Loading...
HomeMy WebLinkAboutSTEPHEN BURK Solar Drawings wStamp 10 18 2022 GENERAL NOTES SITE MAP & PV LAYOUT PV 1.0 1 HEREBY CERTIFY THAT THIS PLAN, CONTRACTOR 1. All electrical materials shall be new and listed by recognized ELECTRICAL 1-LINE DIAGRAM PV 2.0 SPECIFICATION, OR REPORT WAS PREPARED WOLSff 'VER electrical testing laboratory BY ME OR UNDER MY DIRECT SUPERVISION Address:101 Isanti ParkwaySYSTEM LABELING DETAIL PV 31Custom made equipment shall have complete test data submitted . AND THAT I AM A DULY LICENSED NE, Isanti, MN 55040PLACARD PV 3.2 PROFESSIONAL ENGINEER UNDER THE LAWS LECTRIC by the manufacturer attesting to its safety PROPERTY PLAN PV 4.0 OF THE STATNESOTA. Phone number: (763)229-6662 2. Outdoor equipment shall be NEMA 3R rated or equivalent ATTACHMENT LAYOUT PV 5.1 E-mail: contact�wolf rive relectric.com 3. All metallic equipment shall be grounded ATTACHMENT DETAIL PV 5.2 SIGNATURE: Xcel Energy Application#05251750 4. Contractor shall obtain electrical permits prior to installation and INVERTER DATA SHEET D 6.0 shall coordinate all inspections, testing commissioning and NAME: MANOUCHEHR HAKH ANESHI acceptance with the client, ENPHASE RAPID SHUTDOWN D 7 0 Owner: Stephen Burk acce p DATE: LICENSE NUMBER: 58681 Property Address: 1 550 S Bavarian Pass Fridley, MN 55432 utility co. and city inspectors as needed. MODULE DATA SHEET D 8.0 5. The electrical contractor shall verifythe exact locations of service Date Certified and Property Type: Single Family Residence RACKING DATA SHEET D 9.0 Drawn by: New@engineerinc.io points and service sizes with the serving utility company and ATTACHMENT DATA SHEET Signed: 10/18/2022 Date: 1011812022 comply with all utility companies requirements. D 10.0 6. Drawings are diagrammatic only, routing of raceways shall be ENPHASE AC COMBINER BOX D 11.0 option of the contractor unless otherwise noted and shall be INVERTER CERTIFICATION D 12.0 VICINITY MAP (SCALE: NTS) coordinated with other trades. SURGE PROTECTION D 13.0 7. If the roof material or the roof structure not adequate for PV WITNESS TEST PROCEDURE D 14.0 installation, call the engineer of record print to installation. The PV INSPECTION CHECKLIST-D 15.0 contractor is responsible to verify that the roof is capable of BMMwfJp $ withstanding the extra weight. _ 8. If the distances for cable runs are different than shown, the GOVERNING CODES ;` n contractor shall notify the electrical engineer to validate the wire THE INSTALLATION OF SOLAR ARRAYS AND ' size. Final drawings will be red-lined and updated as appropriate. PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH 9. Whenever a discrepancy in quality of equipment arises on the THE FOLLOWING CODES: drawing or specifications, the contractor shall be responsible for i • 2020 National Electrical Code \ providing and installing all materials and services required by the 2018 International Building Code c� strictest conditions noted on the drawings or in the specifications f 6 �aqn • 2018 International Residential Code to ensure complete compliance and longevity of the operable ! ', ; • 2020 Minnesota Residential Code ; i W system required by the engineer of record. . 2020 Minnesota Building Code `-` 'r "��e„�, Q�Pn�ry"i���9 • 2020 Minnesota Energy Code 1550 SBavanan Pass. m � • 2020 Minnesota Accessibility Code •Pr ae,,MN55492,L9A; Q s • 2020 Minnesota State Fire Code =_---- -_---- a �� � • 2018 International Fire Code • 2018 International Energy Conservation Code • 2018 Mechanical Code PHOTOVOLTAIC NOTES: AS ADOPTED BY THE STATE OF MINNESOTA ALL OTHER ORDINANCE ADOPTED BY THE 1. Rooftop mounted photovoltaic panels and modules shall be tested, LOCAL GOVERNING AGENCIES listed and identified by recognized testing laboratory SATELLITE VIEW (SCALE: NTS) 2. Solar system shall not cover any plumbing or mechanical vents SYS' 'M RATING 3. Modules and support structures shall be grounded DC 20.80 KW STC N" unless racking has integrated ground. jPI 4. Removal of an interactive inverter or other equipment shall not AC 15.08 KW STC disconnect the bonding connection between the grounding EQUIPMENT SUMMARY electrode conductor and the photovoltaic source and/or output circuit grounded conductors. 52 HANWHA 400 WATT MODULES �. 5. All PV modules and associated equipment and wiring shall be WITH IQ8+ MICROINVERTERS >►� ' protected from physical damage. i 6. Live parts of PV source circuits and PV output circuits over 150v to ` c ground shall not be accessible to other than qualified persons LECTRICAL NFORMATION while energized. f EXISTING 7. Inverter is equipped with integrated DC disconnect, thus providing MAIN SERVICE PANEL BUS SIZE:200A ground fault protection 8. All conductors shall be copper and 75 deg rated MAIN SERVICE PANEL BREAKER SIZE:200A 9. A single conductor shall be permitted to be used to perform the MOUNTING SYSTEM. SNAPNRACK multiple functions of do grounding, AC grounding and bonding between AC and DC systems. BUILDING INFORMATION "�- 10.Non-current carrying metal parts of equipment shall be effectively bonded together. Bond both ends of raceways. CONSTRUCTION TYPE: V-B OCCUPANCY: R3 CNGI NCCAZ1 NC _ ROOF:COMP SHINGLE �`-- Truss 2 x 4 @ 24" O.C. Engineerinc.io, Truss 2 x 4 @ 16" O.C. 303 N lenoaks Blvd Burbank, CA 91502 (747)333-5991 new(a)engineerinc.io N INDEX d5 0 0° SECONDARY INTERCONNECTION MSP (E)200A Main Service Panel uom�°c, c. ian sr uw MM........................(E) Main Meter Total Roof Area: 1925 D ECB....(N) Enphase Combiner Box ii Total Module Area:1144 W D E AC..................(N) 100A Utility AC e°'` som,imcv temin ent a„rrr,eeual.o' 0 270 D n 90° JB.......................(N)Junction Box U entewinment 59.42 /o of Coverage []........................(N) Microinverter o D ••••••••••••••••••••• Solar Module `y m NOTE:A 36-inchwide pathway type e Conduit S shall be provided to the emergency 180° — Fire Setback Line L� t SCALE: 3/32" = T-0" �„�a,�t$ escape and rescue opening.'••_______.__-_�_, al FMT type Conduit Upholstery Clwmng ............. Cruises-, Sa�arfanPass, m - - *Roof access is not located in areas that require placement of ground ladders over e. exterior wall openings (R324.6.1) Sea�ar Spi AP MODULES 52 HANWHA 400 Watt Solar PV Array 2 Solar PV Array 3 Model#Q.PEAI< DUO BLI< ML-G10+ 18- Hanwha 400 W Modules 10- Hanwha 400 W Modules INVERTER 18 - IQ8+ Microinverters 10 - IQ8+ Microinverters INVERTER TYPE: Micro: 52 EnphaselQ8PLUS Pitch: 14 Deg Pitch: 10 Deg Model#IQ8PLUS-72-2-US(240V) Orientation:33 Deg d Orientation:33 De JB4 p d EQUIPMENT ELEVATION O O d CONTRACTOR O d O d c O d d O d 0 0 o d o WOLF RIVER Q O d ELECTRIC N N O p JB3 O ECB r C N r 0 � 78 Xcel Energy Application#05251750 AC 0 From root UTILITY AC DISCONNECT LOCKABLE Main 78„ O Meter Utility AC fre 0 AND READILY ACCESSIBLE Main Disconnect 0 S\e7b servicea\ Wolf River Electric O � c MM Address:101 Isanti Parkway 8�� Paned 8 ECB �< O fre O MSP NE, Isanti, MN 55040 k b pay O b Phone number: (763)229-6662 �10 10 e 'e �\ O GAS E-mail:contact@wolfriverelectric.com b Gas � � � bO O\�b�Q� O\ SITE MAP & PV LAYOUT Roof Access O O Note:Keep 3ft clearance from gas meter and AC unit O O J61 O O � Solar PV Array1 O ENGINEER INC Q Drawn by:New@engineerinc.io 24- Hanwha 400 W Modules O DATE. 1011812022 J NOTE: No clearance issue 24 - IQ8+ Microinverters O Project Name Distance between all equipments is maximum 10" Stephen Burk Pitch: 27 Deg Property Address Xcel Energy Application#05251750 1550 S Bavarian Pass Note: 24/7 Unescorted keyless access is to be Orientation: 213 De Fridley, MN 55432 provided for ALL UTILITY EQUIPMENT Project: Scale: NOTE: Conduit in attic shall CPV SYSTEM AS INDICATED be minimum 18 inches from roof sheating [_PV 1 .0 ENPHASE QCABLE Note.Keep 3ft clearance from gas meter and AC unit (2)#12 AWG PV WIRE SECONDARY INTERCONNECTION REFERENCE POINT OF APPLICABILITY MAIN METER (1)#6 AWG EGC FREE IN THE AIR 120/24OV, 0 1 P,3W 1-PHASE MICRO-INVERTER UL1741 12.1A J BOX4 NEMA3R ENPHASE AC COMBINER 4 C 0000 0000 0000 120/24OV, NEMA 3R PV MONITORING DEVICE z D 0000 0000 0000 a C) 0000 0000 0000 0000 °000 0000 2 #14 AWG THWN/THWN-2 m 0000 0000 0000 0000 0000 000 000 2000 10000 100A FUSED AC DISCONNECT Line Side Ta 3.63A 1OA 2-POLE WITH80A FUSES, J BOX3 UTILITY AC DISCONNECT VISIBLE-OPEN - _ - NEMA3R =o LOCKABLE,READILY ACCESSIBLE °000 °000 000o NEMA3R z C) °000 0000 OOOo INSTALL(4)20A PV 120/240V 1 P 3W a af °000 0000 0000 (8)#12 AWG THWN/THWN-2 NON CENTER 200A �� o000 0000 0000 °' 00000000 00°°°0 °o°o°O°0 2-POLE C/B (3)#2AWG AL 1 000 -0 0 3000 (1)#12 AWG GND 1 1/4"SCH 80 PVC MAIN C/B 15.73A 3/4"EMT 7 FEET C^� EXISTING 62.92A 200A MAIN _" - - - 62 92A �\ SERVICE 0000 0000 0000 z� 0000 0000 0000 a FX PANEL a af °000 °000 0000 120/240V, K ❑000 ❑000 0000 1 P,3W m- 0000 2000 0000 °000 °000 0000 000 0000 �000 2000 13000 2.42A _ = J BOX2 Surge Protection NEMA3R (NEW)GEC o MNSPD-300-AC U~ 0000 0000 z 5 °000 °000 (3)#2AWG AL - Add 2nd Ground rod and g Q 0 0000 0000 of of 0000 0000 (8)#12 AWG THWN/THWN-2 n o m- 0000 0000 (1)#6 AWG GND tie it to the existin round rod. I I °000 °000 (1)#12 AWG GND 1 000 -000 C - 13.31 3/4"FMT 1 1/4"SCH 80 PV 20 FEET GEC NEMA3R 1 #6 AWG GND = (E)GROUNDING In locations where there is no local Public Authority, the customer is exempt from ELECTRODE SYSTEM 5 0000 °000 °°°°0000 inspection and/or the service has been shut off or disconnected for more than 365 days (1 year) Z 0 0000 0000 0000 Of °DO° °°°° 0000 ' ' CONTRACTOR °000 °000 0000 the licensed electrician or wireman shall submit a signed and dated Xcel Energy Electrical m U OOOo OOOo 0000 °000 0o00 0000 000 20 0 11000 15.73A Inspection Certificate to the Company's Builders Call Line attesting that the electrical installation _ has been completed and installed according to the current National Electrical Code@, the Xcel __ - - - Energy Standard for Electric Installation and Use, and any other applicable codes that apply before WOLRIVER U~ °°°° 0000 0000 ELECTRIC 0000 z 5 °000 °000 °000 a of °000 °000 °000 a ectrlC service IS energized. K K 0000 0000 0000 m U 0000 0000 0000 °000 °000 °000 000 2°O° 13000 PV ARRAY RATING WIRE SIZE CALCULATION Xcel Energy Application#05251750 BRANCH CIRCUIT-A BRANCH CIRCUIT-A SYSTEM RATING AND DER POWER OUTPUT Number Modules 13 Type Q.PEAKDLIDBLKML-GIO+ Han who400Watt Number OFMicroinvertersinCircuit 13 DC20.80 KW STC Number Microlnverters 13 Type EnphaselQ8+Microinverters IQ8PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 AC 15.08 KW STC Total DC Wattage(Watts) Watts STC,(Watts/Module)13*400=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 INVERTER:ENPHASE IQ8PLUS-72-2-US Array Currents I-SC 11.14 JA I I-MP 1 10.77 JA Breaker Size Per Branch Circuit(A) 20 Wolf River Electric INVERTER MAXIMUM CONTINUOUS OUTPUT:290VA Module Voltage V-OC 45.3 V V-MP 37.13 V Address:101 Isanti Parkway SYSTEM POWER OUTPUT:52 x 290=15.08 BRANCH CIRCUIT-B BRANCH CIRCUIT -B NE, Isanti, MN 55040 NOTE:AC DISCONNECT VISIBLE AND LOCKABLE Number Modules 13 Type Q.PEAK DUO BLK ML-G10+ Han who 400Watt Number OF Microin verters in Circuit 13 Phone number: (763)229-6662 Xcel Energy Application#05251750 Number Microln verters 13 1 Type I EnphaselQ8+Microinverters IQ8PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 E-mail:contact@wolfriverelectric.com Note: 24/7 Unescorted keyless access is to be Total DC Wattage(Watts) Watts STC,(Watts/Module)13*400=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 Array Currents I-SC 1 11.14 JA I I-MP 1 10.77 A Breaker Size Per Branch Circuit(A) 20 provided for ALL UTILITY EQUIPMENT Module Voltage V-OC 1 45.3 V V-MP 37.13 V Design meet National Electric Code(NEC codes) BRANCH CIRCUIT -C BRANCH CIRCUIT -C ELECTRICAL 1-LINE DC 20.80 KW STC Number Modules 13 IType Q.PEAK DUO 13LKML-G10+ Hanwha400Watt Number OFMicroinverters in Circuit 13 AC 15.08 KW STC Number Microlnverters 13 Type EnphaselQ8+Microinverters IQ8PLUS-72-2-US(240V) Microinverter Maximum Output Current(A) 1.21 DIAGRAM Total DC Wattage(Watts) Watts STC,(Watts/Module)13*400=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 52 HANWHA 400 WATT MODULES Array Currents I-SC 1 11.14 JA I I-MP 1 10.77 JA Breaker Size Per Branch Circuit(A) 20 52 ENPHASE IQ8PLUS MICROINVERTERS Module Voltage V-OC 1 45.3 1 V V-MP 37.13 1 V ENPHASE IQ8PLUS MICROINVERTERS BRANCH CIRCUIT -D BRANCH CIRCUIT -D CNGINCCI�INC 1 PHASE290VA Number Modules 13 Type Q.PEAK DUO BLKML-G10+ Hanwha400Watt Number OF Microinverters in Circuit 13 MAXIMUM OUTPUT CURRENT 1.21A Number Microlnverters 13 Type I EnphaselQ8+Microinverters IQ8PLUS-72-2-US(24OV) Microinverter Maximum Output Current(A) 1.21 Drawn by.New@engineerinc.io AC PORT BACKFEED CURRENT OA Total OC Wattage(Watts) Watts STC,(Watts/Module)13*400=5200 Branch Circuit Total Current(A) 13*1.21*1.25=19.66 DATE: 1011812022 DC SHORT CIRCUIT CURRENT 15A Array Currents I-SC 1 11.14 JA I I-MP 1 10.77 JA Breaker Size Per Branch Circuit(A) 20 Module Voltage V-OC 45.3 V V-MP 37.13 V Project Name: Stephen Burk FROM IBOX TO ENPHASE COMBINER BOX Property Address: Maximum Con tin ius Current(A) 1 19.66 1 More Than 3 CCCAdjist.Factor 1 0.7 1 JAdiusted ConductorAmpacity(A) 19.66/0.7=28.09 1550 S Bavarian Pass Raceway Height From Roof(Temp 39+22=61C)13 1/2" #of wire(#BC*2) 8 1 JAmbiend Tem Factor Per NEC Table 310.15(b)(2)(o) 0.71 Fridley, MN 55432 Temp.Derate Factor(max.continous current divided ambient tem.Factor(A) 28.09*0.71=39.56 Wire Size from NEC Table 310.15(b)16 12AWG Project: FROM ENPHASE COMBINER BOX TO MAIN PANEL scale: PV SYSTEM AS INDICATED �Total Number Of Microinverters 52 Total Amps From All Microin verters (A) 52*1.21=62.92 Consider Continuous (A) 62.92*1.25=78.65 Temp.Derate Factor(0.91 at wall of the Building)(A) 78.65/0.91=86.43 Wire Size from NEC Table 310.15(b)16 2AWGAL �\ / .O Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.91 V WARNING NOMINAL OPERATING AC VOLTAGE NOMINAL OPERATING AC FREQUANCY � PV TURN OF PHOTOVOLTAIC MAXIMUM AC POWER � AC DISCONNECT PRIOR TO MAXIMUM AC CURRENT � WORKING INSIDE PANEL MAXOCERCURRENTDEVICERATING - FOR AC MODULE PROTECTION ARRAY Photovoltaic Power Source DO NOT DISCONNECT PV SYSTEM DC DISCONNECT © LABEL2 UNDER LOAD - OPERATING CURRENT • OPERATING VOLTAGE - CAUTION: SOLAR CIRCUIT MAXIMUM SYSTEM VOLTAGE - MAIN PV SYSTEM SHORT CIRCUIT CURRENT - DISCONNECT © WARNINGLABEL10 LABEL20 © ELECTRIC SHOCK HAZARD© MAIN PV SYSTEM RATED MAX POWER-FONT CURRENT � PV SUB-PANEL AC DISCONNECT RATED MAX POWER-FONT VOLTAGE � THE DC CONDUCTORS OF THIS MAXIMUM SYSTEM VOLTAGE PHOTOVOLTAIC SYSTEM ARE SHORT CIRCUIT CURRENT � O UNDERGROUND AND MAY BE ENERGIZEDLABEL11MAxRAreDourPurcuRRENroF THE CHARGE CONTROLLER IF INSTALLED © LABEL4SOLAR DISCONNECT WARNING © ELECTRIC SHOCK HAZARD CAUTIONSOLAR PV SYSTEM EQUIPPED WITH CONTRACTOR DISCONNECT D FAULT IS INDICATED SOLAR ELECTRIC SYSTEM RAPID • • 0�) NORMALLY GROUNDED CONDUCTORS CONNECTED MAY BE UNDER G ROUND AND ENERGIZED TURN RAPID SHUTDOWN LABEL 13 SWITCH TO THE • POSITION TO WOLFjRIVER SHUT .• © WARNING-DUAL POWER SOURCEAND REDUCELLI SECOND SOURCE IS PV SYSTEM _• ••� WARNING - • • © ELECTRIC SHOCK HAZARD© CAULABEL 14 TION DO NOT TOUCH TERMINIle ALS PHOTOVOLTAIC SYSTEM CIRCUIT TERMINALS ON BOTH LINE AND LOAD IS BACKFED RiverWolf SIDES MAY BE ENERGIZED IN THE OPEN '•• - • POSITIONLABEL 15 NE, Isanti, MN 55040 MAIN SERVICE Phone number: PANEL E-mail:contact@wolfriverelectric.com PHOTOVOLTAIC AC DISCONNECT • ® LABEL6. MAXIMUM AC OPERATING CURRENT O4�O © ELECTRIC SHOCK HAZARD© MAXIMUM AC OPERATING CURRENT ABEL 16 SYSTEM LABELING DETAIL DO NOT TOUCH TERMINALS PHOTOVOLTAIC TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION UTILITY AC DISCONNECT DC VOLTAGE IS ALWAYS PRESENTDrawn _ __ LABEL WHEN SOLAR MODULES DATE: 1011812022 Project Name ARE EXPOSED TO SUNLIGHT PHOTOVOLTAIC Stephen Property Address: • S Bavarian Pass DC DISCONNECTFridley, Note: C 690 CAUTION CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: DISCONNECTS LOCATED AS SHOWN: SERVICE 1 OF 2 SERVICE 2 OF 2 CONTRACTOR SOLAR PV ARRAY SOLAR PV ARRAY WOL�RIVER ELECTRIC Xcel Energy Application#05251750 o° ENPHASE COMBINER BOX o, ENPHASE COMBINER BOX ° PV SYSTEM DISCONNECT PV SYSTEM DISCONNECT o FOR UTILITY OPERATION o FOR UTILITY OPERATION Wolf River Electric SERVICE POINT & SERVICE POINT & Address:101 Isanti Parkway UTILITY METERING UTILITY METERING NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail:contact@wolfriverelectric.com N N PLACARD W \ / E W E 7) 1550 S Bavarian Pass S 1550 S Bavarian Pass S ENGINEEr"4INC Fridley, MN 55432 Fridley, MN 55432 DDrawn ATE: 10 181@02�gineerinc.io Project Name: Stephen Burk Property Address: 1550 S Bavarian Pass Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED F_PV 3.2 N o° LEGEND Q MSP................ Main Service Panel MM........................ Main Meter AC .............Utility AC Disconnect W E i :AV i ECB..........Enphase Combiner Box 2 00 90° INGINC�IN W S Engineerinc.io, I HEREBY D a�ariahp 303 N lenoaks Blvd SPECIFICATION, IOR REPORT FY THAT THIS WASL PREPARED a o as Burbank O 4� s , CA 91502 BY ME OR UNDER MY DIRECT SUPERVISION /Q 01 A DULY S •, ' 1 " new7lc n3 ineernc.io PROFESSIONAL UNDER Aso THE LAWS ° ., >, � _ 9 SCALE: 1/16" — T-0° OF THE STAT NESOTA. � .. SIGNATURE: �; ay NAME: MANOUCHEHR HAKHA ANESHI / R11 ° DATE: LICENSE NUMBER: 58681 � o... 0. v p Date Certified and a • �o / Signed: 10/18/2022 ' c 10 ECB O o AC o %'' o• ,� CONTRACTOR / 0 0 o MM MSP WOL�RIVER GAS / ELECTRIC / PROPERTY LINE Xcel Energy Application#05251750 / 8'-10" Wolf Rlver Electric Q / Address:101 Isanti Parkway Q NE, Isanti, MN 55040 Phone number: (763)229-6662 ( V E-mail:contact@wolfriverelectric.com Iva o o � , boo S o� • , � o o ' ° a> PROPERTY PLAN ® >, a o • �� o.... CP >; • ENGINEER INC • J p '�• Drawn by:New@engineerinc.io • , .Q, "� o E���O / DATE: 1011812022 \` • � Project Name: • • Stephen Burk Property Address: ^�• 1550 S Bavarian Pass 0 Fridley, MN 55432 Project: Scale: Xcel Energy Application#05251750 PV SYSTEM AS INDICATED Note: 24/7 Unescorted keyless access is to be provided for ALL UTILITY EQUIPMENT F_PV 4.0 ROOF SECTION DETAIL(HOUSE) ROOF SECTION DETAIL(GARAGE) POINT LOAD CALCULATION PER ARRAY Solar Modul Solar Modul Module Weight(Ibs) 48.5 #Of Modules 52 Attachment Truss 2 x 4 @ 24"O.C. Attachment Truss 2 x 4 @ 16"O.C. Total Module Weight(Ibs) 2522 Plywood & Building Felt �� Plywood & Building Felt Rack Weight(Ibs) 504.4 Microlnverters Weight(Ibs) 123.76 1 Layer of COMP SHINGLE 1 Layer of COMP SHINGLE Total System Weight(Ibs) 3150.16 #Of Standoffs 164 Max Span Between Standoffs (in) 48 Loading Per Standoff(Ibs) 19.20 Total Area (sq.ft.) 1144 Loading (PSF) 2.75 Xcel Energy Application#05251750 Note: 24/ 7 Unescorted keyless access is to be provided for ALL UTILITY EQUIPMENT DESIGN CRITERIA SPECIFICATIONTI FY R REPORT THATPLAN, PREPARED Modules: BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED 52 PROFESSIONAL ENGINEER UNDER THE LAWS Max Distributed Load: 3 PSF OF THE STAT NESOTA. Prior to the commencement of work,the contractor shall verify the existing roof and framing conditions.Notify ATTACHMENT New@engineerinc.io of any Discrepancies prior to starting construction.Prior to the commencement of work,the SIGNATURE: contractor shall inspect framing for any damage such as water damage,cracked framing,etc.and These Plans are 07 NAME: MANOUCHEHR HAKHA ANESHI RAIL stamped for structural code compliance of the roof framing supporting the proposed PV installation reference only.These — — — — — — — — — — — — — — — — — Truss 2 x 4 @ 24" O.C. plans are not stamped for water leakage.PV modules,racking,and attachment components must follow manufacturer DATE: LICENSE NUMBER: 58681 guidelines and requirements.Attachments to be installed in a staggered orientation to properly distribute loads. - - - - -- - - - - - - - - - - - Truss2x4@16' O.C. Date Certified and Signed: 10/18/2022 SNAPNRACK,ULTRA RAIL SPEEDSEAL TM FOOT CONTRACTOR / " " PARTS LIST --1.86" 1.0 8" o-3 -0.38 ITEM QTI DESCRIPTION WOLRIVER 1 � � 1 1 SNAPNRACK,SPEEDSEAL FOOT,BASE,SEALING,SILVER/BLACK \ ® / 2 1 BOLT,FLANGE,SERRATED,5/16IN-18 X 2IN,SS / , // / ELECTRIC 1" 3 1 SNAPNRACK,RL UNIVERSAL,MOUNT SPRING,SS 3. 5" 78" 4 1 SNAPNRACK,ULTRA RAIL MOUNT PRC,CLEAR/BLACK / , , // /, Xcel Energy Application#05251750 1 78" 5 1 SNAPNRACK,ULTRA RAIL MOUNT TAPPED PRC,CLEAR/BLACK , /, / '0.25" MATERIALS: DIE CAST A380 ALUMINUM,6000 SERIES ALUMINUM,STAINESS STEEL r 1 DESIGN LOAD(LBS): 802 UP,1333 DOWN,357 SIDE OPTIONS: 1 - 02.24" — 3.20" ULTIMATE LOAD(LBS): 2118 UP,4006 DOWN,1331 SIDE CLEAR/BLACK 0.17" — 2 58" — TORQUE SPECIFICATION: 12 LB-FT Wolf River Electric CERTIFICATION: UL 2703,FILE E359313;WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 Address:101 Isanti Parkway 00.33" WEIGHT(LBS): 0.45 /O, / / / , /, / NE, Isanti, MN 55040 R 1.12" / , / Phone number: (763)229-6662 1. 1" R 0.82" � � 1 1_�11 // O / / / ,� / , / / , / E-mail:contact@wolfriverelectric.com 5 / / / 1. 9" � ATTACHMENT Q 3 / / , / / / /O, LAYOUT -1.50"- 4 / / / , / 1 ENGINCEr"4INC Drawn by:New@engineerinc.io DATE: 1011812022 Project Name: CNGINCC�INC / Stephen Burk / Property Address: Engineerinc.io, / / / 1550 S Bavarian Pass 303 N lenoaks Blvd , Fridley, MN 55432 Burbank,CA 91502 (747)333-5991 Project: Scale: new5enaineerinc.iD PV SYSTEM AS INDICATED F_PV 5. 1 -r,ffwwmGI NEED I NC I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION Engineerinc.io, AND THAT I AM A DULY LICENSED 303 N lenoaks Blvd PROFESSIONAL ENGINEER UNDER THE LAWS Burbank, CA 91502 OF THE STAT NESOTA. (747) 333 - 5991 new(cDengineerinc.io SIGNATURE: NAME: MANOUCHIEHIR HAKHA ANESHI DATE: LICENSE NUMBER: 58681 Date Certified and SNAPNRACK UR SPEEDSEAL FOOT FOR Signed: 10/18/2022 MODULE HEIGHT OFF ROOF, RANGE: COMPOSTION ROOF MOUNTING UR-40:3%" -4%" COMP SHINGLE ROOFING,TYP. REFER TO SNAPNRACK ENGINEERING CHARTS UR-60: 4" -S" SNAPNRACK, UP,SPEEDSEAL FOOT FOR APPLICABLE RAIL SPANS. ROOF DECKING,TYP, 146'0 S.S. LAG SCREW MUST EMBED A MIN, SNAPNRACK, SNAPNRACK,Via"O S.S. OF 2A"INTO STRUCTURAL MEMBER ULTRA RAIL LAG SCREW` STRUCUTRAL MEMBER, REFER TO SNAPNRACK INSTALLATION WOOD RAFTER,TYP. MANUAL FOR Y6"0 HARDWARE TORQUE SPECIFICATIONS STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE= SPF#2 MINIMUM SPECIFIC GRAVITY= 0.42 ALLOWABLE FASTENER UPLIFT=820 LBS CONTRACTOR ALLOWABLE FASTENER LATERAL= 2S4 LBS MINIMUM FASTENER EDGE DISTANCE = 0.5" MINIMUM FASTENER END DISTANCE= 2.2" WOL�RIVER 21/z"MIN.EMBEDMENT INTO WOOD MEMBER ELECTRIC Xcel Energy Application#05251750 SNAPNRACK,ULTRA RAIL MOUNT, TAPPED Sra"WASHER,S.S. (MAY INCLUDE NEOPRENE TYPE GASKET) Wolf River Electric PENETRATION DETAIL Address:101 Isanti Parkway NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail:contact@wolfriverelectric.com SNAPNRACK, ULTRA COIL SPRING FOR BOLT, S.S. CAVITY IN UR SPEEDSEAL FOOT RAIL MOUNT,THRU OPTIONAL IS FILLED WITH SEALANT TO ENCAPSULATE AND PROTECT THE ROOF PENETRATION ATTACHMENT �'6"0-18 X 2" BOLT, FROM MOISTURE DETAIL SERRATED FLANGE,S.S. k� SNAPNRACK, SPEEDSEAL FOOT, BASE,SEALING ENGINEER INC EXPLODED Drawn by:New@engineerinc.io I DATE: 1011812022 I . I SEALANT y Project Name: Stephen Burk T Property Address: T 21f^ 1550 S Bavarian Pass 15t ROOF DECKING Fridley, MN 55432 Project: Scale: --- PV SYSTEMI AS INDICATED UR-40 MAIL I UR-60 RAIL STRUCTURAL MEMBER(RAFTER)FOR USE WITH SNAPNRACK ULTRA SERIES RAILS — FPV 5.2 ENPHASE EMM IQ8 and IQ8+ Microinverters INPUT DATA r , Commonly used module pairings' w 235-350 235-440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell and72-cell/144 half-cell MPPT voltage range V 27-37 29-45 Operating range V 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC curren?[module[so] A 15 Overvoltage class DC port II DC port backfeed current mA 0 - PV array configuration lx1 Ungrounded array:No additional DC side protection required:AC side protection requires max 20A per branch circuit OUTPUT DATA ,r Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal(L-L)voltage/range3 v 240/211-264 CONTRACTOR Max continuous output current A 1.0 t21 Nominal frequency Hz 60 IQ8 and IQ8+ Microinverters Extended frequency range Hz 50-68 Max units per 20 A(L-L)branch circuit" 16 13 WO LFR 1 V E R Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- Total harmonic distortion 5 ELECTRIC defined microinverters with split-phase power conversion capability to convert DC Overvoltage class AC port III power to AC power efficiently.The brain of the semiconductor-based microinverter Easyto install is our proprietary application-specific integrated circuit(ASIC)which enablesthe Lightweight and compact with AC portbackfeedcurreni mA 3o XcelEnergyApplication#05251750 microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced plug-n-play connectors Power factor setting 1.0 55nm technology with high speed digital logic and has super-fast response times Power Line Communication Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging to changing loads and grid events,alleviating constraints on battery sizing for home (PLC)between components Peak efficiency k 97.5 97.6 energy systems. • Faster installation with simple CEC weighted efficiency a 97 97 Wolf River Electric two-wire cabling Night-time power consumption mw 60 Address:101 Isanti Parkway NE, Isanti, MN 55040 Enphase MECHANICAL DATA • '~~ High productivity and reliability Phone number: (763)229-6662 Ambient temperature range -400C to+60°C(-40°F to*140°F) E-mail:contact@wolfriverelectric.com • Produce power even when the Relative humidity range 4%to100%(condensing) grid is down DC Connector type MC4 More than one million cumulative Dimensions(HxWxD) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") Part of the Enphase EnergySystem,IQ8 Series IQB Series Microinverters redefine reliability hours Of testing Microinverters integrate with the Enphase 10 standards with more than one million Weight 1.08 kg(2381bs) INVERTER Battery.En phase I Q Gateway,an d the Enphase cum ulative hours of p ower-on testing. Class lldouble-insulated Appmonitoring and analysis software. enabling an industry-leading limited warranty enclosure Cooling Natural convection-nofans DATA SHEET of up to 25 years. • Optimized for the latest high- Approved forwet locations Yes powered PV modules Acoustic noiseat 1m <60clBA Pollution degree PD3 Microgrid-forming Enclosure Class II double-insulated corrosion resistant polymeric enclosure E N G 1 N E Er"4 1 NC Complies with the latest Environ.category/UV exposure rating NEMA Type 6/outdoor advanced grid support , Drawn by.New@engineerinc.io DATE: 1011812022 Connect PV modules quickly and easily to IQ8 Series Microinverters are UL Listed as Remote automatic updates for CA Rule 21(UL 1741-SA).UL 62109-1.UL1741AEEE1547,FCC Part 15 Class B.ICES-0003 Class B.CAN/CSA-C22.2 NO.107.1-01 IQ8 Series Microinverters using the included PV Rapid Shut Down Equipment and conform Project Name: Q-DCC-2 adapter cable with lu n- la MC4 with various regulations,when installed the latest grid requirements P P 9- P Y e9 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conformswith NEC 2014,NEC 2017.and NEC 2020 section Stephen Burk connectors. according to manufacturer's instructions. Configurable to support a wide 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems.for AC and DC conductors.when installed according to range of grid profiles manufacturers instructions. Property Address: 1550 S Bavarian Pass 02021 Enphase Energy.All rights reserved.Enphase,the!Enphase logo,108microinverters. Meets CA Rule 21(LIL 1741-SA) (1)No enforced DC/AC ratio.SeethecompatibilitycalculatorathttpsJ/Iink.enphase.com/ Fridley, MN 55432 and other names are trademarks of Enphase Energy.Inc.Data subject to change. requirements module-compatibility(2)Maximum continuous input DC current is 10.6A(3)Nominal voltage range can be extended beyond nominal''rf required by the utility.(4)Limits may vary.Refer to Project: scale: IQ8SP-DS-0002-01-EN-(1S-2021-10-19 local requirements to define the number of microinverters per branch in your area. I Q8SP-DS-0002-01-EN-US-2021-10-19 PV SYSTEM AS INDICATED D 6.0 • ENPHASE Install the Enphase IQ8 Series Microinverter To install Enphase IQ8 Series Microinverters,read and follow all warnings and instructions in this guide and in the Enphase IQ8 Series Microinverter Enphase®Energy//Rapid Shutdown Installation and Operation Manual at eelnhase_com/support Safety warnings are listed on the back page of this guide. The Enphase Microinverter models listed in this guide do not require grounding electrode conductors(GEC),equipment grounding conductors(EGC),or grounded conductor(neutral).The microinverter has a Class II double-insulated rating,which includes ground fault protection(GFP).To support GFP,use only PV modules equipped with DC cables labeled PV Wire or PV Cable Rapid shutdown is built-in IMPORTANT:Enphase IQ8 Series Microinverters require the IQ Cable.An IQ Gateway is required to monitor performance of the IQ Microinverters.The Q Accessories worts only with Enphase IQ8 Series Microinverters. Note:After you log in to your Enphase Installer Platform account from Enphase Installer app,Scan the microinverter QR code and connect to the Enphase IQ Gateway to track the system installation progress. The 2014 edition of the National Electrical Code(NEC 2014)added What s new in NEC 2014? new rapid shutdown requirements for PV systems installed on buildings. NEC 2014,Section 690.12 applies PREPARATION Enphase Microinverters fully meet rapid shutdown requirements in the to PV conductors over 10 feet from PV array and requires that the A) Download the Enphase Installer App and open it to log D) Check that you have these other items: conductors power down to 30 volts ❑ new code without the need to install any additional electrical equipment. in to your Enphase Installer Platform account.With this 1 ❑ ACjunction box. app,scan the microinverter QR code and connect to Tools:screwdrivers,wire cutter,voltmeter,torque wrench,sockets, and 240 volt-amperes within 10 the Enphase IQ Gateway to track system installation O and wrenches for mounting hardware seconds of rapid shutdown initiation. progress.To download,go to enphase.com/toolkit or scan the QR code at right. E) Protect your system with lightning and/or surge suppression devices.It is also important to have insurance that protects against lightning and String inverters require work arounds for rapid shutdown B) Refert:enphaseco /tableen-u /suppockPV module ule-cQelectricalcompati electrical surges. bility at:en_pha� com/en-us/supporUmodule-cQmQalLhV. ibility. Model DC connector Typical PV module*cell count IF Plan your AC branch circuits to meet the following limits for maximum CONTRACTOR number of microinverters per branch when protected with a 20-amp Work around. Work around. IQ8-60-2-US MC-4 locking type Pair with 60 cell/120-half-cell over-current protection device(OCPD) Specialized Rapid Shutdown String Inverter Installed modules electrical box installed on the on roof,a hostile IQBPWS-72-2-US MC-4 locking type Pair with 60 cell/120-half-cell,66 Maximum* IQ8 Series Microinverters per AC branch circuit(sin- roof within 10 feet of array. IQ8Mr72-2-US cell,or 72 cell/144-hhalf--cell le- hase environment not 9 P ) WOL�R�VER IQ8A-72-2-US IQ8(240V) IQ8+ (240V) IQBM(240V) inverters are not built IQ8H-240-72-2-US MG4locking type Pair with 60 cell/120-half-cell,66 Work around. to live in. IQBH-208-72-2-US cell,or72 cell/144-half--cell 16 13 11 ELECTRIC Shutoff switch that IS *Enphase IQ8 Series Microinverters are compatible with bi-facial PV modules if IQ8A(240V) IQ8H(240V) IQ8H(208V) the temperature adjusted electrical parameters(maximum power,voltage and 11 10 9 easily accessible to first current)ofthe modules,consideri the front side electrical parameters Xcel Energy Application#05251750 n9 P ( Limits may vary.Refer local requirements to define the number of responders on the ground. back side gain),arewithin the allowable microinverter input parameters range. microinverters per branch in your area. w C) In addition to the Enphase Microinverters,PV modules and racking, you will need these Enphase IQ8 Series Microinverters: G) Size the AC wire gauge to account for voltage rise.Select the correct Work around. Enphase IQ Gateway(model ENV I¢AM1 240)communications wire size based on the distance from the beginning ofthe Enphase IQ gateway or Enphase IQ Combiner check en hase.com for models): Cable to the breaker in the load center.Design for a voltage rise total Wolf River Electric Extra conduit in Installation. Residential String Inverter Commercial String Inverter 9 y P ( P ) of less than 2%for these sections-Refer to the Voltage Rise Technical is required to monitor solar production. Brief at ennhase_com/support for more information. Address:101 Isanti Parkway Tie wraps or cable clips(¢CLIP-100) NE, Isanti, MN 55040 Enphase Sealing Caps(¢SEAL-10):for any unused connectors on Best practice:Center-feed the branch circuit to minimize voltage rise in Phone number: (763)229-6662 the Enphase IQ Cable a fully-populated branch. Enphase Terminator(¢TERM-10):one needed at the end of each E-mail:contact@wolfriverelectric.com Enphase comes standard with rapid shutdown capability AC cable segment Enphase Disconnect Tool(Q-DISC-10) Enphase IQ Cable: ENPHASE RAPID Cable model Connector PV module Connectors SHUTDOWN All Enphase microln- Enphase microinverters spacing* orientation per box r verters,even those that can safely shut down Q-12-1 G-240 1.3m Portrait(all) 240 Terminator COMPATIBILITY were previously installed, automatically,leaving Q-12-17-240 2.Om Landscape(60-and 66-cell) 240 WITH PV inherently meet rapid only low-voltage DC Q-12-20-200 2.3m Landscape(72-cel1) 200 shutdown requirements, electricity isolated to *Allows for 30cm of cable slack no additional equipment the PV module CNGINCC�INC or workarounds needed Enphase IQ Cable Drawn by.New@engineerinc.io AC connector DATE: 1011812022 DC connector 0 2021 Enphase Energy.All rights reserved Enphase,the Enphase logo,Enphase IQ8 Project Name: Series micranverters(IQ8,IQ8+,IQ8A,IQ8H Stephen Burk Residential Microinverter Commercial Microinverter and IQBM),Enphase Installer Platform Property Address: Tie wraps or cable clips Enphase IQ Gateway,and other trademarks 1550 S Bavarian Pass orservice names are the trademarks of Fridley, MN 55432 En hase En Inc.Data sub ect to chan Y, �—Enphase IQ8 Series Microinverter P &9Y. 1 9e t Scale: To learn more,visit enphase.com ��'�enphase installato(horizontnlalstolallowed)lation own,vertical Revo2-10-n232021. PVProjecSYSTEM AS INDICATED AC junction box 140-00195-02 FD 7.0 P0A"O bV MECHANICAL SPECIFICATION r IDVQ© Format 74.0inx41.1in x 1.261n(including frame) (1879mm x 1045mm x 32mm) r°^'aAmml ]e.-(xmem.0 erpremmr Weight 48.5Ibs(22.Okg) Front Cover 013 in(3.2mm)thermally pre-stressed glass with anti-reflection technology 1*==ql_­1 a-ca...e w...o]a w.emml Back Cover Composltefllm sa(wemml Frame Black anodized aluminum Cell 6 x 22 monocrystalline GANTUM solar half cells ® a]-pmem.ro Junction Box 2.09-3.98Inx1.26-2.361nx0.59-0.71in (53 101 mm x 32-60 mm x 15-18 mm),IP67,with bypass diodes Cable 4mm2 Solar cable;(+)>_49.2 in(1250 mm),(-)z49.2 in(1250 mm) t .a.ceaul Connector Staubli MC4;IP68 J 'I�>se<IImm� anon W I ose-0.e TIlkTTp]]•(aeAM . • : , ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 395 400 405 MINIMUM PERFORMANCE AT STANDARDTEST CONDITIONS,STC'(POWER TOLERANCE+5W/-O W) Powerat MPP' P„,P° [w] 385 390 395 400 405 9 E ShortClrcuft Current' 1. [Al 11.04 n.07 1t10 11.14 11.17 o Open Circuit Voltage' ac [V] 45.19 4523 45.27 45.30 45.34 •• ° E I �� S Current at MPP I,- [A] 10.59 10.65 10.71 10.77 10.83 Voltage yMPP Vag 1%] 36.36 36.62 36.88 20.4 37.39 CONTRACTOR 5 Eflklency] ry [%] >_19.6 z19.9 z20.1 z20.4 >20.6 n' MINIMU M PERFORMANCE AT NORMAL OPERATINO CONDITIONS,NMOT] Warranty 2021 Q CELLS Power at MPP Px [W] 288.8 292.6 296.3 30D.1 303.8 I>lpalrlalwtaa.A. yield Secarlty E Short Circuit Current Isc [A] 8.90 8.92 8.95 8.97 9.00 i Open t at M Voltage I_ [A] 4B-35 42.65 48.46 48.51 48.76 57 WO L�R I V E R �I BREAKING THE 20%EFFICIENCY BARRIER F Current at MPP I„rt„ [A] 8.35 8.41 8.46 8.51 8.57 Q.ANTUM DUO Z Technology with zero gap cell layout Voltage at MPP Va [V] 34.59 34.81 35.03 35.25 35A6 ELECTRIC boosts module efficiency lip to 20.9%. Weaswement tolerances P_t 3%;I,;;V,r,t5%atSTC:1000 W/m],25t2•C,AM 1.5 according to IEC 60904-3.1800 W/mr,N MOT,spectrum AM 15 O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE Xcel Energy Application#05251750 THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY LZ' Atleast98%of nomhalpowerduring 7- -T -r -? -------------�-.......Q CELLS is the first solar module manufacturer to ass the most coon rehen- &_ •' -"•'�'�'-�' I p p �� first year.Thereafter max 0.5% sive quality programme in the industry.The new"Quality Controlled PV`of g '• -------'-------- degradatlon per year.At least 93.5% u or nominal power up to 10 years.At LL I i I I the independent certification institute TOV Rheinland. _ least 86%of nominal p to power r 25years. _ `° --r----- -----I------i-----i a Wolf River Electric INNOVATIVE ALL-WEATHER TECHNOLOGY ° At data within measurement toleranc- Address:101 Isanti Parkway Optimal yields,whatever the weather with excellent et.Fullwarrantea Inaccordancewlth " aro eae ,ao Leo o 9 the warranty terms of the O CELLS Ixeaouncs Iwrmq f NE, Isanti, MN 55040 low-light and temperature behavior. sales orgenisa lon of you respective $ " r country, R Phone number: (763)229-6662 Typical module performance under low Imadlance conditions In ENDURING HIGH PERFORMANCE compadsontoSTCcondltlons(25•C,1000W/m9 E-mail:contact@wolfriverelectric.com Long-term yield security with Anti LID Technology,Anti PID � � 9- YI Y 9Y• TEMPERATURE COEFFICIENTS Technology',Hot-Spot Protect and Traceable Quality Tra.QT"'. a [%/p p [%/K) -0.27 0+0.04 Temperature Coefficient of Vic 2 Temperature Coefficient of P,r If [%/K] -0.34 Nominal Modute Opereting Temperature NMOT [°F] 109t5A(43t3°C) EXTREME WEATHER RATING o High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN 2 MODULE high snow(5400Pa)and wind loads(4000Pa). MaximumSysternVoltageV_ [u) 1000(IEC)/1000(UL) PV module classification classll o DATA SHEET 13 A RELIABLE INVESTMENT Maximum Series Fuse Rating [ADC] 20 Fire Rating based on ANSI/UL 61730 TYPE2 y� rd C5� Max.Design Load,Push/Pull] pbs/fte] 75(3600Pa)/55(2n]60Pa) Permitted Module Temperature -40°F up to+185°F p Inclusive25-year product warranty and25-year Max.Test Load,Push/Pulp (Ibs(ft� 1l3(5400Pa)/84(4000Pa) on Continuous Duty (-40°Cupto+85°C) linear performance warrantyz. 'See Iretalatlon Manual 'APT data sheeto rear for IEC/ ation,04-120$methodA(-1500V,96h) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION ENGINE AZINC 'See data sheet on rear fa further hformatlon IVYV�J uL61710,CEcompsela. �Jh Drawn by:New@engineerinc.io ovarn Ce ,eo Pv-Tuv laneamm. DATE: 1011812022 IEC 6121&2016,IEC 61730:2016. THE IDEAL SOLUTION FOR us amen(am.a.egS2lst ae ceesi. � C E Twsr.ra Horizontal 76.4in 43.31n 48.oin 16561bs 24 24 32 5 Project Name: • ocavicenalcamnmyoma OV us packaging 1940mm 1100mm 1220mm 751kg pallets pallets modules Stephen Burk Rooftop arrays on o nn� residential bulldings rR Property Address: Note Installation Instructions must be followed.See the installation and operating manual or contact our technical service deparonem for further lnformatlon on approved installation and use of 1550 S Bavarian Pass this product. - Fridley, MN 55432 CELLS Hanwi0CELLS Arnedea Ina. Scale Project PV SYSTEM AS INDICATED Erlglrleered In Germany 400 Spectrum Center Drive,Surte 1400,Irvine.G4 92fi18,USA I TEL+1 949 748 59 96 1 EMAIL Inqulry@us.q�els.com I WEB waw.gcelB.us D 8.0 Snap rack' UR-40 SnapNrack Ultra Rail UR-60 A sleek' straightforward rail solution for mounting solar modules on all roof .- Solar Mounting Solutions features two rail profiles, , • is a lightweight rail profile suitable •r most geographic Ultra Rail -• • • - • rail profile . . .. . . . .. .. . ... :. compatible with all . . module The Entire System is a Snap to Install • New Ultra Rail Mounts include snap-in brackets for attaching rail • Compatible with all the SnapNrack Mid Clamps and End Clamps customers love • Universal End Clamps and snap-in End Caps provide a clean look to the array edge CONTRACTOR Unparalleled Wire Management 4 Open rail channel provides room for running wires resulting in along-lasting quality install WOL�RIVER • Industry best wire management offering ELECTRIC includes Junction Boxes, Universal Wire Clamps, MLPE Attachment Kits, and Conduit Xcel Energy Application#05251750 Clamps • System is fully bonded and listed to UL 2703 The Ultimate Value in Rooftop Solar Standard Wolf River Electric Address:101 Isanti Parkway NE, Isanti, MN 55040 • Phone number: (763)229-6662 Industry ' • • • Mounts Wire • • Heavy Duty UR-60 Rail E-mail:contact@wolfriverelectric.com Management • • • • • _ • UR-60 rail profile provides increased span capabilities for high wind speeds and snow loads RACKING Sin• _ • • Installation • Nrack Module • Taller, stronger rail profile includes profile- r"' Clamps • specific rail splice and end cap DATA SHEET • All existing mounts, module clamps, and are compatible with accessories are retained for the same great both rail profiles install experience ENGINEErA4IN Drawn by:New@engineerincJo DATE: 1011812022 • • • - • • • IProject Name: Stephen Burk Quality. Innovative . Superior. Property Address: RESOURCES sna nrack.com/resources 1550 y,Bavarian Pass p Fridley, MN 55432 DESIGN snapnrack.com/configurator SnapNrack Solar Mounting Solutions are engineered to optimize material use andProject F Scale: labor re • and improve overall installationquality and safety. PV SYSTEM AS INDICATED WHERE TO BUY snapnrack.com/where-to-buy DESCRIPTION: DRAWN BY: DESCRIPTION: DRAWN BY: SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins 5flapNr ck- REVISION: Solar Mounting Solutions REVISION: Solar Mounting Solutions PART NUMBER(S): PART NUMBER(S): EET,29TH FLOOR.SAN FRANCISCO,CA 94195 USA 595 MARKET STREET,2.-FLOOR.SAN FRANOISOO,CA 94105 USA A PHONE(415)500 0900595 MARKET STR •FAX(415)500.0902 PHONE(415)500b900•FAX(415)5060902 242-02163, 242-02167 ,ENro.M oKNTHIs N 242-02163, 242-02167 ~EUseoNFloem �o_oaW=�. 1.37 .30 .38 1.86— 1.08 1.00 'E6§ SLOT @� 3.05 CONTRACTOR 2.78 5 MpNmck 1.78 .25 WOL�RIVER L ELECTRIC 17 _ 02.24� 3.20— Xcel Energy Application#05251750 2.58 4 3 Wolf River Electric 0.33 Address:101 Isanti Parkway R1.12 NE, Isanti, MN 55040 Phone number: (763)229-6662 1.21 R.82 E-mail:contact@wolfriverelectric.com 2 1 ATTACHMENT DATA SHEET PARTS LIST 1.99 ITEM QTY DESCRIPTION 1 1 SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER/ BLACK 2 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SS ENGINEER INC 3 1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS 4 1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR/ BLACK Drawn DATE: 0/18/101181@engineerinc.io 2022 5 1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR/ BLACK 1.50 Project Name MATERIALS: DIE CAST A380 ALUMINUM, 6000 SERIES ALUMINUM, STAINLESS STEEL Stephen Burk DESIGN LOAD (LBS): 802 UP, 1333 DOWN, 357 SIDE OPTIONS: Property Address: ULTIMATE LOAD (LBS): 2118 UP, 4006 DOWN, 1331 SIDE CLEAR/ BLACK 1550 S Bavarian Pass TORQUE SPECIFICATION: 12 LB-FT Fridley, MN 55432 Project: Scale: CERTIFICATION: UL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 PV SYSTEM AS INDICATED WEIGHT(LBS): 0.45 ALL DIMENSIONS IN INCHES FD 10.0 Enphase IQ Combiner 4/4C Data Sheet MODEL NUMBER Enphase Networking IQ Combiner 4(X-1 Q-AM1-240-4) IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and consumption monitoring(+/-2.5%).Includes a silver solar shield to match the IQ Battery system and IQ System Controller 2 and to deflect heat. IQ Combiner 4C(X-IQ-AMl-240-4C) IQ Combiner 4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20+/-05%)and consumption monitoring(+/-2.5%).Includes Enphase Mobile Connect cellular modem (CELLMODEM-MI-06-SP-05),a plug-and-play industrial-grade cell modem for systems up to 60 microinverters. (Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,where there is adequate cellular service in Enphase The Enphase IQ Combiner 4/4C with Enphase the installation area)Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. IQ Gateway and integrated LTE-M1 cell ACCESSORIES AND REPLACEMENT PARTS (not included,order separately) Q Combiner 4/4 C Ensemble Communications Kit -Includes COMMS-KIT-Oland CELLMODEM-Ml-06-SP-05 with 5-year Sprint data plan for modem(included only with IQ Combiner 4C) C0MM5-CELLMODEM-M1-06 Ensemble sites CELLMODEM-M1-06-SP-05 -4G based LTE-Ml cellular modem with 5-year Sprint data plan X-IQ-AM1-240-4 consolidates interconnection equipment CELLMODEM-Ml-06-AT-05 4G based LTE-Ml cellular modem with 5-year AT&T data plan X'I AM 1-240-4C Circuit Breakers Supports Eaton BR210,BR21 S.BR220,BR230,BR240,BR250,and BR260 circuit breakers. Q- into a single enclosure and streamlines IQ BRK-lOA-2-240V Circuit breaker,2 pole.IOA,Eaton BR210 BRK-15A-2-240V Circuit breaker,2 pole,l5A,Eaton BR215 microinverters and storage installations by BRK-20A-2P-240V Circuit breaker,2 pole,20A,Eaton BR220 BRK-15A-2P-24OV-B Circuit breaker,2 pole.1SA,Eaton BR215B with hold down kit support providing a consistent, pre-wired solution for BRK-20A-2P-24OV-B Circuit breaker,2 pole,20A,Eaton BR220B with hold down kit support residential applications. It offers up to four EPLC-01 Power line carrier(communication bridge pair),quantity-one pair XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C 2 pole input circuits and Eaton BR series XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C(required for EPLC-01) ENPHASE busbar assembly. XA-ENV-PCBA-3 Replacement IQ Gateway printed circuit board(PCB)for Combiner 4/4C X-I Q-NA-H D-125A Hold down kit for Eaton circuit breaker with screws. CONTRACTOR ELECTRICAL SPECIFICATIONS Smart Rating Continuous duty Includes IQ Gateway for communication and control System voltage 120/240 VAC,60 Hz WOLR I VE R Includes Enphase Mobile Connect cellular modem Eaton BR series busbar rating 125A (CELLMODEM-M1-06-SP-05),Included only with IQ Max-continuouscurrentrating 65A ELECTRIC Combiner4C Max.continuous current rating(inputfromPV/storage) 64A Includes solar shield to match Enphase IQ Battery Max fuse/circuit rating(output) 90 A Xcel Energy Application#05251750 aesthetics and deflect heat Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Flexible networking supports Wi-Fl, Max total branch circuit breaker rating(input) 80A of distributed generation/95A with IQ Gateway breaker included Ethernet,or cellular Envoy breaker 10A or 15A rating GE/Sieme ns/Eaton included Optional AC receptacle available for PLC bridge Production metering CT 200 A solid core pre-installed and wired to IQ Gateway • Provides production metering and consumption Wolf River Electric monitoring Consumption monitoring CT(CT-200-SPLIT) A pair of 200 A split core current transformers Address:101 Isanti Parkway MECHANICAL DATA NE, Isanti, MN 55040 Simple Dimensions(WxHxD) 37.5x49.5x16.8cm(14.75"x19.5"x6.63").Height Is21.06"(53.5 cm)with mounting brackets. Phone number: (763)229-6662 Weight 7.5kg(16.Slbs) E-mail:contact@wolfriverelectric.com Centered mounting brackets support single Ambient temperature range AO-C to+46o c(-40o to 1150 F) stud mounting I Cooling Natural convection,plus heat shield Supports bottom,back and side conduit entry E N PHAS E Up to four 2-pole branch circuits for 240 VAC Enclosure environmental rating Outdoor,NRTLaertihed,NEMA type 3R,polycarbonate construction plug-in breakers(not included) Wire sizes 20 A to 50 A breaker inputs 14 to 4 AWG copper conductors AC COMBINER BOX X-IQ-AM1-240-4C 80A total PVorstora storage 60Abreakerbranchmput:4to1/0AWGcopperconductors g Main lug combined output:10 to 2)0 AWG copper conductors DA TAS H E ET •Neutral and ground:14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Reliable Alutude To 2000 meters(6,560feet) Durable NRTL-certified NEMA type 3R enclosure INTERNET CONNECTION OPTIONS Five-year limited warranty Integrated Wi-Fi 802.11b/g/n ENGINEER INC Two years labor reimbursement program coverage Cellular CELLMODEM-MI-06-SP-05,CELLMODEM-Ml-06-AT-05(4G based LTE-Ml cellular modem) Note that an Enphase Drawn by:New@engineerinc.io included for both the IQ Combiner SKUs Mobile Connect cellular modem Is required for all Ensemble installations. Ethernet Optional,802.3.Cat5E(or Cat 6)UTP Ethernet cable(not included) DATE: 1011812022 UL listed COMPLIANCE Project Name: Stephen Burk Compliance,IQ Combiner UL 1741,CAN/CSA C22.2 No.107.1,47 CFR,Part 15,Class B.ICES 003 Ste p O Production metering:ANSI C12.20 accuracy class 0.5(PV production) Property Address: ULConsumption metering:accuracy class2.5 1550 S Bavarian Pass Compliance,IQ Gateway UL 60601-1/CANCSA 22.2 No.61010-1 LISTED x-IQ-AM1-2ao-a J Fridley, MN 55432 ENPHASE E N P H A S E Project Scale To team more about Enphase offerings,visit enuhase.com �./ To learn more about Enphase offerings,visit enohase.com u PV SYS EM_J I AS INDICATED Q 2022 Enphase Energy.All rights reserved.Enphase,the Enphase logo,IQ Combiner 4/4C,and other names are trademarks of Enphase Energy,Inc.Data subject to change 02-1 4-20 2 2 D 11 .0 CERTIFICATE OF COMPLIANCE CERTIFICATE OF COMPLIANCE Certificate Number 20180530-E341165 Certificate Number 20180530-E341165 Report Reference E341165-20171030 Report Reference E341165-20171030 Issue Date 2018-MAY-30 Issue Date 2018-MAY-30 Issued to: ENPHASE ENERGY INC This is to certify that representative samples of the product as specified on this certificate were tested 1420 N McDowell Blvd according to the current UL requirements. Petaluma CA 94954-6515 Permanently-connected, Grid Support utility Interactive,208V single-phase,240V single phase evaluated for use on a split phase system, distributed resource power system. This is to certify that STATIC INVERTERS, CONVERTERS AND representative samples of ACCESSORIES FOR USE IN INDEPENDENT POWER Models 2-2-U,land IQ7 -72, and IQ7X 96.followed by-2,-5, B,or ACM,followed by-US+. Models IQ7PD-72-2-US and IQ7PD-842-US. SYSTEMS, PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM EQUIPMENT USL/CNL—Photovoltaic Rapid Shutdown Equipment. See Addendum Models I07-60,IQ7PLUS-72, and IQ7X-96,followed by-2,-5,-B,or-ACM,followed by-US+. Models CONTRACTOR IQ7PD-72-2-US and I07PD-84-2-US. Have been investigated by UL in accordance with the +may be followed by additional characters not affecting safety Standard(s) indicated on this Certificate. WOL�RIVER Standard(s)for Safety: ELECTRIC Standard(s)for Safety: See Addendum UL 62109-1,SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER Xcel Energy Application#05251750 Additional Information: See the UL Online Certifications Directory at SYSTEMS-PART 1: GENERAL REQUIREMENTS www.u1.com/database for additional information CSA C22.2 NO. 107.1-01, GENERAL USE POWER SUPPLIES IEEE 1547 INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Wolf River Electric Only those products bearing the UL Certification Mark should be considered as being covered by UL's Address:101 Isanti Parkway Certification and Follow-Up Service. IEEE 1547.1 IEEE STANDARD CONFORMANCE TEST PROCEDURES FOR EQUIPMENT NE, Isanti, MN 55040 Look for the UL Certification Mark on the product. INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Phone number: (763)229-6662 UL 1741. INVERTERS,CONVERTERS,CONTROLLERS AND INTERCONNECTION SYSTEM E-mail:contact@wolfriverelectric.com EQUIPMENT FOR USE WITH DISTRIBUTED ENERGY RESOURCES CEC-300-2011-005,-CMF GUIDELINES FOR CALIFORNIA'S SOLAR ELECTRIC INCENTIVE PROGRAMS PURSUANT TO SENATE BILL 1 INVERTER CERTIFICATION ENGINEER IN Drawn by:New@engineerinc.io DATE: 1011812022 /]������ Project Name: Blues Mdrvnlldt Deacla No hArtwrlcm C11uh1 nil Pfogan I Stephen Burk UL LLC ` UL LLC Property Address: Alrylnfam wmddocvnwrtaloninvdvnyULM1kservkasareplovldvdon 1e fofULLLC(UL)aairyaUlwlzvdlta�n fULForµrosnons.pleaso AIrylMamaionanddoam .n l d-9ULM.ksvrvicesaeplovldvdonbe [,fULLLCfULlaa�ryaah dYcense.dULFaWv';t ,.pl— 1550 S Bavarian Pass conlacl a locd UL Cuaarwr Sel—Rapresaltauvv a IJW I:d.canaboad:locapais: cons-1 a focal UL CUWo,rler S.—Rvpreselrallve al IinolluLcanid:aulu4tocdlo,ni Fridley, MN 55432 Page 1 of 2 Page 2 of 2 Project: scale: PV SYSTEM AS INDICATED Created by UL Document Assembler 2018-07-05 15:07:07-05:00 Created by UL Document Assembler 2018-07-05 15:07:07-05.00 D F--1 2.0 / / I I r♦ " Surge Protection f'ArT N!Irv,,F;rR MNSPD-115 MNSPD-300-AC MNSPD-300-DC MNSPD-600 Nominal Voltage 0 to 90 VAC 0 to 250 VAC 0 to 300 VDC 0 to 480 VAC 0 to 115 VDC 0 to 600 VDC _- 1 MCOV 180V 470V 470V 780V Surge Protection You Can 1 VPRLinetoGround 600V 1200V 1200V 1800V ' Suggested Placement Up to 90VAC circuits, 120/240 VAC circuits Off-grid PV combiners 316V/480VAC circuits Count Can• 12V,24V,48VDC battery Charge controller inputs Grid-tie PV combiners circuits up to 30OVDC Grid-tie inverter input Non-Isolated Inverters MidNite Solar Surge Protection Devices are type 1 devices, designed for indoor and outdoor Type UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 applications. Engineered for both AC and PV _ i Diagnostic Blue LED MNSPD-300-AC DC electrical systems, the rOVld@ protection LED indicates when voltage is present between L1 +ground and L2+ground Y Y P P MNSPD-115,MNSPD-300-DC and MNSPD-600: to service panels, load centers or electronic LED indicates when voltage is present between Ll +L2(PV+PV-) devices that are directly connected to a MidNite Thermal Disconnector Internal Fuse Surge Protection Device (SPD). Response Time <1 micro sec. MI CONTRACTOR 1 I' ' MidNite's SPDs are offered in four models to y protect a variety of different voltage ranges. -They achieve this protection by clamping surge MNSPD300ACFM (Cut-in box) WOL�RIVER voltage to a level that your system can sustain (MNSPD-300-AC included) ELECTRIC without damaging the components of the Performance system. Surge Current Rating per Phase 80kA Xcel Energy Application#05251750 03.527" Short Circuit Current Rating 1 OkA Compare our SPDs against other surge protec- Fusing Individually fused MOVs tion devices. You will see there is no com arl- Thermal Fusing Yes P Over current Fusing Yes Wolf River Electric son in both our price and features. All our SPDs Operating Frequency 0 to 500 Hz Address:101 Isanti Parkway are made in the USA and have a 5 year warranty. Mechanical Description NE, Isanti, MN 55040 Enclosure Polycarbonate UL94V-0 Phone number: (763)229-6662 Environmental Rating Type4X E-mail:contact@wolfriverelectric.com Connection Method #12 AWG With lightning you only get one Weight 1 lb. Mounting Method 1/2"Conduit Knockout chance, so get the best! 3,82„ Operating Altitude Sea Level- 12,000'(3,658 Meters) 4.425" Storage Temp -40 Fto+185 F(-40°Cto+85 Q SURGE PROTECTION Operating Temp -40°F to+185°F(-40°C to+85°Q - Diagnostics Four Models: Listings and Performance Blue status LED,one per leg 24"Wires MNSPD-115 UL Standard for Safety,UL 1449 Surge Protective Devices-Fourth Edition ENGINEE14 INC CSA C22.2 No.8-M1986 Electromangetic Interference(EMI)Filters,Fourth Edition Drawn by:New@engineerinc.io MNSPD-300-AC DATE: 1011812022 MNSPD-300-DC Project Name: MNSPD-soo Model No. Max Operating Surge Current Configuration MCOV SCCR VPR 600V/3kA Stephen Burk Voltage i per Phase LG Property Address: MNSPD-115 100 VAC/150VDC 80kA 1 4 3-wire 2 Le s 1 V L-N 10 600V I •�--t--- 1550 S Bavarian Pass MNSPD-300-AC 300VAC l 80kA 1 1 ,3-wire(2 Leas) 470V L-N 110kA �1200V Fridley, MN 55432 E 1 ID�I rC MNSPD-300-DC 385VDC 8OkA 1 3-wire 2 Les 470V L-N 1OkA 1200V TV MNSPD-600 .480VAC/60OVDC a 80kA 1 ,3-wire 2 Les 780V L-N 10kA 1800V Project Scale: www.micinitesolar.comispd 1 SOLAR.u�. PV SYSTEM AS INDICATED 17722 67th Ave.NE.,Arlington,WA.360-403-7207 FAX:360-691.6862 °` www.midnitesolar.com/spd 17722-67th Ave NE.Arlington.WA 98223 PH. 360-403-7207 FAX 360-691-6862 FD 13.0 WITN ESS TEST PROCEDURE Stephen Burk A TEST PROCEDURE THAT WILL BE USED TO VERIFYTHE PROTECTION AND OPERATION OF THE SYSTEM SHALL BE SUBMITTED TO XCEL ENERGY FOR APPROVAL.THE PROCEDURE INCLUDES AN ANTI-ISLANDING TEST(FOR ALL SYSTEMS)TO VERIFYTHE SYSTEM CEASES GENERATING IN PARALLEL WITH THE XCEL ENERGY 1550 S Bavarian Pass DISTRIBUTION SYSTEM WHEN THE UTILITY SOURCE IS LOST.EACH SYSTEM IS UNIQUE AND WILL REQUIRE A CUSTOM TEST PROCEDURE BASED ON THE INVERTER Fridley,MN 55432 MANUFACTURER'S RECOMENDATIONS FOR COMISSIONIND AND ANTI-ISLANDING. IN ADDITION TO THE MANUFACTURER'S RECOMENDATIONS. UTILITY:XCEL ENERGY ALLTESTING SHALL BE PERFORMED BY QUALIFIED PERSONELL ONLY PHOTOVOLTAIC PROJECT INFO PV MODULE:(52)HANWHA 400 STEPS TO VERIFY PV SYSTEM IS READY TO BE ENERGIZED: INVERTER: 1-PHASE 120/240 1.SITE SECURITY (52) IQ8+MICROI NVERTERS 20.80Kw(DC) -SITE SHOULD HAVE 24/7 KEYLESS ENTRY AND DRIVABLE ACCESS IF XCEL EQUIPMENT IS PRESENT WITHIN THE SITE FENCE ARRAYI AZIMUT:213(24) -IF APPLICABLE,SITE SHOULD HAVE 24/7 DRIVABLE ACCESS TO ANY XCEL EQUIPMENT INSTALLED OUTSIDE OF THE SITE FENCE THAT IS USED FOR THE SOLE ARRAY2 AZIMUT:33(18) PURPOSE OF FEEDINGTHE PV SYSTEM ARRAY3 AZI MUT:33(10) 2.PROPER LABELLING VERIFY LABELING FOR THE MAIN SERVICE PANEL,PV SYSTEM CIRCUITBREAKER,DC DISCONNECT(WHEN APPLICABLE), UTILITYAC DISCONNECT,PRODUCTION METER AND OTHER RELEVANT LABELLING AND SIGNAGE. A R RAY TILT:27,14,10 3.ENERGIZE THE PV SYSTEM BY CLOSING THE UTILITY DISCONNECT.PLEASE ALLOW 5-MINUTE FOR THE INVERTER TO BOOT-UP. NEC 2020/IRC 2018/IBC 2018 WOLF RIVER ELECTRIC COMPANY 4.WHILE I N NORMAL OPERATION,REFER TO THE REFERENCE POINT OF APPLICABILITY TO VERIFY THE VOLTAGES AT THE INVERTER AC OUTPUT ARE WITHIN 5%OF THE COMBINED INVERTED AC VOLTAGE RATINGS AND ALL INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE"NORMAL." 1011SANTI PARKWAY NE#G ISANTI,MN 55040 CONTRACTOR 5.WHILE I N N ORMAL OPERATION,VERI FY THAT ALL INVERTERS ARE OPERATIONAL AND PRODUCI NG POWER.VERI FY THAT SYSTEM IS GEN ERATI NG AT FULLEST CONTACT@WOLFRIVERELECTRIC.COM REASONABLE CAPACITY.WHILE IN NORMAL OPERATION VERIFY THE VOLTAGES AT THE DER AC TERMINALS ARE WITHIN 5%OF THE COMBINED DER AC VOLTAGE WOLFRIVERELECTRIC.COM RATINGS AND ALL LEDs,ALARMS AND/OR LCD CODES ARE"NORMAL" WOLRI VER ELECTRIC 6.SI MULATE THE LOSS OF UTI LITY SOURCE FOR THE ANTI-ISLAN DING TEST BY OPEN I NG THE"UTI LI LITY AC DISCON N ECT". Stephen Burk Xcel Energy Application#05251750 7.USING A VOLTMETER,VERIFYTHE VOLTAGE AT THE INVERTER SIDE OF THE AC DISCONNECT HAS DROPPED TO ZERO WOLF RIVER SOLAR CASE#05251750 NOTE:ONLY CUSTOMER-OWNED EQUIPMENT SHALL BE USED FOR THIS VERIFICATION. 24/7 UNESCORTED ACCESS SHALL BE Wolf River Electric Address8.USING AN AMMETER OR THE INVERTER'S DISPLAY,VERIFY THE DER OUTPUT OF THE INVERTER HAS CEASED WITHIN TWO SECONDS. PROVIDED FOR THE METERS&AC NE, Isanti, Isanti Parkway NE, Isanti, MN 55040 DISCONNECT Phone number: (763)229-6662 9.VERIFY INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE APPROPRIATE FOR LOSS OF UTILITY SOURCE E-mail:contact@wolfriverelectric.com METERS&UTILITY DISCONNECT WITHIN 10.RESTORE THE LOST UTILITY SOURCE BY CLOSING THE"UTILITYAC DISCONNECT" 10'&LINE OF SIGHT WITNESS TEST 11.VERIFYTHATTHE INVERTER SYSTEM DELAYS 5 MINUTES BEFORE RESUMING POWER OUTPUTAFTER THE UTILITYSOURCE IS RESTORED UTILITYAC DISCONNECT IS VISIBLE PROCEDURE LOCKABLE&READILY ACCESSIBLE 12.VERIFY FIXED POWER FACTOR SETTINGS FOR EACH INVERTER MEETTHE PROJECT REQUIREMENTS GROUND SNOW:50PSF 13.METER TECH HASVERIFIED METERING EQUIPMENT WIND SPEED:115MPH ENGINEEr"4IMr- EXPOSURE CATEGORY:B 14.SYSTEM RESUMED DELIVERY OF POWER NO LESS THAN 5 MINUTES AFTER UTILITY SOURCE IS RESTORED PV ARRAY:2.75 PSF Drawn by.New@engineerinc.io DATE: 1011812022 Project Name: PRODUCTS: Stephen Burk RA I LS:S N A P N RACK Property Address: MOUNTS:SNAPNRACK 1550 S Bavarian Pass ROOF-MOUNT Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED D 14.0 L DEPARTMENT OF {�0 LABOR AND INDUSTRY Wiring Methods and Disconnecting Means Q Are the conductor and cable ampacities determined at 125%before adjustment factors?690.8(B) Solar PV Inspection Checklist Q How are the PV Source and Output Circuit protected from overcurrent?690.9 Q Do AC or DC OCPD's have the appropriate voltage,current and interrupt ratings?690.9 Solar PV Inspection Checklist for REI #ELE- Installer Wolf Rlver Electric Job Address1550 S Bavarian Pass City/Township Fridley, MN 55432 Q Has arc-fault circuit protection been provided for DC source and/or output circuits?690.11 Required Documentation Q Is a rapid shutdown required and if so, how is it accomplished and identified?690.12&690.56(C) •Manufacturer's specifications for the inverter Q Is the PV disconnect permanently marked and installed in a readily accessible location?690.13 •Manufacturer's specifications for the module •Manufacturer's specifications for the optimizer(if used) Q Are the Isolating devices or equipment disconnecting means installed in circuits connected to •Verification that the racking system grounding and bonding is listed equipment at a location within the equipment,or within sight and 10 feet of the equipment?(Where PV Inverter the maximum circuit current is greater than 30 amperes an equipment disconnecting means shall be CONTRACTOR provided for isolation.)690.15 Q Is the PV system utility-interactive,stand alone or multimode?690.2 Q Has the fuse disconnecting means, if required, been installed?690.15 and 240.40 Q Is all the equipment listed for PV application?690.4 Q Are PV source or output circuits>30 volts in a raceway or guarded if readily accessible?690.31 WOLRI VER Q Is the system grounded, ungrounded or(functionally grounded)?690.2 and 690.41 Q Is single conductor cable used outdoors Type USE-2 or listed &labeled PV wire?690.31 ELECTRIC Q Has DC Ground-Fault Protection been provided and properly labeled?690.41(B)? Q Are PV source or output circuits on or inside a building in a metal raceway and marked?690.31 Xcel Energy Application#05251750 Q What is the maximum PV system voltage?690.7 Q Is all listed equipment rated for the maximum voltage?690.7 Interconnection Wolf River Electric Q Determine the maximum circuit current for the PV Source and Output Circuit; Inverter Output Circuit; Q Has a plaque or directory been installed at each disconnecting means(capable of interconnection) Address:101 Isanti Parkway Inverter Input Circuit; and DC to DC Converter Output(refer to inverter documentation). 690.8 denoting all NE, Isanti, MN 55040 electric power sources&power production sources. 705.10 Phone number: (763)229-6662 Q Has the point of connection to other sources been installed per 705.12? E-mail:contact@wolfriverelectric.com System Grounding Q Is the supply side disconnect readily accessible and within 10'of the connection point?705.11 Q Are all exposed non-current carrying metal parts of the PV system grounded?690.43 and 690.47 Q Are the utility interactive inverters connected to the system through a dedicated circuit breaker or PV INSPECTION Q Are the mounting structures or systems used for equipment grounding?690.43 fusible disconnecting means?705.12 CHECKLIST Q Does the bus or conductor ampacity comply with 705.12? Q Are the interconnecting devices used for equipment grounding listed and identified?690.43 Q Are the EGC properly sized and protected if exposed and not smaller than#6?690.45,690.46, Q Have all the required labels been applied? (See separate label list.) 690.50, 250.122, 250.120(C) ENGINEEiAZINC Drawn by.New@engineerinc.io Q Has the grounding electrode system been installed?690.47 DATE: 1011812022 Q If both are present, has the DC grounding electrode system been bonded to the AC GES?690.47(A) Project Name: Stephen Burk Property Address: 1550 S Bavarian Pass 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.gov Fridley, MN 55432 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.gov sclar_checklist NEC20205olar_Checklist_Checled 20NO317 Project: Scale: 1 2 PV SYSTEM AS INDICATED D 15.0