Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Jalma helical
L/NDUS Installation Checklist CONSTRUCTION Installer's Name: Lindus Construction Franchisee Location: Baldwin,WI Installation Equipment: TORO DingoTX1000 with PierTech MM10k calibrated drill with compression indicator Name of Customer or Contractor: Mike Jalma Project Address: 1380 75th Ave NE Fridley,MN 55432 Installation Date: Select Type Description of customer project: r Deck r Porch Required Required Req uired Tension Achieved Achieved Torque Capacity/Load (Not 5')Pile Number Compression Pile Used Helix Used Total Pile Length Compression Torqure Achieved Tension Capacity Capacity Capacity Pile 1: 15 53 240 2 7/8" 10" Pile 2:1 15 53 240 2 7/8" 10" Pile 3: 115 400 1 1800 2 7/8" 10" Pile 4: 191 667 3000 2 7/8" 10" Pile 5: 290 1013 4560 2 7/8" 10" Pile 6: 80 280 1260 2 7/8" 10" Pile 7: 160 560 2520 2 7/8" 10" Pile 8: 160 560 2520 2 7/8" 10" Pile 9: 80 280 1260 2 7/8" 10" Pile 10: 80 280 1260 2 7/8" 10" Pile 11: 160 560 2520 2 7/8" 10" Pile 12: 160 560 2520 2 7/8" 10" Pile 13: 53 187 840 2 7/8" 10" Pile 14: 1 2 7/8" 10" Draw your project below: Loads calculated at 60 pounds per sq/ft FOOTINGS NUMBERED IN RED ON PLAN 5