar PV Array 3 a a a Note:Keep 3ft clearance from gas meter and AC unit . 5-Rec 40OW Modules D D q1 a ENGINEEr-:2INC 3-DS3-S Microinverters O Pitch:26 Deg Drawn by:New@engineerinc.io Orientation:270 De DATE:10/13/2022 Project Name: REBECCA A WEAVER-LANG MD M M Property Address: 5965 Oakwood Manor NE V J AC Fridley,MN 55432 1, Project: F Scale: PV SYSTEM L AS INDICATED [PV 1 .0 Q CABLE NOTE: Service Panel does not contain center fed Main Breaker.- (2)#12 AWG PV WIRE SECONDARY INTERCONNECTION I REFERENCE POINT OF APPLICABILITY (1)#6AWG EGC I Note:Keep 3ft clearance from gas meter and AC unit . FREE IN THE AIR NEMA3R ENCLOSURE 1-PHASE MICRO-INVERTER UL1741 (2)#10 AWG THWNTfHWN-2 (1)#10 AWG GND 0 O 3/4"EMT 7 FEET Milbank K4977 1 3 .98A JBOX1 APSYSTEMS NEMA3R ECU-C 125A PV SUB PANEL Q - - .......... - NOTE:For AP System Specification 120/240V, N EMA 3R x Down Down some information see page D 14.0 U ~ mama mass SEEN 100A FUSED AC DISCONNECT, z C) BBM■ ■a•a ■BBN INSTALL 15A PV NON CENTER 200A W W soon ■DEB songs 2-POLE C/B WITH 90A FUSES MAIN METER t0 - mass noun SEEM UTILITY AC DISCONNECT VISIBLE-OPEN MAIN C/B 120/240V, 1 P,3W U loss 2�man ........... 51Son LOCKABLE,READILY ACCESSIBLE 2 NEMA3R .66A J BOX2 120/240V 1 P 3W - NEMA3R INSTALL(3)30A PV (3)#2AWG AL THWN/THWN-2 2-POLE C/B + 1/1 4"SCH 80 PVC 2 FEET x Q mass ■Mu U � OBM■ ■Mugg (6)#12 AWG THWN/THWN-2 �� EXISTING z j memo an (1)(1)#12 AWG GND 200A MAIN < C) n��� ���� 3/4"EMT.7 FEET m - ■■■■ SEs. 66.5A 66.5A SERVICE U 11ass 21SEE PANEL 120/240V, 0.64A a 0000 �\ 1 P,3W 1 4 J BOX3 0000 - NEMA3R m - - + U F_ maser mass mgS■ T Surge Protection o � o z 5 EEN■ ■BEE ■■■■ (NEW)GEC Q BBEB ■BEN ■SUB MNSPD-300-AC _ g of of BBM■ ■EBB ■■■■ Add 2nd Ground rod and m ■■B■ ■Mug ���� (6)#12AWG THWN/THWN-2 U 1188E 21ago ......... 7SEE■ (1)#12 AWG GND tie it to the existin round rod. 5.32A 3/4"FMT 15 FEET GEC 1= 2 (3)#2AWG AL THWN/THWN-2 - _ (E)GROUNDING 1 #6 AWG GND ELECTRODE SYSTEM x C0 ENDS ■B:i ......... r r+ 1/1 4"SCH 80 PVC 2 FEET U Boom ENDS NEN■ z Oman Q mass ■Bug NNN■ ■mug -f ■■■■ EBUE mm� Meter Socket must be 200A rated CONTRACTOR m Ewa■ gau0 mama and must have lever Bypass U 11SE■ 21EUS ......... 41gS■ Yp 1_ 5 13.3A J BOX4 NEMA3R In locations where there is no local Public Authority, the customer is exempt from WOLRIVER x memo ■Mug ■Ogg O � mass ■■E■ ■■■■ inspection, and/or the service has been shut off or disconnected for more than 365 days(1 year), z 5 ■■■■ ■■■■ ■■■■ ELECTRIC < 0 UU UU 8800:80 the licensed electrician or wireman shall submit a signed and dated Xcel Energy:#05279016 Down Down m 1mmass mass••• SEE .........."' 1 soon Inspection Certificate to the Company's Builders Call Line attesting that the electrical installation Xcel Energy:#05279016 15.96A has been completed and installed according to the current National Electrical Code@, the Xcel Energy:#05279016 1_ 6_ Standard for Electric Installation and Use, and any other applicable codes that apply before _ - + - + _ electric service is energized. BEB■ ■DEB ■BB■ Wolf River Electric U H mgE■ ■■uS ■Ogg Z j mSS■ ■EMS ■mg■ < C) :0808: on 881:88 Address:101 Isanti Parkway m - BBB■ ■BEE ■■m■ NE, Isanti, MN 55040 U 1,■■■ 2,■■■ .......... 12■■■ PVARRAYRATING WIRE SIZE CALCULATION BRANCH CIRCUIT -A BRANCH CIRCUIT Phone number. )_ 229-6662 1_ 2_ 5.32A J eox5 E-mail:contact@wolwolfriverelectric.com - - NEMA3R NumberMadules 14 Type I REC4004A IREC400WATT Number OF Microinverters in Circuit 7 m _ _ NumberMicrolnverters 7 Type I DS-3S Microinverters Microinverter Maximum Output Current(A) 2.66 x BBB■ ■■■■ ■Ogg Total DC Wattage(Watts) Watts STC,(Waits/Module)14*400�-5600 Branch Circuit Total Current(A) 7*2.66*1.25=23.28 z 5 mSM■ DENS ■Ego Array Currents I-SC 10.1 A I-MP 9.51 A Breaker Size Per Branch Circuit(A) 30 Q U BNB■ ■■uS ■■■■ .... SEEN ■■■■ mass Module Voltage V-OC 48.8 V V-MP 42.1 ELECTRICAL 1-LINE m - .... ■■■■ U 11MEN 2 som .......... was BRANCH CIRCUIT-B BRANCH CIRCUIT -B Number Modules 14 Type REC400AA IREC400WATT Number OF Microinverters in Circuit 7 DIAGRAM SYSTEM RATING AND DER POWER OUTPUT Number Microinverters 7 1 Type DS-3S Microinverters Microinverter Maximum Output Current(A) 2.66 DC 19.60 KW STC Total DC Wattage(Watts) Watts STC.(Watts/Module)14*400=5600 Branch Circuit Total Current(A) 7*2.66*1.25=23.28 AC 16.00 KW STC Array Currents I-SC I lal JA I I-MP 1 9.51 JA Breaker Size Per Branch Circuit(A) 30 INVERTER:DS3-S Module Voltage V-OC 1 48.8 IV I V-MP 1 42.1 IV INVERTER MAXIMUM CONTINUOUSOUTPUT:640VA BRANCH CIRCUIT-C BRANCH CIRCUIT -C ENGINEEr-:2INC Number Modules 15 1 Type REC400AA REC400WATT Number OF Microinverters in Circuit 8 Xcel Energy:#05279016 Number Microinverters s 1 Type 7 Microinverter Maximum Output Current(A) 2.66 Drawn by:New@engineerinc.io Note:24/7 Unescorted keyless access is to be DC 19.60 KW STC Total DC Wattage(Watts) Watts STC,(watts/Module)15*400=6000 Branch Circuit Total Current(A) 8*2.66*1.25=26.6 DATE:10/13/2022 provided for ALL UTILITY EQUIPMENT AC 16.00 KW STC Array Currents I-SC 1 10.1 JA I I-MP I 9.51 A Breaker Size Per Branch Circuit(A) 30 Project Name: Design meet National Electric COde(NEC codes) 49 REC 400 WATT MODULES Module Voltage V-OC 1 48.8 IV I V-MP 1 42.1 IV I REBECCAA WEAVER-LANG 25DS3-S MICROINVERTERS FROM JBOX TO PV SUB PANEL Property Address: DS3-S MICROINVERTERS Maximum Continius Current(A) 1 26.6 1 More Than 3 CCCAdjist.Factor 0.8 Adjusted ConductorAmpacity(A) 26.6/0.8=33.25 5965 Oakwood Manor NE 1 PHASEMAXIMUM 640VA way Height From Roof(Temp 39+22=61C) 31/2" #ofwire(#BC*2) 6 Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.71 Fridley,MN55432 AC PORT BACKFOUTPUT CURRENTRENT 6A Temp.Derate Factor(max.continous current divided ambient tem.Factor(A) 33.25*0.71=46.83 14re Size from NEC Table 310.15(b)l6 12AWG AC PORT BACKFEED CURRENT OA project: scale: DC SHORT CIRCUIT CURRENT15A FROM PV SUB PANEL TO MAIN PANEL PV SYSTEM AS INDICATED Total Number Of Microinverters 1 25 Total Amps From All Microinverters (A) 1 25*2.66=66.51 Consider Continuous(A) 66.5*1.25=83.125 Temp.Derate Factor(0.91 at wall of the Building)(A) 1 83.125/0.91=91.35 Wire Size from NEC Table 310.15(b)16 2 AWG AL �\ , .O Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.91 V WARNING NOMINAL OPERATING AC VOLTAGE � Photovoltaic Power Source NOMINAL OPERATING AC FREQUANCY � TURN OF PHOTOVOLTAIC MAXIMUM AC POWER � AC DISCONNECT PRIOR TO MAXIMUM AC CURRENT WORKING INSIDE PANEL MAXOCERCURRENTDEVICERATING - FOR AC MODULE PROTECTION PV ARRAY wCAUTION: SOLAR CIRCUIT LABEL 19 DO NOT DISCONNECT PV SYSTEM DC DISCONNECT © UNDER LOAD - © WARNING OPERATING CURRENT • OPERATING VOLTAGE - LECTRIC SHOCK HAZARD MAXIMUM SYSTEM VOLTAGE - THE DC CONDUCTORS OF THIS MAIN PV SYSTEM SHORTCIRCUITCURRENT - PHOTOVOLTAIC SYSTEM ARE DISCONNECT © UNDERGROUND AND MAY BE ENERGIZED PV SUB-PANEL MAIN PV SYSTEM RATED MAX POWER-FONT CURRENT RATED MAX POWER-FONT VOLTAGE � WARNING © AC DISCONNECT MAXIMUM SYSTEM VOLTAGE © ELECTRIC SHOCK HAZARD SHORT CIRCUIT CURRENT � AC LABEL5 O MAX RATED OUTPUT CURRENT OF IF GROUND FAULT IS INDICATE THE CHARGE CONTROLLER IF INSTALLED © NORMALLY GROUNDEDCONDUCTORS SOLAR DISCONNECT MAY BE UNDERGROUND AND ENERGIZED CAUTIONSOLAR PV SYSTEM EQUIPPED WITH CONTRACTOR • • SOLAR ELECTRIC SYSTEM RAPID ' • WARNI NG TURN CONNECTED • FWN SH OCK HAZARD© RAPID •• ® LABEL 13 SWITCH TO THE DO NOT TOUCH TERMINALS • •• • •• • • TERMINALS ON BOTH LINE AND LOAD WARNING-DUAL POWER SOURCE © SIDES MAY BE ENERGIZED IN THE OPEN SECOND SOURCE IS PV SYSTEMSHOCK HAZARD LLI Xcel _ .0 16 POSITIONIN THE ARRAY. LABEL 14 CAUTION PHOTOVOLTAIC SYSTEM CIRCUITWolf River Electric WARNING © IS BACKFED '•• - NE, Isanti, MN 55040 MAIN SERVICE E-mail:ELECTRIC SHOCK HAZARD - - - PANEL DO NOT TOUCH TERMINALS PHOTOVOLTAIC AC DISCONNECT ® TERMINALS ON BOTH LINE AND LOAD MAXIMUM AC OPERATING CURRENT SIDES MAY BE ENERGIZED IN THE OPEN POSITION MAXIMUM AC OPERATING CURRENT O 4�O LABEL 16 SYSTEM DC VOLTAGE IS ALWAYS PRESENT LABELING DETAIL WHEN SOLAR MODULES PHOTOVOLTAI ARE EXPOSED TO SUNLIGHT UTILITY AC DISCONNECT Drawn by:New@engineefincJo LABEL 17 • PHOTOVOLTAIC OakwoodProperty Address: 5965 Fridley,MN 55432 roject. Scale DC DISCONNECT PVSYSTE:M::]I AS INDICATED • -: LABELS SHALL COMPLY WITH NEC . •0 "Labels shall be weatherproof, durable and permanently mounted" ALL LABELS RED •PLASTIC/REFLECTIVE , Permanently mounted FPV 3. 1 CAUTION CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: DISCONNECTS LOCATED AS SHOWN: SERVICE 1 OF 2 SERVICE 2 OF 2 On CONTRACTOR a o WOL�RIVER ° ELECTRIC p grSOLAR o Xcel Energy:#05279016 0 PV ARRAY SOLAR PV ARRAY Wolf River Electric Address:101 Isanti Parkway o NE, Isanti, MN 55040 C Phone number: (763)229-6662 E-mail: ;ontact(a)_wolfriverelectric.com SERVICE POINT & SERVICE POINT & UTILITY METERING N UTILITY METERING N PV SYSTEM DISCONNECT PV SYSTEM DISCONNECT FOR UTILITY OPERATION FOR UTILITY OPERATION PLACARD PV SUB PANEL W �j ILI PV SUB PANEL W MONITORING DEVICE MONITORING DEVICE 5965 Oakwood Manor NE 5965 Oakwood Manor NE CTNGINCCr-:2INC Fridley, MN 55432 $ Fridley, MN 55432 S Drawnby:New@engineerinc.io DATE:10/13/2022 Project Name: REBECCA A WEAVER-LANG Property Address: 5965 Oakwood Manor NE Fridley,MN 55432 Project: Scale: PV SYSTEM AS INDICATED PV 3.2 N o° LEGEND PROPERTY LINE MSP............... Main Service Panel 00000 MM ............................ Main Meter 0� E 157'-7" o O 0 c� �o AC ............. Utility AC Disconnect W - — — D o — — PVS........................ PV Sub Panel 270 aD n n so° 0 0 0 g �QQ g a O000 o MD....................Monitoring Device o00 � a ° � � o �OC6 oo moo Do op 0 0 oo a o d � Op Co < Q o �g .490 000 0 S 'op00 o d'o 0 4 00 1so° o 0o O o p �o DIoD SCALE: 1/16" = 1'-0" o o 00 Q.o `b o L 0o a0o O o 000 � , D ° 8 4 0 0 Q o o �? ,ti o 0 0 4111, 0% °� 0 0 90 I p4 0� • a ��o Co o PS Do Ooo 0 o Q Q 4 0� o D 4 ,91 �1b 0 $ o� a, g0a 4 0 00 71 -2" 0 0 0 0 • 7 • D d 0 a• '. o 0L 0 `�' ® p oDoo o D �1• o p o ® Q •� D o��Ia o a 4 4 0 •• 0 0` • D o O o c o `p 4 • O o Q 0 @ o D® O O d , O o o o � • 4• • 00 0� d O 4 O I •�D • o °• o D Q ••• O o � a �poDO El °� ° ° ° ° 000$ o a �'; o I CONTRACTOR hle 0 o Iz 149'- o �o �� a, :911 0 5o� WOL�RIVER o o�• 0� a•� i ELECTRIC o • Xcel Energy:#05279016 o ❑ � Wolf River Electric Add 4 Isanti Pa rkway ° NE, Isanti, IMN 5504048 / o 0bO`' Phone number: (763)229-66 62 0" o oo4o o E-mail: jontacta_wolfriverelectri c.com D ° o 00 0, a 4 00 DRIVEWAY �0 � o 4 �D oD o 0 o Q PROPERTY PLAN o �0 , a MD oD oo PVS ACM moo°�o Sp • t000 0 E NG I NE Er-:2 I NC 25-$ 0 D 0 Q% O `" 0 �• Drawn by.New@engineerinc.io c �0 0 p DATE:10/13/2022 O 00 Project Name: 000o f � 4� REBECCA A WEAVER-LANG • 0 0 Q �� I Properly Address: o 4 5965 Oakwood Manor NE 157-7 0 —Ia Fridley,MN 55432 a Xcel Energy:#05279016 •�D • Project: Scale: Note: 24/7 Unescorted keyless access is to be PV SYSTEM AS INDICATED provided for ALL UTILITY EQUIPMENT FPV 4.0 MODULES ON ROOF DESIGN CRITERIA POINT LOAD CALCULATION PER ARRAY Prior to the commencement of work, the contractor shall verify the existing roof and framing Solar Modul Modules: Module Weight(Ibs) 45 conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction. 49 #Of Modules 49 Prior to the commencement of work, the contractor shall inspect framing for any damage Attachment Truss 2 x 4 @ 24"O.C. 2x6 Max Distributed Load: 3 PSF Total Module Weight(Ibs) 2205 Blocking such as water damage, cracked framing, etc. and These Plans are stamped for structural Plywood &Building Felt g Rack Weight(Ibs) 441 code compliance of the roof framing supporting the proposed PV installation reference only. Ibs Microlnverters Weight 142.5 (Ibs) These plans are not stamped for water leakage. PV modules, racking, and attachment 1 Layer of Comp Shingle Total System Weight(Ibs) 2788.5 components must follow manufacturer guidelines and requirements. Attachments to be ##Of Standoffs 116 installed in a staggered orientation to properly distribute loads. Max Span Between Standoffs (in) 48 XCeI Energy:#05279016 Loading Per Standoff(Ibs) 24.03 Total Area (sq.ft.) 1078 Note: 24/7 Unescorted keyless access is to be Loading (PSF) 2.56 provided for ALL UTILITY EQUIPMENT L— ATTACHMENT O RAIL p p p p p p — — — — — — — — — — — — — — — — — Truss 2 x 4 @ 24" O.C. LT IF �_ �� I I SNAPNRACK.ULTRA RAIL SPEEDSEAL TM FOOT 19 I I I I I I I I 1 1 1 11 1 1 1 T CONTRACTOR IIII � I G PARTS LIST 2 2 -4 1 1 1 1 1 1 1.08" 37�� ITEM QTI DESCRIPTION 0 381 1 1 1 SNAPNRACK,SPEEDSEAL FOOT,BASE,SEALING,SILVER/BLACK I I I I 1 1 1 WOLF R I V E R 2 1 BOLT,FLANGE,SERRATED,5/16IN-18 X 2IN,SS I 1 �ELECTR I C 11 3 1 SNAPNRACK,RL UNIVERSAL,MOUNT SPRING,SS 1 1 1 1 I 1 1 1 3. 5 811 4 1 SNAPNRACK,ULTRA RAIL MOUNT THRU PRC,CLEAR/BLACK 1 78" 5 1 SNAPNRACK,ULTRA RAIL MOUNT TAPPED PRC,CLEAR/BLACK 1 I I Ti I I I 1 1 0 lO I 1 1 1 I Xcel Energy:#05279016 25" I I I I 1 1 MATERIALS: DIE CAST A380 ALUMINUM,6000 SERIES ALUMINUM,STAINESS STEEL I DESIGN LOAD(LBS): 602 UP,1333 DOWN,357 SIDE OPTIONS: IA•J 0.17" 2 24" 3.20"' ULTIMATE LOAD(LBS): 2116 UP,4006 DOWN,1331 SIDE CLEAR/BLACK — 2.58' TORQUE SPECIFICATION: 12 LB-FT CERTIFICATION: UL 2703,FILE E359313;WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2562 —I 0.33" WETGHT(LBS): 0.45 Wolf River Electric 1.12" — — I Address:101 Isanti Parkway 1. 0.82" NE, Isanti, MN 55040 ® — — i Phone number: (763)229-6662 E-mail:contact(a_wolfriverelectric.com � 1I111 � 1.50"-I 1 — — — I ATTACHMENT — I LAYOUT o 2 1 — CNGINCCr-:ZINC: Drawn by.New@engineerinc.io DATE:10/13/2022 O Project Name: — — — — — REBECCA A WEAVER-LANG Property Address. 5965 Oakwood Manor NE Fridley,MN 55432 Project: Scale: PV SYSTEM AS INDICATED PV 5. 1 SNAPNRACK UR SPEEDSEAL FOOT FOR MODULE HEIGHT OFF ROOF,RANGE: COMPOSTION ROOF MOUNTING UR-40:W-43,4. COMP SHINGLE ROOFING,TYP. REFER TO SNAPNRACK ENGINEERING CHARTS UR-60,4" -5" SNAPNRACK, UR SPEEDSEAL FOOT FOR APPLICABLE RAIL SPANS. ROOF DECKING,TYP, SI6,0 S.S. LAG SCREW MUST EMBED A MIN, SNAPNRACK, SNAPNRACK,Via"O S.S. OF 2'6" INTO STRUCTURAL MEMBER ULTRA RAIL LAG SCREW,TYP. STRUCUTRAL MEMBER, REFER TO SNAPNRACK INSTALLATION WOOD RAFTER,TYP, MANUAL FOR Ys"O HARDWARE TORQUE SPECIFICATIONS STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE= SPF#2 MINIMUM SPECIFIC GRAVITY= 0.42 ALLOWABLE FASTENER UPLIFT =820 LBS CONTRACTOR ALLOWABLE FASTENER LATERAL= 250 LBS MINIMUM FASTENER EDGE DISTANCE = 0,5" MINIMUM FASTENER END DISTANCE= 2.2" WOL�RIVER 21A"MIN.EMBEDMENT INTO WOOD MEMBER ELECTRIC SNAPNRACK,ULTRA Xcel Energy:#05279016 RAIL MOUNT, TAPPED Shra"WASHER,S.S. (MAY INCLUDE NEOPRENE TYPE GASKET) Wolf River Electric PENETRATION DETAIL Address:1011santiParkway NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail: ;ontact(awolfriverelectric.com SNAPNRACK, ULTRA COIL SPRING FOR� " 0 BOLT, S.S. CAVITY IN UR SPEEDSEAL FOOT RAIL MOUNT,THRU OPTIONAL IS FILLED WITH SEALANT TO ENCAPSULATE AND PROTECT THE ROOF PENETRATION ATTACHMENT 5'6"0-18 X 2"BOLT, FROM MOISTURE DETAIL p SERRATED FLANGE,S.S. SNAPNRACK,SPEEDSEAL FOOT,BASE,SEALING ENGINEEr-:2INC EXPLODED 11{rr� Drawn 1@engineerinc.io DATE:1010/13123/2022 1 �� SEALANT T Project Name: 1y REBECCA A WEAVER-LAND Properly Address: 5 2/4" 5965 Oakwood Manor NE j LI—L --- Fridley,MN 55432 ROOF DECKING Project: Scale: PV SYSTEM I AS INDICATED UR-40 RAIL I UR-60 RAIL STRUCTURAL MEMBER(RAFTER) -FOR USE WITH SNAPNRACK ULTRA SERIES RAILS --- FPV 5.2 � APs stems Leading the Industry in D' ' DMicroinverter Series� V • A L T E N E R G Y POW E R Solar Mlcrolnverter Technology Model DS3-S Input Data (D(.r) Recommended PV Module Power(ITC)Range 250WpA80Wp+ j[ 265Wp-570Wp+ 300Wp-660Wp+ Peak Power Tracking Voltage 22V-48V 25V-55V 32V-55V DS3 Series Operating Voltage Range 16V-60V dffil 16V-60V 26V-60V The most powerful Maximum Input Voltage 60V Maximum Input Current 16A x 2 18A x 2 20A x 2 One • •r modules Output Data (AC) • •. • • ::• Maximum Continuous Output Power 640VA % 768VA 880VA • independent• • Nominal Output Voltage/Range" 240V/211V-264V compliant Nominal Output Current 2.66A 3.20A 3.7A NEC 2020 690.12 Rapid •• • • Nominal Output Frequency/Range" 60Hz/59.3Hz-60.5Hz Encrypted Wireless ZigBeeCommunication PowerFactor(Default/Adjustable) 0.99/0.7 leading...0.7lagging Phase Monitored and Phase Balanced Maximum Units per 20A and 30A Branch'=' 6/9 517 4/6 AC Bus Cable 12AWG/10AWG Efficiency Peak Efficiency 97% CONTRACTOR CEC Efficiency 96.5% PRODUCT FEATURES Nominal MPPT Efficiency 99.5% Night Power Consumption 20mW APsystems 3r°generation of dual microinverters are reaching unprecedented power outputs of 640VA or 768VA or 880VA to adapt to today's WOL�R 1 VE R larger power module. With 2 independent MPPT, encrypted ZigBee signals, the DS3-S, DS3-L and D53 benefit from an entirely new Mechanical Date ELECTRIC architecture and are fully backwards compatible with the QS1 and YC600 microinverters. Operating Ambient Temperature Range -40"F to+149°F(-40'C to+65'C) The innovative and compact design make the product lighter while maximizing power production.The components are encapsulated with Storage Temperature Range -40-F to+185-F(40-C to+85-C) Xcel Energy:#05279016 silicone to reduce stress on the electronics,facilitate thermal dissipation,enhance waterproof properties,and ensure maximum reliability of the Dimensions(W x H x D) 10.3"x 8.6"x 1.6"(262mm X 218mm X41.2mm) system via rigorous testing methods including accelerated life testing.A 24/7 energy access through Apps or web based portal facilitate Weight 5.7lbs(2.6kg) remote diagnosis and maintenance. DC Connector Type Staubli MC4 PV-ADBP4-S2&ADSP4-S2 The DS3 series is interactive with power grids through a feature referred to as RPC(Reactive Power Control)to better manage photovoltaic power Cooling Natural Convection-No Fans Wolf River Electric arkway P s Ianti spikes in the grid. With a performance and an efficiency of 97%,a unique integration with 20%less components,APsystems DS3-S,DS3-L Enclosure Environmental Rating NEMA6 NE, Isanti,Address:101 1 anti and DS3 are a game changer to residential and commercial PV. 55040 Phone number: (763)229-6662 E-mail: :ontact@wolfriverelectric.com Communication(Inverter To ECU)" Encrypted ZigBee Isolation Design High Frequency Transformers,Galvanically Isolated WIRING SCHEMATIC Energy Management Energy Management Analysis(EMA)system Warranty" 10 Years Standard;25 Years Optional INVERTER DATA SHEET Compliance Safety and EMC Compliance UL1741;CSA C22.2 No.107.1-16;CA Rule 21(UL 1741 SA);FCC Part15;ANSI C63.4;ICES-003;IEEE1547;NEC2014&NEC2017 Section 69 690. Arc-Fault circuit;Protection NEC2014&NEC2 Section ENGINE EI�INC 690.12 NEC Rapid Shutdown of PV systems on Buildings;NEC 2020 SD Nominal voltage/frequency range con be extended beyond nominal if required by the utility. 0 All Rifts Reserved Drawn b y:New@engineerinc.io 2Q Limits may vary.Refer to local requirements to define the number of microinverters per branch Specifications subject to change without notice please ensure you are using the DATE:10/13/2022 in your area. mast recent update found at web:usa.APsystems.com (D Recommend no more than 80 inverters register to one ECU for stable communication. Project Name: QTo be eligible for the warranty,APsystems microinverters need to be monitored REBECCA A WEAVER-LANG viathe EMAportal.Please refer to our warranty T&Cs available on Property Address 10 : v \ usa.APsystems.com. Meets the standard requirements 59850akvvood Manor NE A APsystems S�® for Distributed Energy Resources Fridley,MN 55432 8701 N.Mopac Expy,Ste 160,Austin,TX 78759 (UL1741)and identified with the Tel:844-666-7035 C tSAListedMark project: Scale: PV SYSTEM AS INDICATED 2022/02/15 Rev1.3 apsystems.com FD 6.0 ::1 REC PRODUET 5PEEIREATION5 SOLAR'SOLAR'S MOST TRUSTEDREC SOLARS MOST TRUSTED FECAL"PLRE EILXX Millis 1821±23 I71.730.11 90113551 460118.1] CERTIFICATIONS IEC 6121S:2016,IEC 61730:2016,UL 61730(Pending) ❑ + 150140012004,ISO 9001:2015.OH5A5180012007.EC62941 1100[43s1 �la C E Ed 6.0t01 [014x0.011 S WARRANTY 5tardardi RECPraTrust ;i Installed by an REC Certified o Solar Professional No Yes Yes o n 11z0.2 - '4 S3[0.43t0.011 System Size All € c25kW 25-500kW ProductWarranty(yrs) 20 25 25 F 20.530.5 Power WarraMy(yrs) _ 25 25 25 10.8x0.021 1200[4721 - Labor Warranty(yrs) �. 0 25 10 PowerinYearl 98% ' 98% 98% Annual Degradation 0.25% € 0.25% 0.25% 4s[,.al 22.5[0.91 67,t3126.°=U.,2, -- CONTRACTOR Power inYear25 92% € 92% 92% Seewarranty docum ents for details.Conditions apply Measurements in mm Iln) GENERAL DATA MAXIMUM RATINGS c 132halftutRECheter°juretioncells StaubiMC4PV-KBT4/KST4.l2AWG(4mmj Operational temperature -40._+185°F(-40...+85 Q Cell type withbtad-free,gaplesstechnology Connectors: InaccordancewlthIEC62852 .......'................................o....a,.e:_.__,__.. "-�"�"��»����"._........"»�"� WOLF RIVER 6stringsof22cellsinserLs IP68onlywhencon-ted Maximumsystemvo...... 1000V .............................................................................._....................................Cable:................................................................m ....................... ............._.......... Maximum test Ina d(front): +7000Pa0461bs/sgft)' ELECTRIC 0.13in(3.2mm)solarglasswith 12AWG(4m �PVwire,43+47in(tl+]2nj ........................................................_........__................_..................................Glass: anti-reflection surface treatment arcordancewlthEN50618 Maximum testload(rear): -4000Pa(83.5lbs/sgft)' _.................._......._............._ ..-_.._.........._...._.............._....._......_.................................................................. ......................................._......... ........................................................................,...............................I..........».... Maxseriesfuserati 25A Backsheet: Highly res�tantpolymer(black) Dimensions: 71.7x40x12in(1821x1016x30mm) ......................................_n..g:..........._........_................................... .... � Xcel Energy:#05279016 ..............................................._....................._............................................................................._..._.._.........._................................................_ Max reverse current: 25A Frame: Anodized aluminum(black) Weight: 45 lbs(20.5 kg) 'See installation manual for mountinginstructiore. o .._._............._....._....................... . . ._._................._.._....__......___..................................._...._...__._._.._........_..............................................._ 3-part,3 bypass diodes IP67 rated Design load-Test load/L5(safe[yfactar) O Junction box: , Inaccorda Origin Made in Singapore 3 R ncewlih lEC62790 REC ALPH(X PURE ELECTRICAL DATA ProductCode:RECxxxAAPureBlack TEMPERATURE RATINGS' Wolf PowerOutPut;P (WP)�_ 38 9C 345 ;GG 405 NominaIModule0peratingTemperature: 44"C(x2'C) AddressV10 Electric Parkway _..............._..._ ........................................................................................_...-__................ - NE Isanti MN 55040 Waft CI ass Sortmg (W) 0/5 0/5 0/+5 0/+5 0/+5 Temperature co efficient ofP_x: -026%/'C 2 ' ._..............-.-....-..............-......._......._......._.._................................................................__...._...............-.... _. ......... _._ ......... ................................................................................._..................................... a _ Phone number: (763)229 6662 Nominal Power Voltage-VM„(V) ,412 41.5 41.8 42.1 42.4 Temperature co efficient ofVo,: -0.24%/'C BLACK SERIES ....................._ ...........'_'._................ ....._.............. ........._..._.. ..._...._. ............... . ......._..............................._................_................. _._ E-mail: v NominaIPowerCurfent-],a,�(A) 9.35 9.40 9.45 951 956 Temperaturecoefficientofisc: 0.04%PC . .;ontact WO rivers ectric.com _............................................._.._....._........._._.._..........._.._. _..._. _.__.._.._............................... .._.............._ in Open Circuit Voltage-V.IV) 48.5 48.6 48.7 48.8 48.9 The temperaturecoef6clents stated are limarvalues PRODUCT SPECIFICATIONS Short Circuit Current-Isc(A) 9.99 10.03 10.07 10.10 10.14 .............................-............_...._......................._.......__.........__.............._........._.............. _........_...._........._..... ..._._......_..... Power Density(W/sqft) 19.3 19.6 19.8 201 20.3 LOW LIGHT BEHAVIOUR - _.....................__...................__._.....___...__.............__...._..._................_..._....._...._._-...._.__.....,.........._._.. ..................._......_...... MODULE Panel Efficiency(%) 20.8 21.1 21.3 21.6 21.9 Typic at low irradia nce performance of module at STC: Power Output-P.,(Wp) 293 297 301 305 309 _ W < DATA SHEET .................................................,...»...('V' ......................,.»,.............3-8, ..............»..._»..»................»...........»........................ .........,........0"" r, NominalPowerVoltage-Ve(V) 38.8 39.1 39.4 39.7 40.0 0 ...................._............................._................_...._._..._.__.._......_....._.... .._.._._...._.._... __............_......._._._............................_.. - - - --- f Nominal Power Current-I_(A) 7.55 7.59 7.63 7.68 7.72 'o Z ..................__.._...._....._._....._..........._._......-.._....._._......._.............. ........._._.........._......-..................._.............._...................... Open Circuit Voltage-VaIV) 45.7 45.8 45.9 46.0 46.1 '-- ------ --- --"--"_ --"-j g...................._....................................................................._......................»............................._........_..............................._......_......................... CN GI �NCC ShortC(rcuitCurrent-Isc(A) aO7 810 8.13 8.16 8.19 d m Imadlance(w/m') r-:2'NC EXPERIENCE z Veluezatstandlydtest ruditbns($TCairmass AM15,inadlarxx10.75 W/sgh(1000 W/rtPltemperaMe 7TF(25°C1based an aproductbn 4readwlthatoleranceofP„.,Va&4,s3,AMthino wattclassNmlmlmoduleoperatingtenpermhre(NMOT:airmassAM15,imadiance Drawn by:New@engineerincJo REC DATE:10/13/2022 400wp 25YEAR Project Name: R c mpa y de99ated to roup empowering eying consumers with clean.ng afforar drgy able REBECCA A WEAVER-LANG company dedicated to empowering[onsumers with clean,affordable " REC solar power.As Solar's Most Trusted.REC is committed to high quality, Property Address: . , - innovation,and a low carbon footprint in the solar materials and solar wwwretgroup.com panels[t manufactures.Headquartered in Norway with operational +� 5965 Oakwood Manor NE LE -FEEpa 0 headquartersin Singapore,REC also has regional hubs inNorthAmerica, I Fridley,MN 55432 ELIGIBLE ROH5 COMPLIANT PERFORMANCE Europe,andAsia-Pacific. Project: Scale: PV SYSTEM AS INDICATED F- D 7.0 Snap rack- UR-40 SnapNrack Ultra Rail UR-60 A sleek, straightforward rail solution for mounting solar modules .. types. Ultra Rail Solar Mounting Solutions features two rail profiles; , • is a lightweight rail profile suitable • •st geographic Ultra Rail • - •• • rail . . . . .. . . . .. .. . ... :. compatible with all . . . . clamps, . . . of install. The Entire System is a Snap to Install • New Ultra Rail Mounts include snap-in brackets for attaching rail • Compatible with all the SnapNrack Mid Clamps and End Clamps customers love • Universal End Clamps and snap-in End Caps provide a clean look to the array edge CONTRACTOR Unparalleled Wire Management • Open rail channel provides room for running wires resulting in a long-lasting quality install WOL�RIVER • Industry best wire management offering ELECTRIC includes Junction Boxes, Universal Wire Clamps, MLPE Attachment Kits, and Conduit Xcel Energy:#05279016 Clamps • System is fully bonded and listed to UL 2703 The Ultimate Value in Rooftop Solar Standard Wolf River Electric Address:101 Isanti Parkway NE, Isanti, MN 55040 • Phone number: (763)229-6662 Industry ' • • • Wire Mounts • • E-mail: ;ontact(a)_wolfriverelectric.com Management Heavy Duty UR-60 Rail • • • • • _ • UR-60 rail profile provides increased span capabilities for high wind speeds and snow Single loads ��� � RACKING • • • • • • • Taller, stronger rail profile includes profile- Clamps : Accessories specific rail splice and end cap DATA SHEET _ compatible • All existing mounts, module clamps, and accessories are retained for the same great both rail profiles install experience CENGINCCr-:ZINC Drawn by:New@engineerincJo DATE:10/13/2022 ;Sift - • •• • Ultra • Project Name: REBECCA A WEAVER-LANG Quality. Innvative . Suerir• p • Property Ad dress: 5965 Oakwood Manor NE RESOURCES snapnrack.com/resources 0 1 Fridley,MN55432 DESIGN snapnrack.com/configurator SnapNrack Solar Mounting Solutions are engineered to optimize material use and Project: Scale: labor - • and improve overall installationquality and safety. PV SYSTEM AS INDICATED WHERE TO BUY snapnrack.com/where-to-buy 877-732-2860 • • • • F—D 8.0 DESCRIPTION: DRAWN BY: n �L DESCRIPTION: DRAWN BY: SNAPNRACK, ULTRA RAIL SPEEDSEALTM FOOT mwatkins 5fl(aEHT( d7 SNAPNRACK, ULTRA RAIL SPEEDSEALTM FOOT mwatkins snapmrac�L REVISION: Solar Mounting Solutions REVISION: Solar Mounting Solutions PART NUMBER(S): PART NUMBER(S): 585 MARKET STREET,39TH FLOOR.SAN FRANOISOO,CA MU USA 595 MARIn=T STREET,N-FLOOR.SAN F-WISCO,-94105 242-02163, 242-02167 USA PHONE(415)580-0.FAX(415)580-89112 242-02163, 242-02167 PHONE(415)580d900.FAX(415)580.8902 1.37 .30 .38 1.86- 1.08 1.00 JF6S SLOT 3.05 ��A CONTRACTOR 2.78 1.78 5 .25 WOLF RIVER I- ELECTRIC .17 I 952.24� 3.20 2.58 Xcel Energy:#05279016 4 0.33 3 Wolf River Electric Address:101 Isanti Parkway R1.12 NE, Isanti, MN 55040 R 82 Phone number: (763)229-6662 1.21 E-mail:contact@wolfriverelectric.com w 2 1 ATTACHMENT 1.99 PARTS LIST DATA SHEET ITEM QTY DESCRIPTION 1 1 SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER/ BLACK 2 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SS CNGINCC�INC 3 1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS 4 1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR/ BLACK Drawn by:New@engineerinc.io 1.50 5 1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR/ BLACK DATE:10/13/2022 MATERIALS: DIE CAST A380 ALUMINUM, 6000 SERIES ALUMINUM, STAINLESS STEEL Project Name: REBECCA A WEAVER-LANG DESIGN LOAD (LBS): 802 UP, 1333 DOWN, 357 SIDE OPTIONS: Property Accre99: ULTIMATE LOAD (LBS): 2118 UP, 4006 DOWN, 1331 SIDE CLEAR/ BLACK 5965Oakwood Manor NE Fridley,MN 55432 TORQUE SPECIFICATION: 12 LB-FT CERTIFICATION: UL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 Project: Scale: PV SYSTEM AS INDICATED ALL DIMENSIONS IN INCHES WEIGHT(LBS): 0.45 F-D 9.0 MIUNITF • ISurge Protection • 1 APT^d�l^:1BFR MNSPD-115 MNSPD-300-AC MNSPD-300-DC MNSPD-600 Nominal Voltage 0 to 90 VAC 0 to 250 VAC 0 to 300 VDC 0 to 480 VAC 0 to 115 VDC 0 to 600 VDC MCOV 180V 470V 470V 780V Surge Protection You Can 11i VPR Line to Ground 600V 1200V 1200V 1800V Suggested Placement Up to 90VAC circuits, 120/240 VAC circuits Off-grid PV combiners 316V/480 VAC circuits Count a n r• 12V,24V,48VDC battery Charge controller inputs Grid-tie PV combiners circuits up to 30OVDC Grid-tie inverter input Non-Isolated Inverters MidNite Solar Surge Protection Devices are type 1 devices, designed for indoor and outdoor Type UL14494th Ed.Type 1 UL14444th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 applications. Engineered for both AC and PV i Diagnostic Blue LED MNSPD-300-AC DC electrical systems, the provide protection LED indicates when voltage is present between L1 +ground and L2+ground y y p rov p MNSPD-115,MNSPD-300-DC and MNSPD-600: to service panels, load centers or electronic LED indicates when voltage is present between L1 +L2(PV+PV-) devices that are directly connected to a MidNitel , le -i"i_'Z; -1 Thermal Disconnector Internal Fuse Surge Protection Device (SPD). Response Time <1 micro sec. �IfUIFIh' ry ' CONTRACTOR MidNite s SPDs are offered in four models to ;y, protect a variety of different voltage ranges. They achieve this protection by clamping surge MNSPD300ACFM (Cut-in box) voltage to a level that your system can sustain (MNSPD-300-AC included) WOL�RIVER without damaging the components of the Performance ELECTRIC system. Surge Current Rating per Phase 80kA 03.527" Short Circuit Current Rating 10kA Xcel Energy:#05279016 Compare our SPDs against other surge protec- Fusing Individually fused MOVs tion devices. You will see there is no com ari- Thermal Fusing Yes p Over current Fusing Yes son in both our price and features. All our SPDs Operating Frequency 0 to 500 Hz Wolf River Electric are made in the USA and have a 5 year warranty. - Mechanical Description Address:101 Isanti Parkway Enclosure Polycarbonate UL94V-0 NE, Isanti, MN 55040 Environmental Rating Type4X Phone number: (763)229-6662 Connection Method #12 AWG E-mail: ;ontact(awolfriverelectric.com With lightning you only get one Weight 1 lb. Mounting Method 1/2"Conduit Knockout chance, so get the bests 3 82" Operating Altitude Sea Level- 12,000'(3,658 Meters) 4.425" Storage Temp -40,F to+185 F(-40°C to+85,C) Operating Temp -40,F to+185,F(-40°C to+85,C) SURGE PROTECTION Diagnostics Blue status LED,one per leg Four Models: 24"Wires Listings and Performance r UL Standard for Safety,UL 1449 Surge Protective Devices Fourth Edition CNGI NCCI�I NC .. MNSPD-115 CSA C22.2 No.8-M1986 EIectromangetic Interference(EMI)Filters,Fourth Edition ' MNSPD-300-AC MNSPD-300-DC Drawn by:IVew@engineerinc.io DATE:10/13/2022 MNSPD-600 Model No. Max Operating Surge Current Configuration MCOV SCCR VPR 60OV/3kA Project Name Voltage per Phase i I I L G REBECCA A WEAVER-LANG MNSPD-115 100 VAC/15OVDC 80kA 1 3-wire 2 Les 1 OV L-N 10kA OOV MNSPD-300-AC 300VAC 80kA 1 3-wire 2 Legs) 470V L-N 1 kA o 1200V Property Address: MNSPD-300-DC 385VDC 80kA 1fe 3-wire 2 Le s) 470V L-N 10kA 1200V 5965 Oakwood Manor NE 11[fiTc MNSPD-600 .480VAC/60OVDC 80kA 3-wire 2 Leas) 780V L-N 10kA 1800V Fridley,MN 55432 www.mldnHesol i ar.coms E ��I�//// OLAQ inC - pd (`r`V Project: Scale: 17722 67th Ave.NE.,Arlington,WA.360.403-7207 FAX:360-M-6862 v www.midnitesolar.com/spd Pv SYSTEM AS INDICATED -- 17722-67th Ave NE.Arlington.WA 98223 PH. 360-403-7207 FAX 360-691-6862 D�__l 0.0 s� CSA s� CSA GROUP'" GROUP" oo 59077 Certificate o f Compliance Certificate: 80/25194 Duster Contract: -05-28 Project: 80125194 Date Issued: 2022-OS-28 Certificate: 80069963 Master Contract: 259077 *Note: Conformity to UL 1741(Third Edition,Dated September 28,2021)includes compliance with applicable requirements of IEEE 1547-2003(R2008),IEEE 1547.1-2005(R2011),California Rule 21 and Supplement SA8- Project: 80125194 Date Issued: 2022-05-28 SA18. Issued to: Altenergy Power System Inc. *Note: This product is PV Rapid Shut Down Equipment and conforms with NEC-2014,NEC-2017 and NEC- No.l Yatai Road 2020 Article 690.12 and CEC-2018,CEC-2021 Sec 64-218 Rapid Shutdown of PV Systems,for AC and DC 7iaxing,Zhejiang,314050 conductors,when installed according manufacturer's instructions. CHINA Attention: Kevin Lu Notes: The products listed below are eligible to bear the CSA Mark shown Products certified under Class C531109 have been certified under CSA's ISO/lEC 17065 CONTRACTOR r r r r accreditation with the Standards Council of Canada(SCC).www.scc.ca with adjacent indicators C and US for Canada and US or with adjacent indicator "US"for US only or without either indicator for Canada only NODELECTRIC Issued by: ® 1�1iciZhutt� Xcel Energy:#05279016 Magic Zhang C us Wolf River Electric PRODUCTS Address:101 Isanti Parkway NE, Isanti, MN 55040 Phone number: (763)229-6662 CLASS-C531109-POWER SUPPLIES-Distributed Generation Power Systems Equipment E-mail: ;ontact(awolfriverelectric.com CLASS-C531189-POWER SUPPLIES-Distributed Generation-Power Systems Equipment-Certified to U.S. Standards Grid Support Utility Interactive Microinverter,Models DS34L DS3,DS3-L and DS3-S,rack mounted. INVERTER For details related to rating,size,configuration,etc.,reference should be made to the CSA Certification Record, CERTIFICATION Certificate of Compliance Annex A,or the Descriptive Report. APPLICABLE REOUIBEMENTS E N G I NEED I NC CSA-C22.2 No.107.1-16 - Power Conversion Equipment *UL Std No. 1741-Third Edition - Inverters,Converters,Controllers and Interconnection System Equipment Drawn 11312022 @engineerinc.io DATE:10/13/2 for Use With Distributed Energy Resources (Third Edition,Dated September 28,2021) Project Name: REBECCA A WEAVER-LANG Property Address: 5965 Oakwood Manor NE Fridley,MN 55432 Project: Scale: PV SYSTEM I AS INDICATED DOD 507 Rey-.2019-04-30 C 2018 CSA Grou - All nPhts reserved- Pa e 1 DOD 507 Rev_2019-04-30 C 2018 CSA Qrou - A116WAsreserved Page' D 11 .0 WITNESS TEST PROCEDURE REBECCA A WEAVER-LANG A TEST PROCEDURE THAT WILL BE USED TO VERIFY THE PROTECTION AND OPERATION OF THE SYSTEM SHALL BE SUBMITTED TO XCEL ENERGY FOR APPROVAL.THE PROCEDURE INCLUDES AN ANTI-ISLANDING TEST(FOR ALL SYSTEMS)TO VERIFY THE SYSTEM CEASES GENERATING IN PARALLEL WITH THE XCEL ENERGY 5965 Oakwood Manor NE DISTRIBUTION SYSTEM WHEN THE UTILITY SOURCE IS LOST.EACH SYSTEM IS UNIQUE AND WILL REQUIRE A CUSTOM TEST PROCEDURE BASED ON THE INVERTER Fridley,MN 55432 MANUFACTURER'S RECOMENDATIONS FOR COMISSIONIND ANDANTI-ISLANDING. IN ADDITION TO THE MANUFACTURER'S RECOMENDATIONS. UTILITY:XCEL ENERGY ALLTESTING SHALL BE PERFORMED BY QUALIFIED PERSONELL ONLY PHOTOVOLTAIC PROJECT INFO PV MODULE:(49) REC 400 W STEPS TO VERIFY PV SYSTEM IS READY TO BE ENERGIZED: INVERTER: 1.SITE SECURITY 1-PHASE 120/240 -SITE SHOULD HAVE 24/7 KEYLESS ENTRYAND DRIVABLE ACCESS IF XCEL EQUIPMENT IS PRESENT WITHIN THE SITE FENCE (25)DS3-S Microinverter 19.60 Kw(DC) -IF APPLICABLE,SITE SHOULD HAVE 24/7 DRIVABLE ACCESS TO ANY XCEL EQUIPMENT INSTALLED OUTSIDE OF THE SITE FENCE THAT IS USED FOR THE SOLE ARRAYI AZIMUT:180(22) PURPOSE OF FEEDING THE PV SYSTEM ARRAY2 AZIMUT:180(2) ARRAY3 AZIMUT:270(5) 2.PROPER LABELLING ARRAY4AZIMUT:90(11) VERIFY LABELING FORTHE MAIN SERVICE PANEL, PV SYSTEM CIRCUIT BREAKER, DC DISCONNECT(WHEN APPLICABLE), UTILITYAC DISCONNECT,PRODUCTION METER AND OTHER RELEVANT LABELLING AND SIGNAGE. ARRAYS AZIMUT:91(3) ARRAYTILT:34,26 3.ENERGIZE THE PV SYSTEM BY CLOSING THE UTILITY DISCONNECT.PLEASE ALLOW 5-MINUTE FOR THE INVERTER TO BOOT-UP. NEC 2020/IRC 2015/IBC 2012 WOLF RIVER ELECTRIC COMPANY 4.WHILE IN NORMAL OPERATION,REFER TO THE REFERENCE POINT OF APPLICABILITY TO VERIFY THE VOLTAGES ATTHE INVERTER AC OUTPUT ARE WITHIN 5%OF THE COMBINED INVERTED AC VOLTAGE RATINGS AND ALL INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE"NORMAL." 101 ISANTI PARKWAY NE#G ISANTI,MN 55040 CONTRACTOR 5.WHILE IN NORMAL OPERATION,VERIFY THAT ALL INVERTERS ARE OPERATIONAL AND PRODUCING POWER.VERIFY THAT SYSTEM IS GENERATING AT FULLEST CONTACT@WOLFRIVERELECTRIC.COM REASONABLE CAPACITY.WHILE IN NORMAL OPERATION VERIFY THE VOLTAGES ATTHE DER AC TERMINALS ARE WITHIN 5%OF THE COMBINED DER AC VOLTAGE WOLFRIVERELECTRIC.COM RATINGS AND ALL LEDs,ALARMS AND/OR LCD CODES ARE"NORMAL" WOL�RIVER 6.SIMULATE THE LOSS OF UTILITY SOURCE FOR THE ANTI-ISLANDING TEST BY OPENING THE"UTILILITY AC DISCONNECT". ELECTRIC REBECCA A WEAVER-LANG 7.USING A VOLTMETER,VERIFY THE VOLTAGE AT THE INVERTER SIDE OF THE AC DISCONNECT HAS DROPPED TO ZERO WOLF RIVER SOLAR Xcel Energy:#05279016 CASE#05279016 NOTE:ONLY CUSTOMER-OWNED EQUIPMENT SHALL BE USED FOR THIS VERIFICATION. 24/7 UN ESCORTED ACCESS SHALL BE Wolf River Electric 8.USING AN AMMETER OR THE INVERTER'S DISPLAY,VERIFYTHE DER OUTPUT OF THE INVERTER HAS CEASED WITHIN TWO SECONDS. PROVIDED FOR THE METERS&AC Address:101 Isanti Parkway DISCONNECT NE, Isanti, MN 55040 9.VERIFY INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE APPROPRIATE FOR LOSS OF UTILITY SOURCE Phone number: (763)229-6662 METERS&UTILITY DISCONNECT WITHIN E-mail:contact(a_wolfriverelectric.com 10.RESTORETHE LOST UTILITY SOURCE BY CLOSING THE"UTILITYAC DISCONNECT" 10'&LINE OF SIGHT 11.VERIFYTHATTHE INVERTER SYSTEM DELAYS 5 MINUTES BEFORE RESUMING POWER OUTPUTAFTERTHE UTILITY SOURCE IS RESTORED UTILITYAC DISCONNECTIS VISIBLE LOCKABLE&READILY ACCESSIBLE WITNESS TEST 12.VERIFY FIXED POWER FACTOR SETTINGS FOR EACH INVERTER MEETTHE PROJECT REQUIREMENTS GROUND SNOW:50PSF 13.METER TECH HAS VERIFIED METERING EQUIPMENT WIND SPEED:115MPH EXPOSURE CATEGORY:B ENGI NEE rZINC 14.SYSTEM RESUMED DELIVERY OF POWER NO LESS THAN 5 MINUTES AFTER UTILITY SOURCE IS RESTORED PV ARRAY:2.75 PSF Drawn by.New@engineerinc.io DATE:10/13/2022 PRODUCTS: rProject Name: RAILS:SNAPNRACK REBECCAA WEAVER-LANG MOUNTS:SNAPNRACK Property Address: 5965 Oakwood Manor NE ROOF-MOUNT Fridley,MN 55432 Project: Scale: PV SYSTEM AS INDICATED DF 12.0 h MDEPARTMENT OF Y LABOR AND INDUSTRY Wiring Methods and Disconnecting Means ❑ Are the conductor and cable ampacities determined at 125%before adjustment factors?690.8(B) Solar PV Inspection Checklist ❑ How are the PV Source and Output Circuit protected from overcurrent?690.9 ❑ Do AC or DC OCPD's have the appropriate voltage,current and interrupt ratings?690.9 Solar PV Inspection Checklist for REI #ELE- Installer Wolf Rlver Electric Job Address 5965 Oakwood Manor NE City/Township Fridley, MN 55432 ❑ Has arc-fault circuit protection been provided for DC source and/or output circuits?690.11 Required Documentation ❑ Is a rapid shutdown required and if so, how is it accomplished and identified?690.12&690.56(C) •Manufacturer's specifications for the inverter Q Is the PV disconnect permanently marked and installed in a readily accessible location?690.13 •Manufacturer's specifications for the module •Manufacturer's specifications for the optimizer(if used) Q Are the Isolating devices or equipment disconnecting means installed in circuits connected to •Verification that the racking system grounding and bonding is listed equipment at a location within the equipment,or within sight and 10 feet of the equipment?(Where PV Inverter the maximum circuit current is greater than 30 amperes an equipment disconnecting means shall be CONTRACTOR provided for isolation.)690.15 ❑ Is the PV system utility-interactive,stand alone or multimode?690.2 Q Has the fuse disconnecting means, if required, been installed?690.15 and 240.40 ❑ Is all the equipment listed for PV application?690.4 ❑ Are PV source or output circuits>30 volts in a raceway or guarded if readily accessible?690.31 WOL�RIVER ❑ Is the system grounded, ungrounded or(functionally grounded)?690.2 and 690.41 ❑ Is single conductor cable used outdoors Type USE-2 or listed &labeled PV wire?690.31 ELECTRIC ❑ Has DC Ground-Fault Protection been provided and properly labeled?690.41(B)? ❑ Are PV source or output circuits on or inside a building in a metal raceway and marked?690.31 Xcel Energy:#05279016 ❑ What is the maximum PV system voltage?690.7 ❑ Is all listed equipment rated for the maximum voltage?690.7 Interconnection Wolf River Electric ❑ Determine the maximum circuit current for the PV Source and Output Circuit; Inverter Output Circuit; Q Has a plaque or directory been installed at each disconnecting means(capable of interconnection) Address:101 Isanti Parkway Inverter Input Circuit; and DC to DC Converter Output(refer to inverter documentation). 690.8 NE, Isanti, MN 55040 denoting all electric power sources&power production sources. 705.10 Phone number: (763)229-6662 ❑ Has the point of connection to other sources been installed per 705.12? E-mail:contact(a_wolfriverelectric.com System Grounding ❑ Is the supply side disconnect readily accessible and within 10'of the connection point?705.11 ❑ Are all exposed non-current carrying metal parts of the PV system grounded?690.43 and 690.47 Q Are the utility interactive inverters connected to the system through a dedicated circuit breaker or PV INSPECTION ❑ Are the mounting structures or systems used for equipment grounding?690.43 fusible disconnecting means?705.12 CHECKLIST ❑ Does the bus or conductor ampacity comply with 705.12? ❑ Are the interconnecting devices used for equipment grounding listed and identified?690.43 ❑ Are the EGC properly sized and protected if exposed and not smaller than#6?690.45,690.46, Q Have all the required labels been applied? (See separate label list.) CNGINCCr-ZINC 690.50, 250.122, 250.120(C) Has the grounding electrodes stem been installed?690.47 Drawn 011312@engineerinc.io ❑ 9 9 Y DATE:10/13/2022 ❑ If both are resent, has the DC grounding electrodes stem been bonded to the AC GES?690.47 A rPrEB Name: P 9 9 Y ( ) REBECCA A WEAVER-LANG Property Address: 5965 Oakwood Manor NE 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.gov Fridley,MN 55432 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.Qov solar-checklist NEC20205olar_Checklist_Checked 20200317 Project: Scale: 1 2 PV SYSTEM AS INDICATED F-D1 3.0 APsystems ECU-R Datasheet • A L T E N ERGY POWER Communication Interface The global leader in Integrated Wi-Fi 802.11g/n multi-platform MLPE technology Communication ZigBee2.4GHz Ethernet 10/100 Auto-sensing,Auto-negotiation Wireless security WEP,WPA2-PSK USB interface 5Vdc-1A Output x1 Power Date Power Supply 110VAC-240VAC, 5OHz-6OHz 5V 2A Energy Communication Unit Power Consumption 1.7 W Mechanical Data • COflectlon and transmission O Dimensions(W x H x D) 122mm x 87mm x 25mm(4.8"x 3.4"x 0.98") inverter data Weight 150g(0.33lbs) • Module-level monitoring Of each Ambient Temperature Range -20°C to+65°C(-4°F to 149°F) inverter Cooling Nature Convection- No Fans • Built-in Wi-Fi Enclosure Environmental Rating IP20(Indoor-NEMA 1) • Small size, flexible installation Features CONTRACTOR • ZigBee communication IEC 60950-1,EN60950-1,IEC 60529,EN 60529,ANSI/UL 60950-1, Compliance CAN/CSA C22.2 No.60950-1,UL50E,FCC part 15,EN610 0 0-6-1, EN61000-6-3, ICES-003,AS NZS 60950-1,GB/T17799 Specifications subject to change without notice WOL�RIVER please ensure you are using the most recent update found at Iatam.APsystems.com ELECTRIC 3.8.79,t)All Rights Reserved DIMENSIONS Xcel Energy:#05279016 122 25 Wolf River Electric Address:101 Isanti Parkway Q�(}pp �,�� NE, Isanti, MN 55040 Phone number: (763)229-6662 o E-mail:contact(a_wolfriverelectric.com ti ao r� ECU-C O 0O DATA SHEET The APsystems Communicator, our state-of-the-art Energy Communication Unit(ECU-R), ENGINEEr-4INC is the information gateway for our APsystems inverters. It collects and transfers module Drawn by.New@engineerinc.io performance data in real time, giving you comprehensive monitoring and control over DATE:10/13/2022 each individual module,optimizing the performance of your solar array. Project Name: REBECCA A WEAVER-LANG Property Address: 5965 Oakwood Manor NE Fridley,MN 55432 Proje t I Scale: PV SYSTEM AS INDICATED D 14.0 4 I I 0 Milbank Accessories MILBANK TaP �-vnnGICrv1-s E Nt R G': AT W 0 R I, I • `` a CONTRACTOR K4977-EXT WOL�RIVER ELECTRIC Specifications • 4j.350 kcmll cor.n"tors with 100 Amp-012.1/0lap • Replaces the existing slide rr nut xsembly on Milbank 200 Amps sockets and allows for up to 100 Amps tap conrection in addition to the 96.350 kcm:l connectors. • Connectors des:gred for either fine-side or load-sideWolf River Electirc installation.• Available with both irternal Address:101 Isanti Parkway and external hex set screws. NE, Isanti, 1 anti • Ideal for Irno side cornoction when incorporating renewable energy rot motoring that utilizes two moter6 Phone number: (763)229-6662 • Also perfect for load-side 100 Amps feeds to outdoor lighting,water Weil pumps,hot nubs,outbuildings,whole house surge E-mail:contact@wolfriverelectric.com ruppremors and swimmirq pools • Crrtart I1Ailhart for additional applications and details Tap Connectors MILBANK DATA SHEET K4977-INT Set of 3 tap connectors wnth internal hex set straw Under 300 I K4977-EXT Set of 3 tap connecters%vit h external hex set screw Under 300 K5022-INT Set of 3 tap connectors moth internal hex set screw Over 300 K5022-EXT Scat of 3 tap connectors with internal hex set screw Over 300 I CNGI NEED I NC Drawn by:New@engineerinc.io DATE:10/13/2022 Project Name: REBECCA A WEAVER-LANG �.•••.�.Jr.W.«.s V�lnr�i.dwNr.fir«rr«•�.I.rlw\){C�««•�M 1/'•L�li� r r.r.1.I..v..t•.fin r.�..rr W•w(y,MW rraH..��sr•(�a..1�«a�.��y.e.•K+yn.0 II III•l><tr1 .11r.Mb0•�Srettl•�•111JC•e11�K1hCAn AM1mlJ3=-PM.m.I•rWrl nllq� •r••r4tr•s):1in11•r�e1JY.:Clta:ilr�1117'rtU Y-�rhlln/}n. Property Adress: c�Arnct v-d?r?:r v' -i cto c--t:hn>c_m 5965Oakwood Manor NE Fridley,MN 55432 •- arintm-Ave.Kawxv Oty.M064120 Project: Scale: PvSYSTEM AS INDICATED F_ D 15.0