Loading...
HomeMy WebLinkAboutKristen Ruffing Solar Drawings wStemp 11.08.2022 GENERAL NOTEF iEET INDEX 1. All electrical materials shall be new and listed by recognized SITE MAP &PV LAYOUT PV 1.0 1 HEREBY CERTIFY THAT THIS PLAN, CONTRACTOR SPECIFICATION, OR REPORT WAS PREPARED Address:101 Isanti Parkway WOL R 1 V E R electrical testing laboratory ELECTRICAL 1-LINE DIAGRAM PV 2.0 BY ME OR UNDER MY DIRECT SUPERVISION Custom made equipment shall have complete test data submitted SYSTEM LABELING DETAIL PV 3.1 AND THAT I AM A DULY LICENSED NE, Isanti, MN 55040 by the manufacturer attesting to its safety PLACARD PV 3.2 PROFESSIONAL ENGINEER UNDER THE LAWS Phone number: (763)229-6662 ELECTR I C 2. Outdoor equipment shall be NEMA 3R rated or equivalent PROPERTY PLAN PV 4.0 OF THE STAT NESOTA. E-mail: contacto_wolfriverelectric.com 3. All metallic equipment shall be grounded ATTACHMENT LAYOUT PV 5.1 Xcel EnergyApplication#05302773 4. Contractor shall obtain electrical permits prior to installation and ATTACHMENT DETAIL PV 5.2 SIGNATURE: pp shall coordinate all inspections, testing commissioning and INVERTER DATA SHEET D 6.0 NAME: MANOUCHEHR HA-KHAWAANESHI Owner: Kristen Ruffing acceptance with the client, ENPHASE RAPID SHUTDOWN D 7 0 DATE: LICENSE NUMBER: 58681 Property Address: 5900 5th St NE Fridley, MN 55432 utility co. and city inspectors as needed. Property T Single Family Residence 5. The electrical contractor shall verify the exact locations of service MODULE DATA SHEET D 8.0 p y Type: g y Date Certified and Drawn by: New@engineerinc.io points and service sizes with the serving utility company and RACKING DATA SHEET D 9"0 Signed: 11/08/2022 Date: 1110712022 comply with all utility companies requirements. ATTACHMENT DATA SHEET -D Drawings are diagrammatic only, routing of raceways shall be D 10.0 ENPHASE AC COMBINER BOX option of the contractor unless otherwise noted and shall be D 11.0 VICINITY MAP (SCALE: NTS) coordinated with other trades. INVERTER CERTIFICATION D 12.0 7. If the roof material or the roof structure not adequate for PV SURGE PROTECTION D 13.0 m m m installation, call the engineer of record print to installation. The WITNESS TEST PROCEDURE D 14.0 contractor is responsible to verify that the roof is capable of PV INSPECTION CHECKLIST-D 15.0 ` withstanding the extra weight. 8. If the distances for cable runs are different than shown, the GOVERNING CODES contractor shall notify the electrical engineer to validate the wire THE INSTALLATION OF SOLAR ARRAYS AND m m r size. Final drawings will be red-lined and updated as appropriate. PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH 9. Whenever a discrepancy in quality of equipment arises on the drawing or specifications, the contractor shall be responsible for THE FOLLOWING CODES: ___ providing and installing all materials and services required by the • 2020 National Electrical Code s, strictest conditions noted on the drawings or in the specifications • 2018 International Building Code m •59005th St NE,Fridley, • 20181nternational Residential Code NN 55452,USA to ensure complete compliance and longevity of the operable , system required by the engineer of record. • 2020 Minnesota Residential Code • 2020 Minnesota Building Code • 2020 Minnesota Energy Code 59th Ave NE 59th Ave NE 59th Ave NE 59th Ave NE 59+ • 2020 Minnesota Accessibility Code r • 2020 Minnesota State Fire Code m m m • 2018 International Fire Code RooF�KSYS 9 SYSTEMS • 2018 International Energy Conservation Code - PHOTOVOLTAIC NOTES: • 2018 Mechanical Code AS ADOPTED BY THE STATE OF MINNESOTA 1. Rooftop mounted photovoltaic panels and modules shall be tested, ALL OTHER ORDINANCE ADOPTED BY THE listed and identified by recognized testing laboratory LOCAL GOVERNING AGENCIES SATELLITE VIEW (SCALE: NTS) 2. Solar system shall not cover any plumbing or mechanical vents SYSTEM RATING 3. Modules and support structures shall be grounded unless racking has integrated ground. DC 5.60 KW STCc a 4. Removal of an interactive inverter or other equipment shall not AC 4.06 KW STC ' S disconnect the bonding connection between the grounding electrode conductor and the photovoltaic source and/or output EQUIPMENT SUMMARY circuit rounded conductors. .; r g 5. All PV modules and associated equipment and wiring shall be 14 HANWHA 400 WATT MODULES '._- k�_a+ �. •`J -• + � �;"- - MICROINVERTERS protected from physical damage. WITH IQ8+ '� _�l • ,� .,, �_• b ' 6. Live parts of PV source circuits and PV output circuits over 150v to - ground shall not be accessible to other than qualified persons LECTRICAI NFORMATION while energized. EXISTING +�• _ ''" i' 7. Inverter is equipped with integrated DC disconnect, thus providing ground fault protection MAIN SERVICE PANEL BUS SIZE:100A *•� it 1; � 8. All conductors shall be copper and 75 deg rated MAIN SERVICE BREAKER SIZE:100A g P P MOUNTING SYSTEM: SNAPNRACKf`• �r 9. A single conductor shall be permitted to be used to perform the - -+�' • " .. � .1 -- - -��GR multiple functions of do grounding, AC grounding and bonding between AC and DC systems. BUILDING INFORMATION 10.Non-current carrying metal parts of equipment shall be effectively `�w bonded together. Bond both ends of raceways. CONSTRUCTION TYPE: V-B OCCUPANCY: R3 ROOF:COMP SHINGLE CNGINCC�INC Truss 2 x 4 @ 16 O.C. Engineerinc.io, 303 N Glenoaks Blvd Burbank,CA 91502 (747)333-5991 new(diengineerinc.io N INDEX T m SECONDARY INTERCONNECTION �� MSP (E)100A Main Service Panel MM........................(E) Main Meter Total Roof Area: 1563 D ECB....(N) Enphase Combiner Box s W E AC....................(N)60A Utility AC Total Module Area: 308 m m 270 se JB.......................(N)Junction Box e 19.705% of Coverage Q� oo L � � �........................(N) Microinverter ..................... Solar Module y S .............EMT type Conduit T 59005thStN,Fridley, m 180° — ............. FMT type Conduit MN 55432,U A SCALE: 3/32" = T-0" ............. Fire Setback Line 59th Ave NE 59th Ave NE 59th Ave NE 59th Ave NE 591 v, O SOLAR MODULE' a.- ROOFTEK SYSTEMS m -- -- - m 14 HANWHA 400 Watt UTILITY AC DISCONNECT LOCKABLE Model#Q.PEAI< DUO BLI< ML-G10+ AND READILY ACCESSIBLE INVERTER INVERTER TYPE: Micro: MM A ECB GAS 14 EnphaselQ8PLUS MSP Model#IQ8PLUS-72-2-US(240V) �1 Al I 3'fire setback EQUIPMENT ELEVATION CONTRACTOR WOLFRIVER ELECTRIC Fr� N N 4 Xcel EnergyApplication#05302773 o- `o � JB pp Y Cal Ca ❑ Q Utility N Utility AC Meter Lu Disconnect Main w aEc:ib Z Wolf River Electric Service in Address:101 Isanti Parkway B 10 Panel ❑ a ❑ b NE, Isanti, MN 55040 ECB Phone number: (763)229-6662 10" ❑ a ❑ b E-mail:contact wolfriverelectric.com ❑ ❑ a ❑ b Solar PV Array Gas 14-Hanwha 400 W Modules ❑ a ❑ b 14-IQ8+Microinverters SITE MAP & PV 0 Pitch:20 Deg LAYOUT ❑ a ❑ b Orientation:90 De ❑ a ❑ b NOTE: Keep 3ft clearance from ENGINEEr-:aINC gas meter and AC unit Drawn by:New@engineerinc.io DATE: 1110712022 NOTE: No clearance issue Project Name Distance between all equipments is maximum 10" Kristen Ruffing Property Address: Xcel Energy Application#05302773 59th Ave NE 5900 5th St NE Note: 24/ 7 Unescorted keyless access is to be Fridley, MN 55432 provided for ALL UTILITY EQUIPMENT Project: Scale: NOTE: Conduit in attic shall PV SYSTEM AS INDICATED be minimum 18 inches from roof sheating FPV 1 .0 SECONDARY INTERCONNECTION REFERENCE POINT OF APPLICABILITY NOTE: Service Panel does not contain center fed Main Breaker.- SYSTEM RATING AND DER POWER OUTPUT DC 5.60 KW STC AC 4.06 KW STC INVERTER:ENPHASE IQ8PLUS-72-2-US MAIN METER INVERTER MAXIMUM CONTINUOUS OUTPUT:290VA 120/24OV, PV MONITORING DEVICE ENPHASE IQ COMBINER4 SYSTEM POWER OUTPUT:14 x 290=4.06 1 P,3W 120/24OV, NEMA 3R Line Side Tap (2)#12 AWG THWN/THWN-2 20A 2-POLE 1 #12 AWG GND 60A FUSED WITH FUSE REDUCERS AND ENPHASE Q CABLE INSTALL(2)20A PV WITH 30A FUSES UTILTY AC DISCONNECT (2)#12 AWG PV WIRE 2-POLE C/B VISIBLE-OPEN LOCKABLE, READILY (1)#6 AWG EGC (4)#12 AWG THWN/THWN-2 ACCESSIBLE NEMA3R 120/240V 1 P,3W FREE IN THE AIR (1)#12 AWG GND (3)#1OAWG THWN/THWN-2 NON CENTER 100A 3/4"EMT 7 FEET 3/4"SCH 80 PVC MAIN C/B EXISTING 1-PHASE MICRO-INVERTER UL1741 100A MAIN 16.94A 16.94A SERVICE 8.47A a PANEL �BOX �� 120/24OV, = NEMA3R 000 0000 1 P,3W + N 2 ¢ ❑00❑ 0000 0000 U H 000❑ 0000 pppp Z j ❑00❑ 0000 0000 U 0000 0000 pppp Surge Protection W 0000 0000 0000 3 #10 AWG THWN/THWN-2 (NEW)GEC m - poop pogo pppp MNSPD-300-AC ( ) o U 1 000 2 000 71000 (1)#10 AWG GND Add 2nd Ground rod and 8 8.47A 3/4"SCH 80 PVC tie it to the existing round rod. 1 #6 AWG GND (4)#12 AWG THWN/THWN-2 NOTE:AC DISCONNECT VISIBLE AND LOCKABLE GEC m - - - + (E)GROUNDING x 0000 0000 ❑00o (1)#12 AWG GND In locations where there is no local Public Authority, the customer is exempt from ELECTRODE SYSTEM O � 0000 0000 pppp p Z 5 ❑00❑ 00po 0000 3/4"FMT 20 FEET 0000 0000 pppp inspection, and/or the service has been shut off or disconnected for more than 365 days (1 year), W 0000 000 0000 0000 °000 0000 CONTRACTOR m 1-pj000000 20orl°000 -,°p°p°p the licensed electrician or wireman shall submit a signed and dated Xcel Energy Electrical Inspection Certificate to the Company's Builders Call Line attesting that the electrical installation 14 HANWHA 400 WATT MODULES has been completed and installed according to the current National Electrical Code®, the Xcel 14 ENPHASE IQ8PLUS MICROCROIN ERTER RS EnergyStandard for Electric Installation and Use, and an other applicable codes that apply before ENPHASE IQ8PLUS MICROINVERTERS y pp pp y WOL�RIVER 1 PHASE 290VA electric service is energized. MAXIMUM OUTPUT CURRENT 1.21A ELECTRIC AC PORT BACKFEED CURRENT OA DC SHORT CIRCUIT CURRENT 15A Xcel Energy Application#05302773 Xcel Energy Application#05302773 Note: 24/7 Unescorted keyless access is to be provided for ALL UTILITY EQUIPMENT Design meet National Electric Code(NEC codes) Wolf River Electric DC 5.60 KW STC Address:101 Isanti Parkway AC 4.06 KW STC PVARRAY RATING WIRE SIZE CALCULATION NE, nti, MN 5 5040 Phonea number: (763)763)229-6662 BRANCH CIRCUIT-A BRANCH CIRCUIT-A E-mail:contact(a_wolfriverelectric.com Number Modules 7 Type Q.PEAK DUO BLK ML-G10+ Han who 400 Watt Number OF Microinverters in Circuit 7 Number Microinverters 7 Type EnphaselQ8+Microinverters IQ8PLUS-72-2-US(240V) Microinverter Maximum Output Current (A) 1.21 Total DC Wattage(Watts) Watts STC,(Watts/Module)7*400=2800 Branch Circuit Total Current (A) 7*1.21 *1.25=10.59 Array Currents I-SC 1 11.14 JA I 1-MP 1 10.77 A Breaker Size Per Branch Circuit(A) 201 ELECTRICAL 1-LINE Module Voltage V-OC 45.3 V V-MP 1 37.13 1 V DIAGRAM BRANCH CIRCUIT-B BRANCH CIRCUIT -B Number Modules 7 Type Q.PEAK DUO BLK ML-G10+ Han who 400 Watt Number OF Microinverters in Circuit 7 Number Microinverters 7 Type EnphaselQ8+Microinverters IQ8PLUS-72-2-US(24OV) Microinverter Maximum Output Current (A) 1.21 Total DC Wattage(Watts) Watts STC,(Watts/Module)7*400=2800 Branch Circuit Total Current (A) 7*1.21*1.25=10.59 ENGINEEr-:2INC Array Currents I-SC 1 11.14 JA I 1-MP 1 10.77 JA Breaker Size Per Branch Circuit(A) 20 e V-OC 45.3 V V-MP 37.13 V Drawn 111071@engineerinc.io Module Voltage DATE: 1/07/2022 FROM JBOX TO ENPHASE COMBINER BOX Project Name: Maximum Continius Current(A) 1 10.59 1 More Than 3 CCCAdjist.Factor 0.8 Adjusted Conductor Ampacity(A) 10.59/0.8=13.24 Kristen Ruffing Raceway Height From Roof(Temp 39+22=61C)131/2" #of wire(#BC*2) 4 1 Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.71 Property Address: Temp.Derate Factor(max.continous current divided ambient tem.Factor(A) 13.24*0.71=18.64 Wire Size from NEC Table 310.15(b)16 12 AWG 5900 5th St NE FROM ENPHASECOMBINER BOX TO MAIN PANEL Fridley, MN 55432 Project: Scale: Total Number Of Microinverters 1 14 1 Total Amps From All Microinverters (A) 14*1.21=16.94 Consider Continuous (A) 16.94*1.25=21.175 PV SYSTEM I I AS INDICATED Temp.Derate Factor(0.91 at wall of the Building)(A) 21.175/0.91=23.27 Wire Size from NEC Table 310.15(b)16 10AWG P\/ Ambiend Tem Factor Per NEC Table 310.15(b)(2)(a) 0.91 V 2.0 WARNING NOMINAL OPERATING AC VOLTAGE � NOMINAL OPERATING AC FREQUANCY � TURN OF PHOTOVOLTAIC MAXIMUM AC POWER � AC DISCONNECT PRIOR TO MAXIMUM AC CURRENT � WORKING INSIDE PANEL MAXOCERCURRENTDEVICERATING - FOR AC MODULE PROTECTION Photovoltaic Power Source DO NOT© DISCONNECT PV SYSTEM DC DISCONNECT UNDER LOAD - OPERATING CURRENT •X LABEL9 OPERATING VOLTAGE - CAUTION: SOLAR CIRCUIT MAXIMUM SYSTEM VOLTAGE - MAIN PV SYSTEM SHORT CIRCUIT CURRENT - DISCONNECT © WARNINGLABEL10 LABEL20 © ELECTRIC SHOCK HAZARD© MAIN PV SYSTEM RATED MAX POWER-FONT CURRENT � PV SUB-PANEL AC DISCONNECT RATED MAX POWER-FONT VOLTAGE � THE DC CONDUCTORS OF THIS MAXIMUM SYSTEM VOLTAGE PHOTOVOLTAIC SYSTEM ARE SHORT CIRCUIT CURRENT - O UNDERGROUNDAND MAY BE ENERGIZEDLABEL11MAX RATED OUTPUT CURRENT OF - THE CHARGE CONTROLLER IF INSTALLED © LABEL4 SOLAR DISCONNECT WARNING © ELECTRIC SHOCK HAZARDSOLAR PV SYSTEM EQUIPPEDCONTRACTOR WITH RAPID SHUTDOWN DISCONNECTIF GROUND FAULT IS INDICATED SOLAR ELECTRIC SYSTEM TURN RAPID SHUTDOWN SWITCH TO THE NORMALLY GROUNDED CONDUCTORS CONNECTED ® MAY BE UNDERGROUND AND ENERGIZEDOFF"POSITION To LABEL 13 SHUT • N SHOCK HAZARD LABEL5WARNING-DUAL POWER SOURCEIN THE ARRAY © SECOND SOURCE IS PV SYSTEMXcel Energy WARNING LABEL 14 Wolf River Electric Ile © ELECTRIC SHOCK HAZARD CAUTION DO NOT TOUCH TERMINALS PHOTOVOLTAIC SYSTEM CIRCUIT TERMINALS ON BOTH LINE AND LOAD IS BACKFED SIDES MAY BE ENERGIZED IN THE OPENNE, Isanti, MN 55040 MAIN SERVICE LABEL 15 Phone number: (763)229-6662 POSITION PANEL E-mail: - - - PHOTOVOLTAIC AC DISCONNECT ® LABEL6MAXIMUM AC OPERATING CURRENT O � O WARNING © MAXIMUM AC OPERATINGCURRENT � LABEL 16 SYSTEM LABELING DETAIL ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS PHOTOVOLTAIC TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION UTILITY AC DISCONNECT DC VOLTAGE IS ALWAYS PRESENTDrawn by:New@engineefincJo WHEN SOLAR MODULES LABEL 17 DATE: 1110712022 Kristen Ruffing ARE EXPOSED TO SUNLIGHT PHOTOVOLTAICProject Name Property Address: •••5th St NE FrProject :]I Scale: idley,DISCONNECT • _ LABELS SHALL COMPLY WITH NEC 6•0 PV SYSTEM AS INDICATED "Labels shall be weatherproof, durable and permanently mounted" ALL LABELS RED O. Permanently mounted CAUTION CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: DISCONNECTS LOCATED AS SHOWN: SERVICE 1 OF 2 SERVICE 2 OF 2 PV SYSTEM DISCONNECT PV SYSTEM DISCONNECT CONTRACTOR SERVICE POINT FOR UTILITY OPERATION SERVICE POINT FOR UTILITY OPERATION UTILITY METER ENPHASE COMBINER BOX UTILITY METER ENPHASE COMBINER BOX WOL�RIVER ELECTRIC Xcel Energy Application#05302773 0 0 0 0 ❑ o 0 0 Wolf River Electric Address:101 Isanti Parkway NE, Isanti, MN 55040 o ° Phone number: (763)229-6662 Mi E-mail: :ontact@wolfriverelectric.com ® N � N SOLAR PV ARRAY SOLAR PV ARRAY PLACARD E W_Z) � � E 5900 5th St NE 5900 5th St NE ENGINEER INC Fridley, MN 55432 S Fridley, MN 55432 S DDrawn ATE b :New0engineen'ncJo Project Name: Kristen Ruffing Property Address: 5900 5th St NE Fridley, MN 55432 Proje't I F-s-c.le: PV SYSTEM LAS INDICATED F_PV 3.2 -j N o° LEGEND Q MSP................ Main Service Panel MM ............................. Main Meter D AC .............Utility AC Disconnect I W Q Q E ECB..........Enphase Combiner Box 270 0o as a D I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED Aso° PROFESSIONAL ENGINEER UNDER THE LAWS SCALE: 1/16" — T-0" OF THE STAT NESOTA. SIGNATURE: NAME: MANOUCHEHR HAKHALANESHI PROPERTY LINE 139'4" DATE: LICENSE NUMBER: 58681 Date Certified and ` — MM AC ECB GAS Signed: 11/08/2022 29 GARAGE MAIN HOUSE 0 _ O 0 I 85 2„ \ 0 CONTRACTOR 0Uj 68I `-� U) 0 LIDWOLF RIVER 81 -3" o �0 I ELECTRIC 0 0 Xcel Energy Application#05302773 p oD �O Wolf River Electric Q , o Address:101 Isanti Parkway NE, Isanti, MN 55040 Driveway Phone number: (763)229-6662 E-mail:contact@wolfriverelectric.com V i v 17'-8" PROPERTY PLAN a —126'-10" v- io 59th Ave NE ENGINEErZINC Drawn by.New@engineerinc.io DATE: 1110712022 r NG I NCCr Project Name Kristen Ruffing Property Address: Engineerinc.io, 5900 5th St NEFridley, MN 55432 303 N Glenoaks Blvd Application#05302773 Project: Scale: Burbank, CA 91502 Xcel Energy pp PV SYSTEM AS INDICATED Note: 24/ 7 Unescorted keyless access is to be newa-engineerinc.io provided for ALL UTILITY EQUIPMENT PV 4.0 MODULES ON ROOF DESIGN CRITERIA POINT LOAD CALCULATION PER ARRAY Prior to the commencement of work, the contractor shall verify the existing roof and framing Solar Module Modules: Module Weight(Ibs) 48.5 conditions. Notify New@engineerinc.io of any Discrepancies prior to starting construction. 14 #Of Modules 14 Prior to the commencement of work, the contractor shall inspect framing for any damage Attachment Truss 2 x 4 @ 16"O.C. Max Distributed Load: 3 PSF Total Module Weight(Ibs) 679 such as water damage, cracked framing, etc. and These Plans are stamped for structural Plywood &Building Felt Rack Weight(Ibs) 135.8 code compliance of the roof framing supporting the proposed PV installation reference only. Microlnverters Weight(Ibs) 33.32 These plans are not stamped for water leakage. PV modules, racking, and attachment 1 Layer of COMP SHINGLE Total System Weight(Ibs) 848.12 components must follow manufacturer guidelines and requirements. Attachments to be #Of Standoffs 28 installed in a staggered orientation to properly distribute loads. Max Span Between Standoffs (in) 48 Xcel EnergyApplication#05302773 Loading Per Standoff(Ibs) 30.29 pp Total Area (sq.ft.) 308 Note: 24/7 Unescorted keyless access is to be Loading (PSF) 2.75 provided for ALL UTILITY EQUIPMENT I HEREBY CERTIFY THAT THIS PLAN, CNSPECIFICATION,GI NCEr �1NC OR REPORT WAS PREPARED � BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS Engineerinc.io, OF THE STAT NESOTA. 303 N Glenoaks Blvd Burbank, CA 91502 _ _ _ SIGNATURE: ew( engineerinc.io- 5991 newCa�en I — _ — — — NAME: MANOUCHEHR HAKHA ANESHI ® ATTACHMENT — — — — — — — — DATE: LICENSE NUMBER: 58681 0 RAIL — — — — — — — — — Date Certified and — — — — — — — — — — — — — — — — Truss 2 x 4 @ 16" O.C. — — — — — — — — — Signed: 11/08/2022 SNAPNRACK,ULTRA RAIL SPEEDSEALT"-'FOOT — — — — — — — — — CONTRACTOR 1.86" 1.08" 37 - - - - - - CL - - �3 0.38" - - _0- - - - - - - - - - - - - - - 3.05" 1� 81 — — — - - - - - - OL�RIVER �8„ — — — — — — — ELECTRIC �0.25" — - - - - — 0— — — Xcel Energy Application#05302773 0.17" 2.24" 3.20" o — 2.58" 00.33" _ _ _ _ Wolf River Electric I R 1.12" Address:101 Isanti Parkway 1.21" 0.82" 5 NE, Isanti, MN 55040 — — — — Phone number: (763)229-6662 — — — — E-mail:contact(a_wolfriverelectric.com 3 — — — — 4 — 1.50" — — — ATTACHMENT ® — — — — — LAYOUT 2 PARTS LIST - - li - CNGINCC�INC_ ITEM QTI DESCRIPTION 1 1 SNAPNRACK,SPEEDSEAL FOOT,BASE,SEALING,SILVER/BLACK SIDrawn by.New@engineerinc.io 2 1 BOLT,FLANGE,SERRATED,5/16IN-18 X 2IN,SS 3 DATE: 1110712022 3 1 SNAPNRACK,RL UNIVERSAL,MOUNT SPRING,SS Project Name: 4 1 SNAPNRACK,ULTRA RAIL MOUNTTHRU PRC,CLEAR/BLACK 5, �� Kristen Ruffing 5 1 SNAPNRACK,ULTRA RAIL MOUNT TAPPED PRC,CLEAR/BLACK Property Address: MATERIALS: DIE CAST A380 ALUMINUM,6000 SERIES ALUMINUM,STAINESS STEEL 5900 5th St NE DESIGN LOAD(LBS): 802 UP,1333 DOWN,357 SIDE OPTIONS: Fridley, MN 55432 ULTIMATE LOAD(LBS): 2118 UP,4006 DOWN,1331 SIDE CLEAR/BLACK Project: Scale: TORQUE SPECIFICATION: 12 LB-FT PV SYSTEM I AS INDICATED CERTIFICATION: UL 2703,FILE E359313;WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 WEIGHT(LBS). 0.45 PV 5. 1 I HEREBY CERTIFY THAT PLAN, ENGINEE;ZINC SPECIFICATION, OR REPORT THIS WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED 303 erin PROFESSIONAL ENGINEER UNDER THE LAWS 03 N Glenoak5 Blvd OF THE STAT NESOTA. Burbank, CA 91502 (747) 333 - 5991 SIGNATURE: new(@engineerinc.io NAME: MANOUCHEHR HAKHA ANESHI DATE: LICENSE NUMBER: 56661 Date Certified and Signed: 11/08/2022 SNAPNRACK UR SPEEDSEAL FOOT FOR MODULE HEIGHT OFF ROOF,RANGE: COMPOSTION ROOF MOUNTING UR-40:3%"-�,4. COMP SHINGLE ROOFING,TYP. REFER TO SNAPNRACK ENGINEERING CHARTS UR-60:4"-5" SNAPNRACK UR SPEEDSEAL FOOT FOR APPLICABLE RAIL SPANS. ROOF DECKING,TYP. SI6`0 S.S. LAG SCREW MUST EMBED A MIN. SNAPNRACK, SNAPNRACK,�/16"O S.S. OF 21A" INTO STRUCTURAL MEMBER ULTRA RAIL LAG SCREW,TYP. STRUCUTRAL MEMBER, REFER TO SNAPNRACK INSTALLATION WOOD RAFTER,TYP. MANUAL FOR Y6-0 HARDWARE TORQUE SPECIFICATIONS STRUCTURAL MEMBER SPECIFICATIONS: MINIMUM WOOD GRADE= SPF#2 MINIMUM SPECIFIC GRAVITY= 0.42 ALLOWABLE FASTENER UPLIFT =820 LBS CONTRACTOR ALLOWABLE FASTENER LATERAL= 2SO LBS MINIMUM FASTENER ED(iiE DISTANCE= 0.5" MINIMUM FASTENER END DISTANCE= 2.2" WOL�RIVER 21!" MIN.EMBEDMENT INTO WOOD MEMBER ELECTRIC Xcel Energy Application#05302773 SNAPNRACK,ULTRA. RAIL MOUNT, TAPPEDi6"WASHER,S.S. (MAY INCLUDE NEOPRENE TYPE GASKET) Wolf River Electric PENETRATION DETAIL Address:101 Isanti Parkway NE, Isanti, MN 55040 Phone number: (763)229-6662 E-mail: .:ontacta_wolfriverelectric.com SNAPNRACK, ULTRA COIL SPRING FOR 3�"0 BOLT, S.S. RAIL MOUNT,THRU �� OPTIONAL CAVITY IN UR SPEEDSEAL FOOT IS FILLED WITH SEALANT TO ENCAPSULATE AND PROTECT THE ROOF PENETRATION ATTACHMENT 5'6"0-18 X 2"BOLT, FROM MOISTURE DETAIL C SERRATED FLANGE,S.S. SNAPNRACK, SPEEDSEAL FOOT, BASE,SEALING ENGINEEr-:2INC EXPLODED Drawn by:New@engineerinc.io �Il+z��� DATE: 1110712022 SEALANT Project Name: Kristen Ruffing Properly Address: 2%^ 5900 5th St NE 1 ROOF DECKING; Fridley, MN 55432 L] I Project: Scale: PV SYSTEM AS INDICATED UR-40 RAIL I UR-60 RAIL STRUCTURAL MEMBER(RAFTER)FOR USE WITH SNAPNRACK ULTRA SERIES RAILS - - FPV 5.2 ENPHASE E= IQ8 and IQ8+ Microinverters INPUT DATA r .r Commonly used module pairings' w 235-350 235-440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell and 72-cell/144 half-cell MPPTvoltagerange V 27-37 29-45 Operating range V 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage V 50 60 Max DC currents[module Isc] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded army:No additional DC side protection required:AC side protection requires max 20A per branch circuit OUTPUT DATA 1: 1: Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal(L-L)voltage/range3 V 240/211-264 Max continuous output current A 1.0 CONTRACTOR Nominal frequency Hz 60 IQ8 and I Q 8+ Microinverters Extended frequency range Hz 50-68 Max units per 20 A(L-L)branch circuit" 16 13 Our newest IQ8 Microinverters are the industry's first microgrid-forming,software- Total harmonic distortion `5% WOL RIVER defined microinverters with split-phase power conversion capability to convert DC overvoltageclass AC port III power to AC power efficiently.The brain of the semiconductor-based microinverter Easyto install ELECTR I C is our proprietary application-specific integrated circuit(ASIC)which enables the Lightweight and compact with AC port backfeed current mA 30 microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced plug-n-play connectors Power factor setting 1.0 Xcel Energy Application#05302773 55nm technology with high speed digital logic and has super-fast response times Power Line Communication Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging to changing loads and grid events,alleviating constraints on battery sizing for home (PLC)between components Peak efficiency 97.5 97.6 energy systems. • Faster installation with simple CEC weighted efficiency % 97 97 two-wire cabling Night-time power consumption mw 60 Wolf River Electric Enphase MECHANICAL DATA Address:101 Isanti Parkway High productivity and reliability Ambient temperature range -400Cto+600C(-400Fto+1400F) NE, Isanti, MN 55040 Produce power Phone number: (763)229-6662 P Relative humidity range asstal00%(condensing)grid is down E-mail:contact@wolfriverelectric.com DC Connector type MC4 • More than one million cumulative Part of the Enphase System.tem.IQ8Series IQ8 Series Microinverters redefine Dimensions(HxWxD) 212mm(8.3")x175mm(6.9'7x30.2mm0.2'7 P y hours of testing Microinverters integrate with the EnphaseIQ standards with more than one million Weight 1.08 kg(238 lbs) Battery.Enphase IQ Gateway,and the Enphase cumulative hours of power-on testing. Class lldouble-insulated INVERTER Appmonitoring and analysis software. enabling an industry-leading limited warranty enclosure Cooling Natural convection-nofans of up to 25 years. Optimized for the latest high- Approved for wet locations Yes DATA SHEET powered PV modules Acoustic noise at 1 m <60 dBA Pollution degree PD3 ep=4z CERT-I F,IED Microgrid-forming Enclosure Class II double-insulated,corrosion resistant polymeric enclosure Complies with the latest Environ.category/UV exposure rating NEMA Type 6/outdoor advanced grid support , ENG 1 NEED INC ConnectPV modules quicklyand easilyto IQ8 Series Microinverters are UL Listed as Remote automatic updates for CA Rule 21(UL1741-SA)•UL62109-1•UL1741AEEE1547,FCC Part 15 Class B.ICES-0003 Class B.CAN/CSA-C22.2 NO.107.1-01 Drawnby:New@engineerinc.io I08 Series Microinverters using the included PV Rapid Shut Down Equipment and conform the latest grid requirements DATE: 1110712022 Q-DCC-2 adapter cable with plug-n-play MC4 with various regulations,when installed Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014.NEC 2017.and NEC 2020 section connectors. according to manufacturer's instructions. Configurable to support a wide 69012 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,forAC and DC conductors.when installed according to Project Name: range of grid profiles manufacturer's instructions. Kristen Ruffing Meets CA Rule 21(UL 1741-SA) Property Address: ®2021 Enphase Energy.All rights reserved.Enphase the Enphase logo,IQ8 microinverters. (1)No enforced DC/AC ratio.Seethe compatibility calculator at httpsJ/link.enphase.com/ 5900 5th St N E and other names are trademarks of Enphase Energy.Inc.Data subject to change requirements module-compatibility(2)Maximum continuous input DC current is 10.6A(3)Nominal voltage range can be extended beyond nominal if required by the utility.(4)Limits may vary.Refer to Fridley, MN 55432 IQ8SP-DS-0002-01-EN-US-2021-10-19 local requirements to define the number of microinverters per branch in your area. 1 Q8SP-DS-0002-01-EN-US-2021-10-19 Project: Scale: PV SYSTEM AS INDICATED F-D6.0 QUICK INSTALL GUIDE ENPHASE Install the Enphase IQ8 Series Microinverter To install Enphase IQ8 Series Microinverters,read and follow all warnings and instructions in this guide and in the Enphase IQ8 Series Microinverter Enphase Energy//Rapid Shutdown Installation and Operation Manual at eenphase-com/suo=Safety warnings are listed on the back page of this guide. The Enphase Microinverter models listed in this guide do not require grounding electrode conductors(GEC),equipment grounding conductors(EGC),or grounded conductor(neutral).The microinverter has a Class II double-insulated rating,which includes ground fault protection(GFP).To support GFP,use only PV modules equipped with DC cables labeled PV Wire or PV Cable Rapid shutdown is built-in IMPORTANT:Enphase IQ8 Series Microinverters require the IQ Cable.An IQ Gateway is required to monitor performance of the IQ Microinverters.The Q Accessories work only with Enphase IQ8 Series Microinverters. Note:After you log in to your Enphase Installer Platform account from Enphase Installer app,Scan the microinverter QR code and connect to the Enphase IQ Gateway to track the system installation progress. The 2014 edition of the National Electrical Code(NEC 2014)added What's new in NEC 2014? new rapid shutdown requirements for PV systems installed on buildings. NEC 2014,Section 690.12 applies PREPARATION Enphase Microinverters full meet rapid shutdown requirements in the to PV conductors over 10 feetfrom p y p q A Download the Installerpp and o te Enphase A n it to to ) the PV array and requires that the ) p � g D Check that you have these other items:a ir�.� a new code without the need to install any additional electrical equipment. in to your Enphase Installer Platform account.With this []rr � ACjunction box. conductors power down to 30 volts t., app,scan the microinverter QR code and connect to x� • Tools:screwdrivers,wire cutter,voltmeter,torque wrench,sockets, and 240 volt-amperes within 10 r r seconds of rapid shutdown initiation. the Enphase IQ Gateway to track system installation a and wrenches for mounting hardware progress.To download,go to enphase.com/toolkit or scan the QR code at right. E) Protect your system with lightning and/or surge suppression devices.It is also important to have insurance that protects against lightning and String inverters require work arounds for rapid shutdown B) Referto the following table and check PV module electrical compati- electrical surges. bility at:ennhase com/en-uc_/str)po /mod it .pm atp ihility. Model DC connector Typical PV module*cell count IF Plan your AC branch circuits to meet the following limits for maximum CONTRACTOR 18 60 2-US MC 4lockin number of microinverters per branch when protected with a 20-amp Work around. Work around. Q g type Pair with 60 cell/120-half-cell over-current protection device(OCPD) Specialized Rapid Shutdown String Inverter Installed modules electrical box installed on the on roof,a hostile IQBPLUS-72-2-US MCA locking type Pair with 60 cell/120-half-cell,66 Maximum* IQ8 Series Microinverters per AC branch circuit(sin- roof cell,or 72 cell/144-hhalf--cell le- hase roof within 10 feet of array. environment that string g P ' WOL�R 1 V E R IQ8A-72-2-US IQ8(240V IQ8+ 240V IQBM(240V) inverters are not built ) ( ) IQ8H-240-72-2-US MC-4 locking type Pair with 60 cell/120-half-cell,66 Work around. to live in. IQSH-208-72-2-US cell,or72 cell/144-half--cell 16 13 11 ELECTRIC Shutoff switch that Is `Enphase IQ8 Series Microinverters are compatible with bi-facial PV modules if IQ8A(240V) IQ8H(240V) IQ8H(208V) the temperature adjusted electrical parameters(maximum power,voltage and 11 10 9 easily accessible to first current)ofthe modules,consideri the front side electrical parameters XcelEnergyApplication#05302773 n9 P Limits may vary.Refer to local requirements to defne the number of responders on the ground. back side gain),are within the allowable microinverter input parameters range. microinverters per branch in your area. w it C) In addition to the Enphase Microinverters,PV modules and racking, G) Size the AC wire gauge to account for voltage rise.Select the correct you will need these Enphase IQ8 Series Microinverters: wire size based on the distance from the beginning ofthe Enphase IQ Work around. Enphase IQ Gateway(model ENV-IQ-AM 1-240)communications Cable to the breaker in the load center.Design for a voltage rise total Extra conduit in Installation. Residential String Inverter Commercial String Inverter gateway or Enphase IQ Combiner(check enphase.com for models): of less than 2%for these sections.Refer to the Voltage Rise Technical Wolf River Electric is required to monitor solar production. Brief at ennhase_com/support for more information. Address:101 Isanti Parkway Tie wraps or cable clips(Q-CU P-100) NE, Isanti, MN 55040 Enphase Sealing Caps(Q-SEAL-10):for any unused connectors on Best practice:Center-feed the branch circuit to minimize voltage rise in Phone number: (763)229-6662 the Enphase IQ Cable a fully-populated branch. Enphase Terminator(Q-TERM-10):one needed at the end of each E-mail:contact(a_wolfriverelectric.com Enphase comes standard with rapid shutdown capability AC cable segment Enphase Disconnect Tool(Q-DISC-10) Enphase IQ Cable: ENPHASE RAPID // Cable model Connector PV module Connectors SHUTDOWN All Enphase microln- Enphase microinverters spacing* orientation per box verters,even those that can safely shut down Q-12-1G-240 1.3m Portrait(al 1) 240 Terminator COMPATIBILITY were previously installed, automatjcally,leaving Q-12-17-240 2.om Landscape(60-and b6-cell) 240 WITH PV inherently meet rapid only low-voltage DC Q-12-20-200 2.3m Landscape(72-cell) 200 shutdown requirements, electricity isolated to *Allows for 30cm of cable slack no additional equipment the PV module CNGINCCZINC or workarounds needed Enphase IQ Cable Drawn by.New@engineerinc.io AC connector DATE: 1110712022 DC connector 02021 Enphase Energy.All rights reserved. Enphase,the Enphase logo,Enphase IQ8 Project Name: Residential Microinverter Commercial Microinverter R Series microinverters(IQ8,IQ8+,IQ8A,IQ8H Kristen Ruffing `Tie wraps or cable clips and IQ8M),Enphase Installer Platform, Property Address: Enphase IQ Gateway,and other trademarks 5900 5th St NE or service names are the trademarks of [Fridley, MN 55432 Enphase En Inc.Data subecttochan Y, �—Enphase IQ8 Series Microinverter P Energy, 1 9e r1l enphaser (horizontal installation shown,vertical Rev02-10-23-2021 f Project: Scale: To learn more,visit enphase.com C�J E N E R G Y installation also allowed). III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�I PV SYSTEM AS INDICATED AC junction box 140-00195-02 D 7.0 powered by MECHANICAL SPECIFICATION r QUQ Format 74.Dinx4l.linx1261n(includingframe) (1879mm x 1045mm x 32mm) '°a.. I ,rraosa,,.,I ua•rsaam°a Weight 48.5 lbs(22.0 kg) Front Cover 0.131n(3.2mm)thermally pre-stressed glass wth - antl-reflection technology Back Cover Composite film sriaa°.a Frame Black anodized aluminum Cell 6 x 22 monocrystallne O.ANTUM solar half calls ® m.r nmem ro Junction Box 2.09-3.981nx1.26-2.361nx0.59-0.711n (53-101mm x 32-60mm x15-18mm),IP67,with bypassdiodes 1dtl� anomm� Cable 4mm2 Solar table;(-)>49.2 in(1250mm),H- 49.21n(1250mm) wxcsm•a t Connector StiiubliMC4:IP68 L oss'0.a T IO3-les.� . • : , ELECTRICAL CHARACTERISTICS POWER CLASS 385 390 395 400 405 <F ORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-0 W) • Power at MPP' P_ [W] 385 390 395 400 405 0 E Short Circuit Current' Isc [Al 11.04 11.07 11.10 U14 11.17 ' o Open Circuit Voltage' oc [V] 45.19 4523 45.27 45.30 45.34 Current at MPP I- [A] 10.59 10.65 10.71 10.' 10.83 TOreMND lY Voltage at MPP V_ [VJ 36.36 36.62 36.88 3713 3739 5 j Efficiency' 4 [%] z19.6 z19.9 a20.1 a20.4 z20.6 CONTRACTOR euleore MINIMU M PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT-' Warranty 2U21 Q CELLS Power at MPP Pecs [W] 288.8 292.6 296.3 3001 303.8 I'ro0ucta rertom.,rx Yield Security E Short Circuit Current lu [A] 8.90 8.92 8.95 8.97 9.00 E Open Circuit Voltage V c [V] 42.62 42.65 42.69 42.72 42.76 BREAKING THE 20%EFFICIENCY BARRIER 2 Current at MPP I_ [A] 8.35 8.41 8.46 8.51 8.57 WOL�RIVER Q.ANTUM DUO Z Technology with zero gap cell layout Voltage at MPP V_ IV] 34.59 34.81 35.03 35.25 35.46 ELECTR I C boosts module efficiency up t0 20.9%. 'Measurement tolerances P_m 3%;1s6 Val s5%atSTC:1000 W/m°,26x 2°C,AM 15 according to I EC 60904-3•'800 W/cot,NMOT,spectrum AM 15 O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY Xcel Energy Application#05302773 G- m Atleast 98%of nominal power during `r'a --T-_-__T----Y---- -----' Q CELLS is the first solar module manufacturer to ass the most tom rehen- d, -` W I I i I I _ p P -. first year.Thereafter mar.0.5% sive quality programme in the industry:The new`Quality Controlled PV'of •• ------------------------------ degradaionper year.At least 93.5% 5- -_1_-__I_ of nominal power up to 10 years.At - ' I I the independent certification institute TUVRheinland. leest86%ofnominaipowerupto 5= *'.. --------- 25 yeas. ❑ " --r-----r----t-----I---_-�i z INNOVATIVE ALL-WEATHER TECHNOLOGY All dam within measurement toleranc- m i i I Wolf River Electric es.Full war enlles in accordance with Optimal yields,whatever the weather with excellent NewertantyerrtsofNeOCELLS Address:101 Isanti Parkway low-light and temperature behavior. sales organisation oryorrespective R NE, Isanti, MN 55040 r country. -as Typlcel module per formence Under low irtedlancecondltlonsIn s Phone number: (763)229-6662 ENDURING HIGH PERFORMANCE 4... .d�� .,„ comparison toSTCcondluons(25°C,1000W/W) ^ E-mail: ;ontact@wolfriverelectric.com f� Long-term yield security with Anti LID Technology,Anti PID 9- YI Y 9Y. TEMPERATURE COEFFICIENTS"tV , o v Technology',Hot-Spot Protect and Traceable Quality Tra.QTM. Temperature Coefficient of I;;: a [%/Iq +0.04 Temperature Coefficient of V,_ [%/K] -0.27 ?EXTREME WEATHER RATING Temperature Coefficient of Pam It [%/K] -0.34 Nominal Module Operating Temperature NMOT [°F] 109t5.4(43i3°C) (14 High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN MODULE high snow(5400 Pa)and wind loads(4000 Pa). Maximum System Voltage V;,s [VJ 1000(IEC)/1000(UL) PV module classification Classll �A RELIABLE INVESTMENT DATA SHEET Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 Max.Design Load,Push/Pull' [Ibs/ft=J 75(3600 Pa)/55(2660Pa) Pa rmhted Module Temperature -40°F up to+185°F p Inclusive25-year product warranty and25-year on Continuous Duty (-40°Cupto-85°C) linear performance warranty2. Max.Test Load,Push/Pull' (Ibs/ft9 113(5400Pa)/84(4000Pa) 'See Imtalation Manual 'APT test conditions according to IEC/TS 62804-1:2015,method A(-]500V,96h)`See data sheet on rear for further InformationQUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION ENGINEER INC UL61730.CEcompam- 9 Drawn by:New@engineerincJo QualtyCmudied PV-Tw R,er,mna. /� v7/ o-o I!".".�I 5 DATE: 11/07/2022 IEC 61215.2016,IEC 6173d2d16, //(�6 0 E 4l. THE IDEAL SOLUTION FOR: Us.Paant No 9.893.215(sN.�). 6 ( a.... Horizontal 76.4in 43.3In 48.01n 1656lbs 24 24 32 QCPVCe d1r nwgNrq CUS \ packaging 1940mm 1100mm 1220mm 751kg pallets pallets nodules Project Name: Rooftopanayson unf- o „ter & Kristen Ruffing residential buildings Properly Address: Not«Installation IretmcUons must be followed.See the Installation and operating manual or contact our technical service department for further Information on approved Installation and use of 5900 5th St NE this product. Fridley, MN 55432 GICELLS 400Nambe SpeOCELLSAr DrbaSuit Project: Scale: Engineered in Germany 4005pecirumCen[erDnve,Sutte1400,Irvine,CA92618,USAiTEL+1 949 748 59 96 1EMAlllnqulry@s.gcelStomlWEBwww.¢celB.us PV SYSTEM AS INDICATED LE 8.0 Snap rack- UR-40 SnapNrack Ultra Rail UR-60 A sleek, straightforward rail solution for mounting solar modules .. types. Ultra Rail Solar Mounting Solutions features two rail profiles; , • is a lightweight rail profile suitable • •st geographic Ultra Rail • - •• • rail . . . . .. . . . .. .. . ... :. compatible with all . . . . clamps, . . . of install. The Entire System is a Snap to Install • New Ultra Rail Mounts include snap-in brackets for attaching rail • Compatible with all the SnapNrack Mid Clamps and End Clamps customers love • Universal End Clamps and snap-in End Caps provide a clean look to the array edge CONTRACTOR Unparalleled Wire Management • Open rail channel provides room for running wires resulting in a long-lasting quality install WOL�RIVER • Industry best wire management offering ELECTRIC includes Junction Boxes, Universal Wire Clamps, MLPE Attachment Kits, and Conduit Xcel Energy Application#05302773 Clamps • System is fully bonded and listed to UL 2703 The Ultimate Value in Rooftop Solar Standard Wolf River Electric Address:101 Isanti Parkway NE, Isanti, MN 55040 • Phone number: (763)229-6662 Industry ' • • • Wire Mounts • • E-mail: ;ontact(a)_wolfriverelectric.com Management Heavy Duty UR-60 Rail • • • • • _ • UR-60 rail profile provides increased span capabilities for high wind speeds and snow Single loads ��� � RACKING • • • • • • • Taller, stronger rail profile includes profile- Clamps : Accessories specific rail splice and end cap DATA SHEET _ compatible • All existing mounts, module clamps, and accessories are retained for the same great both rail profiles install experience CNGINCC�INC Drawn by:New@engineerincJo DATE: 1110712022 • - • • - • • Ultra • Project Name: Kristen Ruffing SQnapNuracak Sloilatr Myou.ntiIngn Sonlutions are entgiinveereed t.o oSptimuize maeterrial iuse arn.d • a po Property Address: RESOURCES snapnrack.com/resources L590 e5 tMniS 432 DESIGN snapnrack.com/configurator Project Scale labor - • and improve overall installationquality and safety. Pv SYSTEM L AS INDICATED WHERE TO BUY snapnrack.com/where-to-buy 877-732-2860 • • • • D 9.0 DESCRIPTION: DRAWN BY: DESCRIPTION: DRAWN BY: SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins 5flapHruck" SNAPNRACK, ULTRA RAIL SPEEDSEALTm FOOT mwatkins Sfla NN ack- REVISION: Solar Mounting Solutions REVISION: Solar Mo unting Solutions PART NUMBER(S): PART NUMBER(S): 595 MARKET STREET,29TH FLOOR.SAN FRANCISCO,LA 96105 USA 595 MARKET STREET,29TH FLOOR.SAN FRANLISOO,CA 94105 USA A PHONE(415)500 0900.FAX(415)500.0902 PHONE(415)500b900•FAX(415)5MM2 242-02163, 242-02167 �ENFo.MroKNTHIsoF 9HosoKF9LN� �oaROPRI .a. N. 242-02163, 242-02167 E .o. �=C""'mu,µo�aoaP. . �.�r 1.37 .30 .38 1.86- 1.08 1.00 v�5a SLOT 3.05 CONTRACTOR 2.78 5 fmpNmck 1.78 .25 WOL�ELECTRIC RIVER L 17 _ Q52.24� -�3.20�- Xcel Energy Application#05302773 2.58 4 3 Wolf River Electric 0.33 Address:101 Isanti Parkway R1.12 NE, Isanti, MN 55040 Phone number: (763)229-6662 1.21 R•82 E-mail:contacta_wolfriverelectric.com 2 1 ATTACHMENT DATA SHEET PARTS LIST 1.99 ITEM QTY DESCRIPTION 1 1 SNAPNRACK, SPEEDSEAL FOOT, BASE, SEALING, SILVER/ BLACK 2 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 2IN, SS 11 ENG1NEEZINC 3 1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS 4 1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR/ BLACK Drawn by:New@engineerinc.io DATE: 1110712022 5 1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR/ BLACK 1.50 MATERIALS: DIE CAST A380 ALUMINUM, 6000 SERIES ALUMINUM, STAINLESS STEEL Project Name: Kristen Ruffing DESIGN LOAD (LBS): 802 UP, 1333 DOWN, 357 SIDE OPTIONS: Property Addfe99: ULTIMATE LOAD (LBS): 2118 UP, 4006 DOWN, 1331 SIDE CLEAR/ BLACK 5900 5th St NE TORQUE SPECIFICATION: 12 LB-FT Fridley, MN 55432 Project: Scale: CERTIFICATION: UL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM SUBJECT UL 2582 PV SYSTE L AS INDICATED WEIGHT(LBS): 0.45 ALL DIMENSIONS IN INCHES FD 10.0 Enphase IQ Combiner 4/4C Data Sheet MODEL NUMBER Enphase Networking IQ Combiner 4(X-I0-AM7-240-4) IQ Combiner 4 with Enphase IQ Gateway printed circuit board for integrated revenuegrade PV production metering(ANSI C1220+/-0.5%)and consumption monitoring(+/-25%).Includes a silver solar shield to matchthe IQ Battery system and IQ System Controller 2 and to deflect heat. IQ Combiner 4C(X-I0-AMl-240-4C) IQ Combiner4C with Enphase IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20+/-0.5%)and consumption monitoring(+/-2.5%).Includes Enphase Mobile Connect cellular modem (CELLMODEM-MI-06-SP-05),a plug-and-play industrial-grade cell modem for systems upto 60 microinverters. (Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands,where there is adequate cellular service in Enphase The Enphase IQ Combiner 4/4C with Enphase the i nstallation area.)Inclu des a silver solar shield to match the IQ Battery and lQ System Controller and to deflect heat. IQ Gateway and integrated LTE-M1 cell ACCESSORIES AND REPLACEMENT PARTS (not included,order separately) QCombiner 4/4C Ensemble Communications Kit -Includes COMMS-KIT-01 and CELLMODEM-M1-06-SP-05 with 5-year Sprint data plan for modem(included only with IQ Combiner 4C) COMMS-CELLMODEM-Ml-06 Ensemble sites CELLMODEM-MI-06-SP-05 -4G based LTE-Ml cellular modem with 5-year Sprint data plan X-IQ-AM1-240-4 consolidates interconnection equipment CELLMODEM-Ml-06-AT-05 4G based LTE-Ml cellular modem with 5-year AT&T data plan X'I A M 1-240-4C Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. Q- into a single enclosure and streamlines IQ BRK-10A-2-240V Circuit breaker,2 pole,10A,Eaton BR210 BRK-15A-2-240V Circuit breaker,2 pole,l5A,Eaton BR215 microinverters and storage installations by BRK-20A-2P-240V Circuit breaker,2 pole,20A,Eaton BR220 BRK-15A-2P-240V-B Circuit breaker,2 pole,15A,Eaton BR215B with hold down kit support providing a consistent, pre-wired solution for BRK-20A-2P-24OV-B Circuit breaker,2 pole,20A,Eaton BR220B with hold down kit support residential applications. It offers up to four EPLC-01 Power line carrier(communication bridge pair),quantity-one pair XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C 2-pole input circuits and Eaton BR series XA-PLUG-720-3 Accessory receptacle for Power Line Carrier In IQ Combiner 4/4C(required for EPLC-01) ENPHASE busbar assembly. XA-ENV-PCBA-3 Replacement IQ Gateway printed circurt board(PCB)for Combiner 4/4C X-IQ-NA-HD-125A Hold down kit for Eaton circuit breaker with screws. CONTRACTOR ELECTRICAL SPECIFICATIONS Smart Rating Continuous duty Includes IQ Gateway for communication and control System voltage 120/240 VAC,60 Hz WOLR I V E R Includes Enphase Mobile Connect cellular modem Eaton BR series busbar rating 125A (CELLMODEM-M1-06-SP-05),Included only with IQ Max.continuous current rating 65 A E L E CT R I C Combiner4C Max.continuous current rating(mputfromPV/storage) 64A Includes solar shield to match Enphase IQ Battery Max.fuse/circuit rating(output) 90A Xcel Energy Application#05302773 aesthetics and deflect heat Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Flexible networking supports Wi-Fi, Max.total branch circuit breaker rating(input) 80Aof distributed generation/95A with IQ Gateway breaker included Ethernet,or cellular Production metering CT 200 A solid core pre-installed and wired to IQ Gateway Optional AC receptacle available for PLC bridge Provides production andconsum consumption Consumption monitoring CT(CT-200-SPLIT) Apairof200Asplit core current transformers P 9 P Wolf River Electric monitoring MECHANICAL DATA Address:101 Isanti Parkway Dimensions(WxHxD) 37.5x49.5x16.8cm(14.75'x19.5'x6.63•).Height is21.06"(53.5 cm)with mounting brackets. NE, Isanti, MN 55040 Simple Weight 7.5kg(16.5lbs) Phone number: (763)229-6662 Ambient temperature range 401Cto+46°C(-40"to115*F) E-mail: ;ontact@wolfriyerelectric.com Centered mounting brackets support single Cooling Natural convection,plus heat shield stud mounting I Enclosure environmental rating Outdoor,NRTLcertified,NEMA type3R,polycarbonate construction Supports bottom,back and side conduit entry • Up to four 2-pole branch circuits for 240 VAC wire sizes 20 A breaker inputs:14 to 4 AWG copper conductors E N P HAS E •60A brbreakeakerbranch input:4to1/OAWG copper conductors • plug-in breakers(not included) Main lug combined output:10 to 2/OAWG copper conductors AC COMBINER BOX X-IQ-AM1-240-4C BOA total PV or Storage branch circuits Neutral and ground:14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. DATAS H E ET Attitude To 2000 meters(6,560feet) v7 Reliable INTERNET CONNECTION OPTIONS • Durable NRTL-certified NEMA type 3R enclosure Integrated WFFI 80211b/g/n Five-year limited warranty Cellular CELLMODEM-Ml-06-SP-05,CELLMODEM-M1-06-AT-05(4Gbased LTE-Ml c ellular modem).Note that an Enphase CNGINCCI�INC Mobile Connect cellular modem is required for all Ensemble instal lations. Two years labor reimbursement program coverage Ethernet Optional,802.3.Cat5E(or Cat 6)UTP Ethernet cable(not Included) included for both the IQ Combiner SKU's Drawn 110712022 @engineerinc.io 1 UL listed COMPLIANCE DATE: 1/07/ Compliance,IQ Combiner UL 1741,CAN/CSA C22.2 No.107.1,47 CFR,Part 15,Class B,ICES 003 project Name: Production metering:ANSI C1 2.20 accuracy class 0.5(PV production) Kristen Ruffin Consumption metering:accuracy class 2.5 g Compliance,IQ Gateway UL 60601-1/CANCSA 22.2 No.61010-1 Properly U( Address:. 5900 5th St NE x-IQ-AM1-240-4 Fridley, MN 55432 LISTED � ENPHASE ENPHASE To learn more about Enphase offerings,visit enphase.com �./ To learn more about Enphase offerings,visit enohase.com n Project: Scale: C 2021 Enphase Energy.All rights reserved Enphase,the Enphase logo,10 Combiner 4/4C,and other names are trademarks of PV SYSTEM AS INDICATED Enphase Energy,Inc Data subject to change.10-21-2021 D 11 .0 CERTIFICATE OF COMPLIANCE CERTIFICATE OF COMPLIANCE Certificate Number 20180530-E341165 Certificate Number 20180530-E341165 Report Reference E341165-20171030 Report Reference E341165-20171030 Issue Date 2018-MAY-30 Issue Date 2018-MAY-30 Issued to: ENPHASE ENERGY INC This is to certify that representative samples of the product as specified on this certificate were tested 1420 N McDowell Blvd according to the current UL requirements. Petaluma CA 94954-6515 Permanently-connected, Grid Support utility Interactive,208V single-phase,240V single phase evaluated for use on a split phase system, distributed resource power system. This is to certify that STATIC INVERTERS, CONVERTERS AND representative samples of ACCESSORIES FOR USE IN INDEPENDENT POWER Models 2-2-U,land IQ7 -72, and IQ7X 96,followed by 2,-5, B,or ACM,followed by US+. Models IQ7PD-72-2-US and IQ7PD-842-US. SYSTEMS, PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM EQUIPMENT USUCNL—Photovoltaic Rapid Shutdown Equipment. See Addendum Models IQ7-60,IQ7PLUS-72, and IQ7X-96,followed by-2,-5,-B,or-ACM,followed by-US+. Models CONTRACTOR IQ7PD-72-2-US and IQ7PD-84-2-US. Have been investigated by UL in accordance with the +may be followed by additional characters not affecting safety Standard(s) indicated on this Certificate. WOL�RIVER Standard(s)for Safety: ELECTRIC Standard(s)for Safety: See Addendum UL 62109-1,SAFETY OF POWER CONVERTERS FOR USE IN PHOTOVOLTAIC POWER Xcel Energy Application#05302773 Additional Information: See the UL Online Certifications Directory at SYSTEMS-PART 1: GENERAL REQUIREMENTS www.u1.com/database for additional information CSA C22.2 NO. 107.1-01, GENERAL USE POWER SUPPLIES IEEE 1547 INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Wolf River Electric Only those products bearing the UL Certification Mark should be considered as being covered by UL's Address:101 Isanti Parkway Certification and Follow-Up Service. IEEE 1547.1 IEEE STANDARD CONFORMANCE TEST PROCEDURES FOR EQUIPMENT NE, Isanti, MN 55040 INTERCONNECTING DISTRIBUTED RESOURCES WITH ELECTRIC POWER SYSTEMS Phone number: (763)229-6662 Look for the UL Certification Mark on the product. E-mail: .:ontact(a�wolfriverelectric.com UL 1741. INVERTERS,CONVERTERS,CONTROLLERS AND INTERCONNECTION SYSTEM EQUIPMENT FOR USE WITH DISTRIBUTED ENERGY RESOURCES CEC-300-2011-005,-CMF GUIDELINES FOR CALIFORNIA'S SOLAR ELECTRIC INCENTIVE PROGRAMS PURSUANT TO SENATE BILL 1 INVERTER CERTIFICATION ENG I NEEv-;Z I NC Drawn by:New@engineerincJo DATE: 1110712022 Project Name: &uo.MMr A,dt 0.. N—h All—C.lU61-1 Plogmn &uc.MaM.rJldc Ur.ctm N.nll Anroncan C-1fl ua1 Ploymn Kristen Ruffing UL LLC ` UL LLC L Property Address: AnylMorm wenddocvm.mdlwnvdmgULMlMs.rvk.sereprowd.donU1.foIUL LLC(UL)mm1Ya11m�z.dl—m-WULForµnsborls.Al AirylMmmuimmiddoam.ndi--dwngULMaks.rwc —prowdedonb.hWl.1UL LLC(UL Iamry--..dY�ense.MULForquastbns.plaaw 59005thStNE ..Mmla1-M UL Cu­Sm—R.pr.smtmly.at IJW l:d bcW UL CUWonwr S.—R.pr.smnmiv.m 11R­uLc dr.ulutloc.— Fridley, MN 55432 Page 1 of 2 Page 2 of 2 Project: scale: PV SYSTEM AS INDICATED Created by UL Document Assembler 2018-07-05 15:07:07-05.00 Created by UL Document Assembler 2018-07-05 15:07:07-05.00 D 12.0 I 101 f I I I N a♦ " Surge Protection RT NUMRER MNSPD-115 MNSPD-300-AC MNSPD-300-DC MNSPD-600 Nominal Voltage 0 to 90 VAC 0 to 250 VAC 0 to 300 VDC 0 to 480 VAC 0 to 115 VDC 0 to 600 VDC - MCOV 180V 470V 470V 780V Surge Protection You Can VPRLinetoGround 600V 1200V 1200V 1800V ' Suggested Placement Up to 90VAC circuits, 120/240 VAC circuits Off-grid PV combiners 316V/480VAC circuits Count 4n• 12V,24V,48VDC battery Charge controller inputs Grid-tie PV combiners f circuits up to 30OVDC Grid-tie inverter input Non-Isolated Inverters MidNite Solar Surge Protection Devices are type 1 devices, designed for indoor and outdoorType UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 UL14494th Ed.Type 1 g .4 _ rr - A'.a' applications. Engineered for both AC and PV +� Diagnostic Blue LED MNSPD 300 AC DC electrical systems, the rOVld@ protection LED indicates when voltage is present between Ll +ground and L2+ground Y Y P P MNSPD-115,MNSPD-300-DC and MNSPD-600: to service panels, load centers or electronic LED indicates when voltage is present between Ll +L2(PV+PV-) devices that are directly connected to a MidNite Thermal Disconnector Internal Fuse Surge Protection Device (SPD). Response Time <1 micro sec. I n CONTRACTOR MidNite's SPDs are offered in four models to protect a variety of different voltage ranges. They achieve this protection by clamping surge MNSPD300ACFM (Cut-in box) WOL�RIVER voltage to a level that your system can sustain (MNSPD-300-AC included) ELECTRIC without damaging the components of the Performance system. Surge Current Rating per Phase 80kA Xcel Energy Application#05302773 03.527" Short Circuit Current Rating 10kA Compare our SPDs against other surge protec- Fusing Individually fused MOVs tion devices. You will see there is no com an- Thermal Fusing Yes P + Over current Fusing Yes Wolf River Electric son in both our price and features. All our SPDs Operating Frequency 0 to 500 Hz Address:101 Isanti Parkway are made in the USA and have a 5 year warranty. Mechanical Description NE, Isanti, MN 55040 Enclosure Polycarbonate UL94V-0 Phone number: (763)229-6662 Environmental Rating Type4X E-mail: ;ontact(awolfriverelectric.com Connection Method #12 AWG With lightning you only get one Weight 1 lb. Mounting Method 1/2"Conduit Knockout Operating Altitude Sea Level- 12,000'(3,658 Meters) chance, so get the best! 3 82„ 4.425" Storage Temp -401 Fto+185 F(-40°Cto+85°Q SURGE PROTECTION Operating Temp -40,F to+185,F(-40°C to+85,C) Diagnostics Blue status LED,one per leg Four Models: Listings and Performance 24"Wires.AtI MNSPD-115 UL Standard for Safety,UL 1449 Surge Protective Devices-Fourth Edition ENGINEER INC CSA C22.2 No.8-M1986 Electromangetic Interference(EMI)Filters,Fourth Edition Drawn by:New@engineerinc.io MNSPD-300-AC DATE: 1110712022 MNSPD-300-DC Project Name MNSPD-600 Model No. Max Operating Surge Current Configuration MCOV SCCR VPR 60OV/3kA Kristen Ruffing r i Voltage per Phase L_G Properly Adrke MNSPD-115 100 VAC/150VDC 80kA Ig 3-wire 2 Legs) , 180V L-N �10kA 600V MNSPD-300-AC 300VAC 180k8 �1 3-wire(2 Legs) 470V L-N I tOkA 1200V rk_ffij� _lM_NSPD-300-DC 385VDC 80kA 1P13 wire(2 Legs) ,470V L-N 10kA 1200V MNSPD-600 480VAC/60OVDC 80kA 1/3-wire(2 Le s) 780V L-N 1 OkA 1800V Project scaewww.midnitesolar.comispd I PV SYSTEM AS INDICATED 17722 67th Ave.NE.,Arlington,WA.360-403-7207 FAX:360-691-6862 www.midnitesolar.com/spd 17722-67th Ave NE.Arlington,WA 98223 PH. 360-403-7207 FAX 360-691-6862 D 13.0 WITNESS TEST PROCEDURE Kristen Ruffing A TEST PROCEDURE THAT WILL BE USED TO VERIFY THE PROTECTION AND OPERATION OF THE SYSTEM SHALL BE SUBMITTED TO XCEL ENERGY FOR APPROVAL.THE PROCEDURE INCLUDES AN ANTI-ISLANDING TEST(FOR ALL SYSTEMS)TO VERIFY THE SYSTEM CEASES GENERATING IN PARALLEL WITH THE XCEL ENERGY 5900 5th St NE,Fridley,MN 55432 DISTRIBUTION SYSTEM WHEN THE UTILITY SOURCE IS LOST.EACH SYSTEM IS UNIQUE AND WILL REQUIRE A CUSTOMTEST PROCEDURE BASED ON THE INVERTER MANUFACTURER'S RECOMENDATIONS FOR COMISSIONIND AND ANTI-ISLANDING.IN ADDITION TO THE MANUFACTURER'S RECOMENDATIONS. UTILITY:XCEL ENERGY ALLTESTING SHALL BE PERFORMED BY QUALIFIED PERSONELLONLY PHOTOVOLTAIC PROJECT INFO PV MODULE:(14)HANWHA 40OW STEPS TO VERIFY PV SYSTEM IS READYTO BE ENERGIZED: INVERTER: 1.SITE SECURITY 1-PHASE 120/240 -SITE SHOULD HAVE 24/7 KEYLESS ENTRYAND DRIVABLE ACCESS IF XCEL EQUIPMENT IS PRESENT WITHIN THE SITE FENCE (14)IQ8+MICROINVERTERS -IF APPLICABLE,SITE SHOULD HAVE 24/7 DRIVABLE ACCESS TO ANY XCEL EQUIPMENT INSTALLED OUTSIDE OF THE SITE FENCE THAT IS USED FOR THE SOLE 5.60Kw(DC) PURPOSE OF FEEDING THE PV SYSTEM ARRAY 1AZIMUT:90(14) 2.PROPER LABELLING VERIFY LABELING FORTHE MAIN SERVICE PANEL,PV SYSTEM CIRCUIT BREAKER,DC DISCONNECT(WHEN APPLICABLE),UTILITYAC DISCONNECT,PRODUCTION METER AND OTHER RELEVANT LABELLING AND SIGNAGE. ARRAY TILT:20 3.ENERGIZETHE PV SYSTEM BY CLOSING THE UTILITY DISCONNECT. PLEASE ALLOW 5-MINUTE FOR THE INVERTERTO BOOT-UP. NEC 2020/IRC 2018/IBC 2018 WOLF RIVER ELECTRIC COMPANY 4.WHILE IN NORMAL OPERATION,REFER TO THE REFERENCE POI NTOF APPLICABI LITY TO VERIFY THE VOLTAGES AT THE INVERTER AC OUTPUT ARE WITHIN 5%OF THE COMBINED INVERTED AC VOLTAGE RATINGS AND ALL INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE"NORMAL." 101 ISANTI PARKWAY NE#G ISANTI,MN 55040 S.WHILE I N NORMAL OPERATION,VERI FY THAT ALL INVERTERS ARE OPERATIONAL AN D PRODUCI NG POWER.VERI FY THAT SYSTEM IS GEN ERATI NG AT FULLEST CONTACT@WOLFRIVERELECTRIC.COM REASONABLE CAPACITY.WHILE I N NORMAL OPERATION VERI FY THE VOLTAGES AT THE DER AC TERMI NALS ARE WITHIN 5%OF THE COMBI NED DER AC VOLTAGE WOLFRIVERELECTRIC.COM CONTRACTOR RATINGS AND ALL LEDs,ALARMS AND/OR LCD CODES ARE"NORMAL" 6.SIMULATE THE LOSS OF UTILITY SOURCE FOR THE ANTI-ISLANDING TEST BY OPENING THE"UTILILITY AC DISCONNECT". Kristen Ruffing WOL�RIVER 7.USING A VOLTMETER,VERIFYTHE VOLTAGE ATTHE INVERTER SIDE OF THE AC DISCONNECT HAS DROPPED TO ZERO WOLF RIVER SOLAR ELECTRIC CASE#05302773 Xcel Energy Application#05302773 NOTE:ONLY CUSTOMER-OWNED EQUIPMENT SHALL BE USED FOR THIS VERI FICATION. 24/7 UNESCORTED ACCESS SHALL BE 8.USING AN AMMETER OR THE INVERTER'S DISPLAY,VERIFY THE DER OUTPUT OF THE INVERTER HAS CEASED WITHIN TWO SECONDS. PROVIDED FOR THE METERS&AC DISCONNECT Wolf River Electric 9.VERIFY INVERTER LED'S,ALARMS,AND/OR LCD CODES ARE APPROPRIATE FOR LOSS OF UTILITY SOURCE Address:101 Isanti Parkway METERS&UTILITY DISCONNECT WITHIN NE, Isanti, MN 55040 10.RESTORETHE LOST UTILITY SOURCE BYCLOSINGTHE"UTILITY AC DISCONNECT" 10'&LINE OF SIGHT Phone number: (763)229-6662 E-mail:contact(aD_wolfriverelectric.com 11.VERIFYTHATTHE INVERTER SYSTEM DELAYS 5 MINUTES BEFORE RESUMING POWER OUTPUTAFTERTHE UTILITY SOURCE IS RESTORED UTILITYAC DISCONNECT IS VISIBLE LOCKABLE&READILY ACCESSIBLE 12.VERIFY FIXED POWER FACTOR SETTINGS FOR EACH INVERTER MEETTHE PROJECT REQUIREMENTS WITNESS TEST GROUND SNOW:50PSF PROCEDURE 13.METERTECH HASVERIFIED METERING EQUIPMENT WIND SPEED:115MPH EXPOSURE CATEGORY:B 14.SYSTEM RESUMED DELIVERY OF POWER NO LESS THAN 5 MINUTES AFTER UTILITY SOURCE IS RESTORED PV ARRAY:2.75 PSF PRODUCTS: ENG1NCErZINC RAILS:SNAPNRACK Drawn by.New@engineerinc.io MOUNTS:SNAPNRACK DATE: 1110712022 ROOF-MOUNT Project Name: Kristen Ruffing Property Address: 5900 5th St NE Fridley, MN 55432 Project: Scale: PV SYSTEM AS INDICATED F-D 14.0 --,MDEPARTMENT OF LABOR AND INDUSTRY Wiring Methods and Disconnecting Means ❑ Are the conductor and cable ampacities determined at 125%before adjustment factors?690.8(B) Solar PV Inspection Checklist ❑ How are the PV Source and Output Circuit protected from overcurrent?690.9 ❑ Do AC or DC OCPD's have the appropriate voltage,current and interrupt ratings?690.9 Solar PV Inspection Checklist for REI #ELE- Installer Wolf Rlver Electric Job Address 5900 5th St NE City/Township Fridley, MN 55432 ❑ Has arc-fault circuit protection been provided for DC source and/or output circuits?690.11 Required Documentation ❑ Is a rapid shutdown required and if so, how is it accomplished and identified?690.12&690.56(C) •Manufacturer's specifications for the inverter Q Is the PV disconnect permanently marked and installed in a readily accessible location?690.13 •Manufacturer's specifications for the module •Manufacturer's specifications for the optimizer(if used) Q Are the Isolating devices or equipment disconnecting means installed in circuits connected to •Verification that the racking system grounding and bonding is listed equipment at a location within the equipment,or within sight and 10 feet of the equipment?(Where PV Inverter the maximum circuit current is greater than 30 amperes an equipment disconnecting means shall be CONTRACTOR provided for isolation.)690.15 ❑ Is the PV system utility-interactive,stand alone or multimode?690.2 Q Has the fuse disconnecting means, if required, been installed?690.15 and 240.40 ❑ Is all the equipment listed for PV application?690.4 ❑ Are PV source or output circuits>30 volts in a raceway or guarded if readily accessible?690.31 WOL�RIVER ❑ Is the system grounded, ungrounded or(functionally grounded)?690.2 and 690.41 ❑ Is single conductor cable used outdoors Type USE-2 or listed &labeled PV wire?690.31 ELECTRIC ❑ Has DC Ground-Fault Protection been provided and properly labeled?690.41(B)? ❑ Are PV source or output circuits on or inside a building in a metal raceway and marked?690.31 Xcel Energy Application#05302773 ❑ What is the maximum PV system voltage?690.7 ❑ Is all listed equipment rated for the maximum voltage?690.7 Interconnection Wolf River Electric ❑ Determine the maximum circuit current for the PV Source and Output Circuit; Inverter Output Circuit; Q Has a plaque or directory been installed at each disconnecting means(capable of interconnection) Address:101 Isanti Parkway Inverter Input Circuit; and DC to DC Converter Output(refer to inverter documentation). 690.8 NE, Isanti, MN 55040 denoting all electric power sources&power production sources. 705.10 Phone number: (763)229-6662 ❑ Has the point of connection to other sources been installed per 705.12? E-mail:contact(a_wolfriverelectric.com System Grounding ❑ Is the supply side disconnect readily accessible and within 10'of the connection point?705.11 ❑ Are all exposed non-current carrying metal parts of the PV system grounded?690.43 and 690.47 Q Are the utility interactive inverters connected to the system through a dedicated circuit breaker or PV INSPECTION ❑ Are the mounting structures or systems used for equipment grounding?690.43 fusible disconnecting means?705.12 CHECKLIST ❑ Does the bus or conductor ampacity comply with 705.12? ❑ Are the interconnecting devices used for equipment grounding listed and identified?690.43 ❑ Are the EGC properly sized and protected if exposed and not smaller than#6?690.45,690.46, Q Have all the required labels been applied? (See separate label list.) 690.50, 250.122, 250.120(C) ENGINEEr-:2INC Drawn by.New@engineerinc.io ❑ Has the grounding electrode system been installed?690.47 DATE: 1110712022 ❑ If both are present, has the DC grounding electrode system been bonded to the AC GES?690.47(A)If Name: Kristen Ruffing Property Address: 5900 5th St NE 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.gov Fridley, MN 55432 443 Lafayette Road N.,St.Paul,MN 55155•(651)284-5005•www.dli.mn.Qov solar_drecklst NEC20205olar_Checklst_Checlred 20200317 Project: Scale: 1 2 PV SYSTEM AS INDICATED D 15.0