Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
final bathroom review 1533 Trapp Ct
APPROVED Jensen D05/11/2023 SEPARATE PERMITS FOR: ELECT, PLUMB. MECH. f. Smoke detectors in each 4 _ sleeping room and on each level of the house per R314 Note; the party wall must be reassembled to the original one hour design. call for the inspection) CO detection per R315 2020 1 RC. This plan copy to be at job site s 00 it l _ 11111��1 „”� 1 ,' _ ,�y �� P��� /� i1; /�. ��, r ti ` -- ,i .y d:. .�- �_ '� -. ��',• ,'�' +y' Il' _ - - �,� � . �s =r�, ,- - z ��, �. __..� �_ y � �` ��� R, � I �, .�,.,� 6�EPG1 Pa`� /� 1. •■ `\ �` �� .� �� . �; ,> , ��� E�, -_- � --,� ---=Y -_ -- III, � �r .� ;;���;, - - I,f� � , �� � 1� �� �� �� Date: Customer Name:, Inspector: mad e�ty Address: ��, � ' _�%•f/� rI- WINOCIVV: R 11AT11 . Bath Inspection: Parking access for truck/traller yes no(explanation) Garage/warm cutting area l.d yes no(explanation) Bathroom level 0 1st �. 2nd U 3rd basement Bath to be remodeled Is only bath In home U yes ® no Crawl space only below bath yes U no (if yes)access point Drain exposed yes no (if no, choose) U drywall covered F1 drop ceiling Access Panel to valve yes �;l no Water shut off location C1St ti(i + lclu"IkAf k/ Condo yes no Maintenance/water shut off contact Multifamily D yes©no Maintenance/water shut off contact Shut off works yes F� no FJsticky currently leaks Plumbing composition © t topper n pvc �� galy cpvc pex lead ❑ abs New Plumbing composition D Pex 3(Shower) Pex 4(Tub) Existing plumbing has venting through the roof yes U no Pre install drain function good doesn't drain Pre install water pressure r_ 1 S._�w ® good no pressure Flooring has in floor heat y�•s no Floor framing wood L__J concrete Spancrete 17 steel Floor Integrity solid soft rotted Floor covering l l vinyl hardwood the1:1 carpet laminate Wall framing wood concrete U steel Wall coverings a drywall -tile lath/plaster paneling Leh wall a plumb leans in leans out in Right wall © plumb leans In leans out in Back wall © plumb leans In ❑ leans out in Floor left to right level slopes left slopes right "in Floor back to front level slopes back slopes forward 'in Ceiling left to right ® level n slopes left slopes right in Doorway accessibility D_ 5 door 1 width door 2 with door 3 width Hall accessibility width Tight turns yes no obstructions yes no (If yes,list below): Sizing and accessories: J Contract calls for pan site ( width !�!CLlength Customer Signature Contract size meets customer's expectation yes O no(explaln below) � Customer Slgnature Actual sire to install: � I Length(left to Right) Width(front to back•vlewc�l fro thres old.to all) Skirt Height(tub)_�� Customer Signature ��./ � ��-- Distance from skirt to center of toilet If parallel Distance from skirt to front of toilet if perpendicular Currently finished-length (finish to finish+1") X width Initial Adding/moving wall-length(finish to new stud wall+1/2") X width Initial Already demoed-length(stud to stud) X width �nitlal ly, Accessory Color: CH) BN ORB MB Customer Signature If differs from contract,plea s'note reason why: _ Shower Door: Glass: 0 CLEAR rJ RAIN OBSCURED Swing doors: Hinge side: Handle side: Inline location 'Will be ordered by the pan size minus 2" Customer Signature California glass:will be 6"-10"from telling height and no less than 30"wide(36"glass Is preferred)to allow enough room for the opening and to n:!nIrrdze water outside of wet area(only available on pan 60'or longer) Glass width Glass hc:,oht Customer Signature Options: Wall system to be notched around rLr'� Customer Accepts-Signature - - Will cover current flooring yes 17 no Customer Signature -�- Trim needed to cover flooring 1/4 round 2"lattice custom cut wall section New drain location lef3_ gh�� center F custom Customer Signature //�'/� ✓�� r Custom drain location in "from left stud_ from right stud "from back stud Corner trim city Herring bone qty Wainscoting city Wainscoting corners inside city outside city Installing fan/light U replacing existing l J new \ Fan vent will vent to Customer Signature Pics taken drain/plumbing shower frorn all angles / current damages access areas water shut offs , parking areas of concern breaker box *Customer understands some baths based on extra accessories,options,complexity and unforesfen Issuls may be scheduled for more than or could take longer than one day. Customer Signature � _/ ✓�1�// Inspector: �� Date: Special notes section: n ( u-'t•, A7) �2.Y,�s1 ��/c -(-O V 'r Cf r � [ yt <_�_ Sketch area �t `8 Y � O J � � V` M � O Bathtub & Shower Measure Form Customer name: ` 1� .• ;� _ 111,.)". & P,-.vl.( y Address: 'r, •1),_� ( l J)) �� ; Inspoctor- I !,n Y Job#; I ) 1 C �1-�Ljg1j 1114,' Date: --........ .. .........................•----- �'�A` ...................................... ,• -........... DON'T FORGET THE PICTURES! v To 0 Middle A/Q Bottom : -----................ For length specify finishing measure to(for example, drywall or tile): CEILING FAN/LIGHT SIZE: Window(if present): Drain location: Tech notes: SKIRT HEIGHT. LENGTH: CENTER ❑ Stud to stud TUB WIDTH: V 2 WIDTH: ❑ LEFT eX Drywall to dr ywall rywall 'B"drywall to front DEPTH: RIGHT El Tile to file ❑existing surround to front X", - 7 1 mad City Bath Labor Measure Assessment Form WINDOWS & BATHS Job Name:�;rt`i l'! 1\rl '� ���, �L t`'� �Inl/l/V InstallerNamr.: Address: f 4-y ;1- City: Zi Install Date Demo-Fiberglass shell,shower board,drywall system/backer Each Demo-Cast tub,tile walls,lath and plaster,concrete wall system/backer Each Bust concrete/restructure joists-need pits&need mngr approval Each Build and Install valve/dra'n/water shutof's Each Install tub/shower pan/barrier free/whirlpool Each Instal walk in tub-Alexis Each Wall prep includes all drywall/ply/insulation Each Instal'neo angle wall system Each Install 3 wall system smooth Each Instal'3 wall system tde/impressions Each Instal'tail 3 wall system with herringbone Smoot or tile Each Instal'ceiling panel or extra wall Each Install corner shelf/surface self/caddie/foot rigid l-� Each Instal berth/corner/folds^g/formed comer seat/wir kit Each Install grab bar I Each Irstall shnwPr rod Each Install Standard/s-curve Each Irstall Swing doo- includes inhre panel Each Install Swing door W/in!ine&return panel or neo angle Each Install Cayman doer Each Install shower head and all cover trims Each Install Kauai/slide bar hard held and all cover tarns Each R&R toilet or vanity to install tub/shower Each Remove or build wall/remove or build drop soffit Each R&R door and trimwork to bring unit Into room Each Remove old and install rew vent fan/'ight and connect Ea:h Trip charge 25-50 from shop Each Trip charge 50-75 from shop Each Trip charge 75r from shop Each f here will be no write irs allowed.All prices listed are non regotlable Total Involce: Any work not authorized w;th management and photos wil;not be pall Date of Involce: This invoice will be paid only on complete and collected Jobs - I _—� Invoices must be submitted daily Measur Tech Signature of Pre Inspection Invoices may not be submitted for final payment until a certificate of completion has been signed by the customer Subcontractor Signature of Completion Manager's Authorization