Loading...
HomeMy WebLinkAboutFinal Bath Review 6361 &th Street I I J 1'r S Y j f'�J tiI <! � r• 1,' tear out soffit and run walls to ceiling cb -,- , .i u ��. -�_ � �, -=,_ �, �, _ �, � - _ _ ��-- -- � / ��� _ _ _ � --- °_ - �" - '�' '�� s _� _ -- _ -�-=�� _i _ I ` /I �����' �_� -��, �� � � � __ � _ `-� �'�� ZR. �� '"�- s'yy�� � ` � x.0 a / ��a �_ y ,�Ji _ �� -,. r ram. � ` � ;�, � ,� k� � •� :; 1 h� , _ � _ ,;;. ; �'� -- Date: `` T Customer Name:.Y,/- ,- i r"��i��' 1 Inspector. � s i-� \` �Address: t! � 7 t mad city WINDOWS 8 11nT11 ,U Bath Inspection: Parking access for truck/traller M yesEl no(explanation) Garage/warm cutting area yes no(explanation) Bathroom level 1st 2nd L 3rd basement Bath to be remodeled is only bath in home ,� yes no Crawl space only below bath C yes no (if yes)access point Drain exposed � yes no (if no,choose) U drywall covered 17 drop ceiling Access Panel to valve ❑ yes no Water shut off location ',�Le l►� Condo yes t�4 no Maintenance/water shut off contact Multifamily yes[Zno Maintenance/water shut off contact Shut off works � yes no sticky currently leaks Plumbing composition `r copper n pvc 9 lK- gals cpvc pex lead n abs New Plumbing composition LZN Pex 3(Shower) Pex 4(Tub Existing plumbing has venting through the roof yes no Pre-install drain functicn slow good doesn't drain Pre-install water pressu: ? slow © good no pressure Flooring has in floor hc::! yes Ni,no Floor framing FX4 wood ❑ concrete Spancrete steel Floor integrity © solid F1 soft rotted Floor covering El vinyl ❑ hardwood F)— the carpet laminate Wall framing 91 wood ❑ concrete steel Wall coverings drywall ® the lath/plaster paneling Left wall plumb 1:1 leans in ❑ leans out " in Right wall 5j plumb ❑ leans in ❑ leans out _" in Back wall plumb leans In leans out " in " Floor left to right , level 1:1slopes left 1:1slopes right " in " Floor back to front level 1:1slopes back slopes forward _" in " Ceiling left to right �( level slopes right _" in slopes left " Doorway accessibility all door 1 width door 2 with door 3 width Hall accessibility width Tight turns yes n no Obstructions yes CQ no (if yes,list below): Sizing and accessories: Contract calls for pan size h� width �Li l i length Customer Slgnature_,�lJ�'�� Contract size meets customer's expectation V yes I-I no(explaln below) Customer Signature_ ) 1 � Actual size to Install: Length(left to Right) O Width(Front to back-viewed from threshold to sd wall)_�- Skirt Helght(tub) Customer Signature j�� Distance from skirt to center of toilet If parallel Distance from skirt to front of toilet if perpendicular Currently finished length (finish to finish al") X width Initial Adding/moving wall•length(finish to new stud wall+1/2") X width Initial Already demoed•length(stud to stud) X width Initial 1 Accessory Color: CH BN ORB MB Customer Signature_ J If differs from contract,plea note reason why: J Shower Door: Glass: CLEAR I RAIN OBSCURED Swing doors: Hinge side: Handle side: Inline location: 'Will be ordered by the pan size minus 2" Customer Signature _ California glass:will be 6"-10" from telling height and no less than 30"wide(36"glass is preferred) to allow enough room for the opening and to minimize water outside of wet area(only available on pan 60" or longer) Glass width Glass height Customer Signature Options: Wall system to be notched z.rec 'J !J> Customer Accepts-Signature Will cover current flooring yes U no Customer Signature e' I .I Trim needed to cover flooring FT1/4 round 2"lattice Ej custom cut wall section New drain location right LiLicenter Ej custom Customer Signature le i Custom drain location In "from left stud "from right stud "from back stud Corner trim qty Herring bone city Wainscoting city Wainscoting corners inside city outside qty Installing fan/light replacing existing new I Fan vent will vent to Customer Signature Pics taken drain lumbin /P 8 shower from all angles access areas water shut offscurrent damages breaker box ' areas of concern ��J,' parking 'Customer understands some baths based on extra accessories,options,complexity and unforeseen Issues may be scheduled for more than or could take longer than one day, ,G stomer Signature � �� Inspector: ./ Date: APPROVED Jensen D1 2/12/2022 SEPARATE PERMITS FOR: ELECT, PLUMB. MECH. Special notes section::. ` f` A,-) !71 1 -Al] Sketch area y7t v�1�Ddl� i / � I C2 O Min 15 inches to each side of d W.C., Min 24 inches in front of = `' 3 FAN! fixture. C� �-- c6 MECH c y PERMIT Tub/shower accesscy Q M 0 M 0 � v - ---` L1 Y t v`c rz)p �. n m Z� 0 I 2 -i t_ D C) cu �( D cc CD 'Q' a) ;u ? : Q a '" (A rMIL p ............................................•- .. Do pj m ,,..... f p d r Oy •......................................• •.................................. •- :r. p - - = v z pp CD cD CD Lr oCL cu. h pCL .'D r n d o U CD 0 0 � r .. � 0 CD ° o — m CD m � 1 11111. J lllltl, J mad City Bath Labor Measure Assessment Form WINDOWS & BATHS Job Uame ''i nstaller Namr Address• � .; 1 '� l►� ��I- `/� City: 1-�- .;1� Install Date Demo-Fiberglass shell,shower board,drywall system/backer Each Deena-Cast tub,tile wa Is,lath and plaster,concrete wal sysicrn/backer Each Bust concrete/restructure Joists-need pits&need mngr approval Each Build and Install va've/drain/water shutoffs Fach Install tub/shower pan/barrier free/whirlpool Each Install walk in tub-Alexis Each Wall prep includes all drywall/ply/irsulat ion Each Install neo argle wall sy-,tem Each Install 3 wall system smooth Each Install 3 wall system ti'e/impressions Each I ;nstall tall 3 wa:l system with herringbure srnoot or the Each Install cc ling panel or extra wall I Each Install corner shelf/surface self/caddie/foot ped ! Fach Install bench/corner/folding/formed corner seat/win kit Each Install grab bar Each Instal shower rod (( ( Each Install Standard/,9ortvr Each Install Sw.ng door-includes inhne panel cacti Install Swing door W/inline&return panel or neo angle Each Insta'I Cayman door Each Install shower head and all cover trims Each Install Kauai/slide bar hand held and all cove,trims Each R&R toilet or vanity to install tub/shower Each Remove or build wall/remove or build drop soffit I Each R&R door and trimwork to bring unit into room Each Remove old and install new vent fan/Vght and connect Each Trip charge 25-50 from shop Each Trip charge SO.75 from shop Eich Trip charge 7S+from shop Each There will be no write ins allowed.All prices listed are non neEotlable Total Invoice: Any work not authorized with management and photos will not be paid Date of Innvvoiice: This invoice will be paid oily on complete and collected Jobs r7-✓ v Invoices must be submitted dally Measure Tftl�Signature of Pre Inspection Invoices may not be submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization