HomeMy WebLinkAboutFinal Review 1096 hackmann Cir 111110
/0 11ki n-1 41
ate,. let I., Customer Name: T.
9
v
�� � I
Address: q*TZ
WINDOWS BATHS
Bath 111wCtiO n:
Parkins access for truck/trailer yes � no (explanation)
Ga{W/warts cutting area yes no (explanation)
Bathroom level 1st 2nd Ll 3rd � basement
6aM to be remodeled is only bath in home � yes X-- no
Rawl space only below bath yes no (if yes) access point
Gain exposed yes no (if no, choose) � drywall covered r� drop ceiling
Access Panel to valve Yes no
Water shut off location
Condo yes >< no Maintenance/water shut off contact
Muhifamity yes no Maintenance/water shut off contact
Shut off works � yes � no � sticky Elcurrently leaks
Plumbing composition copper � pvc � galy � cpvc � pex
lead ❑ abs
New Plumbing composition Pex 3(Shower) � Pex 4(Tub)
Existing plumbing has venting through the roof ;< yes no
Pre-install drain function � slow � good El doesn't drain
Pre-install water pressure � slow � good El no pressure
Flooring has in floor heat ❑ Yes � no
Floor framing � Woad � concrete El Spancrete U steel
Floor integrity solid El soh El rotted
Floor covering vinyl ❑ hardwood � file Ll carpet � laminate
Wall framing wood � concrete � steel
Wall coverings drywall the � lath/plaster � paneling
Left wall plumb leans in � leans out " in of
Right wall � plumb � leans in � leans out of in if
Back wall � plumb F-1 leans in � leans out it in of
Floor left to right � level F-1 slopes left � slopes right If in "
Floor back to front � level ❑ slopes back � slopes forward of in it
Ceiling left to right � level El slopes left � slopes right Of in "
Doorway accessibility 27 door 1 width door 2 with door 3 width
Hall accessibility width
Tight turns yes � no
Obstructio s r yes � no (if yes , list below): f/
Sizing and accessories:
Contract X
tabs for pan size 30z- width
4alengt7
h Customer Signatur
g ur
Contract size meets customer's expectation I 1
ves no(explain below)
Actual sire to install: Customer Signatur
-
Length (Left to Ri ht
g ) _ WiftWront to back-viewed thr Id o sd
wall]
Skirt Height(tub) J ,7Customer Signatur g _
Distance from skirt to center o toilet if parallel
Distance from skirt to front of toilet if perpendicular
fe6rrently finished-length (finish to finish +r
) X width Initial
Ading/moving wall-length(finish to new stud 1•
wall + 1/2 ) X widthX Initial ,
ready demoed-length (stud to stud — - -
) X width _ Initial
Accessory Color: CH BN ORB MB Customer
Signature
A(differs from contract, plea note reason why: _
,0SKower Door:
Glass: �� � CLEAR
' I RAIN OBSCURED
ring doors: Hinge side: Handle side:
Inline location ..
'dill be ordered by the pan size minus 2 " Customer Signature g e
Xalifornia glass: will be 6"-10" from ceiling height and no less than 30" "wide(36 glass is preferred) to allow
Sough room for the opening and to minimize water outside of wet area(onl available on "
Y pan 60 or longer)
lass width Glass height Customer Signature g e
Options:
,*all system to be notched around Customer
e Accepts-Signature
Will cover current flooring 4S yes n no Customer Signatur
Trim needed to cover flooring 1/4 round 2" lattice
New drain location left ❑ custom cut wall ection
171 rig � center
custom
Customer Signatur
)216stom drain location in " from left stud "f om right stud "from
back stud
Corner trim qty
,>Mrring bone qty
wainscoting qty
/I1(/ainscoting corners inside qty outside qty
Xstalling fan/light L replacing existing new
?4n vent will vent to Customer Signature —�
Pics taken drain/plumbing shower from all angles current damages
access areas water shut offs parking
areas of concern breaker box
*Customer understands some baths based on extra accessories, options, complexity and unforeseen issues
may be scheduled for more than or could take longer than one day.
Customer Signature
Inspector: - ate
APPROVED
Jensen Dl2/01/2022
EPARATE PERMITS FOR .
Special notes section : � LECT, PLUMB. MECH .7ZC7
jjjj
Sketch area �
O
24 inch min clear space required
Min 15 inches to
each side of
W.C. , Min 24
inches in front of
lout
FAN!
Smoke MECH
detectors in PERMIT 31
each sleeping
room and on C O
each level of the
house per R314
� o
CO detectio
per R315
2020 I RC.
7
G DS
Batht b & Shower rAeas re Form
Customer name: f? n eC�
Address : Inspector: 11
Job #: Date :
• - ` • • • - DON'T FORGET THE PICTURES!
• . . . • . . . . . . . . . . . . . . . - - - - - - - - - - - - . - - . . _ . . - • .
•• . • . . . . . . . • . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . • . • • •
Top• • • • • •
• • • • • • •
• • • • • •33il
• • • • • • •
: Middle
Bottom
• .
• •. • . • . • . • • • - - - - - • - • - - . - - - - - - • . . . . . . . .OF
. • . . . . • • _ • • • . • • • ,
• • / • • /
• • ,, • •
• •
For length specify finishing measure to (for example , drywall or tile):
CEILING FANLIGHT SIZE : Win ow if resent : Drain location:
Tech notes:
T HEIGHT--I: LEN TH : ❑ CENTER ❑SKIRStud to stud
� � ❑ LEFT
1 Drywall to drywall
TUB WIDTH WIDTH . � �
II to front ❑ Tile to the
�a DEPT RIGHT
❑ existing tin surround to front
Bath labor MeasureAssessmentForm
Job Name, tiller Name
Address
City Install Date
D - . O*wet bore, tystam/backer Each
Demo- Cast tub, tale walls, lath and plaster, concrete wall system/backer Each
Wco a joists-geed pks & need mftr approval Each
Build and Instill valve/draln/water shutoffs Each
111M penjU rkr ir%wil Each
Install walk in tub- Alexis Each
Wall prep indudes all drywailVply/insulation Each
Install neo angle wall system Each
Install 3 w&N system smooth Each
Install 3 wall system tile/impressions Each
Install UN 3 w&N system with herringbone smoot or tale Each
Install ceiling panel or extra wall Each
Install corner shelf/surface self/caddie/foot ped Each
Install bench/corner/folding/formed corner seat/win kit Each
Install grab bar Each
Install shower rod Each
Install Standartl/s-curft Each
Install Swing door-includes inline panel Each
Install Swing door W/ inline & return panel or neo angle Each
Install Cayman door Each
Install shover head and all cover trims Each
install Kauai/slide bar hand held and all cover trims Each
R&R toilet or vanitY to install tub/shower Each
Remove or build wall/remove or build drop soffit Each
R&R door and trirnwork to bring unit Into room Each
Remove old and install new vent fanlight and connect Each
Trip charge 25-50 From shop Each
T •ip charge Sa 75 from shop Each
Trip charge 75+ from shop Each
I r►ef P *111 by no w< <te ons ally*tjd � ' � , , � ► � r � Total Invoice
rk nol aurhorltc�i A + , I1,gr � , 1 � ► .. ► f � D InvoKe
Any wo
t and collected ob,§ ♦ I� -
� invoice will be paid o�►IY on tomple e i
This l
1nvOK es
nnust be subrnmed daily re Tech Sig• -e! ..s of Pre Inspection
invoiceS rray not be submitted for final payment un•iI a
�f ��m tetion has beer, Signed by the cu;+ )r,pr ontractor S�gna► ��� of Completion
P
Manage,, ; A,,thor,tatror.