HomeMy WebLinkAboutResidential Permit Card with Standard Notes BUILDING INSPECTIONS DEPARTMENT PERMIT NUMBER: RB23-000160
7071 UNIVERSITY AVE NE
FRIDLEY,MN 55432
PHONE: (763)572-3604 ISSUE DATE: 07/10/2023
ADDRESS: 5250 BUCHANAN ST NE
PERMIT TYPE:Residential Building Permit
PROPERTY TYPE: Residential
CONSTRUCTION TYPE: Addition
VALUATION:40000.00
NOTE: INSTALLING Four season sun room(144 SQ FT)ADDITION PER APPROVED PLANS(ATTACHED). SEE
NOTATIONS ON PLAN.CALL GOPHER STATE ONE AT 651-454-0002 FOR UTILITY LOCATIONS. SEPERATE
PERMITS REQUIRED FOR ELECTRICAL,MECHANICAL&PLUMBING WORK.PROVIDE SMOKE DETECTORS PER
R314 OF THE 2020 IRC. I CARBON MONOXIDE DETECTORS PER R315 OF THE 2020 IRC CALL FOR FINAL
INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.CONSTRUCTION IN THE CITY IS UNLAWFUL EXCEPT
BETWEEN THE HOURS OF 7:00 AM AND 9:00 PM,MONDAY THROUGH FRIDAY AND BETWEEN THE HOURS OF 9:
00 AM AND 9:00 PM ON SATURDAYS.NO WORK IS ALLOWED ON SUNDAYS OR ANY LEGAL HOLIDAY UNLESS
AN ALTERNATE WORK HOUR PERMIT HAS FIRST BEEN ISSUED.
APPLICANT PROPERTY OWNER
New View Construction,Inc. ALBERS,MARIE
11070 Flanders Court NE
Blaine,MN 55449 5250 BUCHANAN ST NE
763-710-7146 FRIDLEY,MN 55421
PAYMENT INFORMATION
Description Total Cost
Building Permit Fee 542.75
Plan Review Fee 352.79
Contractor Fee 5.00
State Surcharge Fee 20.00
Fire Surcharge Fee 40.00
TOTAL 960.54
Payment(s)
Credit-RB23-000160- 8801166835iL1/z960.54
AGREEMENT AND SWORN STATEMENT
This permit becomes null and void if work or construction authorized is not commenced within 180 days or if construction or
work is suspended or abandoned for a period of 180 days at any time after work is commenced.
I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit
does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the
performance of construction.
Applicant Date: 04/19/2023
Bldg Insp Date 07/10/2023
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF FRIDLEY
7071 UNIVERSITY AVENUE NE ISSUED: 07/10/2023
FRIDLEY,MN 55432
(763)572-3604 FAX: (763)502-4977 Permit#RB23-000160
ADDRESS : 5250 BUCHANAN ST NE PERMIT APPLICANT:
PIN : 253024210035 New View Construction,Inc.
MARIAN HILLS CITY OF
FMLEY LOT 22 BLK 1 11070 Flanders Court NE
LEGAL DESC: MARIAN HILLS-SUBJ TO 5 FT Blaine,MN 55449
UTIL EASE ALONG W LINE-
PERMIT TYPE : Addition 763-710-7146
PROPERTY TYPE: Residential
CONSTRUCTION TYPE: Four season sun room
NOTE:
NOTE: INSTALLING Four season sun room(144 SQ FT)ADDITION PER APPROVED PLANS (ATTACHED). SEE
NOTATIONS ON PLAN.CALL GOPHER STATE ONE AT 651-454-0002 FOR UTILITY LOCATIONS.SEPERATE
PERMITS REQUIRED FOR ELECTRICAL,MECHANICAL&PLUMBING WORK.PROVIDE SMOKE DETECTORS PER
R314 OF THE 2020 IRC. I CARBON MONOXIDE DETECTORS PER R315 OF THE 2020 IRC CALL FOR FINAL
INSPECTION WITHIN 10 DAYS OF WORK COMPLETION.CONSTRUCTION IN THE CITY IS UNLAWFUL EXCEPT
BETWEEN THE HOURS OF 7:00 AM AND 9:00 PM,MONDAY THROUGH FRIDAY AND BETWEEN THE HOURS OF 9:
00 AM AND 9:00 PM ON SATURDAYS.NO WORK IS ALLOWED ON SUNDAYS OR ANY LEGAL HOLIDAY UNLESS
AN ALTERNATE WORK HOUR PERMIT HAS FIRST BEEN ISSUED.
BUILDING INSPECTION RECORD
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS.
CALL FOR INSPECTIONS WEEKDAYS: 8 AM TO 4:30 PM
Inspection type Date Inspector Status Comments
Footing Inspection
Foundation Inspection
Electrical Rough In
Inspection
Framing Inspection
Insulation Inspection
Dry Wall Inspection
Electrical Final Inspection
Smoke Detectors Inspection
Carbon Monoxide Detector
Inspection
Final Inspection
INSPECTION COMMENTS:
IN ACCORDANCE WITH CITY ORDINANCE,NEW OR SUBSTANTIALLY REMODELED BUILDINGS SHALL NOT BE OCCUPIED UNTIL ALL
WORK HAS BEEN APPROVED,AND A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED BY THE BUILDING DEPARTMENT.
THIS CARD MUST BE POSTED AND VISIBLE AT ALL TIMES UNTIL WORK IS COMPLETE.