HomeMy WebLinkAboutMaterials list basement finish - 5995 McKinley St Fridley Materials list basement finish —5995 McKinley St, Fridley, MN
2x4 construction grade studs and top plate
2x4 treated bottom plate
3" Interior framing nails
3" hot dipped galvanized exterior nails
Ramset nails
R-19 batt insulation for all walls on exterior/perimeter of basement
6mil vapor barrier
Acoustical sealant on perimeter of vapor barrier
Aluminum flashing above windows
Self-adhesive asphalt window flashing tape
OSI window sealant
1/2" drywall sheets for walls
1/2" drywall sheets on ceiling (floor joists 160C —can do 5/8" if city requires)
Drywall mud, tape, corner bead
Note: Customer is planning on finishing the following items at a later date on their own:
Flooring
Bathroom toilet, vanity, shower, flooring
Doors
Paint