Loading...
HomeMy WebLinkAboutResidential Permit Card with Standard Notes BUILDING INSPECTIONS DEPARTMENT PERMIT NUMBER: RB23-000160 7071 UNIVERSITY AVE NE FRIDLEY,MN 55432 PHONE: (763)572-3604 ISSUE DATE: 07/10/2023 ADDRESS: 5250 BUCHANAN ST NE PERMIT TYPE:Residential Building Permit PROPERTY TYPE: Residential CONSTRUCTION TYPE: Addition VALUATION:40000.00 NOTE: INSTALLING Four season sun room(144 SQ FT)ADDITION PER APPROVED PLANS(ATTACHED). SEE NOTATIONS ON PLAN.CALL GOPHER STATE ONE AT 651-454-0002 FOR UTILITY LOCATIONS. SEPERATE PERMITS REQUIRED FOR ELECTRICAL,MECHANICAL&PLUMBING WORK.PROVIDE SMOKE DETECTORS PER R314 OF THE 2020 IRC. I CARBON MONOXIDE DETECTORS PER R315 OF THE 2020 IRC CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.CONSTRUCTION IN THE CITY IS UNLAWFUL EXCEPT BETWEEN THE HOURS OF 7:00 AM AND 9:00 PM,MONDAY THROUGH FRIDAY AND BETWEEN THE HOURS OF 9: 00 AM AND 9:00 PM ON SATURDAYS.NO WORK IS ALLOWED ON SUNDAYS OR ANY LEGAL HOLIDAY UNLESS AN ALTERNATE WORK HOUR PERMIT HAS FIRST BEEN ISSUED. APPLICANT PROPERTY OWNER New View Construction,Inc. ALBERS,MARIE 11070 Flanders Court NE Blaine,MN 55449 5250 BUCHANAN ST NE 763-710-7146 FRIDLEY,MN 55421 PAYMENT INFORMATION Description Total Cost Building Permit Fee 542.75 Plan Review Fee 352.79 Contractor Fee 5.00 State Surcharge Fee 20.00 Fire Surcharge Fee 40.00 TOTAL 960.54 Payment(s) Credit-RB23-000160- 8801166835iL1/z960.54 AGREEMENT AND SWORN STATEMENT This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Applicant Date: 04/19/2023 Bldg Insp Date 07/10/2023 SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. CITY OF FRIDLEY 7071 UNIVERSITY AVENUE NE ISSUED: 07/10/2023 FRIDLEY,MN 55432 (763)572-3604 FAX: (763)502-4977 Permit#RB23-000160 ADDRESS : 5250 BUCHANAN ST NE PERMIT APPLICANT: PIN : 253024210035 New View Construction,Inc. MARIAN HILLS CITY OF FMLEY LOT 22 BLK 1 11070 Flanders Court NE LEGAL DESC: MARIAN HILLS-SUBJ TO 5 FT Blaine,MN 55449 UTIL EASE ALONG W LINE- PERMIT TYPE : Addition 763-710-7146 PROPERTY TYPE: Residential CONSTRUCTION TYPE: Four season sun room NOTE: NOTE: INSTALLING Four season sun room(144 SQ FT)ADDITION PER APPROVED PLANS (ATTACHED). SEE NOTATIONS ON PLAN.CALL GOPHER STATE ONE AT 651-454-0002 FOR UTILITY LOCATIONS.SEPERATE PERMITS REQUIRED FOR ELECTRICAL,MECHANICAL&PLUMBING WORK.PROVIDE SMOKE DETECTORS PER R314 OF THE 2020 IRC. I CARBON MONOXIDE DETECTORS PER R315 OF THE 2020 IRC CALL FOR FINAL INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.CONSTRUCTION IN THE CITY IS UNLAWFUL EXCEPT BETWEEN THE HOURS OF 7:00 AM AND 9:00 PM,MONDAY THROUGH FRIDAY AND BETWEEN THE HOURS OF 9: 00 AM AND 9:00 PM ON SATURDAYS.NO WORK IS ALLOWED ON SUNDAYS OR ANY LEGAL HOLIDAY UNLESS AN ALTERNATE WORK HOUR PERMIT HAS FIRST BEEN ISSUED. BUILDING INSPECTION RECORD 24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS. CALL FOR INSPECTIONS WEEKDAYS: 8 AM TO 4:30 PM Inspection type Date Inspector Status Comments Footing Inspection Foundation Inspection Electrical Rough In Inspection Framing Inspection Insulation Inspection Dry Wall Inspection Electrical Final Inspection Smoke Detectors Inspection Carbon Monoxide Detector Inspection Final Inspection INSPECTION COMMENTS: IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT. THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.