Loading...
HomeMy WebLinkAboutFinal solar Review 5261 Fillmore Street DIRECTORY OF PAGES w SCOPE OF WORK 62249 PV-1 PROJECT SUMMARY _2 THIS PROJECT INVOLVES THE INSTALLATION OF A GRID- PV 2 SITE PLAN N � INTERACTIVE PV SYSTEM.PV MODULES WILL BE MOUNTED ALL y USING A PREENGINEERED MOUNTING SYSTEM.THE MODULES PV-3 SINGLE-LINE DIAGRAM o WILL BE ELECTRICALLY CONNECTED WITH DC TO AC POWER ENERGY E INVERTERS AND INTERCONNECTED TO THE LOCAL UTILITY 1;01_A.; PV-4 LABELS — USING MEANS AND METHODS CONSISTENT WITH THE RULES ENFORCED BY THE LOCAL UTILITY AND PERMITTING PV-5 ATTACHMENT PLAN JURISDICTION. PV-6 ATTACHMENT DETAILS THIS DOCUMENT HAS BEEN PREPARED TO DESCRIBE THE PV-7 FIRE SAFETY PLAN 3 DESIGN OF A PROPOSED PV SYSTEM WITH ENOUGH DETAIL TO ANCHOR DATASHEET O DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS.THE DOCUMENT SHALL NOT BE RELIED UPON AS ARRAY WIRING BOX DATASHEETS M A SUBSTITUTE FOR FOLLOWING MANUFACTURER INSTALLATION LJJ •+ INSTRUCTIONS.THE SYSTEM SHALL COMPLY WITH ALL = � DISCONNECT DATASHEETS Z MANUFACTURERS INSTALLATION INSTRUCTIONS,AS WELL AS LLJ CV X m ALL APPLICABLE CODES.NOTHING IN THIS DOCUMENT SHALL BE � � � � 0 INVERTER DATASHEET INTERPRETED IN A WAY THAT OVERRIDES THEM.CONTRACTOR (J) (n (n L-0 LU MODULE DATASHEET IS DOCUMENT .IBLE FOR VERIFICATION OF ALL DETAILS IN THIS >_ O LJJ 0- MOUNTING SYSTEM DATASHEET z MOUNTING SYSTEM ENGINEERING LETTER SYSTEM DETAILS 0- �j UL 2703 CLASS A FIRE CERTIFICATION T NEW GRID-INTERACTIVE Q Q DESCRIPTION PHOTOVOLTAIC SYSTEM WITH NO LJJ = J Uj UL 2703 GROUNDING AND BONDING CERTIFICATION O ENERGY STORAGE U — Q DC RATING OF SYSTEM 4.62KW ' � PROJECT DETAILS 0 (D p� • • ' cn Map data©2023 Google AC OUTPUT RATINGS 3.46KW,14.4A Q� CV LL PROPERTY OWNER MICHAEL YOST — INVERTER(S) 11 X ENPHASE IQ7X-96-2-US (D � PROPERTY ADDRESS 5261 FILLMORE ST NE,FRIDLEY,MN 1 PARCEL 55421 MODULE(S) 11 X REC SOLAR REC420AA PURE-R APN 25-30-24-21-0019 PV-1 SCALE: NTS (1)BRANCH OF 6 IQ7X-96-2-US ZONING RESIDENTIAL 0 ❑3 i ARRAY WIRING MICROINVERT ERS (1)BRANCH OF 5 Q7X-96-2-US USE AND OCCUPANCY ONE-OR TWO-FAMILY DWELLING Mounds View MICROINVERTERS CLASSIFICATION GROUP(GROUP R3) N C, `AHJ CITY OF FRIDLEY INTERCONNECTION DETAILS 17 .� UTILITY COMPANY XCEL ENERGY POINT OF NEW SUPPLY SIDE AC CONNECTION INTERCONNECTION PER NEC 705.11 METER SERIAL NUMBER ACD024969783 Fridley UTILITY SERVICE 120/240V 10 ELECTRICAL CODE 2020 NEC(NFPA 70) Brooklyn Shoreview INSIDE PANELBOARD FUSED EATON DG222NRB n FIRE CODE 2018 IFC y z5z e5 �� DISCONNECT,2-POLE,60A,240VAC Center 2020 MN BUILDING CODE SITE DESIGN PARAMETERS 2020 MN RESIDENTIAL CODE OTHER BUILDING CODES 2020 MN PLUMBING CODE iV New Brighton ASHRAE EXTREME LOW -26°C(-15°F) 2020 MN MECHANICAL CODE ASHRAE 2%HIGH 32°c(9o°F) CONTRACTOR INFORMATION �, �'•' ; -�� Hilltop CLIMATE DATA SOURCE ANOKA COUNTY AIRPORT COMPANY ALL ENERGY SOLAR Columbia ❑E Arden Hills , WIND(ASCE 7-16) 109 MPH,EXPOSURE CATEGORY B, ADDRESS 1264 ENERGY LANE,ST PAUL,MN Heights I RISK CATEGORY II 55108 GROUND SNOW LOAD 50 PSF PHONE NUMBER (800)620-3370 PROJECT SUMMARY CONTRACTOR 19 si DOC ID: 112814-3 SIGNATURE Robbinsdale CAPADEN DATE:3/29/23 CREATOR:A.F. ' • • 65 St Anthony Map data©2023 Google REVIEWER:B.X. 2 LOCALE REVISIONS PV-1 SCALE: NTS PV-1 0—n PROJECT INFORMATION 62249 �T CONTRACTOR NAME E(80(0) ENERGY SOLAR CONTRACTOR PHONE 620-3370 ALL 0 Provide clears ace for roof access per Ian GENERAL NOTES ENERGY p p p EQUIPMENT LIKELY TO BE WORKED UPON WHILE ENERGIZED SHALL BE INSTALLED IN LOCATIONS THAT SATISFY MIN.WORKING CLEARANCES PER NEC 110.26. Min 18" 24/7 UNESCORTED KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL ENERGY EQUIPMENT. m CONTRACTOR SHALL USE ONLY COMPONENTS LISTED 3 BY A NATIONALLY RECOGNIZED TESTING LABORATORY LLJ FOR THE INTENDED USE. LLI Z � CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL F___ F--- F--- -g:j- 4 EQUIPMENT,CABLES,ADDITIONAL CONDUITS, Cn Cn Cn 1_0 RACEWAYS,AND OTHER ACCESSORIES NECESSARY FOR p UJ APPROVED A COMPLETE AND OPERATIONAL PV SYSTEM. cry � � z ALL EXPOSED PV ROOFTOP CONDUCTORS NOT UNDER J O TI Jensen D04/19/2023 5 THE ARRAY SHALL BE PROTECTED BY A RACEWAY WITH LLI A LISTED JUNCTION BOX AT BOTH ENDS AND COMPLY Q J WITH NEC 690.31(A). LLI = J LLI ALL EMT CONDUIT FITTINGS SHALL BE LISTED AS U C) 2 6 WEATHERPROOF FITTINGS AND INSTALLED TO ENSURE A i 0 RAINTIGHT FIT,PER NEC 358.42. Q rt 3 4 7 SITE SHALL MEET NESC CLEARANCE REQUIREMENTS (D CV 1_0 5 r-F 6 (N)PROPOSED ROOF-MOUNTED PV ARRAY.5/12(22.6°) m 7 OSLOPED ROOF,(11)REC SOLAR REC420AA PURE-R MODULES(BLACK FRAME,BLACK BACKSHEET),269° AZIMUTH SEPARATE PERMITS FOR: ELECT 8 O (E)MAIN SERVICE PANEL(MSP),INDOOR (N)TRANSITION BOX,OUTDOOR,OUTPUT CIRCUIT O CONDUCTORS SHALL BE RUN IN EMT CONDUIT THROUGH THE INTERIOR OF THE BUILDING O4 (E)UTILITY METER,OUTDOOR (N)VISIBLE-OPEN TYPE,LOCKABLE,READILY m O5 ACCESSIBLE,LABELED PV SYSTEM DISCONNECT LOCATED WITHIN 10 FT OF UTILITY METER(SW2), OUTDOOR (N)READILY ACCESSIBLE PRODUCTION METER i O LOCATED WITHIN 10 FT OF UTILITY METER(M2), OUTDOOR 7O (N)AC COMBINER(Cl),OUTDOOR O (N)UTILITY DISCONNECT(SW1),OUTDOOR r-r ALL ARRAY CIRCUITS SHALL BE ROUTED THROUGH THE 9 INTERIOR OF THE BUILDING,AND WHERE POSSIBLE, SITE PLAN ALONG THE BOTTOM OF LOAD BEARING MEMBERS.NO m CONDUIT SHALL BE INSTALLED ABOVE THE ROOF. DOC ID: 112814-3 DATE:3/29/23 _ CREATOR:A.F. Map data @2023 Gaagl� REVIEWER:B.X. DISTANCE TO NEAREST CROSS STREET FROM ADDRESS 1 SITE PLAN REVISIONS 185' 53RD AVENUE NORTHEAST PV-2 SCALE: 1" = 10' PV-2 + �PVMODULE MODULES GENERAL ELECTRICAL 62249 PM1-11 I I 420W MICROINVERTER REF. QTY. MAKE AND MODEL PMAX PTC ISC INIP VOC I VMP TEMP.COEFF.OF VOC FUSE RATING NOTES PNI1-11 11 REC SOLAR REC420AA PURE-R 420W 402W 8.89A 8.40A 59AV %d°50.OV -0.1408V/°C(-0.24C) 25A AA I UTILITY HAS 24-HR UNRESTRICTED ALLL I INVERTERS DISCONNECTS AA REF. QTY MAKEAND MODEL AC GROUND RATED MAX OUTPUT MAX INPUT MAX INPUT CEC WEIGHTED REF. QTY. MAKE AND MODEL RA 1 RATED CURRENT MAX TED VOLTAGE ACCESS TO ALL PHOTOVOLTAIC VOLTAGE POWER CURRENT CURRENT VOLTAGE EFFICIENCY SW1 1 EATON DG222URBOR EQUIV. 60A 240VAC SYSTEM COMPONENTS LOCATED AT ENERGY 6IN 15IN AA I1-11 11 ENPHASE 240V NOT SOLIDLY 315W 1.3A 10.OA 80V 97.5% SW2 1 EATON DG222NRB OR EQUIV. 60A 240VAC THE SERVICE ENTRANCE. �R CH �R CH IQ72-96-2-US GROUNDED II + III + /7\ OCPDS PASS-THRU BOXES AND COMBINERS CONDUCTORS EXPOSED TO r-- REF. QTY. RATED CURRENT MAX VOLTAGE REF.QTY MAKE AND MODEL RATED CURRENT MAX RATED VOLTAGE SUNLIGHT SHALL BE LISTED AS - - CB1-2 2 15A 240VAC 2 SUNLIGHT RESISTANT PER NEC - - F1-2 2 20A 240VAC J131 1 SOLADECK 0799-5 WITH 01611 KIT OR EQUIV. 30A I 240VAC/60OVDC ARTICLE 300.6 (C)(1)AND ARTICLE ENPHASE IQ COMBINER 4 W/IQ GATEWAY FOR I Cl 1 PRODUCTION MONITORING 64A 240VAC I � 2 SYSTEM SUMMARY CONDUCTORS EXPOSED TO WET JUNCTION BOX BRANCH 1 BRANCH 2 RAPID SHUTDOWN DEVICES COMPLIANT WITH REQUIREMENTS AS PER NEC 690.12(B)(2).PV CIRCUIT CONDUCTORS LOCATED OUTSIDE THE ARRAY BOUNDARY(DEFINED AS 3 FEET FROM THE POINT OF LOCATIONS SHALL BE SUITABLE FOR L- JB1 NVERTERS PER BRANCH 6 5 � PENETRATION INTO A BUILDING OR MORE THAN 3 FEET FROM AN ARRAY)SHALL BE LIMITED TO NOT MORE THAN 30V WITHIN 30 SECONDS OF RAPID SHUTDOWN INITIATION.CONDUCTORS LOCATED 3 AXAC CURRENT 7.B6A 6.55A INSIDE OF THE ARRAY BOUNDARY SHALL BE LIMITED TO NOT MORE THAN 80 VOLTS WITHIN 30 SECONDS OF SHUTDOWN. USE IN WET LOCATIONS PER NEC 3 4 AXACOUTPUT 1,890W 1,575W ARTICLE 310.10(C). w ARRAY STC POWER 4,62OW © ENPHASE SYSTEM MEETS REQUIREMENTS FOR PV HAZARD CONTROL SYSTEM,AS PER NEC 690.12(B)(2). z _ AC COMBINER ARRAY PTC POWER 4,428W ©THE DC AND AC CONNECTORS OF THE ENPHASE IQ7X-96-2-US AND ARE LISTED TO MEET REQUIREMENTS AS A DISCONNECT MEANS AS ALLOWED BY NEC 690.15(C).MATING CONNECTORS SHALL COMPLY ui CN L--- B1 CB2 C1 AXACCURRENT 14A WITH NEC690.33. GROUNDING NOTES �- 5A 15A AX AC POWER OUTPUT 3,465W � � U) Lc A A DERATED AC POWER OUTPUT 3,465W q THE ENPHASE IQ7X-96-2-US HAS A CLASS II DOUBLE-INSULATED RATING AND DOES NOT REQUIRE GROUNDING ELECTRODE CONDUCTORS(GEC)OR EQUIPMENT GROUNDING CONDUCTORS(EGC).THE RATING INCLUDES GROUND FAULT PROTECTION(GFP).TO SUPPORT GFP,USE ONLY PV MODULES EQUIPPED WITH DC CABLES LABELED PV WIRE OR PU CABLE. ALL EQUIPMENT SHALL BE >_ O w Lf7 j PROPERLY GROUNDED PER THE C/) I COMM ©MICROINVERTER BRANCH CIRCUIT CONDUCTORS ARE MANUFACTURED ENPHASE Q CABLES LISTED FOR USE IN 20A OR LESS CIRCUITS OF ENPHASE IQ MICROINVERTERS.THEY ARE ROHS,OIL 1 REQUIREMENTS OF NEC ARTICLES J GATEWAY 5 RESISTANT,AND UV RESISTANT.THEY CONTAIN TWO 12 AWG CONDUCTORS OF TYPE THHN/THWN-2 DRYMET AND CERTIFIED TO UL 3003 AND UL 9703. RE RE c�690 �-�--� RPA ® ALL METAL ENCLOSURES,RACEWAYS,CABLES AND EXPOSED NONCURRENT-CARRYING METAL PARTS OF EQUIPMENT SHALL BE GROUNDED TO EARTH AS REQUIRED BY NEC 250.4(B)AND PART III OF PV MODULES SHALL BE GROUNDED Q Q ARTICLE 250 AND DC EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45.THE GROUNDING ELECTRODE SYSTEM SHALL ADHERE TO NEC 690.47(A)AND NEC 250.169 AND = J L u PoC INSTALLED IN COMPLIANCE WITH NEC 250.64. TO MOUNTING RAILS USING MODULE L u J MAX DC VOLTAGE OFPV MODULE IS EXPECTED TOBE66.6VAT-26°C(-26.1°C-25°C)X-0.141V/C+59.4V=66.6V). LUGS OR RACKING INTEGRATED --- ---ii-UTILITY DISCONNECT ® AC AGGREGATION PANEL BUSBAR AND THE OVERCURRENT PROTECTION PROTECTING THE BUSBAR SHALL BE SIZED IN ACCORDANCE WITH NEC 705.12(B)(3)(3). 2 GROUNDING CLAMPS AS ALLOWED Q 0 L--� SW1 I ±/� THE ENPHASE IQ COMBINER 4 CONTAINS A FACTORY-INSTALLED COMMUNICATIONS GATEWAY WITH AN OCPD RATED NO MORETHAN 20A. BY LOCAL JURISDICTION.ALL OTHER ,y CV " --'* 60A 200A RINGLESS METERSOCKETWITH LEVER SAFETY BYPASS PERXCEL ENERGY SPECIFICATIONS. EXPOSED METAL PARTS SHALL BE L�1L Lo I L -J 6 POINT-OF-CONNECTION IS ON THE SUPPLY SIDE OF SERVICE DISCONNECT,INSIDE PANELBOARD ENCLOSURE USING UNUSED TERMINALS,TERMINALS THAT ARE SUITABLE FOR DOUBLE LUGGING,OR GROUNDED USING UL-LISTED LAY-IN �J USING OTHER LOCALLY-APPROVED METHODS AND HARDWARE,IN COMPLIANCE WITH NEC 705.11.THE PANELBOARD SHALL HAVE SUFFICIENT SPACE TO ALLOW FORANYTAP HARDWARE AS REQUIRED LUGS. -uNe GENERATION METER BY NEC 110.3 AND NEC 312.8(A) (UTILITY-OWNED) INSTALLER SHALL CONFIRM THAT KWHR i L ' PV SYSTEM DISCONNECT SHALL BE AVISIBLE KNIFE-BLADE TYPE DISCONNECT THAT IS ACCESSIBLE AND LOCKABLE BY THE UTILITY IN ACCORDANCE WITH NEC 690.13(E).THE DISCONNECT SHALL BE r--� LOCATED WITHIN 10 FT OF UTILITY METER AND INSTALLED IN COMPLIANCE WITH NEC 705.20 AND GROUPED AS REQUIRED BY NEC 230.72. MOUNTING SYSTEM HAS BEEN I L_-- L°A°-; 7 EVALUATED FOR COMPLIANCE WITH ". PV SYSTEM DISCONNECT MEETS NEC 690.12(C)REQUIREMENT FOR A RAPID SHUTDOWN INITIATION DEVICE 3 UL 2703"GROUNDING AND BONDING" --- Fl-2�PVDISCONNECT ALL AC EQUIPMENT SHALL BE 3-WIRE,SINGLE-PHASE 120/240 V. 0A EATON DG222NRB WHEN USED WITH PROPOSED PV L---yam 2 r---i N I CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS MODULE. I60A i CURRENT-CARRYING MAX. TERM. AMP. IF THE EXISTING MAIN SERVICE --- ---� 8 TEMP.CORR. CONT. DERATED TERM. PANEL DOES NOT HAVE A ID TYP CONDUCTOR CONDUIT/CABLE CONDUCTORS IN OCPD EGC FACTOR FILL FACTOR CURRENT CURRENT BASE AMP. AMP. TEMP. TEMP. LEN. V.D. I (100A MSP W/100A MCB) CONDUIT/CABLE. (125%) RATING RATING VERIFIABLE GROUNDING r ' 1 1 12 AWG THHN/THWN-2IN CABLE 2 15A 6 AWG BARE,COPPER 0.76(55°C) 1.0 7.86A 9.82A 30A 23A 90°C 40A 39AFT 0.51% 4 ELECTRODE, IT IS THE I i ENPHASE Q CABLE,COPPER LOADS 12 AWG THHN/THWN-2IN CONTRACTOR'S RESPONSIBILITY TO 2 1 CABLE 2 15A 6 AWG BARE,COPPER 0.76(55°C) 1.0 6.55A 8.19A 30A 23A 90°C 40A 32.8FT 0.35% ENPHASE Q CABLE,COPPER INSTALL A SUPPLEMENTAL I L__ __ 1 AA 3 1 10 AWG THWN-2,COPPER 0.75"DIA.EMT 4 15A 10 AWG THWN-2,COPPER 0.76(53°C) 0.8 7.86A 9.82A 40A 24.32A 90°C 40A 53.6FT 0.44% -_ - ` ---------1 4 1 10 AWG THWN-2,COPPER 0.75"DIA.EMT 4 15A 10 AWG THWN-2,COPPER 0.76(530C) 0.8 6.55A 8.19A 40A 24.32A 90°C 40A 53.6FT 0.36% GROUNDING ELECTRODE. ©-- 1 5 1 12 AWG THWN-2,COPPER 0.75"DIA.EMT 2 20A 10 AWG THWN-2,COPPER 0.96(33°C) 1.0 14.41A 18.01A 30A 29A 75°C 25A 48IN 0.09% AC SYSTEM GROUNDING '-`°p° -- ELECTRODE CONDUCTOR GEC 6 1 6 AWG THWN-2,COPPER 0.75"DIA.EMT 2 20A 10 AWG THWN-2,COPPER 0.96(33°C) 1.0 14.41A 18.01A 75A 72A 75°C 65A 481N 0.02% UTILITY METER KWHR 1120/240V 1�,3W 7 1 6 AWGTHWN-2,COPPER 0.75"DIA.EMT 2 20A 10 AWG THWN-2,COPPER 0.96(33°C) 1.0 14.41A 18.01A 75A 72A 75°C 65A 48IN 1 0.02% 5 SHALL BE A MINIMUM SIZE#8AWG (EG LNE-J EC I I S/N ACD024969783 8 1 6 AWGTHWN-2,COPPER 1.0"DIA.PVC-80 2 20A N/A 0.96(33°C) 1.0 14.41A 18.01A 75A 72A 75°C 65A 48IN 0.02% WHEN INSULATED,#6AWG IF BARE WIRE. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED SINGLE-LINE DIAGRAM ACCORDING TO NEC ARTICLE 690.45, 6 AND BE A MINIMUM OF#10AWG PROJECT ID: 112814-3 WHEN NOT EXPOSED TO DAMAGE, DATE: 3/29/23 AND#6AWG SHALL BE USED WHEN CREATED BY: A.F. EXPOSED TO DAMAGE GROUNDING AND BONDING CHECKED BY. B.X. CONDUCTORS, IF INSULATED,SHALL REVISIONS 7 BE COLOR CODED GREEN,OR MARKED GREEN IF#4AWG OR LARGER � SINGLE-LINE DIAGRAM PV-3 SCALE: NTS PV-3