Loading...
HomeMy WebLinkAboutFinal Bath review 301 Ironton Street APPROVED Bathroom - JensenD06/13/2023 Remove and Haul Away ❑ Vanity ❑ Flooring SEPARATE PERMITS FOR: ELECT, PLUMB. MECH. ❑ Mirror ❑ Door from bedroom ❑ Toilet Salvage for Reuse ❑ Light fixtures This plan copy to be at job site Plumbing ❑ Relocate plumhina for tub if needed. Construction ❑ Widen and frame new door opening to accommodate a 36" door. CO detection per R315 2020 I RC. Smoke detectors in each Door sleeping room and on each level ❑ Install 36" x 80" hollow core swing door. of the house per R314 ❑ Finish to match existing as closely as possible. ❑ Install lever door hardware. Tub ❑ Install a 30 x 52 soaking transfer tub with low step ❑ Plumbing to include: - Hand-held shower head: o Incorporate pause button o Single lever valve o Standard finish o Tub filler o Quick drain Flooring ❑ Prep sub-floor for new LVP installation. ❑ Slip resistant with a wet DCOF rating of 0.42 or higher ❑ Extend flooring below sink. ❑ Neutral transition to adjacent flooring materials; if neutral cannot be achieved, bevel transition with a 1:2 slope. ❑ PVC or quarter round trim as needed. Vanity/Sink ❑ Vanity - 49 1/2" wide x 19" deep vanity - Open knee space below sink, 36" wide u Single lever faucet hardware. Toilet ❑ Install new comfort height toilet not to exceed 21" height including toilet seat. New wax ring. New supply lines, if needed. Finish ❑ All new woodwork to match existing. ❑ Repair walls, ceiling and floors affected by the modifications. ❑ Prime and apply two coats of low VOC paint to affected areas. Paint the full wall or to a visual barrier. F-2'-5"7 Vj 4'-2" co� T-1 0 0 0 L2'-1 5'-4" s 0•" _ FAN! / MECH PERMIT a° Y d ,,,(Min 15 ' ches to each side of i'�' �,,-W.C., Min ches in front of fixture. �o • 4 4 'd y i � 3 Dac c