Loading...
HomeMy WebLinkAboutPermit scope of work Bathroom - Remove and Haul Away ❑ Vanity ❑ Flooring ❑ Mirror ❑ Door from bedroom ❑ ToilPt Plumbing ❑ Relocate plumhina for tub if needed. Construction ❑ Widen and frame new door opening to accommodate a 36" door. Door ❑ Install 36" x 80" hollow core swing door. ❑ Finish to match existing as closely as possible. ❑ Install lever door hardware. Tub ❑ Install a 30 x 52 soaking transfer tub with low step ❑ Plumbing to include: - Hand-held shower head: o Incorporate pause button o Single lever valve o Standard finish o Tub filler o Quick drain Flooring ❑ Prep sub-floor for new LVP installation. ❑ Slip resistant with a wet DCOF rating of 0.42 or higher ❑ Extend flooring below sink. ❑ Neutral transition to adjacent flooring materials; if neutral cannot be achieved, bevel transition with a 1:2 slope. ❑ PVC or quarter round trim as needed. Vanity/Sink ❑ Vanity - 49 1/2" wide x 19" deep vanity - Open knee space below sink, 36" wide u Single lever faucet hardware. Toilet ❑ Install new comfort height toilet not to exceed 21" height including toilet seat. New wax ring. New supply lines, if needed. Finish ❑ All new woodwork to match existing. ❑ Repair walls, ceiling and floors affected by the modifications. ❑ Prime and apply two coats of low VOC paint to affected areas. Paint the full wall or to a visual barrier. F-2'-5"7 Vj 4'-2" co� T-1 0 0 0 L2'-1 5'-4" y sy �o r 4 'd y i � 3 c