Loading...
HomeMy WebLinkAboutCondon - FRIDLEY (2) /I� - - � ~ �r� _. F, it 1' � II �, j ��� 1 � _ � �.� .�� I i ��� ;.�wir •�mi •.�■ `q � � . . . .-.- - ... t'" � _ i s�r��/ /� ram/I/�/ "9'' �k�<��� f I !- _,,,��� � , ,�: r�, .� Y °: ti�;� � � - ,� _ «� � �' � -� ��: ,�• r.,� � �� =: ,.. ,� �j� i �IIII�����II►►►►i►►�►I�IfllAllll, .,.. F Awl' - " - W in & lVa mad city 11 Date. �1��\ Um WINf)c7WQS b RA1HG ��,� Flo\/� J0 d LLLrC\L.�—1�(.�m� Customer Name Y r `, Inspector: nspector Address: U Oc vnitZI�I\ u 3� Bath Inspection: Parking access for truck/trailer yes no(explanation) Garage/warm cutting area yes x no(explanation) hO QCXq Bathroom level 1st 2nd 3rd basement Bath to be remodeled is only bath in home yes no Crawl space only below bath yes no (if yes)access point Drain exposed yes 1-1 no (if no,choose) c r drop ceiling Access Panel to valve x, yes 71 no Water shut off location MG1Y\-tQY\CZ YY 05S be eOA+CV.,q Condo D yes no Maintenance/water shut off contact Multifamily yesE]no Maintenance/water shut off contacte� Shut off works yes j no sticky currently leaks Plumbing composition ' copper pvc U piv r7 cpvc pex lead abs New Plumbing composition Pex 3(Shower)� (F] Pex 4(Tub) Existing plumbing has venting through the roof yes r 7 no Pre-install drain function slow good doesn't drain Pre install water pressure slowgood no pressure Flooring has in floor heat yes �no Floor framing F ood ;P�I concrete ❑ Spancrete steel Floor integrity solid soft rotted Floor covering vinyl hardwood the L carpet laminate Wall framing wood concrete steel Wall coverings drywall the lath/plaster paneling Left wall N plumb leans in leans out in Right wall plumb leans in leans out _" in Back wall plumb leans in leans out _" in Floor left to right level slopes left slopes right _" in Floor back to front level slopes back slopes forward " in Ceiling left to right I level n slopes left slopes right _"in 1 Doorway accessibility /_ door 1 width _ door 2 with door 3 width Hall accessibility width Tight turns yes no Obstructions yes no (if yes, list below) Sizing and accessories ' Contract calls for pan size width �, lenn Customer Signature Contract sizees no(explain below) meets customer's expectation V Customer Signature Actual size to install: aN 3� Length (Left to Right) Lt V Width(Front to back orn,6reshold to sd wall) Skirt Height(tub) Customer Signa� re i Distance from skirt to center of toilet if parallel Distance from skirt to front of toilet if perpendicular Currently finished-length(finish to finish+1") X width Initial Adding/movingX width InFtlal� wall-length(finish to new stud wall+1/2") Already demoed-length(stud to stud) X width nitial Accessory Color: ®H BN ORB MB Customer Signature If differs from contract,please note reason why: Shower Door: OBSCURED Glass: CLEAR L I RAIN L� Swing doors: Hing side:_ Han side: line location: 'Will be ordered by t pan size minus 2" Customer Sig ure_ California glass: will be %10" from ceili g height and n less than 30' wide(36"gla is prefer r d)to allow enough room for the ope ing and to inimize water out ide of we area only availab on p 60" or longer) lass dth Glass eight Cust er Signature_ Op ons: Wall system to be notched around Customer Accepts Signatur no Customer Signature Will cover current flooring yes1j4und LN 2"lattice ❑ custom cut wall section Trim needed to cover flooringcenter custom New drain location I right Customer Signature - Custom drain location in from lef "from rl�ftt stud "from back stud Corner trim city Herring bone city Wainscoting city Wainscoting corners inside city outside city Installing fan/light L replacing existing ❑ new Fan vent will vent to Customer Signature_ drain/plumbing shower from all angles current damages Pics taken access areas water shut offs PArkin g areas of concern breaker box 'Customer understands some baths based on extra accessories,options,complexity an foreseen issues may be scheduled for more than or could take longer than one day. Customer Signa Date: �� v Inspector: SPec'al rotes section —liar Q LLAtn S�aS, r e xl 4� C054- -fU b 3 W G O �G1V�1 I a lls c>J �, c,,_� V, - 0 has m-} 44,v% \A o - A a ,(ovYA al SO W CO r Vhv - b 2 shvV off' )D n� . je � rn Q d 5how-r- Webd (was inoi- on con-A-f-cC4) X Sketch area P.1 ►1�`(� wall wl g O 5 3� 0Zq '/z 3� +o 3 -r.g �-wa►� i ICi-,-che h O O WOO Bathtub & Shower Measure Form Customer name:ComOY_\���`So&i-yl my Address: �f�U� N yy\N\-[JX VGK tir uy1y " kcJ(o Inspector+ " 211 Job#: MC HQ(QLtMY) Date:01— 13 ......................... * DON'T FORGET THE PICTURES' ................... .. ................................................... v ?v-3 g1* � Middle {� L 8 T-S^pq5Bottom 5 7[�/ ................................................... For length specify finishing measure to(for example,drywall or tile). L ; -- , CEILING FAN/LIGHT SIZE:`— Window if resent Drain location. Tech notes- SKIRT HEIGHT: 15 LENGTH: ❑ CENTER ❑ Stud to stud TUB WIDTH:-Zq I Z WIDTH. LEFT X Drywall to drywall ,drywall to front ❑DEPTH: RIGHT El Tile to tile ❑existing surround to front 1 ��Y Bath Labor Measure Assessment Form JobNamemridnn ,1 Installer Name: Address. p City Install Date Item Description Qty. Unit Tier 1 Pay Tier 2 Pay Total Pay Demo-Fiberglass shell,shower board,drywall system/backer Each Demo-Cast tub,the walls,lath and plaster,concrete wall system/backer Each Bust concrete/restructure joists-need pits&need mngr approval Each Build and Install valve/drain/water shutoffs Each Install tub/shower pan/barrier free/whirlpool Each install walK in tub Alexis Each Wall prep includes all drywall/ply/insulation Each install neo angle wall system Each Install 3 wall system smooth Each install 3 wall system tale/impressions Each Install tall 3 wall system with herringbone smoot or the Each install ceiling panel or extra wall Each Install corner shelf/surface self/caddie/foot ped Each Install bench/corner/folding/formed corner seat/win kit Each Install grab bar Each Install shower rod Each Install a a -curve ' Each Install Swing door includes inhne panel Each Install Swing door W/inline&return panel or neo angle Each install Cayman door Each Install shower head and all cover trims Each Install Kauai/slide bar hand held and all cover trims Ear h R&R toilet or vanity to Install tub/shower Each Remove or build wall/remove or build drop soffit Each R&R door and trimwork to bring unit into room Each Remove old and install new vent fan/light and connect Each Trip charge 25 50 from shop Each Trip charge 50-75 from shop f ach Trip charge 75+from shop Each There will be no write Ins allowed All prices listed are nun negwlable Total invoice! Any work not authorized with management and photos will not be paid to of e: This invoice will be paid only on complete and collected jobs Invoices must be submitted daily sur Signature of Pre Inspection Invoices may not be submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization CAL &all4z 4,-Cl /)D C)Wne n