Bathroom - JensenD06/13/2023
Remove and Haul Away
❑ Vanity
❑ Flooring SEPARATE PERMITS FOR: ELECT, PLUMB. MECH.
❑ Mirror
❑ Door from bedroom
❑ Toilet
Salvage for Reuse
❑ Light fixtures
This plan copy to be at job site
Plumbing
❑ Relocate plumhina for tub if needed.
Construction
❑ Widen and frame new door opening to accommodate a 36" door.
CO detection per R315
2020 I RC.
Smoke detectors in each
Door sleeping room and on each level
❑ Install 36" x 80" hollow core swing door. of the house per R314
❑ Finish to match existing as closely as possible.
❑ Install lever door hardware.
Tub
❑ Install a 30 x 52 soaking transfer tub with low step
❑ Plumbing to include:
- Hand-held shower head:
o Incorporate pause button
o Single lever valve
o Standard finish
o Tub filler
o Quick drain
Flooring
❑ Prep sub-floor for new LVP installation.
❑ Slip resistant with a wet DCOF rating of 0.42 or higher
❑ Extend flooring below sink.
❑ Neutral transition to adjacent flooring materials; if neutral cannot be achieved, bevel transition
with a 1:2 slope.
❑ PVC or quarter round trim as needed.
Vanity/Sink
❑ Vanity
- 49 1/2" wide x 19" deep vanity
- Open knee space below sink, 36" wide
u Single lever faucet hardware.
Toilet
❑ Install new comfort height toilet not to exceed 21" height including toilet seat. New wax ring. New
supply lines, if needed.
Finish
❑ All new woodwork to match existing.
❑ Repair walls, ceiling and floors affected by the modifications.
❑ Prime and apply two coats of low VOC paint to affected areas. Paint the full wall or to a visual
barrier.
F-2'-5"7 Vj 4'-2"
co�
T-1
0
0
0
L2'-1 5'-4"
s 0•" _
FAN!
/ MECH
PERMIT a°
Y
d
,,,(Min 15 ' ches to each side of
i'�' �,,-W.C., Min ches in front of
fixture.
�o •
4
4 'd
y
i � 3
Dac
c