HomeMy WebLinkAboutAhmed Engineering Letter Flat DO M u s Domus Structural Engineering, LLC
T R U C T U R A 1, P.O. Box 560
Broomfield, CO 80038
- N G 1 N E E R T N G, T. 1. C 530-864-7055
projects@domusstruc.com
February 28,2023
To: Blue Raven Solar
1403 North Research Way,Building J
Orem,UT.84097
Subject: Certification Letter
Ahmed Residence
1318&ywood Ln NE
Fridley,MN.55421
To Whom It May Concern,
Ajobsite observation of the condition of the existing framing system wasperformed by an audit team of Blue Raven Solar as a
request from Domus Structural Engineering.All review is based on these observations and the design criteria listed below and
only deemed valid if provided information is true and accurate.
On the above referenced project,the roof structural framing has been reviewed for additional loading due to the installation
of the solar PV addition to the roof.The structural review only appliesto the section of the roof that is directly supporting the
solar PV system and itssupporting elements.The observed roof framing isdescribed below.If field conditions differ,
contractor to notify engineer prior to starting construction.
The roof structure of(M P1)consists of composition shingle on roof plywood that is supported by 2x6 rafters @ 16"o.c.with
ceiling joists acting as rafter ties.The rafters have a max projected horizontal span of 13'-6",with a slope of 19 degrees.The
rafters are connected at the ridge to a ridge board and are supported at the eave by a load bearing wall.
The roof structure of(M P2)consists of composition shingle on roof plywood that is supported by pre-manufactured trusses
that are spaced at @ 24"o.c..The top chords,sloped at 17 degrees,are 2x4 sections,the bottom chords are 2x4 sections and
the web members are 2x4 sections.The truss members are connected by steel gusset plates.The max unsupported projected
horizontal top chord span is approximately 64".
The existing roof framing system of(M P1)isjudged to be inadequate to withstand the loading imposed by the installation of
the solar panels.Structural reinforcement is required.Sister upgrade is required for(MP1)on all raftersthat directly support
solar PV.Stitch new 2x6 DF#2(min)to existing member with 1/4 in.x 3 in.wood screws @ 16"o.c.or 10d nails @ 6"o.c..Lap as
needed with 4'-0"minimum lap per attached detail.
The existing roof framing system of(M P2)isjudged to be adequate to withstand the loading imposed by the installation of the
solar panels.No reinforcement is necessary.
The spacing of the solar standoffs should be kept at 48"o.c.for landscape and 32"o.c.for portrait orientation,with a
staggered pattern to ensure proper distribution of loads.
The scope of this report is strictly limited to an evaluation of the fastener attachment,underlying framing and supporting
structure only.The attachment'sto the existing structure are required to be in a staggered pattern to ensure proper
distribution of loading.All panels,racking and hardware shall be installed per manufacturer specifications and within specified
design limitations.All waterproof ing shall be provided by the manufacturer. Domus Structural Engineering assumes no
responsibility for misuse or improper installation of the solar PV panels or racking.
Note:Seismic check is not required since Ss<.4g and Seismic Design Category(SDC)<B
Ahmed Fridley MN.xlsm 1
Do m IJ s Domus Structural Engineering, LLC
.7 T R tJ C T lI R A I. P.O. Box 560
Broomfield, CO 80038
E. N r I N F F• R i n G 1. 1. C: 530-864-7055
projectsC@domusstruc.com
Design Criteria:
• Applicable Codes=2020 Minnesota Building Code,ASCE7-16
• Roof Dead Load=10 psf(M P1) -- 7 psf(M P2)
• Roof Live Load=20 psf
• Wind Speed=115 mph(Vult),Exposure C
• Ground Show Load=50 psf - Roof Show Load=35 psf
• Attachment:1 -5/16 dia.lag screw with 2.5 inch min.embedment
depth,at spacing shown above. V�
ICEt4f —
PI
ease Dontactmewithanyfurtherquestionsorconcernsregardingthisproject. ENG =
Sincerely, - -
51823
I hereby certify that this plan,specification or report was prepared by me A,
or under my direct supervision and that I am a duly Licensed '� �.••• •'��
Professional Engineer under the laws of the State of Minnesota.John A. , F •••••••••• ••••�
John Calvert,P.E. Calvert,License No.52823 Expiration Date:30-June-2024 'i� OF MI
Project Engineer 'I' '' '`
Digitally signed
by John A. Calvert
Date: 2023.02.28
12:42:03 -07'00'
Ahmed Fridley MN.xlsm 2
1X DECKING OR SHEATHING
(N) INSTALL SIMPSON A34 CLIP.
(E) RAFTERS
(N) SISTER MEMBER TO BE FULL
INSTALL END GROUP OF LENGTH.ATTACH TO(E)RAFTER W/
FASTENERS WITHIN 6"OF J'x3"WOOD SCREWS STAGGERED
EACH END.(3)SCREWS MIN TOP AND BOTTOM @ 16"O.C.
(E) CEILING JOIST
SISTER TO BE WITHIN 3"OF
TOP OF CEILING JOIST OR
TOP OF WALL
OPTION 1 - FULL LENGTH SISTER
SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE.
1X DECKING OR SHEATHING
(N) INSTALL SIMPSON A34 CLIP.
(E) RAFTERS (N) SISTER MEMBER TO BE FULL
LENGTH.ATTACH TO(E)RAFTER W/
INSTALL END GROUP OF /,A J'x3"WOOD SCREWS STAGGERED
FASTENERS WITHIN 6"OF \ / TOP AND BOTTOM @ 16"O.C.
EACH END.(3)SCREWS MIN
(E) CEILING JOIST ``\ �[�d,
SISTER TO BE WITHIN 3"OF ••�"l�
TOP OF CEILING JOIST OR
TOP OF WALL
OPTION 2 - OVERLAPPED SISTER •••. ICEN D ••-
SEE LETTER FOR UPGRADE LAP LENGTH AND SIZE.
(N) SISTER RAFTER ENG E
52823 • ��q-�
T •0
Gj
(N) SISTER RAFTER (E) RAFTER •OF
•
SECTION A-A 2/28/23 / 18111101
SISTER UPGRADE OPTIONS
ALTERNATIVE FASTENER SCHEDULE:10d NAILS STAGGERED TOP AND BOTTOM AT 6"O.C.
I hereby certify that this plan,specification or report was prepared by me or
under my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the State of Minnesota.John A.Calvert,License
No.52823 Expiration Date:30-June-2024
PROJECT NAME:SISTER UPGRADE Scale: N.T.S.
1/18/23
Project Number:Solar PV
Project Description:SISTER UPGRADE Drawn By:JAC Drawing Name:
Revisions:
A SISTER
B
Do m U S Domus Structural Engineering, LLC
T R U CT U R A 1, P.O. Box 560
Broomfield, CO 80038
=K N G T N E E R T N G, T. T. C: 530-864-7055
projects@domusstruc.com
Gravity Loading
Roof Snow Load Calculations
p9=Ground Snow Load= 50.0 psf
pf=0.7 CQ Ct I p9 (ASCE7-Eq 7-1)
CQ=Exposure Factor= 1 (ASCE7-Table 7-2)
Ct=Thermal Factor= 1 (ASCE7-Table 7-3)
1=Importance Factor= 1
pf=Flat Roof Snow Load= 35.0 psf
ps=Csp, (ASCE7-Eq 7-2)
Cs=Slope Factor= 1
ps=Sloped Roof Snow Load= 35.0 psf
PV Dead Load=2.8 psf(Per Blue Raven Solar)
DL Adjusted to 19 Degree Slope 2.96 psf
PV System Weight
Weight of PV System(Per Blue Raven Solar) 2.8 psf
X Standoff Spacing= 2.67 ff
Y Standoff Spacing= 6.08 It
Standoff Tributary Area= 16.22 sft
Point Loads of Standoffs 45 lb
Note:PV standoffs are staggered to ensure proper distribution of loading
Roof Live Load=20 psf
Note:Roof live load is removed in area's covered by PV array.
Roof Dead Load(MPi)
Composition Shingle 4.00
Roof Plywood 2.00
Double 2x6 Rafters @ 16"o.c. 3.44
Vaulted Ceiling 0.00 (Ceiling Not Vaulted)
Miscellaneous 0.56
Total Roof DL(MPi) 10.0 psf
DL Adjusted to 19 Degree Slope 10.6 psf
Roof Dead Load(MP2)
Composition Shingle 4.00
Roof Plywood 2.00
2x4 Top Chords @ 24"o.c. 0.73
Vaulted Ceiling 0.00 (Ceiling Not Vaulted)
Miscellaneous 0.27
Total Roof DL(MP2) 7.0 psf
DL Adjusted to 17 Degree Slope 7.32
Ahmed Fridley MN.xlsm 3
Do m u S Domus Structural Engineering, LLC
-S TRUCTURAL P.O. Box 560
Broomfield, CO 80038
ENGINEER i N G 1. L C 530-864-7055
projects@domusstruc.com
Wind Calculations
Per ASCE7-16 Components and Gadding
- Input Variables
Wind Speed 115 mph
Exposure Category C
Roof Shape Gable Roof
Roof Slope 19 degrees
Mean Roof Height 20 ft
Effective Wind Area 21.3 ft
Ground Elevation 0 ft
Design Wind Pressure Calculations I
qh=0.00256'Kz'Kzt'Kd'Ke'V12 (Eq.26.10-1)
Kz(Exposure Coefficient)=0.90 (Table 30.3-1)
Kzt(topographic factor)= 1.00 (Fig.26.8-1)
Kd(Wind Directionality Factor)= 0.85 (Table 26.6-1)
Ke(Ground Elevation Factor)= 1.00
V(Design Wind Speed)= 115 mph (Fig.26.5-1A)
Risk Category= II (Table 1.5-1)
qh= 25.95
Standoff Uplift Calculations-Portrait
Zone 1 Zone 2 Zone 3 Positive
ya= 0.73 0.80 0.80 0.73
GCp= -2.00 -3.00 -3.60 0.49 (Fig.30.3)
Uplift Pressure= -37.9 psf -62.3 psf -74.7 psf 9.2 psf (Eq.29.4-7)
ASD Uplift Pressure= -22.7 psf -37.4 psf -44.8 psf 9.6 psf
X Standoff Spacing= 2.67 2.67 1.78
Y Standoff Spacing= 6.08 3.04166667 3.04166667
Tributary Area= 16.22 8.11 5.41
Dead Load on attachment= 45 lb 23 lb 15 lb
Footing Uplift(0.6D+0.6W)_ -341 lb -290lb -233Ib
Standoff Uplift Calculations-Landscape
Zone 1 Zone 2 Zone 3 Positive
ya= 0.75 0.80 0.80 0.75
GCp= -2.00 -3.00 -3.60 0.50 (Fig.30.3)
Uplift Pressure= -39.0 psf -62.3 psf -74.7 psf 9.8 psf (Eq.29.4-7)
ASD Uplift Pressure(0.6W)= -23.4 psf -37.4 psf -44.8 psf 9.6 psf
X Standoff Spacing= 4.00 4.00 2.67
Y Standoff Spacing= 3.50 1.75 1.75
Tributary Area= 14.00 7.00 4.67
Dead Load on attachment= 39.20 19.60 13.07
Footing Uplift(0.6D+0.6W)_ -304Ib -250lb -201 lb
Standoff Uplift Check
Maximum Design Uplift=-341 lb
Standoff Uplift Capacity =450 lb
450 lb capacity>341 lb demand Therefore,OK
- Fastener Capacity Check
Fastener= 1-5/16"dia.lag
Number of Fasteners=1
Embedment Depth=2.5
Pullout Capacity Per Inch= 250 lb
Fastener Capacity=625 lb
w/F.S.of 1.5&DOL of 1.6=667 lb
667.2 lb capacity>341 lb demand Therefore,OK Ahmed Fridley MN.xlsm 4
DO M u s Domus Structural Engineering, LLC
T R U C T I1 R A 1, P.O. Box 560
Broomfield, CO 80038
- N G 1 N E E R I N G, T. 1. C 530-864-7055
projects@domusstruc.com
Framing Check
(Mp1) PASS-With Framing Upgrades
w=65 plf
Dead Load 10.6 psf
PV Load 3.0 psf
Snow Load 35.0 psf Double 2x6 Rafters @ 16"o.c.
0 0
Governing Load Combo=DL+SL / Member Span=13-6" \
Total Load 48.5 psf
Member Properties-Based on Upgraded Section _
Member Size S(in^3) I(in^4) Lumber Sp/Gr Member Spacing
Double 2x6 15.13 41.59 DF#2 @ 16"o.c.
IIICheck Bending Stress 4111111
Fb(psi)= f'b x Cd x Cf x Cr (NDS Table 4.3.1)
900 x 1.15 x 1.3 x 1.15
Allowed Bending Stress=1547.3 psi
Maximum Moment =(wL^2)/8
= 1474.328 ft#
= 17691.94 in#
Actual Bending Stress=(Maximum Moment)/S
=1169.8 psi
Allowed>Actual--75.7%Stressed -- Therefore,OK
Check Deflection
Allowed Deflection(Total Load) = L/180 (E=1600000 psi Per NDS)
=0.9 in
Deflection Criteria Based on = Simple Span
Actual Deflection(Total Load) _ (5*w*L^4)/(384*E*I)
=0.727 in
=L/223 > L/180 Therefore OK
Allowed Deflection(Live Load) = L/240
0.675 in
Actual Deflection(Live Load) _ (5*w*L^4)/(384*E*I)
0.525 in
L/309 > L/240 Therefore OK
Check Shear I -
Member Area= 16.5 in^2 Fv(psi)= 180 psi (NDS Table TA—)
Allowed Shear = Fv*A = 2970 lb Max Shear(V)=w*L/2 = 437 lb
Allowed>Actual--14.8%Stressed -- Therefore,OK
Ahmed Fridley MN.xlsm 5
DO M u s Domus Structural Engineering, LLC
T R U C T I1 R A 1, P.O. Box 560
Broomfield, CO 80038
- N G 1 N E E R I N G, T. 1. C 530-864-7055
projects@domusstruc.com
Framing Check
(M P2) PASS
w=91 plf
Dead Load 7.3 psf
PV Load 3.0 psf
Snow Load 35.0 psf 2x4 Top Chords @ 24"o.c.
0
Governing Load Combo=DL+SL Member Span=6'-4"
Total Load 45.3 psf
_ Member Properties
Member Size S(in^3) I(in^4) Lumber Sp/Gr Member Spacing
2x4 3.06 5.36 DF#2 @ 24"o.c.
Check Bending Stress
Fb(psi)= f'b x Cd x Cf x Cr (NDS Table 4.3.1)
900 x 1.15 x 1.5 x 1.15
Allowed Bending Stress=1785.3 psi
Maximum Moment =(wL^2)/8
=454.0696 ft#
=5448.835 in#
Actual Bending Stress=(Maximum Moment)/S
=1779.3 psi
Allowed>Actual-99.7/6 Stressed -- Therefore,OK
Check Deflection
Allowed Deflection(Total Load) = U180 (E=1600000 psi Per NDS)
=0.422 in
Deflection Criteria Based on = Continuous Span
Actual Deflection(Total Load) _ (w*L^4)/(185*E*I)
=0.159 in
= U478 > L/180 Therefore OK
Allowed Deflection(Live Load) = U240
0.316 in
Actual Deflection(Live Load) _ (w*L^4)/(185*E*I)
0.123 in
U618 > L/240 Therefore OK
Check Shear
Member Area= 5.3 in^2 Fv(psi)= 180 psi (NDS Table 4A)
Allowed Shear = Fv*A = 945 lb Max Shear(V)=w*L/2 = 287 lb
Allowed>Actual--30.4%Stressed -- Therefore,OK
Ahmed Fridley MN.xlsm 6
Domus Domus Structural Engineering, LLC
-c3 T R U C T U R A L P.O. Box 560
ENGINEER T N G LLC Broomfield, CO 80038
530-864-7055
projects@domusstruc.com
Appendix A:General Notes
GENERAL
• The contractor shall verify all dimensions,property setbacks,AHJ/HOA CC&R's,elevations and site conditions before
starting work and shall notify Domus Structural Engineering,LLC of any discrepancies.
• All report conclusions represent Domus Structural Engineering,LLC's best professional judgment based upon industry
standards.
• Resolve any conflicts on the drawings with Domus Structural Engineering,LLC before proceeding with construction.
• The design criteria used for this project&listed on the first page of the report is based on the engineers best judgement
and/or provided by the ATC council.AHJ specific requests may differ.Please contact our team if the design criteria needs to
be modified.
• A site visit was not physically conducted by Domus Structural Engineering,LLC.The accompanying calculations and
certification are provided with the understanding that the site building and construction standards meet an acceptable level of
industry standards.It shall be the contractors responsibility to identify any irregularities such as inconsistent framing
conditions,water damage,fire damage,cracked,split or noticeably deflecting framing members.
• Domus Structural Engineering,LLC is not responsible for enforcing safety measures or regulations.The contractor shall
design,construct,and maintain all safety devices including shoring and bracing,and shall be solely responsible for
conforming to all local,state and federal safety and health standards,laws and regulations.The contractor shall take
necessary precautions to maintain and insure the integrity of the structure during construction.If a lawsuit is filed by one of
the contractor's or subcontractor's employees,or any one else,the contractor will indemnify,defend and hold the owner and
Domus Structural Engineering,LLC harmless of any and all such claims.
• Any and all waterproofing shall be provided by the contractor.Domus Structural Engineering,LLC is not responsible for
waterproofing.
• All hardware shall be installed per manufacturer specifications and within specified design limitations.Domus Structural
Engineering,LLC assumes no responsibility for incorrectly installed hardware or hardware installed outside of the
manfacturer specifications.
USER RELIANCE
• Domus Structural Engineering,LLC was engaged by Blue Raven Solar(Client)to perform this assessment.This report and
the information therein,are for the exclusive use of the Client.This report has no other purpose and shall not be relied upon,
or used,by any other person or entity without the written consent of Dous Structural Engineering,LLC.Third parties that
obtain this report,or the information within shall have no rights of recourse or recovery against Domus Structural
Engineering,LLC,it's officers or employees.
ROOF MOUNTED ARRAYS
• If an analysis of a supporting stucture is included in our scope of work,the structural assessment only applies to the section
of the roof that is directly supporting the proposed solar PV system.
• No structural members can be cut for conduit,etc.,unless specifically shown.Obtain prior written approval for installation of
any additional conduit,etc.
• It is assumed that a standard quality of construction care was used to construct the original building.It shall be the
contractors responsibility to field verify any and all framing member supporting the proposed PV array are in adequate
condition.The contractor shall field inspect for sub-standard construction means,signs of dry rot,mold,fire damage,etc.and
notify engineer if any compromised material is found on site prior to starting construction.
• It is assumed that there have been no additional loads(HVAC or MEP equipment,additional layers of roofing,etc)added to
the building over the course of the structures histroy.The contractor and/or client shall verify this with the property owner and
notify Domus Structural Engineering,LLC if additional load has been added to the structure already.
• Flexible utility connections must be used at any building seismic joint.
• Care should be taken to ensure that PV arrays do not preclude drainage of rain water.
• Unless otherwise noted,construction material shall be evenly distributed if placed on framed floors or roofs.Loads shall not
exceed the allowable loading for the supporting members and their connections.
• All lags or wood screws at the roof shall be stainless steel and installed withing the middle 1/3 of the dimensional width of the
framing members.
• All fasteners shall be a minimum of 6"away from any truss panel or hinge joints,truss plates and/or member ends.Field
verify location of fasteners prior to starting construction.All fasteners shall be pre-drilled to avoid splitting existing lumber.
• Domus Structural Engineering,LLC is not responsible for downslope effects of snow shedding or sliding off of the PV array
nor any damage to downslope decks,roofs,walkways,landscaping,automobiles,pets,people,etc..If snow guards are
requested by the customer,notify Domus Structural Engineering,LLC.
Ahmed Fridley MN.xlsm 7