HomeMy WebLinkAboutFinal Exterior Basement entrance review 6874 wahington St APPROVED SEPARATE PERMITS FOR: ELECT, PLUMB. MECH.
JensenD06/20/2023
Insulated exterior basement stairwell PROVIDE A GRIPi BLE
HANDRAIL WITH 4 OR MORE
rellin® •, ® so w"opening nd an st ass STAIRS.
soli around eAerior
Iloor frerning I S baaernerl starwel
should Wope away to
I H I T reduce .eater p+esaure
:in 610-0 wal,
PROVIDE STAIRIN Y ILLUMINATION
deck ttus well
for bovong or
cracks MAX STAIR RISE; 7 3/4"
MIN TREAD - 10"
footng-n to 6'
4 d
re
e
basement 5l`1 wagered
floor dramAl drain -.
to of
layer of rigid insulation to prevent frost
heaving of House looting iloobng
doeen't need to be loweradt
Insulation should also extend up sWee—
crccS of stairvaell and exiend out honzontagy
sc=ti •, for nCout 4 arnord amrwall
connected to city
sewer